A funher factor that may have caused :his increase in time fron~ the last hexing in uhich cases were<br />

resewed for final judgment to the publication of coun opinion is the fact that uses nerc conswntly<br />

reassigned to new panels and judges in an aucmpt by the XCC to reduce corruption in the couns. This<br />

meant that aRer a case was resewed for judgment. it may have been transfencd to a ncw panel that needed<br />

to review the case holistically before it could formulate its final opinion and issue its judgment. In such<br />

cases. it is customary for panels to reson lo a law that allowx thcni to postpone the publication of he coun's<br />

opinion with regard to the said case until they have had the time to review the case file in detail.<br />

These factors also impacted the avenge number of days consumcd by the opinion pmcss xhicred in <strong>2003</strong><br />

(34 days). However, the final average achieved again marks a decreasing trend (from 59.7 in 1002 to j4 in<br />

1003) This decrease points to the couns' effons. in close collaboration with the AOJS tcmt. to cspcdile the<br />

opinion process and bring older cases to closure in order for panels to Stan conccntnting on nowr uws.<br />

I Indicator: Number ofcottrt procedures re-engineered and simplijed I<br />

Unit or Xltnsure I: Number of procedural steps simplified and re -engineered in thc<br />

filing process<br />

Total numbcr pl~nnccl by <strong>2003</strong>: 8 Total number achievcd by <strong>2003</strong>: 10<br />

Discussion of result: AOJS set out to simplify and rccngincer a total of 8 procedures pruining to the<br />

filins process. Over the life of the Project. 20 proccdures were identified for reengineering and succasfully<br />

simplified or rcengineered. This represents an outstanding achievement of 150% of Project u qcu in this<br />

area. This ach~evement \\as made possiblc by thc cffcc~ivencss of automated systcn~s introduced by the<br />

Project. especially thc ClRN system. Annex B list$ the relevant filing procedures simplified or<br />

recngincered.<br />

Unit of Ncasurr I: Nuntbcr or procedural steps simplified and re-engineered in the<br />

service process<br />

Total number plrnnecl by <strong>2003</strong>: 12 Total number achicrcd by <strong>2003</strong>: 6<br />

Discussion of result: Work on senkc ,crocedurcs \