- Page 1 and 2:
APPENDIX E-6 CONSULTATION A portion
- Page 3 and 4:
Loup River Hydroelectric Project FE
- Page 5 and 6:
Loup River Hydroelectric Project Ap
- Page 7 and 8:
Loup River Hydroelectric Project Ap
- Page 9 and 10:
Loup River Hydroelectric Project Ap
- Page 11 and 12:
Loup River Hydroelectric Project Ap
- Page 13 and 14:
Loup River Hydroelectric Project Ap
- Page 15 and 16:
Loup River Hydroelectric Project Ap
- Page 17 and 18:
Loup River Hydroelectric Project
- Page 19 and 20:
Loup River Hydroelectric Project
- Page 21 and 22:
Loup River Hydroelectric Project
- Page 23 and 24:
Loup River Hydroelectric Project
- Page 25 and 26:
Loup River Hydroelectric Project
- Page 27 and 28:
Loup River Hydroelectric Project
- Page 29 and 30:
Loup River Hydroelectric Project
- Page 31 and 32:
Loup River Hydroelectric Project
- Page 59 and 60:
November 30, 2007 Barb Friskopp U.S
- Page 61 and 62:
Project: Loup River Hydroelectric P
- Page 63 and 64:
LPD Hydropower Relicensing FERC Pro
- Page 65 and 66:
Selzle, Lydia From: Buss, Emily D.
- Page 67 and 68:
Selzle, Lydia From: Frank Albrecht
- Page 69 and 70:
Selzle, Lydia From: Randy_Thoreson@
- Page 71 and 72:
Neal Suess President / CEO Loup Pow
- Page 73 and 74:
Title FirstName LastName JobTitle C
- Page 75 and 76:
May, XX, 2008 , Re: Loup Powe
- Page 77 and 78:
Greetings: cc "Neal Suess" Subject
- Page 79 and 80:
Selzle, Lydia From: John.Bender@NDE
- Page 81:
Please prepare your responses to th
- Page 85:
Selzle, Lydia From: Marty.Link@NDEQ
- Page 94 and 95:
Selzle, Lydia From: Henry Santin [s
- Page 96 and 97:
Selzle, Lydia From: Buss, Emily D.
- Page 98 and 99:
Project: Loup River Hydroelectric P
- Page 100 and 101:
LPD Hydropower Relicensing FERC Pro
- Page 102 and 103:
TO: Emily Buss RE: Issues concernin
- Page 104 and 105:
TO: Emily Buss RE: Issues concernin
- Page 107 and 108:
Selzle, Lydia From: Robert_Harms@fw
- Page 109 and 110:
c) water withdrawals for other uses
- Page 111 and 112:
c) access to project property for p
- Page 113 and 114:
Project: Loup River Hydroelectric P
- Page 115 and 116:
LPD Hydropower Relicensing FERC Pro
- Page 117 and 118:
LPD Hydropower Relicensing FERC Pro
- Page 119:
LPD Hydropower Relicensing FERC Pro
- Page 124 and 125:
Selzle, Lydia From: White, Stephani
- Page 126:
From: White, Stephanie To: Snow, Sh
- Page 139 and 140:
Selzle, Lydia From: Pillard, Matt S
- Page 141 and 142:
Agency Meeting Attendees June 25, 2
- Page 145 and 146:
Selzle, Lydia From: Pillard, Matt S
- Page 147:
J ~ ~ °flAol;j o;;JU~Q(?U, ~+ (~ .
- Page 152 and 153:
Agency Meeting Attendees June 25, 2
- Page 154 and 155:
Selzle, Lydia From: Pillard, Matt S
- Page 156 and 157:
Selzle, Lydia From: Pillard, Matt S
- Page 158 and 159:
Project: Loup River Hydroelectric P
- Page 160:
LPD Hydropower Relicensing FERC Pro
- Page 167:
6 404(B)(1) Guidelines (Guidelines)
- Page 179 and 180:
LPD Hydropower Relicensing FERC Pro
- Page 181 and 182:
Project: Loup River Hydroelectric P
- Page 183 and 184:
Project: Loup River Hydroelectric P
- Page 185 and 186:
LPD Hydropower Relicensing FERC Pro
- Page 187 and 188:
LPD Hydropower Relicensing FERC Pro
- Page 189 and 190:
LPD Hydropower Relicensing FERC Pro
- Page 191 and 192:
) Reduction of sediment supply in P
- Page 193 and 194:
Attendance by Meeting Hydroelectric
- Page 195 and 196:
Name Organization Contact Type Gene
- Page 197 and 198:
From: Pillard, Matt To: Anna Baum;
- Page 199 and 200:
Selzle, Lydia From: Henry Santin [s
- Page 201 and 202:
• Flow depletions on the Loup Riv
- Page 203 and 204:
August 4, 2008 Jim Gates Re: Loup R
- Page 205 and 206:
From: Pillard, Matt To: King, Wendy
- Page 207 and 208:
Selzle, Lydia From: Shadle, John J.
- Page 210 and 211:
Selzle, Lydia From: Marinovich, Mel
- Page 212 and 213:
Selzle, Lydia From: Angell, Jean [j
- Page 214 and 215:
Concern to be addressed in the FERC
- Page 216 and 217:
LPD Hydropower Relicensing FERC Pro
- Page 218 and 219:
LPD Hydropower Relicensing FERC Pro
- Page 220 and 221:
LPD Hydropower Relicensing FERC Pro
- Page 222 and 223:
Attendance by Meeting Hydroelectric
- Page 224 and 225:
Name Organization Contact Type Dave
- Page 226 and 227:
Selzle, Lydia From: Mary B Brown [m
- Page 234 and 235:
September 5, 2008 Mr. Tony Provost
- Page 236 and 237:
September 5, 2008 Mr. Francis Morri
- Page 246 and 247:
20081023-3047 FERC PDF (Unofficial)
- Page 248 and 249:
20081023-3047 FERC PDF (Unofficial)
- Page 250 and 251:
20081023-3049 FERC PDF (Unofficial)
- Page 252 and 253:
20081023-3049 FERC PDF (Unofficial)
- Page 254 and 255:
20081023-3048 FERC PDF (Unofficial)
- Page 256 and 257:
20081023-3048 FERC PDF (Unofficial)
- Page 258 and 259:
20081023-3046 FERC PDF (Unofficial)
- Page 260 and 261:
20081023-3046 FERC PDF (Unofficial)
- Page 262 and 263:
20081023-3045 FERC PDF (Unofficial)
- Page 264 and 265:
20081023-3045 FERC PDF (Unofficial)
- Page 266 and 267:
20081023-3050 FERC PDF (Unofficial)
- Page 268 and 269:
20081023-3050 FERC PDF (Unofficial)
- Page 270 and 271:
~0081107-0075 FERC PDF (Unofficial)
- Page 272 and 273:
From: Sunneberg, Jon M. Sent: Monda
- Page 274 and 275:
• operation of Columbus Powerhous
- Page 276:
Selzle, Lydia From: Pillard, Matt S
- Page 279 and 280:
I've attached an EXCEL spreadsheet
- Page 281 and 282:
2. On a National level, what types
- Page 283 and 284:
December 2, 2008 Ms. Jean Angell Ne
- Page 285 and 286:
20081212-3009 FERC PDF (Unofficial)
- Page 287 and 288:
20081212-3009 FERC PDF (Unofficial)
- Page 289 and 290:
20081212-3009 FERC PDF (Unofficial)
- Page 291 and 292:
20081212-3009 FERC PDF (Unofficial)
- Page 293 and 294:
20081212-3009 FERC PDF (Unofficial)
- Page 295 and 296:
20081212-3009 FERC PDF (Unofficial)
- Page 297 and 298:
20081212-3009 FERC PDF (Unofficial)
- Page 299 and 300:
20081212-3009 FERC PDF (Unofficial)
- Page 301 and 302:
20081212-3009 FERC PDF (Unofficial)
- Page 303 and 304:
20081212-3009 FERC PDF (Unofficial)
- Page 305 and 306:
20081212-3009 FERC PDF (Unofficial)
- Page 307 and 308:
20081212-3009 FERC PDF (Unofficial)
- Page 309 and 310: 20081212-3009 FERC PDF (Unofficial)
- Page 311 and 312: 20081212-3009 FERC PDF (Unofficial)
- Page 313 and 314: 20081212-3009 FERC PDF (Unofficial)
- Page 315 and 316: [Subject] [Date] Recreation Survey
- Page 317 and 318: o Applications and subsequent filin
- Page 319 and 320: Selzle, Lydia From: Bob Puschendorf
- Page 321 and 322: 20081212-4007 FERC PDF (Unofficial)
- Page 323 and 324: 20081212-4007 FERC PDF (Unofficial)
- Page 325 and 326: Postcard Mailer Actual will be prin
- Page 327 and 328: December 24, 2008 Lisa M. Richardso
- Page 329: disseminate this information to a w
- Page 332 and 333: At this time we are seeking concurr
- Page 334: Project: Loup Public Power FERC Rel
- Page 338 and 339: 20090116-5000 FERC PDF (Unofficial)
- Page 340 and 341: ~0090227-0071 FERC PDF (Unofficial)
- Page 342 and 343: Selzle, Lydia From: Richardson, Lis
- Page 344 and 345: 20090120-5001 FERC PDF (Unofficial)
- Page 346 and 347: 20090120-5085 FERC PDF (Unofficial)
- Page 348 and 349: ~0090205-0092 FERC PDF (Unofficial)
- Page 350 and 351: t0090202-0320 FERC PDF (Unofficial)
- Page 352: ~0090212-0045 FERC PDF (Unofficial)
- Page 355 and 356: _~0090128-0249 FERC PDF (Unofficial
- Page 357 and 358: Selzle, Lydia From: Jorgensen, Joel
- Page 359: The 2006 International Piping Plove
- Page 363 and 364: COUNTY/ REGION SITE NAME The 2006 I
- Page 365 and 366: COUNTY/ REGION SITE NAME Keith Keit
- Page 367 and 368: COUNTY/ REGION SITE NAME Valley Was
- Page 369 and 370: Selzle, Lydia From: Christine Thody
- Page 387: t0090227-0166 FERC PDF (Unofficial)
- Page 390 and 391: ~0090220-0058 FERC PDF (Unofficial)
- Page 393 and 394: ~0090223-0045 FERC PDF (Unofficial)
- Page 396 and 397: ~0090224-0028 FERC PDF (Unofficial)
- Page 400 and 401: 600~/61/~0 (TETDT~OUN) ~Qd 0~ 8~00-
- Page 402 and 403: 20090202-5001 FERC PDF (Unofficial)
- Page 406 and 407: Nebraska Off Highway Vehicle Associ
- Page 408 and 409: NOHVA Comment to FERC for Loup Powe
- Page 410 and 411:
20090202-5073 FERC PDF (Unofficial)
- Page 412 and 413:
20090202-5080 FERC PDF (Unofficial)
- Page 414 and 415:
20090203-5000 FERC PDF (Unofficial)
- Page 416 and 417:
20090204-5000 FERC PDF (Unofficial)
- Page 418:
~0090304-0023 FERC PDF (Unofficial)
- Page 421 and 422:
?0090304-0019 FERC PDF (Unofficial)
- Page 423 and 424:
Selzle, Lydia From: Richardson, Lis
- Page 426 and 427:
Selzle, Lydia From: Richardson, Lis
- Page 428 and 429:
Lunch will be provided so we ask th
- Page 430:
Sigler, Bill Subject: Loup Power Di
- Page 434:
February 6, 2009 Kimberly D. Bose,
- Page 438:
20090209-5003 FERC PDF (Unofficial)
- Page 461 and 462:
~0090212-0201 FERC PDF (Unofficial)
- Page 463 and 464:
Loup Power District Comments on Sco
- Page 465 and 466:
Loup River Hydroelectric Project FE
- Page 475 and 476:
FEDERAL ENERGY REGULATORY COMMISSIO
- Page 477 and 478:
to enhance existing recreational op
- Page 479 and 480:
duration) is consistent with genera
- Page 481 and 482:
PAD (2008). Pre-application documen
- Page 484 and 485:
February 19, 2009 Mr. Brian Dunniga
- Page 486 and 487:
~0090227-0077 FERC PDF (Unofficial)
- Page 489:
~0090227-0074 FERC PDF (Unofficial)
- Page 493 and 494:
Pre-Application Document (PAD) Recr
- Page 495 and 496:
March 13, 2009 Honorable Kimberly D
- Page 497 and 498:
located within the Project Boundary
- Page 499 and 500:
100 to 200 mile-wide corridor, and
- Page 501 and 502:
Loup River Hydroelectric Project lo
- Page 504 and 505:
Selzle, Lydia From: Damgaard, Quinn
- Page 506 and 507:
Good afternoon! As the point of con
- Page 508 and 509:
March 26, 2009 Ansley Griffin, Chai
- Page 510 and 511:
March 26, 2009 George Howell, Presi
- Page 512 and 513:
March 26, 2009 Larry Wright, Jr., C
- Page 514 and 515:
March 26, 2009 Trey Howe, Chairman
- Page 516 and 517:
March 26, 2009 Roger Trudell, Chair
- Page 518 and 519:
March 26, 2009 John Blackhawk, Chai
- Page 520 and 521:
OFFICE OF ENERGY PROJECTS FEDERAL E
- Page 522 and 523:
SCOPING DOCUMENT 2 LOUP RIVER HYDRO
- Page 524 and 525:
LIST OF FIGURES Figure 1. Location
- Page 526 and 527:
Figure 1. Location of the Loup Rive
- Page 528 and 529:
entities filed written comments on
- Page 530 and 531:
2.2.1 Issues Raised During Scoping
- Page 532 and 533:
Comment: The District does not beli
- Page 534 and 535:
the time of relicensing, not pre-pr
- Page 536 and 537:
REQUEST FOR INFORMATION AND STUDIES
- Page 538 and 539:
eleasing a minimum of 50 to 75 cfs
- Page 540 and 541:
esources that may be cumulatively a
- Page 542 and 543:
Nebraska Natural Legacy Project. 4.
- Page 544 and 545:
upstream. Recreational User Survey
- Page 546 and 547:
6.2 Cost of Environmental Measures
- Page 548 and 549:
ROBERT E WHITE, GEN. MANAGER LOUP R
- Page 550 and 551:
US Bureau of Land Management PO Box
- Page 552 and 553:
Responsible Party Pre-Filing Milest
- Page 554 and 555:
with potential tern and plover issu
- Page 556 and 557:
River* Cultural Resources • Secti
- Page 558 and 559:
April 2, 2009 Mr. George Howell Paw
- Page 560 and 561:
Lisa Richardson Project Manager HDR
- Page 562 and 563:
Selzle, Lydia From: Simpson, rachel
- Page 564 and 565:
lock locations. Each species occurr
- Page 566 and 567:
State_stat: State status. Status un
- Page 568 and 569:
Selzle, Lydia From: Bender, John [j
- Page 570 and 571:
STATE OF NEBRASKA DEPARTMENT OF ENV
- Page 572 and 573:
MEMORANDUM To: Fish Kill File From:
- Page 574:
• The meeting time has been moved
- Page 577 and 578:
Selzle, Lydia From: Martha_Tacha@fw
- Page 579 and 580:
geographic entities (i.e., using va
- Page 581 and 582:
Selzle, Lydia From: Crane, Kelly A
- Page 583 and 584:
Project: Loup River Hydroelectric P
- Page 585 and 586:
Loup River Hydroelectric Project FE
- Page 587 and 588:
Attendance by Meeting Hydroelectric
- Page 589 and 590:
Selzle, Lydia From: Engelbert, Pat
- Page 591 and 592:
Selzle, Lydia From: Pillard, Matt S
- Page 593 and 594:
2 , "bczoning@frontiernet.net" , "b
- Page 595 and 596:
RSVP 48 hours in advance of each me
- Page 597 and 598:
SHPO Project reference: HP#0804 127
- Page 599 and 600:
LPD Hydropower Relicensing FERC Pro
- Page 601 and 602:
LPD Hydropower Relicensing FERC Pro
- Page 603 and 604:
HDR Engineering, Inc. o Nebraska Na
- Page 605 and 606:
Selzle, Lydia From: Pillard, Matt S
- Page 607 and 608:
Selzle, Lydia From: Richardson, Lis
- Page 609 and 610:
Also, as a reminder, we will contin
- Page 611 and 612:
1-800-833-6747 Jill.Dolberg@nebrask
- Page 613 and 614:
Selzle, Lydia From: Schainost, Stev
- Page 615 and 616:
Selzle, Lydia From: Pillard, Matt S
- Page 617 and 618:
Selzle, Lydia From: Pillard, Matt S
- Page 619 and 620:
Selzle, Lydia From: Pillard, Matt S
- Page 621 and 622:
Selzle, Lydia From: Pillard, Matt S
- Page 623 and 624:
Selzle, Lydia From: Schainost, Stev
- Page 625 and 626:
Project: Loup River Hydroelectric P
- Page 627 and 628:
Loup River Hydroelectric Project FE
- Page 629 and 630:
Loup River Hydroelectric Project FE
- Page 631 and 632:
Loup River Hydroelectric Project FE
- Page 633 and 634:
Selzle, Lydia From: Pavelka, Gregor
- Page 635 and 636:
digital photography of all the habi
- Page 637 and 638:
June 4, 2009 Mr. Rick Schneider Neb
- Page 639 and 640:
Selzle, Lydia From: Jorgensen, Joel
- Page 641 and 642:
wondering if you have access to act
- Page 643 and 644:
HDR Engineering, Inc. Nest locatio
- Page 645 and 646:
Selzle, Lydia From: Marinovich, Mel
- Page 647 and 648:
HDR Engineering, Inc. Nest locatio
- Page 649 and 650:
Selzle, Lydia From: Pillard, Matt S
- Page 661 and 662:
FWS-NE: 2009-594 Ms. Kimberly Bose
- Page 663 and 664:
General Comments - Proposed Studv P
- Page 665 and 666:
supplied with study result summarie
- Page 667 and 668:
it (Beaver Creek, Looking Glass Cre
- Page 669 and 670:
Studv Criteria 5. The Project has a
- Page 671 and 672:
FERC subdivide the evaluation of po
- Page 673 and 674:
downstream; and d) longitudinal eff
- Page 675 and 676:
Swdv Criteria J. The Service suppor
- Page 677 and 678:
Study Criteria 2. The Service suppO
- Page 679 and 680:
Swdv Criteria 4. The Service sugges
- Page 681 and 682:
ReCOl1l111 elIdati 0115: I) Obtain
- Page 683 and 684:
Literature Cited Alexander, J.S., Z
- Page 685 and 686:
Nebraska Department of Environmenta
- Page 687 and 688:
Selzle, Lydia From: Albrecht, Frank
- Page 689 and 690:
Selzle, Lydia From: Jeff_Runge@fws.
- Page 691 and 692:
Selzle, Lydia From: Stephen_K_Wilso
- Page 693 and 694:
Melissa From: Marinovich, Melissa S
- Page 695 and 696:
Melissa, 2 06/30/09 04:37 PM cc Mat
- Page 697 and 698:
Selzle, Lydia From: Richardson, Lis
- Page 699 and 700:
Selzle, Lydia From: Jorgensen, Joel
- Page 701 and 702:
Also - did the Tern and Plover Cons
- Page 703:
Selzle, Lydia From: Jorgensen, Joel
- Page 724 and 725:
Selzle, Lydia From: Pillard, Matt S
- Page 726 and 727:
From: Richardson, Lisa (Omaha) To:
- Page 728 and 729:
20090807-5090 FERC PDF (Unofficial)
- Page 730 and 731:
20090807-5090 FERC PDF (Unofficial)
- Page 732 and 733:
20090807-5090 FERC PDF (Unofficial)
- Page 734 and 735:
20090807-5090 FERC PDF (Unofficial)
- Page 736 and 737:
20090807-5090 FERC PDF (Unofficial)
- Page 738 and 739:
20090807-5090 FERC PDF (Unofficial)
- Page 740 and 741:
20090807-5090 FERC PDF (Unofficial)
- Page 742 and 743:
20090807-5090 FERC PDF (Unofficial)
- Page 744:
20090807-5090 FERC PDF (Unofficial)
- Page 759 and 760:
an analysis. As noted on page 12-9
- Page 761 and 762:
Page 2 gather this data and will be
- Page 763 and 764:
Page 4 • Finally, the District wi
- Page 766 and 767:
OFFICE OF ENERGY PROJECTS Neal D. S
- Page 768 and 769:
P-1256-029 - 3 - APPENDIX A STUDY R
- Page 770 and 771:
P-1256-029 - 5 - advantage of our a
- Page 772 and 773:
P-1256-029 - 7 - tailrace 3 based o
- Page 774 and 775:
P-1256-029 - 9 - to dispense with t
- Page 776 and 777:
P-1256-029 - 11 - total bed materia
- Page 778 and 779:
P-1256-029 - 13 - Conclusions We ag
- Page 780 and 781:
P-1256-029 - 15 - the Program’s s
- Page 782 and 783:
P-1256-029 - 17 - near the USGS Nor
- Page 784 and 785:
P-1256-029 - 19 - For this reason,
- Page 786 and 787:
P-1256-029 - 21 - Objective 4 - Det
- Page 788 and 789:
P-1256-029 - 23 - scale would be at
- Page 790 and 791:
P-1256-029 - 25 - Study Issues The
- Page 792 and 793:
P-1256-029 - 27 - shall define a re
- Page 794 and 795:
P-1256-029 - 29 - and calculating i
- Page 796 and 797:
P-1256-029 - 31 - experienced sever
- Page 798 and 799:
P-1256-029 - 33 - Nebraska Departme
- Page 800 and 801:
October 16, 2009 Mr. Robert Puschen
- Page 820 and 821:
October 21, 2009 Ansley Griffin, Ch
- Page 825 and 826:
November 2, 2009 Public Comments Pr
- Page 827 and 828:
Please feel free to contact Melissa
- Page 829 and 830:
Loup Power District Meeting - Final
- Page 831 and 832:
Study Site B represents a five-mile
- Page 833 and 834:
Selzle, Lydia From: Pillard, Matt S
- Page 835 and 836:
Project: Loup River Hydroelectric P
- Page 837 and 838:
LPD Hydropower Relicensing FERC Pro
- Page 839 and 840:
LPD Hydropower Relicensing FERC Pro
- Page 841 and 842:
LPD Hydropower Relicensing FERC Pro
- Page 843:
Selzle, Lydia From: Jorgensen, Joel
- Page 847 and 848:
Selzle, Lydia From: Jorgensen, Joel
- Page 852 and 853:
Selzle, Lydia From: Jorgensen, Joel
- Page 854 and 855:
letter addressed to Ms. Richardson,
- Page 856 and 857:
I agree with your comment that isol
- Page 858 and 859:
Project: Loup River Hydroelectric P
- Page 860 and 861:
LPD Hydropower Relicensing FERC Pro
- Page 862 and 863:
From: Damgaard, Quinn V. Sent: Tues
- Page 864 and 865:
Selzle, Lydia From: Robert_Harms@fw
- Page 866 and 867:
Project: Loup River Hydroelectric P
- Page 868 and 869:
LPD Hydropower Relicensing FERC Pro
- Page 870:
Loup Power District 2010 Recreation
- Page 873 and 874:
From: user-submission@response-o-ma
- Page 875 and 876:
Selzle, Lydia From: Richardson, Lis
- Page 877 and 878:
From: user-submission@response-o-ma
- Page 879 and 880:
especially during trying economic t
- Page 881 and 882:
Project: Loup Public Power FERC Rel
- Page 883 and 884:
From: Damgaard, Quinn V. To: Thomps
- Page 885 and 886:
From: Richardson, Lisa (Omaha) To:
- Page 887 and 888:
From: Pillard, Matt To: Frame, Gail
- Page 889 and 890:
Selzle, Lydia From: Pillard, Matt S
- Page 891 and 892:
Thompson, Wendy From: Jeff_Runge@fw
- Page 893 and 894:
3 , "vwills@pawneenation.org" , "bd
- Page 895 and 896:
Email: Matt.Pillard@hdrinc.com 5
- Page 897 and 898:
cothern.joe@epa.gov; danno@nohva.co
- Page 899 and 900:
4 , "Robert_F_Stewart@ios.doi.gov"
- Page 901 and 902:
August 26, 2010 George Howell, Pres
- Page 903 and 904:
August 26, 2010 Larry Wright, Chair
- Page 905 and 906:
August 26, 2010 Douglas Rhodd, Chai
- Page 907 and 908:
August 26, 2010 Roger Trudell, Chai
- Page 909 and 910:
August 26, 2010 Amen Sheridan, Chai
- Page 911 and 912:
August 26, 2010 Mr. Robert Puschend
- Page 913 and 914:
August 26, 2010 Ansley Griffin, Cha
- Page 915 and 916:
Selzle, Lydia From: Pillard, Matt S
- Page 917 and 918:
arbara.j.friskopp@usace.army.mil; a
- Page 919 and 920:
each year in the period of record f
- Page 921 and 922:
Project: Loup River Hydroelectric P
- Page 923 and 924:
Loup River Hydroelectric Project FE
- Page 925 and 926:
Loup River Hydroelectric Project FE
- Page 927 and 928:
Loup River Hydroelectric Project FE
- Page 929 and 930:
Loup River Hydroelectric Project FE
- Page 931 and 932:
Loup River Hydroelectric Project FE
- Page 933 and 934:
Loup River Hydroelectric Project FE
- Page 935 and 936:
Loup River Hydroelectric Project FE
- Page 937 and 938:
Loup River Hydroelectric Project FE
- Page 939:
From: Richardson, Lisa (Omaha) To:
- Page 944 and 945:
Selzle, Lydia From: Pillard, Matt S
- Page 946 and 947:
Selzle, Lydia From: Pillard, Matt S
- Page 959 and 960:
Selzle, Lydia From: Pillard, Matt S
- Page 961 and 962:
Comments on Meeting Summary APPENDI
- Page 963 and 964:
as hydrocycling, have been successf
- Page 965 and 966:
October 22, 2010 Mr. Robert Puschen
- Page 967 and 968:
October 25, 2010 Kimberly D. Bose,
- Page 969:
7) A model-based analysis or Bayesi
- Page 975 and 976:
November 1, 2010 Gary Robinette Pon
- Page 978 and 979:
November 3, 2010 Emily Smith Winneb
- Page 980 and 981:
November 24, 2010 Honorable Kimberl
- Page 982 and 983:
Attachment A November 24, 2010 Dist
- Page 984 and 985:
November 24, 2010 scientific commun
- Page 986 and 987:
Attachment B District response to U
- Page 988 and 989:
dam, lower Platte River between the
- Page 990 and 991:
For example, the District’s calcu
- Page 992 and 993:
the Columbus gage which showed a st
- Page 994 and 995:
District Response The District beli
- Page 996 and 997:
The District agrees that the inform
- Page 998 and 999:
similar in other traits. It is reco
- Page 1000 and 1001:
12. General Comments on Loup Bypass
- Page 1002 and 1003:
References dramatic changes can occ
- Page 1004 and 1005:
Attachment C November 24, 2010 Dist
- Page 1006 and 1007:
November 24, 2010 allow them the fr
- Page 1008 and 1009:
Attachment D District response to N
- Page 1010 and 1011:
Project: Loup River Hydroelectric P
- Page 1012 and 1013:
Loup River Hydroelectric Project FE
- Page 1014 and 1015:
Loup River Hydroelectric Project FE
- Page 1016 and 1017:
Loup River Hydroelectric Project FE
- Page 1018 and 1019:
Loup River Hydroelectric Project FE
- Page 1020 and 1021:
Loup River Hydroelectric Project FE
- Page 1022 and 1023:
Loup River Hydroelectric Project FE
- Page 1024 and 1025:
Loup River Hydroelectric Project FE
- Page 1026 and 1027:
Loup River Hydroelectric Project FE
- Page 1028 and 1029:
Selzle, Lydia From: Pillard, Matt S
- Page 1030 and 1031:
Selzle, Lydia From: Robert Mohler [
- Page 1032 and 1033:
December 16, 2010 Mr. Robert Pusche
- Page 1034 and 1035:
OFFICE OF ENERGY PROJECTS Mr. Neal
- Page 1036 and 1037:
Loup River Hydroelectric Project Pr
- Page 1038 and 1039:
Loup River Hydroelectric Project Pr
- Page 1040 and 1041:
Loup River Hydroelectric Project Pr