08.04.2013 Views

View/Download PDF - RailSafe

View/Download PDF - RailSafe

View/Download PDF - RailSafe

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HORNSBY (NORTH) – RENEWAL OF 533A POINT AND<br />

CONVERSION TO ‘A’ UNIT<br />

Commencing at 0200 on Saturday, 9 June 2012, and continuining until<br />

0200 on Tuesday, 12 June 2012, the following work will be carried out:<br />

533A facing turnout connecting to the No.1 Up Siding will be renewed<br />

and moved approximately 4.4 metres towards Country.<br />

The existing 533A D84M point machine will be removed and replaced<br />

with an ‘A’ valve unit.<br />

533A EOL of the fortress key type will be removed. The existing 533B<br />

EOL of the ‘A’ valve type will be renamed 533 EOL and apply to both 533<br />

A and B point ends.<br />

Mark Skribins<br />

Signal Engineer<br />

Trackwork Services Alliance<br />

Mob: 0412 520 806<br />

Email: Mark.Skribins@jhg.com.au<br />

Gerald Chin<br />

Signal Design Engineer<br />

Engineering Standards and Services, Signals<br />

Tel: 02 9714 3863<br />

Email: Gerald.Chin@invensysrail.com<br />

VER14052012<br />

10 (W.N. 22 – 2012)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!