10.04.2013 Views

Volume I. Part I - California Public Utilities Commission

Volume I. Part I - California Public Utilities Commission

Volume I. Part I - California Public Utilities Commission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PACIFIC GAS AND ELECTRIC COMPANY<br />

VOLUME 1 – 2006 LONG-TERM PROCUREMENT PLAN<br />

TABLE OF CONTENTS<br />

(CONTINUED)<br />

Section Title Page<br />

2. Demand Assumptions IV-56<br />

a. 1-in-2 Summer Temperature Demand<br />

(Normal)<br />

IV-57<br />

b. Uncommitted Energy Efficiency IV-57<br />

c. Distributed Generation IV-57<br />

d. Loss Adjustment From Demand Reduction IV-57<br />

3. 1-in-2 Summer Temperature Demand Planning<br />

Reserves<br />

IV-58<br />

4. 1-in-10 Summer Temperature Demand Case IV-58<br />

a. 1-in-10 Summer Temperature Demand<br />

Adjustment<br />

IV-59<br />

b. Planning Reserves IV-59<br />

c. Operating Reserves IV-59<br />

5. Summary of Results IV-65<br />

F. Price Forecasting IV-67<br />

1. Commodity Prices IV-67<br />

2. Costs by Resource Type IV-70<br />

3. RA Capacity Price IV-71<br />

G. Resource Trade-off Assessment IV-72<br />

1. Reliability Versus Cost Trade-off IV-72<br />

2. Environment Versus Cost Trade-off IV-73<br />

H. Candidate Resource Plan IV-73<br />

1. Criteria Used to Develop Candidate Plans IV-73<br />

2. Candidate Plan Descriptions IV-74<br />

a. Basic Procurement Plan IV-75<br />

b. Increased Reliability Plan IV-78<br />

c. Increased Reliability and Preferred<br />

Resources Plan<br />

IV-79<br />

-vii-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!