08.04.2013 Views

View/Download PDF - RailSafe

View/Download PDF - RailSafe

View/Download PDF - RailSafe

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RE-ISSUE OF STANDARD WORKING TIMETABLE BOOKS 1,<br />

2 AND 3 INSTRUCTION PAGES<br />

The Rail Passenger Services Standard Working Timetable Books 1 and 2 will<br />

be re-issued with effect from Monday, 18 June 2012.<br />

Books 1 and 2 will be designated as Version 4.10, 120420 and replace<br />

the RailCorp Passenger Standard Working Timetable Books 1 and 2 from<br />

Sunday, 23 October 2011, (Version 3.42, 110721) and all subsequent<br />

amendments.<br />

Book 3 Instruction Pages will also be re-issued from 18 June 2012.<br />

Any copies of Books 1 and 2 not designated as Version 4.10, 120420 are<br />

to be discarded. Any copies of Book 3 Instruction Pages not dated 18 June<br />

2012 are to be discarded.<br />

With the re-issue of the Standard Working Timetable from Monday, 18<br />

June 2012, a number of changes to the content and format of the Working<br />

Timetable have been incorporated including:<br />

Introduction of 3 x Waratahs (A sets) onto Sector 3 and the provision of<br />

Maintenance Exchange Paths to AMF via Homebush Loop.<br />

More preparatory work for increased Waratah running including Run<br />

numbering.<br />

Replacement of all 6R sets with 8 car set consists in Sector 3. Run<br />

Number and Set Type Changes.<br />

Replacement of 1 x 2K set with a 4H set on selected trips between<br />

Gosford and Newcastle. Run Number and Set type changes.<br />

Replacement of 3L sets with 4S sets. Set Type Changes. (Mainly<br />

Carlingford and Olympic Park).<br />

Build Up of selected Newcastle/Central Coast Services.<br />

Continued on the next page<br />

(W.N. 22 – 2012)<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!