HORNSBY (NORTH) – CONVERSION OF 522A, 524A AND<br />
525A POINTS TO ‘A’ UNITS<br />
Commencing at 0200 on Saturday, 9 June 2012, and continuing until 0200<br />
on Tuesday, 12 June 2012, the following work will be carried out:<br />
The existing 522A points from Down Shore to Up Main, 524A points<br />
from Down Shore to Inward Car Shed Road will be Spherolock operation.<br />
525A points on the Up Shore will be converted to claw lock operation.<br />
522A and 524A points will be relocated approximately 0.4 metres<br />
towards Gosford.<br />
525A points will be relocated approximately 0.7 metres towards Gosford.<br />
The existing 522, 524 and 525 points Emergency Operation Lock (EOL)<br />
equipment will be replaced with EOL equipment of the keyless type.<br />
Mark Skribins<br />
Signal Engineer<br />
Trackwork Services Alliance<br />
Mob: 0412 520 806<br />
Email: Mark.Skribins@jhg.com.au<br />
Joompot Prachakstham<br />
Signal Design Engineer<br />
Professional Services Division, Signal Design<br />
Tel: 02 89220403 (external) 2 0403 (internal)<br />
Email: Joompot.Prachakstham@railcorp.nsw.gov.au<br />
VER15032012<br />
(W.N. 22 – 2012)<br />
7