Important<br />

- 27 -<br />

Tanco Autowrap <strong>280</strong> CS<br />

Operator’s manual<br />

The above recommendations are only offered as a guide to correct wrapping of silage bales and the manufactures<br />

accept no responsibility for variations that many arise and the consequence of same. They are based upon<br />

turntable speeds of up to 25 r.p.m., and a approx film width of 600mm applied to end bale when using 750mm<br />

wide film roll.<br />

It is the responsibility of the operator to ensure the correct number of wraps are applied, as variances can<br />

occur with fluctuations in speed of rotation, film quality and tensioning, shape and density of bale etc.<br />

11.0 Service and Maintenance<br />

1. All nuts and bolts should be tightened after one hour’s use, thereafter regularly.<br />

2. Wheel pressure should be normally kept at 42 psi depending on bale weight and field<br />

conditions.<br />

3. Inspection moving parts for wear on daily basis.<br />

4. Lubrication<br />

Drive chain & sprocket Grease every 24 hours<br />

Main rollers Grease every 24 hours<br />

Hinge pins on lift Grease every 24 hours<br />

Hinge pins on main tip frame Grease every 24 hours<br />

Hydraulic rams Grease every 24 hours<br />

Film spool assy Grease every 24 hours<br />

Dispenser gearboxes One shot of Grease every,<br />

500 bales. See 6<br />

Main spindle Grease even 4000-5000<br />

bales<br />

5. Adjustments<br />

Turntable drive chain: Adjust after first days work then check/adjust every 50 hours. See Fig.<br />

8<br />

Gearbox Drive chain: Adjust after first days work then check/adjust every 50 hours. See Fig.<br />

2<br />

Roller Drive chain: Adjust after first days work then check/adjust every 50 hours. See Fig.<br />

3<br />

Main Bale Belt: See belt tracking instructions.<br />

6. Film Dispenser<br />

Apply P.T.F.E. based grease to gears every 2 to 3 months.<br />

7. Film Adjustment<br />

Centre of film roll must be in line with centre of bale and the film mast should be vertical.