29.04.2013 Views

Management - Lloyd Werft Bremerhaven

Management - Lloyd Werft Bremerhaven

Management - Lloyd Werft Bremerhaven

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

LW Advanced_08 innen_hr:Layout 25.03.2009 14:33 Uhr Seite 5<br />

tter:<br />

egian Dream”<br />

sty”.<br />

Result: All three ships were not just bigger<br />

but also became more elegant through the<br />

lengthening. Within 60 days new interna -<br />

tional standards were created in the cabins,<br />

salons, restaurants and bars. This double<br />

success was made possible by the <strong>Lloyd</strong><br />

<strong>Werft</strong>’s modern prefabrication methods and<br />

its solid experience with demanding ship<br />

conversions.<br />

1 The “Norwegian Dream” (ex<br />

“Dreamward”) had to pass<br />

under this 40 metre bridge of<br />

the Kiel-canal. With the funnel<br />

folded down it is not a<br />

problem; 2 The whole ship cut<br />

in two halves and the<br />

midbody in serted; 3 From two<br />

old ship sections of the<br />

“Windward” and one new<br />

section grew the “Norwegian<br />

Wind”.<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!