20.04.2013 Views

RAD RADAN EB: RADAN ED: RADAN EE: - Network operations

RAD RADAN EB: RADAN ED: RADAN EE: - Network operations

RAD RADAN EB: RADAN ED: RADAN EE: - Network operations

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Updated on 10/01/13 <strong>RAD</strong><br />

Valid from 07/03/13 APPENDIX 5 - Airport connectivity Page 26 of 40<br />

<strong>RAD</strong>AN EV<br />

The use of SID/STARs is mandatory where published<br />

SIDs/STARs shall be completely followed within EVRRFIR, leaving or joining at an intermediate point is not permitted<br />

AD Departures/Arrivals DCT = 0nms<br />

EVRA Departures/Arrivals DCT = 0nms (except local training flights with type of<br />

flight “X” or “M”)<br />

<strong>RAD</strong>AN EY<br />

AD Departures/Arrivals DCT = 50nms<br />

<strong>RAD</strong>AN GM<br />

AD Departures/Arrivals DCT = 50nms<br />

<strong>RAD</strong>AN LA:<br />

For AD’s where SID/STARs are published:<br />

- the last RP of the SID shall be filed as the first RP of the route<br />

- the first RP of the STAR shall be filed as the last RP of the route<br />

AD Departures/Arrivals DCT = 50nms<br />

LATI Departures/Arrivals DCT = 0nms<br />

<strong>RAD</strong>AN LB:<br />

For AD’s where SID/STARs are published:<br />

- the last RP of the SID shall be filed as the first RP of the route<br />

- the first RP of the STAR shall be filed as the last RP of the route<br />

AD Departures/Arrivals DCT = 50nms<br />

LBBG/GO/PD/SF/WN Departures/Arrivals DCT = 0nms<br />

Connecting points for ARR. to airfields:<br />

LBSF: NAPET<br />

LBGO: AMTOV/DELIN<br />

- 26 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!