tanco autowrap 280 cs operators handbook wd66-280-m0207
tanco autowrap 280 cs operators handbook wd66-280-m0207
tanco autowrap 280 cs operators handbook wd66-280-m0207
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Important<br />
- 27 -<br />
Tanco Autowrap <strong>280</strong> CS<br />
Operator’s manual<br />
The above recommendations are only offered as a guide to correct wrapping of silage bales and the manufactures<br />
accept no responsibility for variations that many arise and the consequence of same. They are based upon<br />
turntable speeds of up to 25 r.p.m., and a approx film width of 600mm applied to end bale when using 750mm<br />
wide film roll.<br />
It is the responsibility of the operator to ensure the correct number of wraps are applied, as variances can<br />
occur with fluctuations in speed of rotation, film quality and tensioning, shape and density of bale etc.<br />
11.0 Service and Maintenance<br />
1. All nuts and bolts should be tightened after one hour’s use, thereafter regularly.<br />
2. Wheel pressure should be normally kept at 42 psi depending on bale weight and field<br />
conditions.<br />
3. Inspection moving parts for wear on daily basis.<br />
4. Lubrication<br />
Drive chain & sprocket Grease every 24 hours<br />
Main rollers Grease every 24 hours<br />
Hinge pins on lift Grease every 24 hours<br />
Hinge pins on main tip frame Grease every 24 hours<br />
Hydraulic rams Grease every 24 hours<br />
Film spool assy Grease every 24 hours<br />
Dispenser gearboxes One shot of Grease every,<br />
500 bales. See 6<br />
Main spindle Grease even 4000-5000<br />
bales<br />
5. Adjustments<br />
Turntable drive chain: Adjust after first days work then check/adjust every 50 hours. See Fig.<br />
8<br />
Gearbox Drive chain: Adjust after first days work then check/adjust every 50 hours. See Fig.<br />
2<br />
Roller Drive chain: Adjust after first days work then check/adjust every 50 hours. See Fig.<br />
3<br />
Main Bale Belt: See belt tracking instructions.<br />
6. Film Dispenser<br />
Apply P.T.F.E. based grease to gears every 2 to 3 months.<br />
7. Film Adjustment<br />
Centre of film roll must be in line with centre of bale and the film mast should be vertical.