View/Download PDF - RailSafe
View/Download PDF - RailSafe
View/Download PDF - RailSafe
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
HORNSBY (NORTH) – RENEWAL OF 533A POINT AND<br />
CONVERSION TO ‘A’ UNIT<br />
Commencing at 0200 on Saturday, 9 June 2012, and continuining until<br />
0200 on Tuesday, 12 June 2012, the following work will be carried out:<br />
533A facing turnout connecting to the No.1 Up Siding will be renewed<br />
and moved approximately 4.4 metres towards Country.<br />
The existing 533A D84M point machine will be removed and replaced<br />
with an ‘A’ valve unit.<br />
533A EOL of the fortress key type will be removed. The existing 533B<br />
EOL of the ‘A’ valve type will be renamed 533 EOL and apply to both 533<br />
A and B point ends.<br />
Mark Skribins<br />
Signal Engineer<br />
Trackwork Services Alliance<br />
Mob: 0412 520 806<br />
Email: Mark.Skribins@jhg.com.au<br />
Gerald Chin<br />
Signal Design Engineer<br />
Engineering Standards and Services, Signals<br />
Tel: 02 9714 3863<br />
Email: Gerald.Chin@invensysrail.com<br />
VER14052012<br />
10 (W.N. 22 – 2012)