LW Advanced_08 innen_hr:Layout 25.03.2009 14:33 Uhr Seite 5<br />
tter:<br />
egian Dream”<br />
sty”.<br />
Result: All three ships were not just bigger<br />
but also became more elegant through the<br />
lengthening. Within 60 days new interna -<br />
tional standards were created in the cabins,<br />
salons, restaurants and bars. This double<br />
success was made possible by the <strong>Lloyd</strong><br />
<strong>Werft</strong>’s modern prefabrication methods and<br />
its solid experience with demanding ship<br />
conversions.<br />
1 The “Norwegian Dream” (ex<br />
“Dreamward”) had to pass<br />
under this 40 metre bridge of<br />
the Kiel-canal. With the funnel<br />
folded down it is not a<br />
problem; 2 The whole ship cut<br />
in two halves and the<br />
midbody in serted; 3 From two<br />
old ship sections of the<br />
“Windward” and one new<br />
section grew the “Norwegian<br />
Wind”.<br />