07.04.2013 Views

ARP001013 Syrgis Performance Initiators Process Water Analysis

ARP001013 Syrgis Performance Initiators Process Water Analysis

ARP001013 Syrgis Performance Initiators Process Water Analysis

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

lead and zinc. The calculated limit for lead is 57.6 µg/l and for zinc is 132 µg/l. <strong>Syrgis</strong> reported 1.24 µg/l for<br />

lead and 45.7 µg/l for zinc in the effluent.<br />

Referring to the Department’s letter dated August 12, 2011, find:<br />

<strong>Syrgis</strong> must sample only the process wastewater to verify compliance with the limits in 40 CFR 414.85 (Sub<br />

Part H). In accordance with 40 CFR 414.111(b), since <strong>Syrgis</strong> does not have a lead or zinc bearing waste<br />

stream listed in Appendix A, <strong>Syrgis</strong> must comply with the lead and zinc limits shown in the Department letter<br />

dated August 6, 2010. To verify compliance <strong>Syrgis</strong> must sample the process wastewater before it enters the<br />

pond and commingles with the stormwater. <strong>Syrgis</strong>’ process wastewater enters the pond in three different<br />

lines. <strong>Syrgis</strong> must sample each line and may take grab samples (in lieu of flow proportional sampling). <strong>Syrgis</strong><br />

may composite the three samples in proportion to flow and submit only the one composite sample to the lab for<br />

analysis.<br />

The Department cannot verify that the submitted lead and zinc analyses were composited samples. Please<br />

submit the calculation sheet which shows how <strong>Syrgis</strong> determined the percentages. This may be a handwritten<br />

page, an Excel spreadsheet or a formal tabulated form. In either case, the submitted item must clearly show<br />

how <strong>Syrgis</strong> determined the percentages.<br />

Please submit the calculation information within thirty days of receiving this letter/email or by April 20, 2012<br />

(whichever comes first). In the future, please submit the calculation information with each semi-annual report.<br />

If <strong>Syrgis</strong> has concerns or requires more details, please contact Rufus Torrence at (501) 682-0626 or<br />

torrence@adeq.state.ar.us.<br />

Sincerely,<br />

Rufus J. Torrence, <strong>Water</strong> Division Engineer<br />

Encl: ADEQ Letters dated 9-4-2009, 8-6-2010 and 8-12-2011<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!