AMDAVAD MUNICIPAL CORPORATION<br />

Tender Documents<br />

for<br />

SITC of Hydraulically operated Grit Mechanism with related Electrical work at<br />

E, E3, W & W5 sites with one year of Operation & Maintenance period for<br />

Sabarmati River Front Development <strong>Corporation</strong> Ltd.<br />

of Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

TENDER NO : AMC/_______________________/2011<br />

NOTICE NO. : _________________________________<br />

Volume I: - Technical Bid<br />

Part – I : General Specifications<br />

Part – II : Technical Specifications<br />

Part – III : Drawings<br />

(1) Last date of Tender Submission :<br />

30/08/2011 Upto 14:00 Hours.<br />

By RPAD / Speed post / Hand delivery / Courier<br />

(2) Date of Tender Opening : 30/08/2011 at 16:00 Hours.<br />

<strong>Municipal</strong> Commissioner<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Sardar Patel Bhavan<br />

<strong>Ahmedabad</strong> - 380 001.<br />

Gujarat<br />

India<br />

IN ASSOCIATION WITH<br />

4th Floor, Krishna Complex- A, Opp Devashish School, off. S. G. Highway, Bodakdev, <strong>Ahmedabad</strong> - 15<br />

PH: 0091-079-40222999, FAX: 0091-079-40222998<br />

EMAIL: stcpl@shethtechno.com<br />

AUGUST - 2011<br />

1


PROJECT :<br />

DOCUMENT : INDEX<br />

VOLUME - I : TECHNICAL BID<br />

SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM WITH<br />

RELATED ELECTRICAL WORK AT E, E3, W & W5 SITES WITH ONE<br />

YEAR OF OPERATION & MAINTENANCE PERIOD FOR<br />

SABARMATI RIVER FRONT DEVELOPMENT CORPORATION LTD.<br />

OF AMDAVAD MUNICIPAL CORPORATION<br />

SECTION TITLE PAGE NO.<br />

PART - I : GENERAL SPECIFICATIONS<br />

[ A ] GENERAL 4 - 43<br />

[ B ] GENERAL CONDITIONS OF CONTRACT 44 - 97<br />

[ C ] SPECIFICATIONS - NON TECHNICAL 98 - 119<br />

PART - II : TECHNICAL SPECIFICATIONS<br />

[ D ] TECHNICAL SPECIFICATIONS FOR MECHANICAL WORK 121 - 147<br />

[ E ] TECHNICAL SPECIFICATIONS FOR ELECTRICAL WORK 148 - 184<br />

[ F ] CONDITIONS OF CONTRACT FOR OPERATION &<br />

MAINTENANCE WORK<br />

185 - 196<br />

2


PART – I<br />

GENERAL SPECIFICATIONS<br />

3


SECTION: A<br />

A-1: NOTICE INVITING TENDER<br />

A-2: MEMORANDUM OF WORKS IN BRIEF<br />

A-3: SCOPE OF WORKS<br />

A-4: INSTRUCTIONS TO TENDERERS<br />

A-5: QUALIFICATION CRITERIA FOR TENDERER<br />

4


Section<br />

No.<br />

SECTION - A : GENERAL<br />

CONTENTS<br />

Description Page No.<br />

A-1 Notice Inviting Tender 7<br />

A-2 Memorandum of work in brief 13<br />

A-3 Scope of Work 28<br />

A-4 Instructions to Tenderers<br />

A.4.1. Note 32<br />

A.4.2. Invitation to Tender 32<br />

A.4.3. Tender Validity Period 32<br />

A.4.4. Language of Tender 32<br />

A.4.5. Documents 32<br />

A.4.6. Earnest Money 33<br />

A.4.7. Income-tax Return 34<br />

A.4.8. Submission of Tender 34<br />

A.4.9. General Performance Data 35<br />

A.4.10. Signing of Tender Document 35<br />

A.4.11. Interpretation of Documents 36<br />

A.4.12. Errors and Discrepancies in Tender 36<br />

A.4.13. Modification of Documents 37<br />

A.4.14. Evaluation of Tenders 37<br />

A.4.15. Policy for tenders under consideration 37<br />

A.4.16. Alternatives (Deleted) 37<br />

A.4.17. Cost of tendering 38<br />

A.4.18. Award of Contract 38<br />

A.4.19. Signing of Contract 38<br />

A.4.20. Stamp Duty and Legal Charges 38<br />

A.4.21. Solvency Certificate 38<br />

A.4.22. Documents / Information to be submitted along with Volume- I 38<br />

A.4.23. Forms<br />

Bank Guarantee 40<br />

Performance Bond 42<br />

5


Section<br />

No.<br />

SECTION - A : GENERAL<br />

CONTENTS<br />

A-5 Qualification criteria for Tenderers<br />

Description Page No.<br />

A.5.1 Eligibility Criteria 45<br />

A.5.2 General Experience 45<br />

A.5.3 Financial Position 45<br />

A.5.4 Litigation History 45<br />

A.5.5 Solvency Certificate 46<br />

A.5.6 Bidding Capacity 46<br />

A.5.7 Personnel 46<br />

A.5.8 Equipment 46<br />

A.5.9 Joint Ventures 47<br />

6


SECTION: A-1<br />

NOTICE INVITING TENDER<br />

7


To,<br />

SECTION – A: GENERAL<br />

A - 1 : NOTICE INVITING TENDER<br />

Sub: SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM WITH RELATED<br />

ELECTRICAL WORK AT E, E3, W & W5 SITES WITH ONE YEAR OF<br />

OPERATION & MAINTENANCE PERIOD FOR SABARMATI RIVER FRONT<br />

DEVELOPMENT CORPORATION LTD. OF AMDAVAD MUNICIPAL<br />

CORPORATION.<br />

Dear Sirs,<br />

A.1.1 The <strong>Municipal</strong> Commissioner, Amdavad <strong>Municipal</strong> <strong>Corporation</strong> (AMC) invites the item<br />

rate tenders (two-bid system) from the Grit Mechanism Manufacturers or Authorized<br />

Dealers who qualify to the eligibility criteria, as mentioned in Section–A.5 of the tender<br />

document for the SITC of Hydraulically operated Grit Mechanism with related Electrical<br />

work at E, E3, W & W5 Sites with One year of Operation & Maintenance Period for<br />

Sabarmati River Front Development <strong>Corporation</strong> Ltd. of Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

A.1.2 One set of tender documents consisting of –<br />

Volume – I : Technical Bid<br />

Part – I :<br />

Section – A General<br />

Section – B General Conditions of Contract etc.<br />

Section – C Specifications – Non Technical<br />

Section – D Technical Specifications - Mechanical Items<br />

Part – II : Section – E Technical Specifications - Electrical Items<br />

Part – III : Section – F Drawings<br />

Volume – II : Financial Bid<br />

Section – G Schedule of Quantities & Rates<br />

A.1.3 Tender along with conditions of contract will be available from the website<br />

www.egovamc.com. Tenderer shall have to present D.D. in favour of <strong>Municipal</strong><br />

Commissioner payable at <strong>Ahmedabad</strong> of Rs. 1500/- as tender fee along with the tender<br />

submission.<br />

The tenderer is required to check the AMC website for Addendum if any before 72<br />

hours of tender submission date and time. The tenderer who quotes the tender<br />

without attaching the addendum will be rejected.<br />

A.1.4 Earnest Money Deposit shall be in the form of Demand Draft / Bank Guarantee of any<br />

Nationalized Bank, located at <strong>Ahmedabad</strong> and payable to <strong>Municipal</strong> Commissioner, AMC<br />

for Rs. 32,000/-. All the tenderers have to submit the earnest money as specified in the<br />

tender document.<br />

A.1.5 The successful tenderer shall have to pay security deposit in Indian Rupees in approved<br />

Form ‘A’ enclosed with the tender document in Section A4, clause. A.4.23.<br />

8


A.1.6 The Earnest Money Deposit of all the bidders except first lowest, second lowest and third<br />

lowest will be returned within 20 days.<br />

A.1.7 The tender shall be accompanied with the copy of Similar type of work carried, Works<br />

on hands, Financial capacity and required details in Schedules (Format) given in<br />

Section – A2 & “Memorandum of work in brief” of Technical bid, Volume-I. & blank<br />

data sheets of Technical Specifications of Volume- I”.<br />

A.1.8 Two sets (One Original + One Xerox copy) of tender documents (Volume – I, Part-I, II<br />

& III The tenderer shall clearly state in the forwarding letter (in duplicate) to be enclosed<br />

with the tender documents, the deviations from General Terms and Conditions, if any<br />

with cross references. If no such letter is received, it will be presumed that the<br />

tenderer agrees entirely with the General Terms and Conditions.<br />

A.1.9 Earnest Money Deposit in the form of Demand Draft (in favour of <strong>Municipal</strong><br />

Commissioner payable at <strong>Ahmedabad</strong>) / Bank Guarantee should be sealed in separate<br />

envelope and the same shall be enclosed along with Volume – I and drawings in Envelope<br />

– ‘A’ only (Technical Bid) (One Original + One Xerox copy).<br />

A.1.10 Volume – II (One Original + One Xerox copy) should be sealed in another separate<br />

envelope, marked envelope ‘B’ (Financial Bid).<br />

A.1.11 Both envelopes ‘A’ and ‘B’ should then be sealed in one large envelope. On all these<br />

envelopes, the name of tenderer, name of work as well as date of opening of the bid<br />

shall be written invariably.<br />

A.1.12 The first envelope ‘A’ containing technical bids from the bidders received, will be opened<br />

in the presence of the bidder’s representatives; who choose to attend at the office of the<br />

City Engineer 2 nd floor, Sardar Patel Bhavan, Khamasa Gate, Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong> at the time and date mentioned in tender notice and the technical bids will be<br />

scrutinized by AMC for satisfying various eligibility criteria prescribed for the bidders for<br />

this work.<br />

A.1.13 After this, the financial bids – Volume – II (envelope ‘B’) of the technically responsive<br />

tenderers only will be opened. The actual date of opening of financial bids will be<br />

communicated to technically responsive tenderers at a later date.<br />

A.1.14 Tenders received without Earnest Money will be considered as Non-Responsive and will<br />

be rejected outright.<br />

A.1.15 The conditional tender will not be accepted and will be rejected outright, unless, the<br />

nature of condition(s) put up by the bidder is acceptable to AMC. Any suggestions /<br />

alterations from the tender, if suggested in specifications, must be mentioned in the<br />

main forwarding letter.<br />

A.1.16 The tender shall be item rate tender. Tenderer shall be offered the rate for each item in<br />

figures. Sub total of each item and grand total shall be indicated both in figures and<br />

words in Volume-II of the tender document (Financial Bid). The tenderer shall also<br />

work out the total tender amount and shall write this tender amount in words and<br />

figures as per the item rate.<br />

A.1.17 Tenderer shall have to attach the following documents in duplicate with tender:<br />

9


Schedules of Section A-2 “Memorandum of work in brief” of Volume I.<br />

Other documents, as per A.4.8.5, A.4.9 & A.4.22 of Section A-4, Volume – I, Arbitration /<br />

Litigation history if applicable.<br />

It is mandatory for all the tenderers to fill the format as mentioned in A2 <strong>section</strong> (from A<br />

2.1 to A 2.8) of Technical bid, Volume-I. All the financial and technical guaranteed<br />

parameters along with required supportive documents (mentioned in format) to be<br />

submitted with prescribed format only. It is mandatory to submit all the documents in spiral<br />

binding. There shall not be any loose paper. Proper index shall be made for all submitted<br />

documents i.e. format and supportive documents. This is mandatory. In case of not filling<br />

and submitting of documents as mentioned in tender at the time of technical bid (all<br />

technical & commercial documents) and price bid ( cost of each item and any discount- if<br />

applicable) opening then no further correspondence shall be done and the same time tender<br />

will be rejected. Technical details shall be filled in the blank data sheet mentioned in<br />

Technical bid, Volume- “Technical Specifications”.<br />

A.1.18 Incomplete tender which does not fulfill any of the above conditions will be liable for<br />

rejection and Volume – II including addendum if any), duly completed in all respects shall<br />

be submitted as described further, so as to reach at the following address on or before the<br />

date and time mentioned in tender notice.<br />

Assistant Manager (Project)<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

2 nd floor, <strong>Corporation</strong> Bank Building,<br />

Sardar Patel Bhavan,<br />

Khamasa Gate,<br />

<strong>Ahmedabad</strong> – 380 001<br />

Gujarat (INDIA)<br />

A.1.19 Tender will also be liable to be rejected if –<br />

i) The tenderer proposes any alteration in the work specified or in the time allowed in<br />

carrying out the works or make corrections in Schedule of Quantities.<br />

ii) Any of the page or pages in the tender is / are removed or replaced.<br />

iii) The rate of each item is not entered in ink, in figures in Financial Bid. Also the rate of<br />

sub total of each item and grand total is not written in word and figure and signed.<br />

iv) All corrections, additions or pasted slips are not initialed by the tenderer.<br />

v) Any erasure is made in the tender.<br />

vi) The tenderer or in the case of a firm, each partner or the person holding the power of<br />

attorney thereof does not sign or the signature(s) is (are) not attested by the witness,<br />

wherever it is required.<br />

vii) Earnest money for required amount is not paid with the tender.<br />

viii) The tenderer returns the tender document without signing relevant pages of the bid<br />

and amendments, if any.<br />

10


ix) Information vide Section A.2 must be furnished.<br />

x) Data sheet by the bidder in Section ‘D’ & ‘E’ must be furnished.<br />

A.1.20 Acceptance of the tenders will rest with the competent authority, who does not bind<br />

himself to accept the lowest tender and reserves the right to reject any or all tenders without<br />

assigning any reason thereof.<br />

A.1.21 It must be clearly and distinctly understood that the conditions of contract and<br />

specifications shall be rigidly enforced and no relaxation on the grounds of customs<br />

prevailing shall be allowed.<br />

A.1.22 The quoted rates in the Financial Bid (Volume – II) shall be inclusive of all taxes,<br />

duties, octroi, etc. and no claim in this context shall be entertained. Contractor shall<br />

not be paid any extra due to increase in any type of Government Taxes including<br />

excise duty during implementation of contract. Any variations in taxes etc. shall be<br />

borne by the contractor.<br />

A.1.23 It is considered that the tenderer has visited the site of work, fully acquainted himself with<br />

the local situations regarding materials, labour and other factors pertaining to work and<br />

studied the plans and estimates before submitting the tender.<br />

A.1.24 It will be the responsibility of the bidder to arrange for necessary import license and<br />

clearance of Govt. of India in time, if required, so that the imported plant or equipment<br />

could be utilized for the proposed work. The bidder has to assure AMC that he is in a<br />

position to import the plant or equipment at the time of commencement of proposed work.<br />

A.1.25 In the event of a discrepancy between description in words and figures in total offered<br />

amount by the tenderer, the description in words shall prevail.<br />

A.1.26 In the event of any calculation error found in the bid of submission, the rate will be<br />

considered as final and accordingly the amount will be corrected. Also in case of<br />

calculation error like error in summation, subtraction, etc., the actual calculation will be<br />

considered as final.<br />

A.1.27 The tender for the work shall remain open for a period of 120 days from the date of<br />

opening of price bid of the tender and the tenderer shall not be allowed to withdraw or<br />

modify the offer on his own during this period any modifications or additions in terms and<br />

conditions of his tender not acceptable to the <strong>Municipal</strong> Commissioner, AMC, <strong>Ahmedabad</strong>.<br />

The <strong>Municipal</strong> Commissioner shall without prejudice to any right or remedy, be at liberty<br />

to forfeit in full the said earnest money absolutely.<br />

A.1.28 The AMC reserves the right to reject all the tenders of the lowest or any other tender which<br />

is the judgment of the AMC and also does not appear to be in its best interest and the<br />

tenderers shall have no cause of action or claim against the AMC of its officers, employees,<br />

successors for assignees for rejection of its tender. The <strong>Municipal</strong> Commissioner does not<br />

bind himself to accept the lowest or any tender. If the tenderer wishes to offer discount in<br />

the event of this entire work being awarded to him, he shall state so in the tender. Tender<br />

documents are not transferable.<br />

A.1.29 (a) The Contractor shall furnish to the Additional Chief Engineer – (S.O. E & M), AMC<br />

every week during the progress of the works, classified weekly returns of the number of the<br />

11


people employed on the work during the week. The report of skilled and unskilled labour<br />

shall be given in the prescribed forms.<br />

(b) Details of machineries deployed on site shall be furnished by the Contractor, every week.<br />

A.1.30 The tenderer, if directed by the Engineer in charge; shall increase or decrease the strength<br />

of the labour both skilled and unskilled. The Contractor shall also furnish the following<br />

returns:<br />

(a) A weekly medical report showing the health of the Contractor’s labours and the number<br />

and the nature of their illness, and<br />

(b) A report of any accident which may have occurred within 24 hours of its occurrence.<br />

A.1.31 The tenderer shall strictly observe all the requirements laid down in the Contract Labour<br />

(Regulation and abolition) Act, 1970 and the Contract Labour (Regulation and Abolition)<br />

(Gujarat) Rules, 1972 and other acts as amended from time to time so far as applicable. The<br />

tenderer should obtain necessary permission, license and registration from the labour<br />

commissioner, as per labour law.<br />

A.1.32 The work is to be completed in all respects within 6 (Six months) inclusive of monsoon,<br />

reckoned from the date of written order to be commence the work. Out of 6 months, the<br />

contractor shall take approval of all documents & drawings and as per tender specification<br />

and refer to the approval given by AMC within 1 (One) month. In 4 month the contractor<br />

shall supply & deliver at site, & within 1 month for execution, testing and commissioning<br />

of all mechanical & electrical work related to the job. This duration shall also include<br />

inspection at manufacturer’s works for the Grit Mechanism as per technical specification.<br />

A.1.33 The tenderer shall carefully read the eligibility criteria, furnish the details and satisfy the<br />

same; otherwise the tender will be rejected without assigning any reason.<br />

A.1.34 The tenderer is required to check the AMC website for Addendum if any before 72<br />

hours of tender submission/ due or cut off date and time. The tenderer who quotes the<br />

tender without attaching the addendum will be rejected.<br />

A.1.35 This notice will form part of the Contract.<br />

A.1.36 Tender documents can be downloaded from AMC website www.egovamc.com and tender<br />

fees Rs.1500/- by DD (in favour of <strong>Municipal</strong> Commissioner Payable at <strong>Ahmedabad</strong>)<br />

submitted along with the tender submission.<br />

Last date of tender submission will be on 30/08/2011 up to 14.00 hours. Tender (only<br />

technical bid) will be opened on same date: 30/08/2011 at 16.00 hours at the office of the<br />

City Engineer 2 nd floor, Sardar Patel Bh1avan, Khamasa Gate, Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong>.<br />

Signature of Tenderer: Additional Chief Engineer (S.O.E. & M.)<br />

Name : Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal :<br />

Date : Date<br />

12


SECTION: A-2<br />

MEMORANDUM OF WORKS<br />

IN BRIEF<br />

13


A.2.1 Name of Work:<br />

A - 2 : MEMORANDUM OF WORK IN BRIEF<br />

SITC of Hydraulically operated Grit Mechanism with related Electrical work at E, E3, W<br />

& W5 Sites with One year of Operation & Maintenance Period for Sabarmati River Front<br />

Development <strong>Corporation</strong> Ltd. of Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

A.2.2 Earnest Money : Rs. 32, 000/- (Rs. Thirty Two Thousand only)<br />

EMD shall be in the form of Demand Draft (in favour of <strong>Municipal</strong> Commissioner Payable at<br />

<strong>Ahmedabad</strong>) / Bank Guarantee.<br />

A.2.3 Validity Period : 120 Days from the date of price bid opening<br />

A.2.4 Security Deposit : 5% of the contract value in the form of Bank Guarantee<br />

from any Nationalized Bank<br />

A.2.5 Performance Guarantee Bond: 5 % of the contract value in form of Bank Guarantee for<br />

period of 12 months beyond time limit i.e.6 Months.<br />

A.2.6 Solvency Certificate : Not Applicable<br />

A.2.7 Time – Limit : 6 Months (Including monsoon season). Within 1 month for<br />

documents, drawings approval, within 4 month for<br />

Inspection, supply & delivery of goods at site, within 1<br />

month for Execution, Testing & Commissioning at site.<br />

A.2.8 O & M period : One Year<br />

A.2.9 i) Last date of submission<br />

of the tender : 30/08/2011 up to 14.00 hours<br />

ii) Mode of Sending<br />

iii) Description essential to<br />

: a) In sealed cover in (One Original + One Xerox copy)<br />

copies by Registered Post A.D. or Speed Post or Hand<br />

delivery or Courier.<br />

b) Tender sent by ordinary post will be rejected out right.<br />

be made on sealed cover :<br />

iv) Mode of quoting rates in<br />

a) Name of Work and Tender No.,<br />

Name of Contractor<br />

b) Last date of receiving tender by the AMC.<br />

Schedule of rates : Rate of each item shall be mentioned in figure and rate of<br />

sub total of each item and total of each work and grand total<br />

shall be mentioned in figures as well as in words.<br />

A.2.10 Performance Guarantee : The security deposit paid will be converted in the<br />

performance guarantee and will be released after Operation<br />

& Maintenance Period of one year.<br />

A.2.11 EMD : BG / D.D. No. _______________ Dt. ________,<br />

Drawn on ______________ Bank ________<br />

14


Payable to <strong>Municipal</strong> Commissioner, at <strong>Ahmedabad</strong> is<br />

enclosed herewith representing the earnest money, the full<br />

value of which is to be absolutely forfeited by AMC, should<br />

I / We not deposit the full amount of security deposit<br />

specified above.<br />

A.2.12 Excess Item : It is mandatory for the successful tenderer to give excess<br />

item (up to 40 % of tender qty) at the quoted rate up to<br />

project completion limit.<br />

A.2.13 Important Instruction : i) It is mandatory for all the tenderer to fill the Format as<br />

mentioned in Schedule A-2 (A2.1 to A2.8) of Technical bid,<br />

Volume-I.<br />

ii) All the financial and technical guaranteed parameters along<br />

with required supportive documents (mentioned in format)<br />

to be submitted with prescribed format only.<br />

iii) It is mandatory to submit all the documents spiral binding<br />

having proper checklist index indicating the page no. as per<br />

format and supportive documents.<br />

iv) Loose paper or left out paper later submitted will not be<br />

accepted.<br />

v) In case of not filling and submitting of documents as<br />

mentioned in tender at the time of tendering then no further<br />

correspondence shall be done with bidders for further<br />

submission of either technical or commercial documents or<br />

any discount, and at the same time tender will be rejected.<br />

vi) Technical details shall be filled in the blank data sheet<br />

mentioned in Technical bid, Volume-I “Technical<br />

Specifications”.<br />

Signature of Tenderer : Additional Chief Engineer (S.O.E & M)<br />

Name : Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal :<br />

Date :<br />

15


INDEX FOR SCHEDULES<br />

Sch. No. Description Page No.<br />

A-2.1<br />

INFORMATION REGARDING FINANCIAL CAPACITY FOR<br />

THE TENDERER<br />

1. Earnest Money Deposit<br />

2. Solvency certificates<br />

3.<br />

Certificate of Grit Mechanism Manufacturer / Authorised dealer of<br />

Grit Mechanism of approved make specified in the tender &<br />

Qualifying to the Qualification Criteria<br />

4. Annual Average Turn Over<br />

5. An overall schedule of the work plan of the project<br />

6.<br />

7.<br />

Experience of execution of water supply or sewage application for<br />

electrical and mechanical work<br />

Blank data sheet to be furnished as mentioned in technical bid Part<br />

II<br />

8. A certified copy of power of attorney<br />

9. Agreement in case of joint Venture<br />

10. Income Tax return copy of last three financial year<br />

A.2.2 BID CAPACITY<br />

A.2.3<br />

A.2.4<br />

A.2.5<br />

A.2.6<br />

A.2.7<br />

INFORMATION REGARDING TECHNICAL PARAMETERS<br />

BY THE TENDERER – NOT APPLICABLE<br />

DETAILS OF THE WORKS OF SIMILAR TYPE &<br />

MAGNITUDE CARRIED OUT BY THE TENDERER DURING<br />

LAST 5 YEARS PERIOD<br />

DETAILS OF THE WORKS IN HAND AND WORKS<br />

TENDERED FOR AS ON DATE OF SUBMISSION OF THE<br />

TENDER.<br />

DETAILS OF TECHNICAL PERSONNEL WITH TENDERER<br />

WHO ARE PROPOSED FOR THIS CONTRACT – NOT<br />

APPLICABLE<br />

DETAILS OF THE EQUIPMENT IN POSSENSSION OF THE<br />

CONTRACOTR AND THE EQUIPMENT HE PROPOSES TO<br />

BRING TO THE SITE FOR THIS WORK – NOT APPLICABLE<br />

A.2.8 STRUCTURE AND ORGANISATION OF FIRM<br />

16


Sr.<br />

No.<br />

1. Earnest Money Deposit<br />

A – 2: SCHEDULES<br />

SCHEDULE - A.2.1<br />

INFORMATION REGARDING FINANCIAL CAPACITY OF THE TENDERER.<br />

Details Amount in Lacs<br />

Details to be<br />

furnished<br />

Submitted<br />

Yes / No<br />

Min EMD value shall be<br />

Rs. 32,000/-<br />

2. Solvency Certificates Not Applicable<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

Certificate of Grit<br />

Mechanism Manufacturer /<br />

Authorized Dealer of Grit<br />

Mechanism of approved make<br />

Annual average turnover for<br />

last three years:<br />

Year :<br />

2008 – 2009<br />

2009 – 2010<br />

2010 – 2011<br />

Average:<br />

An overall schedule of the<br />

‘Work Plan’ of the project<br />

Experience of execution of<br />

Grit Mechanism with<br />

electrical and mechanical<br />

work<br />

Blank Data sheet to be<br />

furnished as mentioned in<br />

technical bid Part II<br />

Remarks<br />

Certificate of Grit Mechanism Manufacturer /<br />

Authorized dealer of Grit Mechanism of<br />

approved make shall be attached.<br />

Minimum average Annual Turnover for last three<br />

financial years shall be Rs. 20,00,000/-<br />

Certificates duly signed and stamped from C.A.<br />

shall be attached with this schedule along with<br />

the audited balance sheets for the last three years<br />

showing long term profitability.<br />

Separate chart to be enclosed with this schedule<br />

considering project completion period<br />

Separate sheet to be enclosed with this schedule<br />

as supportive documents.<br />

Blank Data sheet to be filled in format attached in<br />

technical specification and shall be attached with<br />

this schedule<br />

17


Sr.<br />

No.<br />

8.<br />

9.<br />

10.<br />

Details Amount in Lacs<br />

A certified copy of power of<br />

attorney<br />

Agreement in case of Joint<br />

Venture<br />

Income Tax return copy of<br />

last three financial year<br />

Details to be<br />

furnished<br />

Submitted<br />

Yes / No<br />

Not Applicable<br />

Note: No Deviation with respect to technical guaranteed parameters and commercial terms shall be acceptable.<br />

Signature of the Tenderer with stamp: Company’s seal:<br />

Name: Date:<br />

Remarks<br />

Copy shall be attached with this schedule<br />

18


SCHEDULE - A.2.2<br />

BID CAPACITY:<br />

The Contractor shall furnish the schedule for capacity in the following format for this work<br />

I. Annual average turnover for last three financial years (A):<br />

Year :<br />

2008 – 2009<br />

2009 – 2010<br />

2010 – 2011<br />

II. Value of work the existing commitments and on-going works to be completed during the next one year (B) :<br />

Name of work in progress<br />

II. Qualification Criteria<br />

Date of issue of work order<br />

along with its tendered cost<br />

(Rs. Lacs)<br />

Actual Tentative Date of<br />

Completion of work<br />

Minimum Annual Turnover<br />

for last three financial years<br />

shall be<br />

Rs. 20,00,000/-<br />

Amount of existing<br />

commitment as well as<br />

ongoing work to be done<br />

in next 12 months<br />

The bidder should be original manufacturer of Grit Mechanism or authorised dealer of the Grit Mechanism (for approved make refer to the technical<br />

specifications, Make of Material). In case of Authorization, the Bidder should be Authorised dealer for current year and should hold the same authorization since<br />

last one year. The certification for the same shall be submitted.<br />

III. Completion period / 12 = 6/12 = 0.5 (N) :<br />

Bid Capacity<br />

Bid Capacity = (2AN – B) = __________________________ (Shall be minimum Rs. 10, 00, 000/- (Rs. Ten lacs only))<br />

Where, A = Annual average turnover of last three years<br />

B = Value of work the existing commitments and on-going works to be completed during the next one year<br />

N = Completion period / 12 = 6/12 = 0.5<br />

Signatures of the Tenderer with stamp Name:<br />

Company’s Seal: Date:<br />

19


SCHEDULE - A.2.3<br />

NOT APPLICABLE<br />

20


Sr.<br />

No.<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

SCHEDULE - A.2.4<br />

DETAILS OF THE WORKS OF SIMILAR TYPE AND MAGNITUDE CARRIED OUT BY THE TENDERER<br />

DURING LAST 5 YEARS PERIOD<br />

Name of Work<br />

Place and<br />

Country<br />

Tendered<br />

Cost<br />

Date of start Prescribed date<br />

of completion<br />

Note :<br />

Date of Completion<br />

Actual date of<br />

completion<br />

Principal Features<br />

1) Experience of execution of at least ONE similar (Hydraulic type) Grit Mechanism SITC work with related electrical & mechanical work completed<br />

during last five years each having costing not less than Rs. 7,50,000 (Rs. 7.5 Lacs Only) & satisfactory working at least one year.<br />

2) Certificate of satisfactory completion of the work from the owner shall be submitted for each work which is mandatory. If required separate sheet can be<br />

used for more details.<br />

Signatures of the Tenderer with stamp Company’s seal:<br />

Name: Date:<br />

21


Sr.<br />

No<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

SCHEDULE - A.2.5<br />

DETAILS OF THE WORKS IN HAND AND WORKS TENDERED FOR AS ON THE DATE OF SUBMISSION OF THE TENDER<br />

Name of<br />

Work<br />

Place and<br />

Country<br />

Tendered<br />

Cost<br />

WORKS IN HAND WORKS TENDERED FOR<br />

Cost of work<br />

remaining to<br />

be executed as<br />

on date<br />

Anticipated<br />

Date of<br />

Completion<br />

Note:<br />

Tender<br />

Cost<br />

Date when<br />

decision is<br />

expected<br />

Stipulated date &<br />

period of<br />

Completion<br />

Main features of<br />

the work<br />

1. Correct details of work on hand to be furnished. In case of hiding / not showing of the details of work on hand, contractor shall not be considered<br />

technically qualified and their price bid will not be opened.<br />

2. If required separate sheet can be used for more details.<br />

Signature of the Tenderer with stamp Company’s seal:<br />

Name: Date:<br />

22


Sr.<br />

No<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

SCHEDULE - A.2.6 : NOT APPLICABLE<br />

DETAILS OF TECHNICAL PERSONNEL WITH TENDERER WHO ARE PROPOSED FOR THIS CONTRACT<br />

Description of Category Name Qualification<br />

Professional<br />

experience and<br />

details of works<br />

carried out<br />

Since how long in<br />

service with<br />

tenderer<br />

Note: The complete biodata of each personnel with qualification and experience shall be furnished separately alongwith this schedule.<br />

Signature of the Tenderer with stamp<br />

Name:<br />

Company’s seal:<br />

Date:<br />

Remarks<br />

23


SCHEDULE - A.2.7 : NOT APPLICABLE<br />

DETAILS OF THE QUIPMENT IN POSSESSION OF THE CONTRACTOR AND THE EQUIPMENT HE PROPOSES TO<br />

BRING TO THE SITE FOR THIS WORK<br />

Sr. No.<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

7.<br />

8.<br />

9.<br />

10.<br />

Type and Description of the<br />

Equipment & Capacity<br />

Age and Approximate Value<br />

Numbers the Tenderer<br />

has in possession<br />

Numbers he proposes to<br />

bring on to site.<br />

Tenderer hereby confirms that quantity and type of tools he will employ for execution will not be less than those listed in para A.5.8 and agree to bring more<br />

equipment, if so warranted in the opinion of the Engineer.<br />

Signatures of the Tenderer with stamp Company’s seal:<br />

Name: Date:<br />

24


1. Name of Applicant<br />

2. Nationality of Applicant<br />

3. Office Address<br />

Telegraphic Address<br />

Telephone No.<br />

Telex No.<br />

Fax No.<br />

E-mail Address<br />

4. Year and location of establishment<br />

5. The Applicant is<br />

a) An individual<br />

b) A proprietary firm<br />

c) A firm in partnership<br />

d) A limited company or Corp.<br />

(if a firm in partnership)<br />

SCHEDULE - A.2.8<br />

STRUCTURE AND ORGANISATION OF FIRM<br />

6. Attach the organization chart showing the<br />

structure of the organization including the<br />

names of the Directors and position of<br />

officers.<br />

7. Number of years of experience<br />

8. Give details of your experience in Grit<br />

Mechanism manufacturing and quality<br />

control.<br />

9. Give details of equipments, if any.<br />

Signature of Tenderer<br />

Name<br />

Company’s Seal<br />

Date<br />

25


A - 3<br />

SECTION: A-3<br />

SCOPE OF WORKS<br />

26


A.3: SCOPE OF WORK<br />

A.3. 1 Scope for Mechanical work shall include design, manufacture, testing of Hydraulically<br />

Operated Grit Mechanism at manufacturer’s works by third party inspecting (TPI) agency<br />

jointly with AMC representatives’ inclusive of all the expenses incurred towards the<br />

inspection like commercial fees, to & fro charges, lodging & boarding, etc., delivery of<br />

equipment at site, unloading & storage at site, installation, testing at E, E3, W & W5 sites<br />

of Sabarmati River Front Development <strong>Corporation</strong> Ltd. for STP Department of<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> as follows:<br />

I. The scope of Mechanical work may include but not limited to the following:<br />

A.3.1.1 Hydraulically operated Grit Mechanism with related Electrical & Civil work for various<br />

sites of SRFDCL.<br />

A.3.1.2 Carbon Steel with hot dipped galvanized Nuts, bolts, washers, gaskets, etc.<br />

A.3.1.3 Structural steel, square bar, etc. as required on site<br />

II. The scope of Electrical work may include but not limited to the following for AMC:<br />

A.3. 2.1 Connection from spare feeder of the MLTP to Grit mechanism through cable.<br />

A.3. 2.2 Power and control cables.<br />

A.3. 2.3 Earthing system<br />

A.3. 2.4 Cabling system<br />

A.3. 2.5 Control Panel<br />

A.3. 2 ADDITIONAL SCOPE:<br />

In addition to the above, following services are also included in the scope of the<br />

Contractor:<br />

A.3.3.1. Cable tray support<br />

A.3.3.2. Final painting of equipment at site after installation<br />

A.3.3.3. Drawings and Instruction Manuals<br />

A.3.3.4. Verifying the existing dimensions as relevant to the Contractors scope.<br />

A.3.3.5. Civil repairing and maintaining of damage done to the pump house during execution.<br />

Signature of Tenderer Additional Chief Engineer (S.O.E & M.)<br />

Name: Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal:<br />

Date: Date:<br />

27


SECTION: A-4<br />

INSTRUCTIONS TO TENDERERS<br />

28


A.4.1. Note<br />

A – 4: INSTRUCTIONS TO TENDERERS<br />

A.4.1.1 These instructions are provided to assist tenderers while preparing their tenders. They do<br />

not form part of the Contract and they shall not be taken into consideration in interpreting<br />

or construing the Contract.<br />

A.4.2. Invitation to Tender<br />

A.4.2.1 The <strong>Municipal</strong> Commissioner, AMC for and on behalf of the Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong>, <strong>Ahmedabad</strong>, hereinafter referred to as the AMC, will receive tenders for the<br />

Supply, installation, testing & commissioning of pumping machinery with related electrical<br />

& mechanical works according to the specifications and Schedule of Quantities and Rates<br />

in the tender documents herewith attached.<br />

A.4.2.2 Tenders will not be accepted after the hour and date fixed for receiving of tenders.<br />

Telegraphic tenders will not be accepted under any circumstance. Tenders received after<br />

the hour and date so fixed will not be considered. Tenders will be received by RPAD /<br />

Speed Post / Hand delivery / Courier on or before due date and time as mentioned in<br />

tender notice. Tenderer’s authorized representatives may attend the tender opening. The<br />

tenders shall be opened at the date and time as mentioned in tender notice.<br />

A.4.2.3 However, the AMC reserves the right to reject all the tenders or the lowest or any other<br />

tender which in the judgment of the AMC does not appear to be in its best interest, and the<br />

tenderer shall have no cause of action or claim against the AMC or its officers, employees,<br />

successors or assignee for rejection of its tender.<br />

A.4.2.4 The <strong>Municipal</strong> Commissioner does not bind himself to accept the lowest or any tender. If<br />

the tenderer wishes to offer discount in the event of the entire work he shall state so in the<br />

tender.<br />

A.4.2.5 Tender documents are not transferable.<br />

A.4.2.6 Technical bid shall not contain any commercial detail or letter pertaining to commercial<br />

part (like discount letter, optional offer letter, etc.).<br />

A.4.3. Tender Validity Period<br />

A.4.3.1 The tender shall be kept valid for acceptance for a period of one hundred & twenty days<br />

(120) calendar days from the date of opening of price bid.<br />

A.4.4. Language of Tender<br />

A.4.4.1 Tenders shall be submitted in English, and all information in the tender shall be in English.<br />

Information in any other language shall be accompanied by its translation in English.<br />

Failure to comply with this may disqualify a tender. Only English text shall be governing.<br />

A.4.5. Documents<br />

A.4.5.1 Two sets (One Original + One Xerox copy) of tender documents (Part – I and II of<br />

Volume-I & Volume-II, drawings & addendum if any), comprehensively referred to as<br />

Tender Document, are issued to every tenderer. The details of the Tender Document<br />

referred above are as follows:<br />

29


(A) : Technical Bid<br />

(1) : Volume – I : Part – I (General)<br />

Section: A - Notice Inviting Tender, Scope of Work, Instructions to Tenderers etc.<br />

Section: B - General Conditions of Contract, Schedules etc.<br />

Section: C - Specifications : Non-Technical, Safety Provisions etc.<br />

(2) : Volume – I : Part – II (Technical Specification & Drawings)<br />

Section: D - Technical Specifications (Mechanical)<br />

Section: E - Technical Specifications (Electrical)<br />

Section: F - Drawings<br />

(B) : Financial Bid<br />

(3) : Volume – II :<br />

Section: G - Schedule of Quantities & Rates (Schedule B)<br />

A.4.6. Earnest Money<br />

A.4.6.1 Each tender must be accompanied by Earnest Money in the form of Demand Draft / Bank<br />

Guarantee of any Nationalized Bank, located at <strong>Ahmedabad</strong> (in favour of <strong>Municipal</strong><br />

Commissioner Payable at <strong>Ahmedabad</strong>).<br />

A.4.6.2 Tenders not accompanied by Earnest Money as required shall be rejected as nonresponsive.<br />

A.4.6.3 If during the tender validity period, the tenderer withdraws his tender or the successful<br />

tenderer fails to accept the contract within 15 calendar days after receiving notice of the<br />

award of contract and fails to submit security deposit, the earnest money shall be<br />

forfeited and the tenderer may be disqualified from tendering for further works with<br />

the Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

A.4.6.4 After the awarding of contract has been finalized, the Earnest Money will be returned to the<br />

respective tenderers, with the exception of the successful tenderer.<br />

A.4.6.5 The successful tenderer’s earnest money will be retained as security after signing the<br />

contract and for making of the contract deposit.<br />

A.4.6.6 No interest will be paid on any tender deposit.<br />

A.4.7 Income Tax Return<br />

A.4.7.1 In case of domestic tenderers, the tender must be accompanied by an Income-Tax return<br />

copy of last three financial years. If a tender is submitted without complying with these<br />

requirements, it is liable to be rejected outright.<br />

A.4.8 Submission of Tenders<br />

30


A.4.8.1 Tenders shall be submitted together with the other documents that form the tender. In the<br />

event of a Contract, the tender and the documents attached there to shall be considered as<br />

forming part of the Contract Documents.<br />

A.4.8.2 Two sets (One Original + One Xerox copy) of tender documents (Vol. I, Part – I and II &<br />

Vol. II, drawings and addendum, if any) duly completed in all respects shall be submitted<br />

as described in notice inviting tender in a sealed envelope so as to reach by at the following<br />

address on or before the date and time as mentioned in tender notice without which the<br />

tender shall be considered non responsive.<br />

Assistant Manager (Project)<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

2 nd floor, <strong>Corporation</strong> Bank Building,<br />

Sardar Patel Bhavan,<br />

Khamasa Gate,<br />

<strong>Ahmedabad</strong> – 380 001<br />

Gujarat (INDIA)<br />

A.4.8.3 The sealed envelopes ‘A’ & ‘B’ shall show on the outside, the name of the tenderer<br />

and his address. In addition, the lower left hand corner of the envelope or other container<br />

should indicate the Contract number if any given by AMC and the tender opening date.<br />

Tenders which are opened before the due date with no indication having been given on the<br />

outside of the envelope or container to indicate that it is a tender liable to be disqualified.<br />

A.4.8.4 The tender shall be considered non-responsive if Technical and Financial Bids<br />

(envelopes ‘A’ & ‘B’) are not sealed in separate envelope. Tenderers shall not be<br />

allowed to fill in or seal their tenders at the AMC Office. Tenderers are requested to<br />

present the tenders well in time before stipulated date and time of receipt; so as to<br />

avoid rush at the closing hours.<br />

A.4.8.5 Envelope ‘A’ of the tender document shall be accompanied by the following documents in<br />

duplicate:<br />

(a) Vol. I of the tender with duly signed.<br />

(b) Tenderer’s programme for the execution of the works.<br />

(c) A chart showing the estimated monthly labour force proposed for the execution of<br />

this contract.<br />

(d) List of plant and machinery in good working order available with the tenderer<br />

which he proposes to deploy on the works.<br />

(e) Details of schedule of <strong>section</strong> A-2, of Vol. I. In case of work completed by tenderer<br />

during last 5 years, he should submit completion certificate from the owner.<br />

(f) A covering letter (in duplicate) stating any other matter in relation to this tender<br />

which the tenderer considers should be drawn to the particular notice of the AMC<br />

or Consulting Engineers if any.<br />

In addition, the original tender shall be accompanied by:<br />

(g) DD for tender fee & DD or Bank Guarantee for EMD as detailed in item A.4.6,<br />

above.<br />

31


(h) In case of domestic contractor, an income-tax return copy of last three financial<br />

years as detailed in item A.4.7, above.<br />

A.4.8.6 Envelope ‘B’ of the Tender Documents shall be accompanied with Volume-II in<br />

duplicate.<br />

A.4.8.7 Erasures and other changes shall be noted over by the initials of the person signing<br />

the tender.<br />

A.4.9 General Performance Data<br />

A.4.9.1 Tenderers shall present the following information along with their tenders in duplicate:<br />

(a) Evidence of financial capacity to execute a contract of this magnitude in terms of<br />

annual turnover and price of biggest job carried out.<br />

(b) The bidders are requested to furnish requisite information as described in Section: A-5<br />

so as to enable the competent authority to decide the technical and financial capability<br />

of the bidder, based on which, the bidder shall be evaluated.<br />

(c) Experience of similar works with names of authorities for which the works were<br />

executed along with completion / performance certificate.<br />

(d) List of current jobs of comparable nature along with starting date and likely completion<br />

dates with their contract values.<br />

(e) The extent of responsibilities carried by Contractors associated with the tenderer.<br />

(f) General detail of tenderers’ organization, management, staff and personnel, Facilities<br />

for design and execution<br />

A.4.9.2 Tenders will not be considered if the above information is not provided or is considered to<br />

be unsatisfactory.<br />

A.4.10 Signing of Tender Document<br />

A.4.10.1 Tenderers are requested to quote the item rates and their total offered amount of the work<br />

and also sign the Schedule of Quantities in Volume–II etc. after making appropriate<br />

inquiries wherever necessary.<br />

A.4.10.2 If the tender is made by an individual, it shall be signed with his full name above his<br />

current address.<br />

A.4.10.3 If the tender is submitted by a proprietary firm, it shall be signed by the proprietor above<br />

his name and the name of his firm with its current address.<br />

A.4.10.4 If the tender is made by a firm in partnership, it shall be signed by all the partners of<br />

the firm above their full names and current addresses, or by a partner holding the<br />

power of attorney for the firm signing the tender in which case a certified copy of the<br />

power of attorney shall accompany the tender. A certified copy of the partnership<br />

deed, current address of the firm and the full name and the current address of all the<br />

partners of the firm shall also accompany the tender.<br />

A.4.10.5 If the tender is made by a limited company or a limited <strong>Corporation</strong>, it shall be signed by a<br />

duly authorized person holding the power of attorney for signing the tender, in which case,<br />

32


a certified copy of the power of attorney shall accompany the tender. Such limited<br />

Company or <strong>Corporation</strong> may be required to furnish satisfactory evidence of its existence<br />

before the contract is awarded.<br />

A.4.10.6 Not Applicable<br />

A.4.10.7 All witnesses and sureties shall be persons of status and probity and their full names,<br />

occupations and addresses shall be stated below their signatures.<br />

A.4.10.8 The tenders from Contractors shall be accompanied by an attested copy of income-tax<br />

return copy of last three financial years.<br />

A.4.10.9 All signatures in the tender documents shall be dated.<br />

A.4.11 Interpretation of Documents<br />

A.4.11.1 Tenderers shall carefully examine the Tender Documents and fully inform themselves as to<br />

all the conditions and matters which may in any way affect the work or the cost thereof.<br />

Should a tenderer find discrepancies in or omission from the specification or other<br />

documents, or should be in doubt as to their meaning, he should at once address a query to<br />

the Additional Chief Engineer (S.O.E &M), AMC. Any resulting interpretation of the<br />

Tender Documents will be issued to all tenderers as an Addendum. Verbal clarification<br />

and/or information given by the <strong>Municipal</strong> Commissioner, AMC shall not be binding on<br />

the AMC.<br />

A.4.12 Errors and Discrepancies in Tenders<br />

A.4.12.1 Should the Schedule of quantities and Rates (Vol. II) submitted with the tender be found to<br />

contain errors, or discrepancies, the owner / engineer will not permit any bidder to change<br />

the substance or price of his bid after the bid opening. In case of discrepancy in the quoted<br />

rate and the corresponding amount the rate quoted in words in all cases shall govern. Also<br />

the bidder will not be permitted to correct or withdraw material deviations or reservations<br />

once bids have been opened.<br />

A.4.13 Modification of Documents<br />

A.4.13.1 Modifications of specifications and extension of the closing date of the tender, if required,<br />

will be made by an Addendum. Copies of each Addendum will be put up on website.<br />

These shall be signed and returned by the tenderers and shall form a part of the tender<br />

document. The tenderer is required to check the AMC website for Addendum if any before<br />

72 hours of tender submission date and time. The tenderer who quotes the tender without<br />

attaching the addendum will be rejected.<br />

A.4.13.2 The tenderer shall not add to or amend the text of any of the documents except in so far as<br />

may be necessary to comply with the Addenda.<br />

A.4.14 Evaluation (Technical Bid & Price Bid) of Tenders<br />

A.4.14.1 For evaluation and comparison of bids, the following factors shall be considered in addition<br />

to the points mentioned in Clause A.4.22.1 of Section : A-4 of Volume-I.<br />

i) The costs of procurement of principal element of the work of similar magnitude<br />

executed earlier.<br />

ii) The time of completion of SITC job.<br />

33


iii) The reliability of the proposed execution of electrical and mechanical work.<br />

iv) Deviations, if any.<br />

v) Technical competence.<br />

vi) Relative quality of previous jobs.<br />

vii) Organization set up.<br />

viii) Financial Capability.<br />

ix) In case of joint venture, financial capacity of each partner.<br />

A.4.15 Policy for tenders under consideration<br />

A.4.15.1 Tenders shall be deemed to be under consideration from the opening of tenders, until such<br />

time as an official announcement of award is made.<br />

A.4.15.2 While tenders are under consideration, tenderers and their representatives, or other<br />

interested parties, are advised to refrain from contacting by any means any AMC personnel<br />

or representatives on matters relative to the tenders under study. The Engineer’s<br />

Representative, if necessary, will obtain clarification of tenders by requesting such<br />

information from any or all the tenderers either in writing or through personal contact, as<br />

may be necessary. The tenderer will not be permitted to change the substance of his tender<br />

after tenders have been opened. This includes any post tender price revision or major<br />

modification as defined in Clause No. A.4.13. Non-compliance with this provision is a<br />

cause for disqualification.<br />

A.4.16 Alternatives<br />

Deleted<br />

A.4.17 Cost of Tendering<br />

The AMC will not defray the expenses incurred by tenderers in tendering and will not be<br />

bound to accept the lowest or any tender.<br />

A.4.18 Award of Contract<br />

A.4.18.1 Notification of award will be made in writing to the successful tenderer.<br />

A.4.18.2 The contract will be awarded to the technically and financially qualified and responsive<br />

tenderer offering the lowest overall evaluated tender or tenders in conformance with<br />

specifications subject to the provisions in Clause No. A.4.14 and A.4.15 i.e. Evaluation of<br />

tenders and policy for tenders under considerations, mentioned earlier.<br />

A.4.18.3 A responsive tender is one which accepts all the terms and conditions of the Tender<br />

Documents without any major modifications. A major modification is one which affects in<br />

any way the price, quality, quantity or completion of works or which limits in any way, any<br />

responsibilities or liabilities of the tenderer or any rights of the AMC, as specified in the<br />

Tender Documents. The AMC may waive any minor informality in a tender which does<br />

not constitute a major modification. However, the failure of successful bidder to pay<br />

‘Security Deposit’ and signing the contract shall constitute sufficient grounds for<br />

annulment of the award of contract and forfeiture of the earnest money deposit, in which<br />

34


case the Owner/Engineer may award the contract to the next lowest evaluated responsive<br />

bidder. In the event of not finding any such bidders, the employer is empowered to call for<br />

new bids.<br />

A.4.18.4 In case, the tender is found technically responsive, tenderer will be intimated accordingly.<br />

Financial bid of only technically qualified tenderer will be opened. Financial bid of the<br />

technically unqualified tenderer will be retained un-opened.<br />

A.4.19 Signing of Contract<br />

A.4.19.1 The successful tenderer shall be required to execute the Contract within 15 days of receipt<br />

of intimation to execute the Contract. If the contractor will not pay security deposit and<br />

will not sign agreement within 15 days after issuing the first letter from the authority of<br />

AMC, his EMD shall be forfeited and such tenderer shall be disqualified for getting further<br />

any work in AMC. Also their registration will be kept in abeyance for three years.<br />

A.4.19.2 The person to sign the contract documents shall be the persons as detailed in Clause No.<br />

A.4.10 i.e. signing of tender documents.<br />

A.4.20 Stamp Duty and Legal Charges<br />

It shall be incumbent on the successful tenderer to pay stamp duty on the contract and legal<br />

charges for preparation of the contract agreement.<br />

A.4.21 Solvency Certificate: Refer <strong>section</strong> A2 “Memorandum of work” for solvency Certificate.<br />

A.4.22 Documents / Information to be submitted along with Volume – I (Technical Bid)<br />

A.4.22.1 The following documents/information must be submitted by the tenderer in duplicate along<br />

with Volume-I of the tender.<br />

i. Details of the work of similar type and magnitude carried out by the tenderer including<br />

names of the authorities for which works were executed, as per Schedule-A-2.1 to A-<br />

2.8 of Section A – (Volume-I) along with certificate of timely completion of work by<br />

owner.<br />

ii. Demand draft/ Bank Guarantee as earnest money as detailed in Clause No. A.4.6 of<br />

Instructions to Tenderers – (Volume-I).<br />

iii. An Income-tax return copy of last three financial years as detailed in Clause No. A.4.7,<br />

of Instructions to tenderers - (Volume-I).<br />

iv. If the tender is not submitted by an individual, the necessary certified copy of the power<br />

of attorney, a certified copy of the partnership deed and other relevant information in<br />

this connection as detailed in Clauses A.4.10.3 to A.4.10.7 of Instruction to Tenders –<br />

(Volume-I).<br />

v. General details of tenderer’s organization, facilities for design and execution.<br />

vi. Data asked wide blank data sheet shall be furnished in the given formats in the tender.<br />

A.4.22.2 Bidders not submitting the above mentioned information along with their tenders as per<br />

clause No. A.4.22.1 above, the tender will not be considered for evaluation and the bid will<br />

be outright rejected.<br />

35


A.4.23 Forms<br />

BANK GUARANTEE<br />

for<br />

EARNEST MONEY DEPOSIT / SECURITY DEPOSIT / PERFORMANCE BANK<br />

GUARANTEE<br />

In consideration of the <strong>Municipal</strong> <strong>Corporation</strong> of the city of <strong>Ahmedabad</strong> (hereinafter to as the<br />

corporation) having agreed to exempt ______________________________________ (hereinafter<br />

referred to as "the said Contract") from the demand of earnest money / security deposit in cash for the<br />

due fulfillment of the terms and conditions of the agreement made between the corporation and the<br />

said BIDDER on ____________________________________________ for<br />

________________________________________________________________________ (hereinafter<br />

referred to us "the said agreement") on production of Bank Guarantee for Rs._________________<br />

Rupees ____________________________________________ only.<br />

We ___________________________________________________________________ Bank<br />

(hereinafter referred to as "Bank") do hereby undertake to pay to the <strong>Corporation</strong> as a amount not<br />

exceeding Rs. _____________________________ Rupees<br />

_______________________________________________________________________ only on the<br />

demand from <strong>Corporation</strong>.<br />

Any such demand on the bank shall be conclusive as regards as amount due and payable by the bank<br />

under this guarantee. However, liability of the bank under this agreement shall restricted to as amount<br />

not exceeding Rs. ___________________________ Rupees<br />

______________________________________________________________________ only.<br />

We the bank further agree that the guarantee herein contain shall remain in full force and effect during<br />

the period that would be mentioned in the bid and that it shall continue to be enforceable till all the<br />

dues of the <strong>Corporation</strong> under or virtue of the said agreement have been paid and its claim satisfied or<br />

discharged and till a certificate to the effect has been received by the bank from the <strong>Corporation</strong>.<br />

However, unless the demand of claim under the guarantee is made to the bank in writing on or before<br />

the _____________________ (specify the date) the bank shall be discharged from all liabilities under<br />

this guarantee.<br />

36


With the bank further with <strong>Corporation</strong> shall have fullest liberty, without the concert of the bank<br />

without effecting in any manner it obligations herein under to vary any of the terms and conditions of<br />

the said agreement or extend time for validity by the said bid from time to time or to postpone for any<br />

time or from time to time any of the powers exercisable by the <strong>Corporation</strong> against the said Contractor<br />

and to forebear to enforced any of the terms and conditions relating to the said agreement and the bank<br />

shall not be relieved from liability by reason of any such variation, or extension granted to the<br />

contractor for any forbearance, at Contractor or by any such matter or thing whatsoever which under<br />

the law relating to sureties would, but this provision, have the effect of so relieving the Bank.<br />

We ________________________________________________________________ the bank<br />

undertake not to revoke the Guarantee during currency except with the previous concert of the<br />

<strong>Corporation</strong> in writing.<br />

Dated the ________________________ day of ________________________ of 20____.<br />

For ____________________________________ Bank<br />

Principal (Contractor)<br />

Surety (Bank)<br />

Contract No. and date of Contract<br />

37


PERFORMANCE BOND<br />

(The date of this bond must not be prior to the date of the instrument in connection with which it to<br />

given)<br />

Principal (Contractor)<br />

Surety (Bank)<br />

Sub of bond (Express in words and figures)<br />

Contract No. and date of Contract<br />

38


KNOW ALL MEN BY THESE PRESENTS, THAT WE,<br />

THE PRINCIPALS AND SURETY<br />

Above mentioned are held and firmly bound unto the <strong>Municipal</strong> Commissioner , AMC, owner of<br />

the work of “SITC of Hydraulically operated Grit Mechanism with related Electrical work at E,<br />

E3, W & W5 Sites with One year of Operation & Maintenance Period for Sabarmati River<br />

Front Development <strong>Corporation</strong> Ltd. of Amdavad <strong>Municipal</strong> <strong>Corporation</strong>”, hereinafter called<br />

the "employer" in the amount stated for payment of which sum, well and truly to be made, we<br />

bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly<br />

by these presents subject to the provisions of which the aforesaid contract on demand and<br />

without demand on a claim being made by the "employer".<br />

THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the principals herein after<br />

called contractor viz. have entered into a contract with the Employer numbered and dates as shown<br />

above and hereto attached for the execution of work.<br />

NOW THEREFORE, if the principal shall well and truly perform and fulfill all the under takings,<br />

covenants, terms, conditions and agreements, of said contract during the original terms of the said<br />

contract and any extensions thereof, they may be granted by the employer with or without notice to the<br />

surety and during the lift of any guarantee required under the contract and shall also well and truly<br />

perform, and fulfill all the undertakings, contract, terms, conditions and agreements of any and all duly<br />

authorized modifications of said contract that may hereafter be made, notice of which modifications to<br />

the surety being hereby waived or shall pay over, make good and reimburse to the employer all losses<br />

and damages which the employer may sustain by reason of failure or default on the part of said<br />

principal so to do.<br />

We _____________________________________________ further agree that guarantee herein<br />

contained shall remain in full force and affect during the period that would be taken for the validity<br />

_______________________ of the said contract and that it shall continue to be enforceable till all the<br />

dues of the employer under or by virtue of the contract have been fully paid and its claims satisfied of<br />

discharged or till the Employer certifies that the terms and conditions of the contract have been fully<br />

and properly carried out by the said contractor and accordingly discharges the guarantee. Unless a<br />

demand or claim under this guarantee is made on us in writing on or before the<br />

___________________________________________<br />

_____________________________________________ we shall be discharged from all liability under<br />

this guarantee thereafter.<br />

IN WITNESS WHEREOF the above bounded parties have executed this instrument under their<br />

several on the date indicated above the name and corporate seal of each corporate party being hereto<br />

affixed and these presents duly signed by its undersigned representative, pursuant to authority of its<br />

governing body.<br />

In the presence of witness Individual Principal<br />

1. as to (Seal)<br />

2. as to (Seal)<br />

3. as to (Seal)<br />

4. as to (Seal)<br />

39


Affix<br />

By Corporate Seal<br />

Attested Corporate Surety<br />

Business Address<br />

Affix<br />

By Corporate Seal<br />

Title<br />

For and on behalf of the employer<br />

40


SECTION: A-5:<br />

QUALIFICATION CRITERIA<br />

FOR TENDERER<br />

41


A – 5 : QUALIFICATION CRITERIA FOR TENDERERS<br />

A.5.1 Eligibility Criteria<br />

A.5.1.1 Qualification will be based on meeting all the following minimum pass/fail criteria<br />

regarding the bidder’s general and particular experience, personnel and equipment<br />

capabilities, and financial position, as demonstrated by the bidder’s responses in the forms<br />

attached (specific requirements for joint ventures are given under Para A.5.9 below). The<br />

bidder should be original manufacturer of Grit Mechanism / Authorized dealer of<br />

Grit Mechanism of approved make refer to the technical specifications, Make of<br />

Material). The AMC reserves the right to waive minor deviations, if they do not materially<br />

affect the capability of a bidder to perform the contract. Sub-contractor’s experience and<br />

resources shall not be taken into account in determining the bidder’s compliance with the<br />

qualifying criteria.<br />

A.5.2 General Experience<br />

A.5.2.1 The bidder shall meet the following minimum criteria:<br />

(1) The bidders shall have financial capability and having annual average turnover<br />

not less than value of Rs. 20, 00,000/- during last 3 years.<br />

(2) Execution of atleast one similar SITC work of an Amount of Rs.7,50,000<br />

Hydraulic type Grit Mechanism (Grab Bucket type) Mechanism with related<br />

electrical & civil work during last five years and in satisfactory operation for at<br />

least one year.<br />

A.5.3 Financial Position<br />

A.5.3.1 The audited balance sheets for the last three financial years should be submitted and must<br />

demonstrate the soundness of the bidder’s financial position, showing long-term<br />

profitability. Where necessary, the Employer will make enquiries with the bidder’s<br />

bankers.<br />

A.5.4 Litigation History<br />

A.5.4.1 The bidder should provide accurate information on any litigation history or arbitration<br />

resulting from contracts completed or under execution by him over the last ten years.<br />

This should also include such cases, which are in process/progress. A consistent history of<br />

awards against the bidder or any partner of a joint venture may result in failure of the bid.<br />

In case the bidder has not provided such information and has come to the notice of the<br />

Authority, the tender will be rejected at whatsoever stage and in such case all the losses<br />

that will arise out of this issue will be recovered from the tenderer/contractor and he<br />

will not have any defence for the same.<br />

A.5.5 Solvency Certificate : Not Applicable<br />

A.5.5.1 Solvency Certificate for all bidder of current financial year from the collector of the district<br />

within which he resides or a Banker’s Certificate. Minimum amount of solvency certificate<br />

shall be of an amount up to 20% of the tendered cost plus the amount of Works on hand still<br />

to be executed. This certificate shall be enclosed with Envelope “A”. If he fails to produce<br />

such certificate his tender will not be considered.<br />

42


A.5.5.2 Solvency certificate for successful bidder: It is mandatory for successful tenderer to submit<br />

the fresh solvency certificate (of an amount up to 20% of the tendered cost plus the amount<br />

of Works on hand still to be executed) of his financial stability from the collector of the<br />

district within which he resides or a Banker’s Certificate for the current financial year.<br />

A.5.6 Bidding Capacity: Not Applicable<br />

Even though the bidders meet the above criteria, they are subject to be rejected, if they<br />

have:<br />

• Made misleading or false representation in the form, statements and attachments<br />

submitted, false or hiding the value of work on hand, and / or<br />

• Record of poor performance such as abandoning the work, not properly completing<br />

the contract, inordinate delays in completion, litigation history, or financial failures<br />

etc.<br />

A.5.7 Personnel<br />

A.5.7.1 The bidder shall furnish the organization chart<br />

A.5.8 Equipment<br />

A.5.8.1 The Bidder should have own, or have assured access to (through hire, lease, purchase<br />

agreement, availability of manufacturing capacity or other means), for the following key<br />

items of equipment in full working order, and must demonstrate that, based on known<br />

commitments, they will be available for use in the proposed contract. The Bidder may also<br />

list alternative equipment which he would propose for the Contract, together with an<br />

explanation of the proposal.<br />

A.5.9 Joint Ventures – Not Applicable<br />

43


SECTION: B<br />

B-1: SPECIAL INSTRUCTIONS TO TENDERERS<br />

B-2: GENERAL CONDITIONS OF CONTRACT<br />

B-3: SCHEDULE - 'B'<br />

B-4: GENERAL INSTRUCTIONS<br />

B-5: ANNEXURES<br />

B-6: SCHEDULES<br />

44


Sr.<br />

No.<br />

CONTENTS<br />

Description Page No.<br />

B.1 Special instructions to tenderers 54<br />

B.1.1 Special instructions to persons tendering 55<br />

B.1.2 Additional Instructions to Persons Tendering 57<br />

B.1.3 Payment 57<br />

B.1.4 Declaration Form 58<br />

B.1.5 General Rules and Directions for the Guidance of Tenderers 58<br />

B.1.6 Tender for works 61<br />

B.2 General Conditions of Contract<br />

B.2.1 Clause – 1 63<br />

B.2.2 Clause – 2 63<br />

B.2.3 Clause – 3 64<br />

B.2.4 Clause – 4 64<br />

B.2.5 Clause – 5 65<br />

B.2.6 Clause – 6 65<br />

B.2.7 Clause – 7 65<br />

B.2.8 Clause – 8 66<br />

B.2.9 Clause – 9 66<br />

B.2.10 Clause – 10 66<br />

B.2.11 Clause – 11 67<br />

B.2.12 Clause – 12 67<br />

B.2.13 Clause – 13 68<br />

B.2.14 Clause – 14 69<br />

B.2.15 Clause – 15 69<br />

B.2.16 Clause – 16 70<br />

B.2.17 Clause – 17 70<br />

B.2.18 Clause – 18 71<br />

B.2.19 Clause – 19 72<br />

B.2.20 Clause – 20 72<br />

B.2.21 Clause – 21 72<br />

B.2.22 Clause – 22 73<br />

B.2.23 Clause – 23 73<br />

B.2.24 Clause – 24 73<br />

45


Sr.<br />

No.<br />

Description Page No.<br />

B.2.25 Clause – 25 73<br />

B.2.26 Clause – 26 73<br />

B.2.27 Clause – 27 74<br />

B.2.28 Clause – 28 74<br />

B.2.29 Clause – 29 74<br />

B.2.30 Clause – 30 74<br />

B.2.31 Clause – 31 75<br />

B.2.32 Clause – 32 75<br />

B.2.33 Clause – 33 76<br />

B.2.34 Clause – 34 76<br />

B.2.35 Clause – 35 76<br />

B.2.36 Clause – 36 76<br />

B.2.37 Clause – 37 76<br />

B.2.38 Clause – 38 77<br />

B.2.39 Clause – 39 77<br />

B.2.40 Clause – 40 77<br />

B.2.41 Clause – 41 77<br />

B.2.42 Clause – 42 77<br />

B.2.43 Clause – 43 77<br />

B.2.44 Clause – 44 78<br />

B.2.45 Clause – 45 78<br />

B.2.46 Clause – 46 78<br />

B.2.47 Clause – 47 79<br />

B.2.48 Clause – 48 79<br />

B.2.49 Clause – 49 79<br />

B.2.50 Clause – 50 79<br />

B.2.51 Clause – 51 79<br />

B.2.52 Clause – 52 79<br />

B.2.53 Clause – 53 79<br />

B.2.54 Clause – 54 80<br />

B.2.55 Clause – 55 80<br />

B.2.56 Clause – 56 80<br />

B.2.57 Clause – 57 83<br />

B.2.58 Clause – 58 83<br />

B.2.59 Clause – 59 83<br />

46


Sr.<br />

No.<br />

Description Page No.<br />

B.2.60 Clause – 60 83<br />

B.2.61 Clause – 61 83<br />

B.2.62 Clause – 62 83<br />

B.2.63 Clause – 63 84<br />

B.2.64 Clause – 64 84<br />

B.2.65 Clause – 65 84<br />

B.2.66 Clause – 66 85<br />

B.2.67 Clause – 67 85<br />

B.2.68 Clause – 68 85<br />

B.2.69 Clause – 69 85<br />

B.2.70 Clause – 70 85<br />

B.2.71 Clause – 71 85<br />

B.2.72 Clause – 72 86<br />

B.2.73 Clause – 73 87<br />

B.2.74 Clause – 74 87<br />

B.2.75 Clause – 75 87<br />

B.2.76 Clause – 76 87<br />

B.2.77 Clause – 77 87<br />

B.2.78 Clause – 78 87<br />

Annexure – 1 88<br />

B.3 Schedules<br />

Schedules – A 90<br />

Schedules – B 91<br />

B.4 General instructions 93<br />

B.5 Annexures<br />

B.5.A Rules for grant of advance against machinery etc. (Deleted) 96<br />

B.5.B Rules for grant of mobilization advance (Deleted) 97<br />

B.5.C Cause for Arbitration (Deleted) 98<br />

B.5.D Price escalation (Deleted) 99<br />

B.5.E Liquidated damages 100<br />

B.5.F Star Rate (Deleted) 101<br />

B.6 Schedules<br />

Schedules 103<br />

47


SECTION: B-1<br />

SPECIAL INSTRUCTIONS TO TENDERERS<br />

48


SECTION – B: GENERAL CONDITIONS OF CONTRACT<br />

B – 1: SPECIAL INSTRUCTIONS TO TENDERERS (FORM B – 2)<br />

AMDAVAD MUNICIPAL CORPORATION<br />

Item Rate Tender and Contract for Mechanical & Electrical Work<br />

Name of work: SITC of Hydraulically operated Grit Mechanism with related Electrical work at<br />

E, E3, W & W5 Sites with One year of Operation & Maintenance Period for<br />

Sabarmati River Front Development <strong>Corporation</strong> Ltd. of Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong><br />

Last date of acceptance of tender: 30/08/2011 up to 14.00 Hours.<br />

Additional Chief Eng<br />

49


B.1.1 SPECIAL INSTRUCTIONS TO PERSONS TENDERING<br />

Item Rate Tenders are invited for and on behalf of <strong>Municipal</strong> Commissioner for SITC of<br />

Hydraulically operated Grit Mechanism with related Electrical work at E, E3, W & W5<br />

Sites with One year of Operation & Maintenance Period for Sabarmati River Front<br />

Development <strong>Corporation</strong> Ltd. of Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

B.1.1.1 The works are required to be completed within specified time as mentioned in <strong>section</strong> A2<br />

of Volume-I as per the terms of the contract conditions. The contractor shall have to fill up<br />

the rate carefully & genuinely. He should properly evaluate the item & fill up the rate of<br />

each item. He should not be allowed to load rate of any item irrelevantly. As being an item<br />

rate tender, the Client shall have right to execute the full or part of the tender.<br />

B.1.1.2 Only Grit Mechanism Manufacturers / Authorised dealer of Grit Mechanism of approved<br />

make as specified in the tender (refer technical specification, Make of Material) are eligible<br />

to purchase the tender. Not more than one tender shall be submitted by a Contractor.<br />

B.1.1.3 A tenderer shall produce income-tax return copy along with tender documents.<br />

B.1.1.4 Tenderers are advised to visit the site sufficiently in advance of the date fixed for<br />

submission of the tender. A tenderer shall be deemed to have full knowledge of all the<br />

relevant documents, samples, site etc., whether he inspects them or not.<br />

B.1.1.5 Submission of a tender by a tenderer implies that he has read this notice and all other<br />

contract documents and has made himself aware of the scope and specification of the work<br />

to be done and of conditions and rates at which stores, tools and plant etc., will be issued to<br />

him by Government and local conditions and other factors bearing on the execution of the<br />

works.<br />

B.1.1.6 A tenderer should quote in figures of each item, in figures as well as in words the rate of<br />

sub total of each item, total and grand total. The amount for each item should be worked<br />

out and the requisite total given. Special care shall be taken to write figures as well as in<br />

words and the amounts in figures only, in case of any calculation error found in the bid of<br />

submission the rate will be found final and accordingly amount will be corrected. The total<br />

amount shall be written both in figures and in words. In case of figures the words Rs.<br />

should be written before the figure of rupees and the words ‘paise’ after the decimal figure<br />

e.g. Rs. 2.15 p. and in case of words the words ‘Rupees’ should proceed and the words<br />

‘paise’ should be written at the end. Unless the rate is in whole rupees and followed by the<br />

word ‘only’, it should invariably be up to two places of decimal.<br />

B.1.1.7 All rates shall be quoted on the tender form.<br />

B.1.1.8 The tender for the works shall not be witnessed by a Contractor or Contractors who<br />

himself/themselves has/have tendered or who may and has/have tendered for the same<br />

works. Failure to observe this condition shall render the tender of the contractor tendering,<br />

as well as of those witnessing the tender, liable to rejection.<br />

B.1.1.9 Tender shall be received by Registered Post A.D. or Speed post or Hand Delivery to the<br />

Asst. Manager (Projects), Engineering Department, Amdavad <strong>Municipal</strong> <strong>Corporation</strong> and<br />

technical bid shall be opened as prescribed date and time as mentioned in <strong>section</strong>-A2<br />

“memorandum of work” in the presence of tenderers who may be present as per the rule of<br />

4 “General Rules and Directions for the Guidance of Contractors” printed in this form. The<br />

bidder shall submit their bid before the last date & time mentioned elsewhere. As the<br />

50


construction work is going on at the AMC office, the bidder shall take caution to submit<br />

their bid well in advance.<br />

B.1.1.10 The tender shall be accompanied by Earnest Money by Demand Draft / Bank Guarantee<br />

issued in favour of <strong>Municipal</strong> Commissioner, <strong>Ahmedabad</strong> by a nationalized bank or from<br />

banks as per the list attached of approved banks of Amdavad <strong>Municipal</strong> <strong>Corporation</strong> the<br />

amount being credited to Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

B.1.1.11 A tenderer shall submit the tender which satisfies each and every condition laid down in<br />

this notice and tender documents, failing which, the tender will be liable to be rejected.<br />

B.1.1.12 The Amdavad <strong>Municipal</strong> <strong>Corporation</strong> does not bind himself to accept the lowest or any<br />

tender or to give any reasons for his decision.<br />

B.1.1.13 This notice of tender shall form part of the contract documents.<br />

For and on behalf of Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Date……….. Signature…………..<br />

Designation…………….<br />

51


B.1.2 ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING<br />

B.1.2.1. Competency of Tenderer –<br />

No contract will be awarded except to responsible bidders capable of performing the class<br />

of work contemplated. Before the award of the contract, any bidder may be required to<br />

show that he has the necessary facilities, experience, ability and financial resources to<br />

perform the work in satisfactory manner within the time stipulated. Contractor may be<br />

required to furnish the corporation with the statement as to their experience and their<br />

financial status.<br />

B.1.2.2. Tenderer will be deemed to have inspected the site and to have satisfied himself as to the<br />

nature of all works, all existing roads, water-way and other means of communication and<br />

access to and from the site and work and the building that may be required for temporary<br />

purpose in connection with the construction, completion and maintenance of the works and<br />

must make his own enquiries as to work, yard sites and depot, and dumps and as to<br />

acquisition of such additional sites and areas as may be necessary for temporary purpose<br />

for constructing, completing and maintaining the works.<br />

B.1.2.3 The tenders will be received under “Registered Post” namely receiving of tenders by Speed<br />

post / in persons, should be adopted under the circumstances.<br />

B.1.3 Payment -<br />

(i) Late tenders (i.e. tender received after the specified time of opening), delayed tenders<br />

(i.e. tenders received before the time of opening but after due date and time of receipt<br />

of tenders) and post tender offers shall not be opened and considered at all.<br />

(ii) The tenders received (by registered post) after the time and the date specified in the<br />

tender notice shall not be received by the concerned office from the postmen, for<br />

which, date and time may be recorded on the cover of the tender as to when tender<br />

was refused by the <strong>Municipal</strong> Commissioner or the Administrative Head or any other<br />

person in charge.<br />

(iii) Necessary records should be maintained for refusal of such tenders in the registers for<br />

receiving tenders and should be initialed by the <strong>Municipal</strong> Commissioner or the<br />

Administrative Head or any other person in charge.<br />

The tenderer must understand clearly that the rates quoted are for completed works and<br />

include all costs due to labour, scaffolding plant, supervision, service work, power,<br />

royalties and octroi etc. and to include all extras to cover the cost of night work if and when<br />

required and no claim for additional payment beyond the price or rates quoted will be<br />

entertained and the tenderers will not be entitled subsequently to make any claim on the<br />

ground of misrepresentation or on the ground that he was supplied with information given<br />

by any person (whether the member is the employee of Amdavad <strong>Municipal</strong> <strong>Corporation</strong> or<br />

not). Any failure on his part to obtain all necessary information for the purpose of making<br />

his tender and filling the several prices and rates therein shall not relieve him from any<br />

risks or liabilities arising out of or consequent upon the submission of the tender.<br />

B.1.3.1 Tender Forms –<br />

Every ‘blank’ in the form of tender and in the schedule must be filled up by the tenderer<br />

and must return the document sent herewith.<br />

52


Erasures -<br />

Persons tendering are informed that no erasures or alterations by them in the text of the<br />

document sent herewith will be allowed and any such erasures or alterations will be disregard.<br />

If there is any error in writing, no overwriting should be done, the wrong word or a figure<br />

should be struck out and the correct one written above or near it in unambiguous way. Each<br />

correction should be initialed.<br />

Contractors to Please Read This Carefully:<br />

(i) The item rate in Schedule ‘B’ or Schedule of Quantities & Rates must be given in<br />

words and figures.<br />

(ii) If the tender is taken in favour of the company, a power of attorney in favour of the<br />

person who may have signed the tender for the company must accompany the tender.<br />

(iii) Solvency certificate of a Bank or a Revenue Officer of an amount upto 20% of the<br />

tendered cost plus the amount of works on hand still to be executed will have to be<br />

produced by the Contractor.<br />

(iv) Receipt for earnest money value mentioned in <strong>section</strong>-A must accompany the tender.<br />

The EMD will be accepted in the form of Demand Draft / Bank Guarantee from<br />

Approved Bank by AMC for validity period as specified in Memorandum of Works.<br />

If the contractor do not turn up to pay the Security Deposit and execute contract<br />

agreement within specified (or extended) time after intimation to him, the earnest<br />

money paid for this work will be forfeited and his registration will be held in abeyance<br />

for three years.<br />

B.1.4 DECLARATION FORM<br />

B.1.4.1 I/ We hereby declare that I / We have visited the site and fully acquainted myself /<br />

ourselves with the local situations regarding materials, labour and other factors pertaining<br />

to the work before submitting this tender.<br />

B.1.4.2 I / We hereby declare that I / We carefully studied the conditions of contract, specifications<br />

and other documents of this work and agree to execute the same accordingly.<br />

Declaration Certificate<br />

B.1.4.3 I / We hereby declare that my / our near relatives are not working in Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong> as an Concerned <strong>Municipal</strong> Commissioner, Additional City Engineer, City<br />

Engineer, Assistant City Engineer, Assistant Engineer, Additional Assistant Engineer,<br />

Supervisor, Overseer, Divisional Accountant, Store Keeper, Manager as on today.<br />

B.1.5 GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS<br />

B.1.5.1 Where the works are proposed to be executed according to the specifications recommended<br />

by a contractor and approved by a competent authority on behalf of the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong>, such specifications with designs and drawings shall form part of<br />

the accepted tender.<br />

B.1.5.2 In the event of the tender being submitted by a firm, it must be signed separately by each<br />

partner thereof or in event of the absence of any partner it shall be signed on his behalf by<br />

53


person holding a power of attorney authorizing him to do so. Details of partners shall be<br />

furnished along with the copy of partnership deed.<br />

B.1.5.3 Receipts for payment made on account of any work, when executed by a firm, shall also be<br />

signed by all the partners except where the contractors are described in their tender as a<br />

firm in which case the receipts shall be signed in the name of the firm by one of the<br />

partners or by some other person having authority to give effectual receipts for the firm.<br />

B.1.5.4 Any person who submits a tender shall fill up the usual printed form at what cost he is<br />

willing to undertake the work. Tender which proposes any alternation in works specified in<br />

the said form of invitation to tender or in the time allowed for carrying out the work or<br />

which contain any other condition of any sort, will be liable to rejection. No single tender<br />

shall include more than one work but contractors who wish to tender for two or more works<br />

shall submit a separate tender for each. Tender shall have the name and the number of the<br />

work (to which they refer) written outside the envelope.<br />

OR<br />

The following rule shall apply to the works having estimated cost of Rs. 100 Lacs (Rupees one<br />

hundred Lacs) and above.<br />

(a) It is not desirable to make any alteration in the work specified in the said tender form of<br />

invitation to tender or in the time allowed for carrying out the work or any other<br />

conditions of any sort. However if it is felt necessary by the tenderer to have any<br />

conditions, he shall have to submit tender documents duly super scribed on the sealed<br />

cover. No such tender shall include more than one work but contractors who wish to<br />

tender for two or more works shall submit a separate tender for each.<br />

(b) If any price bid contains any conditions the same shall have to be rejected outright.<br />

Document of payment of earnest money or exemption certificate should accompany the<br />

Tender Document.<br />

(c) The sealed tender document cover duly completed as above should be submitted<br />

simultaneously by the “Registered post Acknowledgement Due”. The bids shall contain<br />

adequate cross-reference wherever necessary to ensure clear and proper correction of<br />

them with single bid without any ambiguity whatsoever.<br />

(d) The bidders shall clearly indicate deviations (s) from specifications or the tender<br />

conditions very explicitly in the appropriate <strong>section</strong> and submit a copy of the same. It<br />

should be very clearly understood by all tenderers that it is a two bid system should be<br />

considered technical and financial matters.<br />

(e) The technical bid will be opened as mentioned in memorandum of work of A2 <strong>section</strong><br />

of technical bid in the presence of those bidders who remain present.<br />

(f) The conditions specified in bid should invariably be accompanied by proper financial<br />

evaluation with mode of calculation specifying assumptions, quantities, percentage and<br />

ceiling amounts for each condition and shall also accompany the information in the<br />

form stating (a) Sr. No. (b) Description of the condition (c) financial evaluation (vide R<br />

& B D.G.R. No. / TNC / 7777 / 281-C dated 30-09-92 (d) ceiling amount to be added in<br />

price bid, on case condition is not accepted.<br />

54


(g) Ceiling amounts shall be binding on the contractors and are liable to be added to the<br />

tender amount.<br />

(h) It is necessary that the contractor or his authorized representative remains present at the<br />

time of opening of bid as specified in (e) above, so that wanting details and<br />

clarifications in respect of conditions can be furnished by him or conditions withdrawn<br />

on the spot by him. If the bid is incomplete in respect of any of the details referred to in<br />

sub-clauses 2 (f) above, and the contractor does not furnish the wanting details as<br />

required above on the spot in the presence of other bidders after opening the bid, the<br />

tender would be liable to rejection.<br />

B.1.5.5 The <strong>Municipal</strong> Commissioner or his duly authorized assistant shall open tenders in the<br />

presence of any intending contractors who have submitted tenders or their representatives<br />

who may be present at the time and he will enter the amounts of the several tenders in a<br />

comparative statement in a suitable form. In the event of a tender being accepted, the<br />

contractor shall, thereupon, for the purpose of identification, sign copies of the<br />

specifications and other documents mentioned in this tender. In the event of tender being<br />

rejected, the Divisional Officer shall authorize the Treasury Officer concerned to refund the<br />

amount of the earnest money deposited, to the contractor making the tender on his giving a<br />

receipt for the return of the money.<br />

B.1.5.6 The Officer competent to dispose of the tenders shall have the right of rejecting all or any<br />

of the tenders.<br />

B.1.5.7 No receipt for any payment alleged to have been made by a contractor in regard to any<br />

matter relating to this tender of the contract shall be valid and binding on <strong>Corporation</strong><br />

unless it is signed by the Concerned Additional Chief Engineer (STP Department).<br />

B.1.5.8 All works shall be measured net by standard measure and according to the rules and<br />

customs of the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> without reference to any local custom.<br />

B.1.5.9 Every contractor shall, unless exempted in writing by the Concerned Engineer, produce<br />

along with his tender a solvency certificate of his financial ability from the collector of the<br />

District within which he resides or a Banker’s certificate. If he fails to produce such a<br />

certificate his tender will not be considered.<br />

B.1.5.10 All Corrections and additions or pasted slips should be initialed.<br />

B.1.5.11 The measurements of work will be taken according to the usual method in use in the<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> and no proposals to adopt alternative methods will be<br />

accepted. The Concerned Additional Chief Engineer’s decision as to what is ‘the usual<br />

method in use in the Amdavad <strong>Municipal</strong> <strong>Corporation</strong>’ will be final.<br />

B.1.5.12 The Insurance Company’s bond will not be accepted against the security deposit.<br />

B.1.5.13 The contractor shall have to attach to his tender Income Tax Return copy of last three<br />

financial years.<br />

B.1.5.14 The Contractor will have to construct a shed for storing controlled and valuable materials<br />

issued to him under Schedule ‘A’ of the agreement at work-site having double locking<br />

arrangement. The materials will then be taken for use in the presence of the AMC person.<br />

No materials will be allowed to be removed from the site of work.<br />

55


B.1.5.15 No foreign exchange will be released by the <strong>Corporation</strong> for the purpose of plant and<br />

machinery required for the execution of the work contracted for.<br />

B.1.5.16 Controlled materials (Essentiality Certificate)<br />

(i) As regards controlled materials, the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> will help to<br />

arrange for the permit as far as possible and help the Contractor in securing the same.<br />

All incidental charges met with in procuring these materials shall be borne by the<br />

Contractor himself. Though the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> will help to arrange<br />

for the permit as far as possible and help the Contractor in obtaining the materials, it<br />

shall not accept any responsibility for any delay or loss on account of delay caused to<br />

the Contractor while obtaining the same.<br />

(ii) The contractor shall submit to the Concerned Additional Chief Engineer (STP<br />

Department) on close of every calendar month, the monthly returns in the prescribed<br />

forms as to the receipts and actual use of the controlled materials during the month.<br />

(iii) The contractor shall permit the Concerned <strong>Municipal</strong> Commissioner or his<br />

representatives to inspect the stock of the controlled materials stored by him at any<br />

time whenever the <strong>Municipal</strong> Commissioner of his representative(s) so desires (s).<br />

B.1.5.17 The tender for the work shall remain open for a period of 120 days from the date of<br />

opening of bid for this work and that the tenderer shall not be allowed to withdraw or<br />

modify the offer on his own after handing over the tender to the postal authorities for<br />

dispatch during this period. If any tenderer withdraws or makes any modifications, or<br />

additions in the terms and conditions of this tender not acceptable to the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> then the <strong>Corporation</strong> shall, without prejudice to any right remedy,<br />

be at liberty to forfeit in full the said earnest money absolutely. In this connection G. R. R.<br />

and BD No. TNC-IIB-22-(10)-C dated 14-8-90 should be referred to.<br />

B.1.5.18 The contractor shall employ only such labourer who shall produce a valid certificate of<br />

having been vaccinated against small pox within a period of last thee years.<br />

B.1.5.19 Immediately after issue of the work order for the works of roads, bridges and buildings the<br />

contract shall display the bored showing brief details of the specifications on the site of<br />

work (R & B D Gr. No. TNC-1090 – 24- 3 dated 18-11-1991.<br />

B.1.5.20 The buildings under the contract will not be occupied by the contractor for use of the<br />

labourers, staff or for any other purpose. In case of breach of this condition market rent<br />

will be recovered for the area unauthorized occupied.<br />

B.1.6 TENDER FOR WORKS<br />

I/We hereby tender for the execution for the Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

(hereinbefore and hereinafter referred to as <strong>Corporation</strong>) of the work specified in the under<br />

written memorandum within the time specified in such memorandum at tendered<br />

percentages entered in Schedule ‘B’ (memorandum showing item of works to be carried<br />

out) and in accordance in all respects with the specifications, designs, drawings and<br />

instructions in writing referred to in this tender.<br />

56


SECTION: B-2<br />

GENERAL CONDITIONS OF CONTRACT<br />

57


B.2.1 Clause - 1 : Security Deposit<br />

B – 2 : GENERAL CONDITIONS OF CONTRACT<br />

TERMS & CONDITIONS OF CONTRACT<br />

The person / persons whose tender may be accepted (here-in-after called the ‘Contractor’<br />

which expression shall unless excluded by or repugnant to the context include his heirs,<br />

executors, administrators and assignees) shall (within one day for a contract of Rs. 1,000 or<br />

less or 2 days for a contract of more than Rs. 1,000 but less than Rs. 2,000 and so on up to<br />

a limit of ten days which can be extended up to 15 days by the Concerned Dy. <strong>Municipal</strong><br />

Commissioner, if he thinks it fit to do so for a contract of Rs. 10,000 or more of the receipt<br />

by him of the notification of the acceptance of his tender), deposit with the <strong>Municipal</strong><br />

Commissioner in cash or <strong>Corporation</strong> securities endorsed to the <strong>Municipal</strong> Commissioner.<br />

Provided always that in the event of the Contractor depositing a lump sum by way of<br />

security deposit as contemplated above, then and in such case, if the sum so deposited shall<br />

not amount to 5 percent of the total contract cost of the work, it shall be lawful for<br />

<strong>Municipal</strong> <strong>Corporation</strong> at the time of making any payment to the Contractor for work done<br />

under the contract to make up the full amount of 5 percent by deducting a sufficient sum<br />

from every such payment as last aforesaid until the full amount of the security deposit is<br />

made up. All compensation or other sums of money payable by the Contractor to<br />

<strong>Municipal</strong> <strong>Corporation</strong> under the terms of this contract may be deducted from, or paid by<br />

the sale of a sufficient part of his security deposit or from the interest arising there from, or<br />

any sums which may be due or may become due by <strong>Municipal</strong> <strong>Corporation</strong> to the<br />

Contractor on any account whatsoever, and in the event of his security deposit being<br />

reduced by reason of any such deduction or sale as aforesaid, the Contractor shall, within<br />

ten days thereafter, make good in cash or Government securities endorsed as aforesaid any<br />

sum or sums which may have been deducted from or realized by sale of his security deposit<br />

or any part thereof. The security deposit referred to, when paid in cash may, at the cost of<br />

the depositor, be converted into Interest Bearing Securities provided the depositor has<br />

expressly desired this in writing.<br />

If the amount of the security deposit to be paid in a lump within a period specified above is<br />

not paid, the tender / contract already accepted shall be considered as canceled and legal<br />

steps shall be taken against the contractor for recovery of the amounts. Security Deposit<br />

shall be converted into the Performance Guarantee Bond Valid for the entire defect liability<br />

period (60 months) to be executed by the contractor after completion of the work and<br />

certificate of completion issued by Engineer that effect after deducting there from the<br />

amount of expenses if any due to <strong>Municipal</strong> <strong>Corporation</strong> under this agreement.<br />

B.2.2 Clause - 2 : Liquidated damages for delay<br />

(i) If the Contractor fails to complete the work under contract by the stipulated date, he<br />

shall pay liquidated damages of 0.2 percentage of the balance work value per day<br />

from the date of delaying the said work up to the date of completion and handing<br />

over to the Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

(ii) However also if the Contractor fails to complete any part of the work as designated<br />

in schedule (c) by the time indicated against such parts, he shall pay Liquidated<br />

damages per day from the date of delaying the said part of the work up to the date<br />

of completion of the said designated part at the rates shown in the said schedule of<br />

the contract value of such part for such failure till the said designated part is<br />

completed.<br />

58


(iii) The aggregate maximum of liquidated damages payable under clause No. 2 shall<br />

not exceed Rs. 0.2 percentage of balance work value per day and shall be subject to<br />

the maximum amount of ten percentage of the quoted amount put to tender.<br />

(iv) Delays for requiring payment of ten percentage liquidated damages of the amount<br />

put to tender for performance shall be sufficient causes for termination of contract<br />

and forfeiture of security deposit including amount of performance bond in respect<br />

of works estimated to cost more than Rs. 15 lacs of performance and contractor<br />

will be blacklisted and registration of the contractor shall also be kept in<br />

abeyance for one year from the date as fixed on all cases.<br />

B.2.3 Clause - 3: Default by Contractor: (GR dt. 15-10-91)<br />

If the Contractor shall neglect or fails to proceed with the work with due diligence or if he<br />

violates any of the provision of the Contract, the Engineer-in-Charge shall give the<br />

Contractor a notice, identifying deficiencies in performance and demanding corrective<br />

action. Such notice shall clearly state that it is given under the provision of this clause.<br />

After service of such notice, the Contractor shall not remove any plant, equipment and<br />

material from the site. The Amdavad <strong>Municipal</strong> <strong>Corporation</strong> shall have a lien on all such<br />

plant, equipment and material from the date of such notice till the said deficiencies have<br />

been corrected as mentioned in the said notice.<br />

If the Contractor fails to take satisfactory corrective action within ten days after receipt of<br />

such notice, the Engineer-in-charge on behalf of Amdavad <strong>Municipal</strong> <strong>Corporation</strong> shall<br />

terminate the contract in whole. In case, the entire contract is terminated, the amount of<br />

security deposit and performance bond if any together with the value of the work done but<br />

not paid for, shall stand forfeited to the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> and the remaining<br />

work shall be got executed by other contractor at the full risk and at cost of the original<br />

contractor. The plants equipment and material held under this clause shall then be at the<br />

disposal of the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> to recover the amount equivalent to the<br />

liquidated damages and registration of the Contractor shall be kept in abeyance for three<br />

years from the date as fixed in all such cases.<br />

The Engineer-in-Charge if necessary shall direct that a part or the whole of such plant,<br />

equipment and material be removed from the site within a stipulated period. If the<br />

Contractor fails to do so, the Engineer-in-Charge shall cause them or any part of them to be<br />

sold holding the net proceeds of such sale to the credit of the Contractor. After settlement<br />

of accounts, the lien by the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> on the Contractors remaining<br />

plant equipment and balances of materials shall be released.<br />

Termination of the contract in whole shall be adequate authority for the Engineer-in-<br />

Charge to demand discharge of the obligations from the guarantors of the security for the<br />

performance.<br />

B.2.4 Clause – 4: If the progress of any particular portion of the work under Contract is<br />

unsatisfactory, the Engineer-in-Charge shall, notwithstanding that the general progress of<br />

the work is satisfactory, in accordance with clause 2, be entitled to take necessary action<br />

under Clause 3, after giving the Contractor ten day’s notice in writing and the Contractor<br />

shall have no claim whatsoever for any compensation for any loss caused to him due to<br />

such action.<br />

(Clause 1, 2, 3 and 4 are substituted vide GR No. TNC – 1091/IB-10/(11)-C, dated 15-<br />

10-91 & modified by GR dated 29-10-91)<br />

59


B.2.5 Clause – 5 : In any case in which any of powers conferred upon the Engineer-in-Charge by<br />

clause 3 hereof shall have become exercisable and the same shall not have been exercised,<br />

the non exercise thereof shall not constitute a waiver of any of the conditions hereof and<br />

such powers shall notwithstanding be exercisable at any future date.<br />

B.2.5A Clause – 5A : In the event of the Engineer-in-Charge taking action under Clause 3, he<br />

may, if the so desires, take possession of all or any tools, plants, machineries, materials and<br />

stores in or upon the work or the site thereof or belonging to the Contractor or procured by<br />

him and intended to be used for the execution of the work or any part thereof, by paying or<br />

allowing for the same in account at the contract rate or in case of contract rates not being<br />

applicable at such reasonable rates, as may be comparable to current market rates where<br />

ascertainable of similar articles and comparable condition, to be certified by the Engineerin-Charge.<br />

In the alternative the Engineer-in-Charge may by notice in writing to the<br />

Contractor or his clerk of the works, foreman or other authorized agent, require him to<br />

remove such tools, plants, machineries, materials or stores from the premises within a time<br />

to be specified in such notice and in the event of the Contractor failing to comply with any<br />

such requisition, the Engineer-in-Charge may remove them at the Contractor’s expense or<br />

shall remove them by auction or private sale at the risk and cost of the Contractor in all<br />

respect, and the certificate of the Engineer-in-Charge as to the expenses of any such<br />

removal and the amount of the proceeds and expenses of any such removal shall be final<br />

and conclusive against the Contractor.<br />

B.2.6 Clause - 6 : Extension of time : If the Contractor shall desire an extension of the time for<br />

completion of the work on the ground of his having been unavoidably hindered in its<br />

execution or any other ground, he shall apply in writing to the <strong>Municipal</strong> Commissioner,<br />

AMC before the expiration of the period stipulated in the tender or before the expiration of<br />

30 days from the date of which he was hindered whichever is earlier and the <strong>Municipal</strong><br />

Commissioner, AMC may, in his opinion, believe that there are reasonable grounds for<br />

granting an extension, grant such extension, as he thinks necessary or proper. The decision<br />

of the <strong>Municipal</strong> Commissioner, AMC in this matter shall be final.<br />

B.2.7 Clause – 7 : As soon as the work is completed, the Contractor shall give a notice of such<br />

completion to the Engineer-in-Charge and on receipt of such notice, the Engineer-in-<br />

Charge shall inspect the work, and if he is satisfied that the work is completed in all<br />

respects then: –<br />

(i) For all works costing up to Rs. 50 lakhs (amount put to tender), the final<br />

measurements shall be recorded within 45 days from the date of physical<br />

completion of the work and the final bill shall be prepared within 45 days from the<br />

date of recording final measurements. The completion certificate shall be issued<br />

within one month from the date of final measurements subject to the Contractor<br />

fulfilling his obligation as provided in the contract and subject to the work being<br />

complete in all respect.<br />

(ii) In respect of works costing more than Rs. 50 lakhs (amount put to tender), the final<br />

measurements shall be recorded within 75 days from the date of physical<br />

completion of the work and the final bill shall be prepared within 75 days from the<br />

date of final measurements subject to the Contractor fulfilling his obligation as<br />

provided in the contract and subject to the work being complete in all respects.<br />

When separate periods of completion have been specified for items or groups of items, the<br />

Engineer-in-Charge shall issue separate completion certificate for such items or groups of<br />

items.<br />

60


No certificate of completion shall be issued nor shall the work be considered to be<br />

complete till the contractor shall have removed from the premises, on which the work has<br />

been executed, all scaffoldings, sheds and surplus materials, except such, as are required<br />

for rectification of defects, rubbish and all huts and sanitary arrangements required for his<br />

workmen on the site in connection with the execution of the work, as shall have been<br />

erected by the Contractor for the workmen and cleared all dirt from all parts of the<br />

building(s) in, upon or around which the work has been executed or of which he may have<br />

possession for the purpose of the execution thereof and cleared floors, gutters and drains,<br />

cased doors and sashes, oiled locks and fastenings, labeled keys clearly and handed them<br />

over to the Engineer-in-Charge or his representative and made the whole premises fit for<br />

immediate occupation or use to the satisfaction of the Engineer-in-Charge. If the<br />

Contractor shall fail to comply with any of the requirements of these conditions as<br />

aforesaid, on or before the date of completion of the work, the Engineer-in-Charge may, at<br />

the expense of the Contractor, fulfill such requirements and dispose of the scaffolding, or<br />

surplus materials and rubbish materials except for any sum actually realized by the sale<br />

thereof less the cost of fulfilling the requirement and any other amount that may be due<br />

from the Contractor. If the expenses of fulfilling such requirement pay such excess. The<br />

Engineer-in-Charge shall also have the rights to adjust the amount of excess against any<br />

amounts that may be payable to the Contractor.<br />

B.2.8 Clause – 8: No payment shall be made for any work, estimated to cost less than rupees one<br />

thousand till after the whole of the said work shall have been completed and a certificate of<br />

completion given. But in the case of works estimated to cost more than rupees one<br />

thousand, the Contractor shall, on submitting a monthly bill therefore, be entitled to receive<br />

payment proportionate to the part of the work then approved and passed by the Engineerin-Charge,<br />

whose certificate of such approval and passing of the sum so payable shall be<br />

final and conclusive against the Contractor. All such intermediate payments shall be<br />

regarded as payments by way of advance against the final payments only and not as<br />

payments for work actually done and completed and shall not preclude the Engineer-in-<br />

Charge from requiring bad, unsound, imperfect or unskilled work to be removed and taken<br />

away and reconstructed, or re-erected, nor shall any such payment be considered as an<br />

admission of the due performance of the contract or any part thereof if any other way very<br />

or effect the contract. The final bill shall be submitted by the Contractor within one month<br />

of the completion of the work, otherwise the Engineer-in-Charge’s certificate of the<br />

measurements and of the total amount payable for the work shall be final and binding on all<br />

parties.<br />

B.2.9 Clause – 9: The rates for items of works shall be valid only when the item concerned is<br />

accepted as having been completed fully in accordance with the sanctioned specifications.<br />

In cases where the items of work are accepted as not so completed, the Engineer-in-Charge<br />

may make payment on account of such items at such reduced rates as he may considered<br />

reasonable in preparation of final or on account bill.<br />

B.2.10 Clause – 10: Bills to be submitted for payment: A bill shall be submitted by the contractor<br />

each month on or before the date fixed by the engineer in charge for all work executed in<br />

the previous month and the engineer in charge shall take or cause to be taken the requisite<br />

measurement for the purpose of having the same verified and the claim, so far as it is<br />

admissible shall be adjusted, if possible within ten days from the presentation of the bill. If<br />

the contractor does not submit the bill within the time fixed as aforesaid, the engineer in<br />

charge may depute a subordinate to measure up the said work in the presence of the<br />

contractor or his duly authorized agent whose counter signature to the measurement list<br />

shall be sufficient warrant and the engineer in charge may prepare a bill from such list<br />

which shall; be binding on the contractor in all respects.<br />

61


B.2.11 Clause – 11: The Contractor shall submit all the bills on the printed forms to be had on<br />

application at the office of the Engineer-in-Charge. The charges to be made in the bills<br />

shall always be entered at the rates specified in the agreement or at the part/reduced rates<br />

subject to the approval by the Engineer-in-Charge in the case of items not<br />

completed/executed as per agreements or in the case of any extra work ordered in<br />

pursuance of these conditions and not mentioned or provided for in the tender, at the rate<br />

hereinafter provided for such work.<br />

B.2.12 Clause – 12 : If the specification of the work provides for the use of any special<br />

description of materials to be supplied from the Departmental Store of Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong> or if it is required that the Contractor shall use certain stores to be provided by<br />

the Engineer-in-Charge (such materials and stores and the prices to be charged therefore as<br />

hereinafter mentioned being so far as practicable for the convenience of the Contractor but<br />

not so as in any way to control the meaning or effect of this contract specified in the<br />

schedule or memorandum herein annexed) the Contractor shall be supplied with materials<br />

and stores as may be required from time to time to be used by him for the purpose of the<br />

contract only, and the value of the full quantity of materials and stores so supplied shall be<br />

set off or deducted from any sum then deposit, or thereafter to become due to the<br />

Contractor under the contract, or otherwise, or from the security deposit, or the proceeds of<br />

sale thereof; if the deposit is held in Amdavad <strong>Municipal</strong> <strong>Corporation</strong> securities/Bank<br />

Guarantee/ Bank Draft the same or a sufficient portion thereof, shall, in that case be sold<br />

for the purpose. All materials supplied to the Contractor shall remain the absolute properly<br />

of Amdavad <strong>Municipal</strong> <strong>Corporation</strong> and shall, on no account, be removed from the site of<br />

the work, and shall at all time, be open to inspection by the Engineer-in-Charge. Any such<br />

materials, unused and in perfectly good condition at the time of completion or termination<br />

of the contract, shall be returned to the Departmental store if the Engineer-in-Charge so<br />

requires by a notice in writing given under his hand, but the Contractor shall not be entitled<br />

to return any such materials except with the consent in writing of the Engineer-in-Charge<br />

and he shall have no claim for compensation on account of any such material supplied to<br />

him as aforesaid but remaining unused by him or for any wastage in or damage thereto.<br />

For materials provided in Schedule-A and consumed in excess quantities, the rates<br />

provided in Schedule – A shall be increased / decreased corresponding to the<br />

increase/decrease in the new rate payable for excess quantity as compared to the tender<br />

rates. The rate for materials provided in extra items will be the issue rates plus storage<br />

charges ruling on the date of issue of such quantity of materials.<br />

B.2.12A Clause – 12A: The Contractor shall be entitled to use the materials supplied by the AMC<br />

only to the extent of quantities of such materials required for execution of the work as per<br />

theoretical calculations. The Engineer-in-Charge may, however, on being satisfied that a<br />

large quantity of such materials is required for the execution of the work, permit the<br />

Contractor to use such larger quantity of the materials. Such permission shall be given in<br />

writing.<br />

The Contractor is bound to return in good condition such materials issued in excess of the<br />

requirements so worked out or in excess of the quantities so permitted to be used by the<br />

Engineer-in-Charge. If the Contractor fails to return such extra materials within a period of<br />

15 days from the date of demand in writing of such materials being made by the Engineerin-Charge,<br />

he shall be changed for the excess materials at double the issue rate for such<br />

materials specified in “Schedule A” of the contract Agreement.<br />

B.2.12B Clause – 12B : - (NOT APPLICABLE)<br />

All stores and materials such as cement, if the total consumption of which exceeds 25 tons,<br />

and steel etc, supplied to the Contractor by Amdavad <strong>Municipal</strong> <strong>Corporation</strong> shall be kept<br />

by the Contractor in separate godown provided with a Double lock. The key of one of the<br />

lock shall remain with the Engineer-in-Charge or his agent. The godown shall be accessible<br />

62


to the Engineer-in-Charge or his agent at all times. No materials shall be allowed to be<br />

removed from the site of the work, and any material required for the execution of the work<br />

shall be taken out from the godown only in the presence of a duly authorized agent of the<br />

Engineer-in-Charge.<br />

B.2.13 Clause – 13:<br />

(1) The Contractor shall execute the whole and every part of the work in the most substantial and<br />

workman-like manner and both as regards materials and in other respect in strict accordance<br />

with specifications.<br />

The Contractor shall also conform exactly, fully and faithfully to the designs, drawings and<br />

instructions in writing to the work signed by the Engineer-in-Charge. The design and the<br />

drawings shall be lodged in the office of the Engineer-in-Charge to which the Contractor shall<br />

be entitled to have access for the purpose of inspection at such office during office hours.<br />

Where the instructions referred to above are not contained in separate letters addressed to the<br />

Contractor the same shall be recorded in the work order book, which shall be maintained and<br />

kept on the site of the work. The Contractor shall be required to sign such entries in the workorder<br />

book in token of having noted the instructions. However, if the Contractor fails to sign<br />

the work-order book for any reason whatsoever, the entry of the instructions in the work-order<br />

book shall be deemed to be due notice to him of the said instructions. The work-order book<br />

shall be open for inspection to the Contractor on the site of the work during office hours.<br />

(2) The Contractor will be entitled to receive one certified copy of the accepted tender along with<br />

the work order free of cost and will also be entitled to receive, on request, two sets of contract<br />

and working drawings according to the progress of work, as and when needed, free of cost.<br />

(3) The several documents forming the contract are essential parts of the contract and a<br />

requirement occurring in one is a binding as through occurring in all. They are intended to be<br />

mutually explanatory and complementary and to describe and provide for a complete work.<br />

Further copies of the contract drawings and working drawings if required by them shall be<br />

supplied at a rate of Rs. 2500/- per set of contract drawing for the work and Rs. 500/- per<br />

working drawings except where other wise specified.<br />

In the event of any discrepancy in the several documents forming the contract or in any one<br />

document, the following order of precedence should apply.<br />

(a) Dimension and quantities :<br />

(i) Drawings<br />

(ii) Schedule B of the Tender form<br />

(iii) Specifications. On drawings, figured dimensions, unless obviously incorrect, will be<br />

followed in preference to scaled dimensions.<br />

(b) Description:<br />

(i) Schedule – B of the ‘Tender Form’<br />

(ii) Drawings.<br />

(iii) Specifications. In the case of defective description or ambiguity, the Engineer-in-<br />

Charge is entitled to issue further instructions directing in what manner the work is to<br />

63


e carried out. The Contractor cannot take any advantage of any apparent error or<br />

omission in drawings or specifications and the Engineer-in-Charge shall be entitled to<br />

make corrections and interpretations as necessary to fulfill the plans and specifications.<br />

B.2.14.1 Clause – 14.1 : The Engineer in charge shall have power to make any alterations in or<br />

addition to the original specifications, drawings, designs and instructions that may appear<br />

to him to be necessary or advisable during the progress of the work and the Contractor shall<br />

be bound to carry out the work in accordance with any instructions in this connection<br />

which may be given to him in writing signed by the Engineer-in-Charge and such alteration<br />

shall not invalidate the contract and additional work which the Contractor may be directed<br />

to do in the manner above specified as part of the work shall be carried out by the<br />

Contractor on the same conditions in all respect on which he agreed to do the main work<br />

and at the as are specified in the tender for the main work<br />

B.2.14.2 Clause – 14.2: Deleted<br />

B.2.14.3 Clause – 14.3: Deleted<br />

B.2.14.4 Clause – 14.4: If the additional or alternation work includes any class of work for which<br />

no rate is specified in this contract when such class of work shall be carried out at the rate<br />

entered in the Schedule of Rates of the Department or, at the rates mutually agreed upon<br />

between the Engineer-in-Charge and Contractor, whichever are lower. If the additional or<br />

altered work, for which no rate is entered in the Schedule of Rates of Department is<br />

ordered to be carried out before the rates are agreed upon, then the contractor shall within<br />

seven days of the date of receipt by him of the order to carry out the work, inform the<br />

Engineer-in-Charge of the rate, he shall by notice in writing, be at liberty to cancel his<br />

order to carryout such class of work and arrange to carry it out in such manner as he may<br />

consider advisable, provided always that if the contractor shall commence work or incur<br />

any expenditure in regard thereto before the rates shall have been determined as lastly<br />

herein before mentioned, then in such case, he shall only be entitled to be paid in respect of<br />

the work carried out or expenditure incurred by him prior to the date of the determination<br />

of the rate as aforesaid according to such rate or rate as shall be fixed by the Engineer-in-<br />

Charge. In the event of a dispute, the decision of the <strong>Municipal</strong> Commissioner of the<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> shall be final.<br />

Where, however, the work is to be executed according to the designs, drawings and<br />

specifications recommended by the Contractor and accepted by the competent authority,<br />

the alterations above referred to shall be within the scope of such designs and<br />

specifications appended to the tenders.<br />

The time limit for the completion of the work shall be extended in the proportion that the<br />

increase in the cost occasioned by alteration bears to the cost of the original contract work,<br />

and the certificate of the Engineer-in-charges as to such proportion shall be final and<br />

conclusive.<br />

B.2.14.5 Clause – 14.5: Deleted<br />

B.2.15 Clause -15 : No claim to any payment or compensation or for restriction of work : If<br />

any time after the execution of the contract documents the Engineer-in-charge shall for any<br />

reason whatsoever, require the whole or part of the work, as specified in the tender, be<br />

stopped for any period or shall not require the whole or part of the work to be carried out at<br />

all or to be carried out by the Contractor, he shall give notice in writing, stating the fact to<br />

the Contractor who shall thereupon suspend or stop the work totally or partially, as the case<br />

may be. In any such case, except as provided hereunder, the Contractor shall have no claim<br />

64


to any payment or compensation whatsoever except as provided hereunder on account of<br />

any profit or advantage which he might have derived form the execution of the work in full<br />

but which he did not so derive in consequence of the full amount of the work not having<br />

been carried out, or on account of any loss that he may be put to on account of materials<br />

purchased or agreed to be purchased or for unemployment of labour required by him. He<br />

shall not have also any claim for compensation by reason of any alterations having been<br />

made in the original specifications, drawings, designs and instructions which may involve<br />

any curtainment of the work as originally contemplated.<br />

B.2.15A Clause – 15A : The Contractor shall not be entitled to claim any compensation from<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> on account of delay by Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

in the supply of materials entered in Schedule “A” where such delay is caused by the (i)<br />

Non-supply due to short allotment of quota in case materials available under quota<br />

regulations (ii) Difficulties relating to the supply of railway wagons (iii) Force majeure (iv)<br />

Act of God (v) Act of the country’s enemies or any other reasonable cause beyond the<br />

control of <strong>Corporation</strong>.<br />

In the case of such delay in the supply of materials, Amdavad <strong>Municipal</strong> <strong>Corporation</strong> shall<br />

grant such extension of time for the completion of the works as shall appear to the<br />

Engineer-in-Charge to be reasonable to accordance with the circumstances of the case. The<br />

decision of the Engineer-in-Charge as the extension of time shall be accepted as final by<br />

the Contractors. (As modified Vide R & B D.G.R. No. TNC – 1096 – IB – 143 – (16) – C<br />

dated 11 – 1 99)<br />

B.2.16 Clause – 16: Time-Limit for unforeseen claims: The Contractor shall not be entitled to<br />

any compensation from Amdavad <strong>Municipal</strong> <strong>Corporation</strong> on any account unless where<br />

allowed by the conditions of this contract. In such case, the Contractor shall have to submit<br />

a claim in writing to the Engineer-in-charge within one month of the cause of such claim<br />

occurring.<br />

B.2.17 Clause – 17 : Action and compensation in case of bad work : If, at any time before the<br />

expiry of defects Liability, period, as detailed in Clause 17-A, it shall appear to the<br />

Engineer-in-charge or his sub-ordinate in charge of the work, that any work has been<br />

executed with unsound, imperfect or unskilled workmanship or with materials or inferior<br />

quality or that any materials or articles provided by him for the execution of the work are<br />

unsound, or of a quality inferior to that contracted for or are otherwise not in accordance<br />

with the contract, it shall be lawful for the Engineer-in-Charge to intimate this fact in<br />

writing to the Contractor and then notwithstanding the fact that the work, materials or<br />

articles complained of, may have been passed, certified and paid for, the Contractor shall<br />

be bound forthwith to rectify, or remove and reconstruct the work so specified in whole or<br />

in part as the case may require, or if so required shall remove the materials or articles so<br />

specified in whole or in part and provide other proper and suitable materials or articles at<br />

his own charge and cost, and in the event of his failing to do so within a period to be<br />

specified by the Engineer-in-charge in the written intimation aforesaid, the Contractor shall<br />

be liable to pay compensation at the rate of one percent on the amount of the estimate of<br />

the rectification for every day not exceeding ten days during which the failure so continues,<br />

and in the event of any such failure as aforesaid continuing beyond ten days, the Engineerin-charge<br />

may rectify or remove, and re-execute the work or remove and replace the<br />

materials complained of, as the case may be at the risk and expense in all respects of the<br />

Contractor should the Engineer-in-charge consider that any such inferior work of materials<br />

as described above may be accepted or made use of, it shall be within his discretion to<br />

accept the same at such reduced rates as he may fix therefore,<br />

65


However, the contractor shall be responsible for normal maintenance of the work till the<br />

final bill for the work is prepared by the corporational officer.<br />

B.2.17A Clause – 17A: Defect Liability Period: It shall be 18 months from the date of supply or<br />

12 months from the date of delivery of equipment at site whichever is later.<br />

B.2.17B Clause – 17 B: Operation & Maintenance of Grit Mechanism with related mechanical<br />

& electrical work during guaranteed period: 1 Year.<br />

B.2.18 Clause – 18 : Work to be open to inspection Contractor or responsible agent to be<br />

present : All works under or in course of execution or executed in pursuance of the<br />

contract shall at all times, be open to the inspection and supervision of the Engineer-incharge<br />

and his subordinate and the Contractor shall, at all times during the usual working<br />

hours, and at all other times at which reasonable notice of the intimation of the Engineerin-charge<br />

or his subordinate to visit the works shall have been given to the Contractor,<br />

either himself be present to receive orders and instructions or have a responsible agent duly<br />

accredited in writing present for that purpose. Orders given to the Contractor’s duly<br />

authorized agent shall be considered to have the same force and effect as if they had been<br />

given to the Contractor himself.<br />

B.2.18.1 Clause – 18 (i): Employment of a qualified Site Engineer by the Contractor: (Vide<br />

G.R.B & CD No. RGN-6090-UO 24 (42)-C, Dated 26-11-90). The Contractor shall employ<br />

full-time (on contract or on pay roll) technically qualified staff during the execution of<br />

work.<br />

B.2.19 Clause – 19 : Notice to be given before work is covered up : The Contractor shall give<br />

not less than five day’s notice in writing to the Engineer-in-charge or his subordinate in<br />

charge of the work before covering up or otherwise placing beyond the reach of<br />

measurement any work, in order that the same may be measured and correct dimensions<br />

thereof taken before the same is so covered up or placed beyond the reach of measurement<br />

and shall not cover up or place beyond the reach of measurement any work without the<br />

consent in writing of the Engineer-in-charge or his subordinate in charge of the work and if<br />

any work shall be covered up or placed beyond the reach of measurement without such<br />

notice having been given or consent obtained, the same shall be uncovered at the<br />

Contractor’s expense and in default thereof, no payment or allowance shall be made for<br />

such work or for the materials with which the same was executed.<br />

B.2.20 Clause – 20 : If the Contractor or his workmen, or servants shall break, deface injure or<br />

destroy any part of the building or work in question or work in question in/on which they<br />

may be working or any building, road, fence, enclosure or grass-land or cultivated ground<br />

contiguous to the premises on which the work or any part-thereof is being executed or if<br />

any damage shall be done to the work from any cause whatever before completion of the<br />

work or before the completion of the maintenance period whichever is later or any damage<br />

occurred / caused due to normal flood or rain or if any imperfections become apparent in it<br />

within three months from the grant of a certificate of completion, final or otherwise by the<br />

Engineer-in-charge the Contractor shall make good the same at own expenses or in default,<br />

the Engineer-in-charge may cause the same to be made good by other contractor and<br />

deduct the expenses (of which the certificate of the Engineer-in-charge shall be final) from<br />

any sums that may thereafter become due to the contractor or from his security deposit or<br />

the proceeds of sale thereof or a sufficient portion thereof.<br />

B.2.20A Clause – 20A : Force Majeure : Neither party shall be to liable to the other for any loss or<br />

damage occasioned by or arising out of acts of god, and in particular, unprecedented<br />

Floods, volcanic eruption, earth quake or other convulsion of nature, and other acts such as<br />

66


ut not restricted to general strike, invasion, the act of foreign countries, hostilities or war<br />

like operations before or after declaration of war, rebellion, military or usurped power<br />

which prevent performance of the contract and which could not have been for seen or<br />

avoided by a prudent person.<br />

NOTE: “Unprecedented flood” means the flood crossing the high flood level of the past 50 years<br />

which is on the available record. (Modified Vide R & B D.G.R. No. TNC – 1096 – IB –143<br />

– (16) – C dated 11-1-99.<br />

B.2.21 Clause – 21 : Contractor to supply plant, ladders, scaffolding etc., and is liable for<br />

damage arising from non-provision of lights, fencing etc., : The Contractor shall supply<br />

at his own cost all materials (except such special materials if any, as may, in accordance<br />

with the contract of be supplied from the Public Works <strong>Corporation</strong> Stores), plant, tools,<br />

appliances, implements, ladders, cordage, tackle, scaffolding and any temporary works<br />

which may be required for the proper exe7cution of the work whether in the original,<br />

altered or substituted from and whether included in the specifications, or other documents<br />

forming part of the contract or referred to in these conditions or not and which may be<br />

necessary for the purpose of satisfying or complying with requirements of the Engineer-incharge<br />

as to any matter or to which under these conditions he is entitled to be satisfied or<br />

which he is entitled to require together with carriage therefore to and from the work. The<br />

Contractor shall also supply without charge the requisite number of persons with the means<br />

and material necessary for the purpose of setting out works and counting, weighing and<br />

assisting in the measurement or examination at any time and from time to time, of the work<br />

or the materials. Failing this, the same may be provided by the Engineer-in-Charge at the<br />

expense of the Contractor and the expenses may be deducted from any money due to the<br />

Contractor under the contract or from his security deposit, or proceeds of sale thereof, or of<br />

a sufficient portion thereof. The contractor shall provide all necessary fencing and lights<br />

required to protect the public form accident and shall also be bound to bear expenses of<br />

defense of every suit, action or other legal proceeding at law that may be brought by any<br />

person for injury sustained owing to neglect of the above precautions and to pay any<br />

damages and costs which may be awarded in any such suit, action or proceedings to any<br />

such person, or which may, with the consent of the Contractor, be paid in compromising<br />

any claim by any such persons.<br />

B.2.21A Clause – 21A: (NOT APPLICABLE)<br />

such fire spreading to or other-wise damaging surrounding property.<br />

B.2.22 Clause – 22: Deleted.<br />

B.2.23 Clause – 23 : Liability of Contractors for any damages done in or outside work area :<br />

Compensation for all damage done intentionally or unintentionally by contractors labourers<br />

whether in or beyond limits of Amdavad <strong>Municipal</strong> <strong>Corporation</strong> property including any<br />

damage caused by the spreading of fire mentioned in the clause 22, shall be estimated by<br />

the Engineer-in-charge, or such other officer as he may appoint, and the estimates of the<br />

Engineer in charge, subject to the decision of the <strong>Municipal</strong> Commissioner, AMC, on<br />

appeal, shall be final and the Contractor shall be bound to pay the amount of the assessed<br />

compensation on demand, failing which the same will be recovered from the Contractor as<br />

damages in the manner prescribed in clause 1 or deducted by the Engineer-in-Charge from<br />

any sums that may be due or become due from Amdavad <strong>Municipal</strong> <strong>Corporation</strong> to the<br />

Contractor under this contract or otherwise.<br />

The contractor shall bear the expenses of defending any action or other legal proceeding<br />

that may be brought by any person for injury sustained by him owing to neglect of<br />

67


precautions to prevent the spread of the fire and he shall also pay the damages and cost that<br />

may be awarded by the court in consequences.<br />

B.2.24 Clause – 24: Deleted.<br />

B.2.25 Clause – 25: Deleted.<br />

B.2.26 Clause – 26: Work not to be sublet. Contract may be rescinded and security deposit<br />

forfeited for subletting it without approval or for bribing a public officer or if<br />

contractor becomes insolvent: The contract shall not be assigned or sublet without the<br />

written approval of the Engineer-in-charge. And if the contractor shall assign or sublet his<br />

contract or attempt to do so or become insolvent or commence any proceeding to get<br />

himself be adjudicated an insolvent or make any compromisation with his creditors, or<br />

attempt of do so, the Engineer-in-charge may, by notice in writing rescind the contract.<br />

Also if any bribe, gratuity, gift, loan, perquisite, reward or advantage, pecuniary or<br />

otherwise, shall either directly or indirectly be given, promised or offered by the contractor,<br />

or any of his servants or agents to any public officer or person in the employ of Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> in any way relating to his office or employment, or if any such<br />

officer or person shall become in any way directly or din directly interested in the contract,<br />

the Engineer-in-Charge may thereupon by notice in writing rescind the contract. In the<br />

event of contract being rescinded, the security deposit of the Contractor shall thereupon<br />

stand forfeited and be absolutely at the disposal of Amdavad <strong>Municipal</strong> <strong>Corporation</strong> and<br />

the same consequences shall ensue as if the contract had been rescinded under clause 3<br />

hereof and in addition the Contractor shall not be entitled to recover or be paid for any<br />

work thereof actually performed under the contract.<br />

B.2.27 Clause – 27: Sum payable by way of compensation to be considered as reasonable<br />

compensation without reference to actual loss: All sums payable by a Contractor by way<br />

of compensation under any of these conditions shall be considered as a reasonable<br />

compensation to be applied to the use of Amdavad <strong>Municipal</strong> <strong>Corporation</strong> without<br />

reference to the actual loss or damage sustained and whether any damage has or had not<br />

been sustained.<br />

B.2.28 Clause – 28: Changes in the constitution of firm to be notified: in the case of a tender<br />

by partners, any changes in the constitution of a firm shall be forthwith notified by the<br />

contractor to Engineer-in-Charge for his information.<br />

B.2.29 Clause – 29: Works to be under directions of <strong>Municipal</strong> Commissioner, AMC: All<br />

works to be executed under the Contract shall be executed under the direction and subject<br />

to the approval in all respects of the <strong>Municipal</strong> Commissioner, AMC of the Circle for the<br />

time being, who shall be entitled to direct at what point or points and in what manner they<br />

are to be commenced and from time to time carried on.<br />

B.2.30 Clause – 30 (1) : The disputes relating to this contract, so far as they relate to any of the<br />

following matters, whether such disputes arise during the progress of the work or after the<br />

completion or abandonment thereof, shall be referred to the court of law and its jurisdiction<br />

will be of <strong>Ahmedabad</strong>.<br />

(i) The rates of payment under clause 5 for any tools, materials and stores in or<br />

upon the works of the site thereof or belonging to the contractor or procured by<br />

him and intended to be use for execution of the work or any part thereof of<br />

which possession may have been taken by the Engineer-in-Charge under the<br />

said clause-5.<br />

68


(ii) The reduction in rates made by the Engineer-in-Charge, under clause 9 for the<br />

items of work not accepted as completed fully in accordance with the<br />

sanctioned specifications.<br />

(iii) The rates of payment for any class of work which is included in the additional<br />

or altered work carried out by the Contractor in accordance with the instructions<br />

of the Engineer-in-Charge under clause 14 and the rate for which is to be<br />

determined under the said clause 14.<br />

(iv) The rates of payment for materials already purchased or agreed to be purchased<br />

by the Contractor before receipt of notice given by the Engineer-in-Charge<br />

under clause 15, and / or the amount of compensation payable to the Contractor<br />

under the said clause for loss in respect of such materials.<br />

(v) The amount of compensation which the contractor shall be liable to pay under<br />

clause 17 in the event of his failure to rectify, remove or reconstruct the work<br />

within the period specified in the written intimation or the amount of expenses<br />

incurred by the Engineer-in-Charge under the said clause 17 in rectifying,<br />

removing, or re-executing the work or in removing and replacing the materials<br />

or articles complained of.<br />

(vi) The reduction of rates as may be fixed by the Engineer-in-Charge under clause<br />

17 for the inferior work or materials as accepted or made use of.<br />

(vii) The amount of compensation payable by the Contractor for damages as<br />

estimated and assessed under clause 23.<br />

(viii) The amount payable to the Contractor for the work carried out under clause 33<br />

in accordance with the instruction and the requirement of the Engineer-in-<br />

Charge in a case where there is no specification.<br />

(2) Deleted<br />

(3) Deleted<br />

(4) Deleted<br />

(4a) The disputes will be referred to court of law and its jurisdiction will be<br />

<strong>Ahmedabad</strong>.<br />

(5) In case of dispute leading to the contractor or Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

approaching to Court of Law, it shall be within the jurisdiction where the site of<br />

work is situated.<br />

(6) The reference to court proceeding under this clause shall not:<br />

i) affect the right of the Engineer in charge under clause 5 to take possession of all<br />

or any tools, plants, materials and stores in or upon the works of site thereof<br />

belonging to the contractor or procured by him and intended to be used for the<br />

execution of the work or any part thereof.<br />

ii) Preclude the Engineer in charge from utilizing the materials purchased by the<br />

contractor in any work or from removing such materials to other places, during<br />

the period the work is stopped or suspended in pursuance of notice given to the<br />

contractor under clause 15.<br />

69


iii) Entitle the contractor to stop the progress of the work or carrying out the<br />

additional or altered work in accordance with the provisions of clause 14 or as<br />

the case may be, of clause 33.<br />

B.2.31 Clause – 31: Deleted.<br />

B.2.32 Clause – 32 : Lump sums in estimates : When the estimate on which a tender is made<br />

includes lump sum in respect of part of the work, the contractor shall be entitled to<br />

payment in respect of the items of work involved or the part of the work in question at the<br />

same rates as are payable under this contract for such items or if the part of the work in<br />

question is not in the opinion of the Engineer-in-charge capable of measurement, the<br />

Engineer-in-Charge may, as his discretion, pay the lump sum amount entered in the<br />

estimate and the certificate in writing of the Engineer-in-charge shall be final and<br />

conclusive against the Contractor with regard to any sum or sums payable to him, under the<br />

provisions of this clause.<br />

B.2.32A Clause – 32 A: Access to the Site: The Contractor shall arrange to construct, maintain and<br />

afterwards remove and reinstate any temporary access required for and in connection with<br />

the execution of the works. Reinstatement shall include restoring the area of the access<br />

route to at least the degree of safety, stability, drainage and appearance that existed before<br />

the Contractor entered the site.<br />

B.2.33 Clause – 33: Action where no specifications: In case of any class of work for which there<br />

is no such specification, such work shall be carried out in accordance with the IS<br />

specifications, and in the event of there being no IS Specifications, then, in such case the<br />

work shall be carried out in all respects in accordance with the instructions and<br />

requirements of the Engineer-in-Charge.<br />

B.2.34 Clause – 34: Definition of work: The expression “work” or “works” where used in these<br />

conditions shall, unless, there be something in the subject or context repugnant to such<br />

construction, be construed to mean the work, or the works, contracted to be executed under<br />

or in virtue of the contract, whether temporary or permanent and whether original, altered,<br />

substituted or additional.<br />

B.2.35 Clause – 35 : Contractor’s percentage whether applied to net or gross amount of the<br />

bill: Percentage referred to in the tender shall be deducted from / added to the gross amount<br />

of the bill before deducting the value of any stock issued. (This clause shall be Applicable<br />

only for B-1 tender).<br />

B.2.36 Clause – 36 - (B-1) Clause 35 (B-2) : Non-refund of quarry fees and Royalties : The<br />

contractor shall pay the royalty to the competent authority/local body as per rules. The<br />

contractor shall furnish quarterly the statement showing quantity of quarried materials from<br />

whom purchased (with full address of the seller) and copies of bill for purchase to the<br />

district officer of the Geology and Mining Department or authority competent to levy<br />

royalty in the area of work. Copy of such statement shall be furnished to the Engineer in<br />

charge also. Contractor shall also furnish such additional information as regards royalty<br />

payment of the Engineer in charge and the Royalty authority. The royalty charges paid<br />

shall be borne by the Contractor and shall not be reimbursed by the Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong> (Authority: - R & BD. Circular No. TNC-2286-UO-39 (19)-C dated 23-10-<br />

1989.)<br />

B.2.37 Clause – 37(B-1) / Clause 36 (B-2) : Compensation under the Workmen’s<br />

Compensation Act : The Contractor shall be responsible for and shall pay any<br />

compensation to his workman payable under the Workmen’s Compensation Act, 1923 (<br />

70


VIII of 1923) (hereinafter called the said ACT) for injuries caused to the workmen. If such<br />

compensation is paid by Amdavad <strong>Municipal</strong> <strong>Corporation</strong> as principal under sub-<strong>section</strong><br />

12 (1) of the said Act, on behalf of the Contractor, it shall be recoverable by the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> from the Contractor under sub-<strong>section</strong> 12 (2) of the said <strong>section</strong>.<br />

Such compensation shall be recovered in the manner laid down in clause 1 above.<br />

B.2.37A Clause – 37 - A (B-1) / Clause 36-A (B-2) : The Contractor shall be responsible for and<br />

shall pay the expenses of providing medical aid to any workmen who may suffer a bodily<br />

injury as a result of an accident. If such expenses are incurred by Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong>, the same shall be recoverable from the Contractor forthwith and be deducted,<br />

without prejudice to any other remedy of Amdavad <strong>Municipal</strong> <strong>Corporation</strong>, from any<br />

amount due or that may become due to the Contractor.<br />

B.2.37B Clause – 37-B (B-1) / Clause 36-B (B-2) : The Contractor shall provide all necessary<br />

personal safety equipment and first-aid apparatus available for the use of the persons<br />

employed on the site and shall maintain the same in suitable condition for immediate use at<br />

any time and shall comply with the following regulations in connection therewith :<br />

(a) The workers shall be required to use the equipment so provided by the Contractor<br />

and the Contractor shall take adequate steps to ensure proper use of the equipment<br />

by those concerned.<br />

(b) When work is carried out in proximity to any place where there is a risk of<br />

drowning all necessary equipments shall be provided and kept for use and all<br />

necessary steps shall be taken for the prompt rescue of any person in danger.<br />

(c) Adequate provision shall be made for prompt first-aid treatment of all injuries likely<br />

to be sustained during the course of the work.<br />

B.2.38 Clause – 38 (B-1) / Clause 37 (B-2) : The Quantities shown in the tender are approximate<br />

and no claim shall be entertained for quantities of work executed being less than any<br />

extent or more up to 40 % of tender qty at the quoted rate up to project completion<br />

limit.<br />

B.2.39 Clause – 39 (B-1) / Clause - 38 (B-2): Employment of famine or other labour: The<br />

Contractor shall employ any famine, convict or other labour of particular kind or class, if<br />

ordered in writing to do so by the Engineer-in-charge.<br />

B.2.40 Clause – 40 (B-1) / Clause - 39 (B-2) : No compensation shall be allowed for any delay<br />

caused in the staring of the work on account of delay in making available the full site of<br />

land at a time.<br />

B.2.41 Clause – 41 (B-1) / Clause - 40(B-2): Claim for compensation for delay in the<br />

execution of work: No compensation shall be allowed for any delay in execution of the<br />

work on account of water standing in borrow-pits or compartments. The rates are inclusive<br />

of hard or cracked soil, excavation in mud, sub-soil water or water standing in borrow-pits<br />

and no claim for an extra rate shall be entertained unless otherwise expressly specified.<br />

B.2.42 Clause – 42 (B-1) / Clause – 41 (B-2): Entering upon or commencing any portion or<br />

work: The contractor shall not enter upon or commence any portion of work except with<br />

the written authority and instructions of the Engineer-in-charge or of his subordinate in<br />

charge of the work. Failing such authority, the contractor shall have no claim to ask for<br />

measurements of or payment for work.<br />

71


B.2.43 Clause – 43 (B-1) / Clause – 42 (B-2): Minimum age of person employed: (i) No<br />

contractor shall employ any person who is under the age of 15 years.<br />

B.2.43A Clause – 43 (I) (A) (B-1) / Clause – 42 (I) (A) (B-2): The employment of donkeys<br />

and/or other animals and the payment of fair wages:<br />

(i) For asphalt work(s), as far as possible only the adult persons should be<br />

employed by Contractor OR the contracted work as the case may be. If the adult<br />

persons are not available, then the children below the age of 15 (Fifteen years)<br />

should not be employed under any circumstances.<br />

(ii) No contractor shall employ donkeys or other animals with breaching of string or<br />

thin rope. The breaching must be atleast three inches wide and should be of tape<br />

(Nawar).<br />

(iii) No animal suffering from sores, lameness or emaciation or which is immature<br />

shall be employed on the work.<br />

(iv) The Engineer-in-Charge or his agent is authorized to remove from the work any<br />

person or animal found working which does not satisfy these conditions and no<br />

responsibility shall be accepted by Amdavad <strong>Municipal</strong> <strong>Corporation</strong> for any<br />

delay caused in the completion work by such removal.<br />

(v) The Contractor shall pay fair and reasonable wages to the workmen employed<br />

by him in the contract undertaken by him. In the event of any dispute arising<br />

between he contractor and his workmen on the grounds that the wages paid are<br />

not fair and reasonable, the dispute shall be referred without delay to the<br />

Engineer – in – charge who shall decide the same. The decision of the Engineer<br />

– in – charge shall be conclusive and binding on the Contractor, but such<br />

decision shall not in any way affect the conditions in the contract regarding the<br />

payment to be made by Amdavad <strong>Municipal</strong> <strong>Corporation</strong> at the sanctioned<br />

tender rates.<br />

(vi) The Contractor shall provide drinking water facilities to the workers / labourers<br />

employed on Amdavad <strong>Municipal</strong> <strong>Corporation</strong> works. Amenities relating to<br />

sanitation shall also be provided to the workers / labourers employed on works<br />

(in urban areas). If the contractor fails to comply with these provisions, the<br />

Engineer - in - charge shall give notice in writing and if the contractor does not<br />

provide this facility to the workers / labourers within a period of ten days from<br />

the date of the notice in writing, the Engineer in charge shall there upon make<br />

the arrangement for drinking water at the cost of the Contractor.<br />

(vii) The Contractor shall provide the amenity of proper shade and shelter to the<br />

workers / labourers and their children on Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

works as soon as the work starts. If the Contractor fails to provide shed and<br />

shelter, the Engineer-in – charge shall provide the same at the cost of<br />

Contractor.<br />

B.2.44 Clause – 44 (B-1) / Clause 43 (B-2): Method of payment: Payment to Contractor shall be<br />

made by cheque drawn on any treasury, accounts department of AMC, provided the<br />

amount exceeds Rs. 10/-. Amount not exceeding Rs. 10/- will be paid in cash.<br />

B.2.44A Clause – 44-A (B-1) / Clause 43-A (B-2) : Any sum of money due and payable to the<br />

Contractor (including the security deposit returnable to the Contractor) executing any<br />

72


Amdavad <strong>Municipal</strong> <strong>Corporation</strong> work under this contract shall be appropriated by<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> and shall be set off against any claim of the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> for the payment of a sum of money arising out or under any other<br />

contract made by the Contractor with the Amdavad <strong>Municipal</strong> <strong>Corporation</strong>. When no such<br />

amount for purpose of the recovery from the Contractor against any claim of the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> is available, such a recovery shall be made from the Contractor as<br />

arrears of land revenue.<br />

B.2.45 Clause – 45 (B-1) / Clause-44 (B-2):<br />

Deleted<br />

B.2.46 Clause – 46 (B-1) / Clause-45 (B-2) : Employment of scarcity labour : If Government<br />

declares a state of scarcity or famine to exist in any village situated within 16 kilometers of<br />

the work, the Contractor shall employ upon such parts of the work, as are suitable for<br />

unskilled labour, any person certified to him by the Engineer in charge or by any persons to<br />

whom, the Engineer in charge may have delegated this duty in writing to be in need of<br />

relief and shall be bound to pay to such persons, wages not below the minimum which<br />

Government may have fixed in this behalf. Any disputes which may arise in connection<br />

with the implementation of this clause shall be decided by the Engineer in charge whose<br />

decision shall be final and binding on the Contractor.<br />

B.2.47A Clause – 47 A: Deleted<br />

B.2.47B Clause – 47 (B-1) / Clause-46 (B-2): Deleted<br />

B.2.48 Clause – 48 (B-1) / Clause-47 (B-2): The rates to be quoted by the Contractor must be<br />

inclusive of sales tax. No extra payment on this account will be made to the Contractor.<br />

B.2.49 Clause – 49 (B-1) / Clause-48 (B-2): The Contractor should as far as possible, obtain his<br />

requirement of labourers, skilled and unskilled, from the nearest Employment Exchange so<br />

as to utilize the local employment potential. If there are no local Employment Exchanges<br />

or such Exchanges are not able to provide the required labourers locally. Suitable labourers<br />

should be utilized to the maximum extent possible.<br />

B.2.50 Clause – 50 (B-1) / Clause-49 (B-2) : Fair Wages : If the Contractor fails to pay within 7<br />

(Seven) days to the labourer(s) / worker (s) the minimum wages prescribed by the<br />

Government under the minimum wages Act, 1948 as in force from time to time, the<br />

Engineer in charge shall be at liberty to deduct the amount payable to the labourer(s)<br />

worker(s) from his (Contractor’s) bills or deposit(s) payable by the Contractor after making<br />

due inquiries and establishing the claim(S) of the labourers(s) worker(s).<br />

The Contractor shall not be entitled to any payment or compensation on account of any loss<br />

that the Contractor may have to incur on account of the action as aforesaid. Before the<br />

action as aforesaid, is enforced, a notice in writing to the Contractor shall be issued by the<br />

Engineer-in-charge to pay the wages as per Minimum Wages Act in force at the relevant<br />

time. If contractor does not act as aforesaid within seven days, then the action<br />

contemplated as above shall be taken against him.<br />

B.2.51 Clause – 51 (B-1) / Clause-50 (B-2): Deleted<br />

B.2.52 Clause – 52 (B-1) / Clause-51 (B-2): List of Machinery: The Contractor shall also give a<br />

list of machineries in his possession and which he proposes to use on the work<br />

73


B.2.53 Clause – 53 (B-1) / Clause-53 (B-2): (i) In case, the roller deployed by Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> for the use on contract work is kept idle by the Contractor for want<br />

of adequate labour and materials, the Contractor will have to pay rental charges as per<br />

prevailing rules even though the items of rolling and watering are to be carried out by the<br />

AMC.<br />

(ii) If the Contractor does not plan his programme so as to suit the requirement of the<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong>, the proportionate rental charges on roller shall<br />

have to be recovered from the Contractor.<br />

B.2.54 Clause – 54 (B-1) / Clause-53 (B-2): Local labour on normal rates: The Contractor shall<br />

have to engage local labour and person seeking employment where available on<br />

normal rate.<br />

B.2.55 Clause – 55 (B-1) / Clause - 54 (B-2): Deleted<br />

B.2.56 Clause – 56 (B-1) / Clause-55 (B-2): The Contractor shall employ only such labour<br />

who shall produce a valid certificate of having been vaccinated against small pox<br />

within a period of last three years.<br />

B.2.57 Clause – 57 (B-1) / Clause 56 (B-2):<br />

(1) Huts: The Contractor shall build a sufficient number of huts on a suitable plot of<br />

land for the use of the labourers according to the following specifications:<br />

(i) Huts of bamboos and grass may be constructed.<br />

(ii) A good site shall be selected; high ground removed from jungle but well<br />

provided with trees shall be chosen wherever it is available. The neighborhood<br />

of rank jungle, grass or weeds should particularly be avoided; camps should not<br />

be established close to large cuttings of earth work.<br />

(iii) The lines of huts shall have open spaces of atleast 10 m. between rows, when a<br />

good natural site can not be procured, particular attention should be given to the<br />

drainage.<br />

(iv) There should be no over crowding, Floor spaces at the rate of 2.8 sq.m. per head<br />

shall be provided. Care should be taken to see that the huts are kept clean and<br />

in good order.<br />

(v) The Contractor must find out his own land and if he wants Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong> land, he should apply for it and pay assessment for it.<br />

(2) Drinking Water :<br />

The Contractor shall, as far as possible, provide an adequate supply of chlorinated pure<br />

potable drinking water for the use of labourers. This provision shall be at the rate of<br />

not less than 45 liters per head, no provision need be made where there is a suitable<br />

nalla, river or well within 0.4 km. of the camp. However arrangement should, as far as<br />

possible, be made to chlorinate water by chlorine tablets before it is allowed for<br />

drinking purpose.<br />

(3) The Contractor shall construct semi permanent latrines for the use of labourers<br />

on the following scale, namely :<br />

74


a) Where females are employed, there shall be least one latrine for every 25<br />

females.<br />

b) Where males are employed, there shall be at lease one latrine for every 25<br />

males.<br />

Provided that where the number of males or females exceed 100, it shall be<br />

sufficient if there is one latrine for every 25 males or females, at the case may<br />

be, up to the first 100 and one for every 50 thereafter.<br />

(4) Privacy in latrines :<br />

Every latrine shall be under cover and so partitioned off as secure privacy, and<br />

shall have a proper door and fastenings.<br />

(5) Notice to be displayed outside latrines and urinals:<br />

(1) Where workers of both sexes are employed, there shall be displayed outside<br />

each block of latrine and urinal a notice in the language understood by the<br />

majority of the workers “For Men only” or “For Women only”: as the case may<br />

be.<br />

(2) The notice shall also bear the figures of a man or of a woman, as the case may be.<br />

(6) Urinals:<br />

There shall be atleast one urinal for male workers up to 50 and the for female<br />

workers up to 50 employed at a time. Provided that there where the number of<br />

male or female workmen, as the case may be exceeds 500, it shall be sufficient<br />

if there is one urinal for every 50 males or females up to the first 500 and one<br />

for every 100 males or females or part thereof.<br />

(7) Latrines and Urinals to be accessible:<br />

(1) The latrines and urinals shall be conveniently situated and accessible to<br />

workers at all times at the establishment.<br />

(2) (i) The latrines and urinals shall be adequately lighted and shall be<br />

maintained in a clean and sanitary condition at all time<br />

(ii) Latrines and urinals other than those connected with a flush sewage<br />

system shall comply with the requirements of the Public Health Authorities.<br />

(8) Water for latrines and urinals:<br />

Water shall be provided by means of tap of otherwise, so also be conveniently<br />

accessible in or near the latrines and urinals.<br />

(9) Bathing and washing places:<br />

1. The Contractor shall construct a sufficient number of bathing places, every unit<br />

of 20 persons being provided with a separate bathing place.<br />

2. Washing places should also be provided for the purpose of washing clothes.<br />

Every unit of 30 persons shall have atleast one washing place.<br />

75


3. Such bathing and washing places should be suitably screened and separate<br />

places provided for male and female workers.<br />

4. Such facilities shall be conveniently accessible and shall be kept in clean and<br />

hygienic.<br />

(10) Drainage:<br />

The Contractor shall make sufficient arrangements for draining away the<br />

sewerage water as well as water form the bathing and washing places and shall<br />

dispose of this waste in such a way as not to cause nuisance. The Contractor<br />

should obtain a permission form the Gujarat Water Pollution Control Board,<br />

Gandhinagar, if water is to be drained in river or near the well. The Contractor<br />

would put material oil once in a week in stagnant water round about the<br />

residence.<br />

(11) Medical facilities:<br />

The Contractor shall engage a medical officer with a traveling dispensary for a<br />

camp having 500 or more persons if there is no Government or other private<br />

dispensary situated with 6 Km. form the camp.<br />

(12) Conservancy and cleanliness:<br />

The Contractor shall provide the necessary staff for effecting the satisfactory<br />

conservancy and cleanliness of the camp to the satisfaction of the Engineer in<br />

charge. Atleast one sweeper per 200 persons should be engaged. Conservancy<br />

staff should dump refuge in compost pit, away from the labour camp.<br />

(13) Health Provisions:<br />

The Health Officer of the <strong>Municipal</strong> <strong>Corporation</strong> of Health Services shall be<br />

consulted before opening a labour camp and his instructions on matters, such as,<br />

the water supply, sanitary convenience, the camp-site, accommodation and food<br />

supply shall be followed by the Contractor.<br />

(14) Precautions against epidemic:<br />

(a) The authorities in charge of the colonies should get the labourers inoculated<br />

against cholera and plague and vaccinated against smallpox at the time of<br />

recruitment, if they are not inoculated or vaccinated within 6 months or 3 years<br />

respectively, prior to the date of recruitment.<br />

(b) When, in any labour camp, there is a outbreak of an epidemic disease or is<br />

threatened with such an outbreak, the authorities in charge of the labour camps,<br />

should ensure that all the inmates of the labour colonies are inoculated or<br />

vaccinated, at the case may be, depending on the diseases, with 72 hours after<br />

the outbreak.<br />

(c) The authorities in charge of the labour colony should arrange to communicate<br />

by wire regarding the outbreak of the epidemic diseases on the very day of the<br />

outbreak, to the Health Officer of <strong>Municipal</strong> <strong>Corporation</strong> in charge of that area.<br />

Thereafter they should continue to send daily reports to the above officers in the<br />

prescribed form regarding the progress of the epidemic disease.<br />

76


(d) When the authorities in charge of the labour colony suspect or have reason to<br />

believer that any in mate of the labour colony it suffering form the infections or<br />

contagious disease, they shall forthwith arrange for the segregation of such<br />

persons to isolated huts to be specifically provided for the purpose and also for<br />

their treatment.<br />

(e) As regional malaria epidemic outbreaks are likely to occur in such project areas,<br />

the authorities in charge of the labour colonies should report promptly the<br />

occurrence of unusual incidence of cases of malaria and also inform the Health<br />

officers of the <strong>Municipal</strong> <strong>Corporation</strong> and also arrange to institute all necessary<br />

anti-malarial measures as may be advised by the officials of the Public Health<br />

<strong>Corporation</strong>.<br />

(f) The authorities in charge of the colonies should also arrange to carry out any<br />

other measures that may be recommended by the officials of the Public Health<br />

<strong>Corporation</strong> necessary to prevent or control the spread of disease.<br />

B.2.58 Clause – 58 (B-1) / Clause-57 (B-2): Contractor shall have to arrange for the supply of<br />

gumboots, hand gloves, mask etc., invariably to the labourers/workers engaged by the<br />

Contractor on asphalt work.<br />

B.2.59 Clause – 59 (B-1) / Clause-58 (B-2): The Contractor shall not show any distinction<br />

between Harijan and other class of labourers/ workers employed to carry out the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> work.<br />

B.2.60 Clause – 60 (B-1) / Clause-59 (B-2): Price Variation clause: Deleted<br />

B.2.60A Clause – 60A (B-1) / Clause-59A (B-2): Price Variation for Cement, Steel and Asphalt<br />

brought by Contractor: Deleted<br />

B.2.61 Clause – 61 (B-1) / Clause-60 (B-2): Fencing and Lighting:<br />

(a) The Contractor shall, unless otherwise specified, be responsible for the proper<br />

fencing, lighting, grading and taking of the necessary safety measures for all works<br />

comprised in the contract and for the proper provision of temporary road, way, footways,<br />

guards, fences, caution notices etc., as the same may be rendered necessary by<br />

reasons of the work for the accommodation of workmen, foot passengers or other<br />

traffic and of owners and occupiers of adjacent property and the public and shall<br />

remain responsible for any accidents that may occur on account of his failure to take<br />

proper & timely precautions.<br />

(b) All the arrangements made for fencing and lighting shall be maintained by the<br />

Contractor throughout the currency of the contract till the physical taking over of the<br />

work by Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

B.2.62 Clause – 62 (B-1) / Clause-61 (B-2): Liability of accidents to persons: Responsibilities<br />

and liabilities of the contractor under Workmen’s Compensation Act.<br />

(a) On the occurrence of an accident, which results in death of workmen employed by the<br />

contractor or which is so serious as is likely to result in death of any such workmen,<br />

the Contractor, shall within 24 hours of happening of such accident(s) intimate, in<br />

writing, to the Engineer in charge the fact of such accident(s). The contractor shall<br />

indemnify Amdavad <strong>Municipal</strong> <strong>Corporation</strong> against all loss or damage sustained by<br />

77


the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> resulting directly form his failure to give<br />

intimation in the manner aforesaid including the penalties or fines, if any, payable by<br />

the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> as consequence of Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong>’s failure to give notice under the Workmen’s Compensation Act or<br />

otherwise to conform to the provisions of the said Act in regard to such accidents(s).<br />

(b) In the case of an accident, in respect of which compensation may become payable<br />

under Workmen’s Compensation Act, whether by the Contractor or by the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> as principal Employer, it shall be lawful for the Engineer-incharge<br />

to retain out of money due and payable to the Contractor , such sum or sum of<br />

money as may, in the opinion of the Engineer in charge, be sufficient to meet such a<br />

liability. The opinion of the Engineer in charge shall be final in regard to all matters<br />

arising under this clause.<br />

B.2.63 Clause – 63 (B-1) / Clause-62 (B-2) : Access to site and work on site : The Engineer<br />

may, if he considers fit from time to time, enter upon any land(s), which may be in<br />

possession of the Contractor this contract for the purpose of executing any work not<br />

included in this contract and may execute such work not included in this contract by agent<br />

or by other Contractors, at his opinion and the Contractor shall, in accordance with the<br />

requirements of the Engineer-in-charge, afford all reasonable facilities for execution of<br />

the work including occupation of lands by structure or otherwise for any other contractor<br />

employed by the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> and his workmen or for the workmen of<br />

the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> who may be employed in the execution on or near<br />

the site of the work not included in the contract or of any contract in connection with or<br />

ancillary to the work and in default, the Contractor shall be liable to the Amdavad<br />

<strong>Municipal</strong> <strong>Corporation</strong> for any delay or expense incurred by reason of such default.<br />

Provided always that if the exercise of these powers shall cause any damage to the contract,<br />

he may, within fifteen days of such damage arising, make a statement of the same to the<br />

Engineer in charge who shall, from time to time, assess the value in his judgment of such<br />

damage and the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> shall form time to time pay to the<br />

Contractor the amounts (if any) accepted as justified by the Engineer in charge.<br />

B.2.64 Clause – 64 (B-1) / Clause 63 (B-2): Reports regarding labour: The contractor shall<br />

submit the following reports to the Engineer in charge.<br />

(a) (i) A daily report in the from as may be prescribed of the strength of labour both<br />

skilled and unskilled employed by him on the work(s). The contractor shall increase<br />

or decrease the strength, both skilled or unskilled, if directed by the Engineer in<br />

charge. The submission of such report shall not, however, relieve the contractor of<br />

his responsibilities and duties regarding progress or any other obligations under the<br />

contract.<br />

(ii) A classified weekly return in the prescribed form of the number of persons<br />

employed on the works during the preceding week.<br />

(iii) A weekly medical report in the prescribed form showing the health of the<br />

Contractor’s camp, the number of persons ill or incapacitated and the nature of their<br />

illness.<br />

(iv) A report of any accident, which may have occurred, to be sent within 24 hours of<br />

the occurrence.<br />

(v) Such other reports as may be prescribed.<br />

78


B.2.65 Clause – 65 (B-1) / Clause-64 (B-2) : Treasure trove : In the event of discovery by the<br />

Contractor or his employees, during the progress of work of any gold, silver, oil or other<br />

minerals of any description and precious stones, treasures, coils, antiquities, relic fossils or<br />

other articles or value of interest whether geological, archaeological or any other such<br />

treasure & other things shall be deemed to be absolute property of the Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong> and the Contractor shall duly preserve the same to the satisfaction the<br />

Engineer in charge, from time to time, and deliver the same to such persons as the<br />

Engineer in charge may appoint.<br />

The Contractor shall take all reasonable precautions to prevent his workmen or any other<br />

person form removing or damaging any such articles or thins, immediately after the<br />

discovery thereof and before removal acquaint Engineer in charge with such discovery and<br />

carry out his orders for the disposal of the same.<br />

B.2.66 Clause – 66 (B-1) / Clause-65 (B-2): Indemnity: The Contractor shall indemnify the<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> against all actions, suits claims & demands through or<br />

made against the Amdavad <strong>Municipal</strong> <strong>Corporation</strong> in respect of work of this contract and<br />

against any loss or damage to AMC in consequence of any action or suit being brought<br />

against the contractor for anything done or omitted to be done in execution of the work of<br />

this contract.<br />

B.2.67 Clause – 67 (B-1) / Clause-66 (B-2): Insurance of labourers: The Contractor shall be<br />

responsible to arrange for insurance of all labourers. Skilled and unskilled, workers,<br />

supervisors etc., employed by him as per labour regulations of the state.<br />

B.2.68 Clause – 68(B-1) / Clause-67 (B-2) : Setting out : The Contractor shall be responsible for<br />

the true and proper setting out of the works and the correctness of positions, levels,<br />

dimensions and alignments of all parts of the work and for the provisions of all necessary<br />

instruments, appliance and labour in connection therewith. If, at any time, during the<br />

progress of the work, any errors, appear or arise in the positions, levels, dimensions or<br />

alignments of any part of the work, the Contractor, on being required to rectify such errors<br />

by the Engineer in charge shall at his own expense do so to the satisfaction of the Engineer<br />

in charge, if however, such error is based on incorrect data supplied in writing by the<br />

Engineer in charge, the expense of rectifying the same shall be borne by the <strong>Corporation</strong>.<br />

The checking of and setting out of any line or level by the Engineer in charge or his<br />

representative shall not in any way, relieve the contractor of his responsibilities for the<br />

correctness of the error. The Contractor shall carefully protect and observe all bench<br />

marks, site nails, pags and other thins used in setting out of the work(s).<br />

B.2.69 Clause – 69 (B-1) / Clause-68 (B-2): Deleted<br />

B.2.70 Clause – 70 (B-1) / Clause-69 (B-2): Deleted<br />

B.2.71 Clause – 71 (B-1) / Clause-70 (B-2): Progress schedule: The Contractor shall furnish,<br />

within one month (unless extended by the Engineer in charge) of the order to start the<br />

work, the progress schedule in quadruplicate indicating the date of starting, the monthly<br />

progress expected to be achieved and the anticipated completion date of each major item of<br />

work to be done by him, also indicating dates of procurement and setting up the materials<br />

plants and machinery. The Schedule should include a statement of proposed general and<br />

detailed arrangements for carrying out works and of time, order and manner in which it is<br />

proposed that these shall be executed. The schedule should be farmed keeping<br />

requirements of the clause 2 of Tender form in view and be such as in practice to the<br />

achievement towards completion of the work in the time limit and of the particular items<br />

79


on the dates specified in the contract and shall have the approval of the Engineer in charge.<br />

Further, the dates for the progress, as in this schedule shall be adhered to.<br />

(a) In case it is found necessary, at any stage, to alter the schedule, the Contractor shall<br />

submit in good time. A revised schedule incorporating necessary modifications<br />

proposed and get the same approved from the Engineer - in – charge is further<br />

empowered to ask for more detailed schedule or schedules, say, week by week, for<br />

any item or items and the Contractor shall supply the same as and when asked for.<br />

(b) The Engineer in charge shall have, at all times, the right, without in any way violating<br />

this contract forming grounds for any claim, to alter the order of the work or any part<br />

thereof and the Contractor shall also revise the progress schedules accordingly and<br />

submit four copies of the revised schedule to the Engineer - in – charge within seven<br />

days of the said Engineer’s direction to alter the order of works.<br />

(c) The Contractor shall furnish sufficient plant, equipment and labour and shall work<br />

such hours and shifts as may be necessary to maintain the progress of the work as per<br />

approved progress schedule. The working and shift hours shall comply with all<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> regulations in force and shall be such, as may be<br />

approved by the Engineer - in – charge and the same shall not be varied without the<br />

prior approval of Engineer - in – charge.<br />

(d) The Contractor shall from time to time, as may be required by the Engineer - in –<br />

charge, furnish the Engineer - in – charge with a statement in writing of the<br />

arrangements he proposes to adopt for the execution of this contract and the Engineer<br />

- in – charge may, if he considers necessary at any time advise alteration in the same,<br />

which the Contractor shall adopt on notice thereof.<br />

(e) The progress schedule(s) shall be in the form of progress chart, forms, statements<br />

and/or reports as may be approved by the Engineer - in – charge<br />

(f) The approval of the progress schedules by the Engineer - in – charge shall not relieve<br />

the Contractor of any of his duties and responsibilities under the contract. The<br />

adoption of any modification in the schedule required by the Engineer - in – charge<br />

shall not entitle the Contractor to any extra payment.<br />

B.2.72 Clause – 72 (B-1) / Clause-71 (B-2) : Secured advance to contract : (NOT APPLICABLE)<br />

(1) The secured advance will be paid on tested materials like cement and steel only after<br />

contractor furnish the bank guarantee for the amount of secured advance applied, test<br />

certificate and bill of payment. The contractor shall apply for secured advance in<br />

Form No. 31 prescribed by the Government of Gujarat and shall make mortgage deed<br />

while applying for secured advance.<br />

(2) Advance on security of materials brought to site will not exceed 75 percent of the<br />

value (as assessed by the Executive Engineer) of such materials provided that they are<br />

of imperishable nature.<br />

(3) Recovery of advances will be done as soon as it is used and it shall not be postponed<br />

until the whole of the work entrusted is completed. Secured advance shall be<br />

recovered within 3 months from the month in which secured advance is given even if<br />

material is not utilized in the work<br />

80


(4) Secured advance is permissible on materials which are actually brought on site and<br />

are required by the contractor for use on items if works for which rates for finished<br />

work have been agreed upon.<br />

(5) Secured advance will be given only on such materials for which the full cost is paid<br />

by the contractor to the seller.<br />

(6) When the secured on advance on material is to be granted for the amount more than<br />

50,000 the Executive Engineer will verify the quality and quantity of the material<br />

before payment of advance.<br />

(7) When the deficit material for which secured advance is given in noticed the<br />

contractor shall immediately notify the same to the Engineer-in-charge.<br />

B.2.73 Clause – 73 (B-1) / Clause-72 (B-2): Advance payment: Deleted<br />

B.2.74 Clause – 74 (B-1) / Clause-73 (B-2): Advance against machineries: Deleted<br />

B.2.75 Clause – 75 (B-1) / Clause-74 (B-2): Mobilization advance: Deleted<br />

B.2.76 Clause – 76 (B-1) / Clause-75 (B-2):<br />

Before starting the work, the contractor will have to obtain the license from the District<br />

Assistant Labor Commissioner under the contract labor (Regulation and abolition) Act,<br />

1970 and contract labor (Regulation and abolition) Gujarat Rules, 1972 after paying<br />

necessary fees and deposit on the basis of the number of laborers to be employed on the<br />

work and will have to supply two true copies of the said license to the client before the<br />

work is stared.<br />

B.2.77 Clause – 77 (B-1) / Clause-76 (B-2):<br />

All the testing works shall be carried out as specified in specifications at the cost of<br />

contractor.<br />

B.2.78 Clause – 78 (B-1) / Clause-77 (B-2): Deleted<br />

Annexure: The information in the following annexure specimens should be furnished on<br />

separate letter pad if necessary.<br />

81


Sr.<br />

No.<br />

ANNEXURE – 1<br />

(Referred to in Condition No. 2 General Rules and Direction for the guidance of<br />

contractors)<br />

To,<br />

The <strong>Municipal</strong> Commissioner, AMC<br />

Place:<br />

Date:<br />

Details regarding my / our partners / our company (in the case of limited company) Names,<br />

Address (es), telephone numbers(s) etc. are as under:<br />

Name(s) of<br />

person/partner<br />

Director of the<br />

Company<br />

Full address of<br />

the place of<br />

business<br />

(with pin code)<br />

Telephone<br />

No.(s) (Office)<br />

Residential<br />

address (es)<br />

(Resi.)<br />

Telephone<br />

No.(s)<br />

1 2 3 4 5 6<br />

I/We hereby agree to intimate to you about change if any, in the above mentioned address<br />

(es) and telephone No.(s) within Fifteen days of its occurrence till my / our deposit, for the<br />

said work paid by me/us is not returned to me/us.<br />

Dated Signature of Tenderer<br />

82


SECTION: B-3<br />

SCHEDULE S – A & B<br />

83


B – 3: SCHEDULES<br />

SCHEDULE ‘A’ – NOT APPLICABLE<br />

Schedule Showing (approximately) the materials to be supplied from the<br />

Amdavad <strong>Municipal</strong> <strong>Corporation</strong> Store for Work Contracted to be executed and<br />

the rates at which they are to be charged for<br />

Particulars<br />

Approximate<br />

Quantity<br />

Rate at which the materials will be<br />

charged to the Contractor<br />

Unit Rs.<br />

Place<br />

delivery<br />

Note – 1 : The person of firm submitting the tender should see that the rates in the<br />

above schedule are filled up by the Engineer - in – charge on the issue of<br />

the from prior to the submission of the tender.<br />

Note – 2 : Stores to be supplied to Contractors for a work free of cost should be<br />

mentioned in Schedule ‘A’ in addition to Schedule ‘B’ and the specification<br />

attached to the contract agreement form.<br />

Note – 3 : All empty drums involved in the supply by <strong>Corporation</strong> to the Contractor<br />

under this contract shall be returned in undamaged condition within the time<br />

prescribed by the <strong>Municipal</strong> Commissioner, AMC by the Contractor to the<br />

original place of delivery. No allowance on account of these empty drums<br />

will be made to the Contractor and in the event of non-return, Rs. 65 will be<br />

changed to the Contractor for each unreturned drum or badly damaged one.<br />

Note – 4 : Empty bags of cement supplied by the Government will be the property of<br />

the Contractor and no recovery for the non-return of the same will be made.<br />

84


Items No.<br />

SCHEDULE ‘B’<br />

Memorandum Showing Items of Works to be carried out<br />

Quantities<br />

estimated<br />

but may<br />

be more<br />

or less<br />

Estimated Rate<br />

Item of<br />

work In figures In words<br />

Unit<br />

Total<br />

amount<br />

according<br />

to<br />

estimated<br />

quantities<br />

1 2 3 4 5 6 7<br />

I/We am/are willing to carry out the work at _______________ (should be written in<br />

figures and words) the tendered amount mentioned above. Amount of my / our tender<br />

works out as under:<br />

Estimated amount put to tender: Rs. __________Estimated amount : Rs. _________<br />

Total Tender Amount Net : Rs. __________ Total Tender Amount : Rs. _________<br />

In words ______________________________________________________________<br />

Note – 1 : All work shall be carried out as per specification of AMC and in absence of<br />

specification, ISS specification shall be applicable.<br />

Note – 2 : Rate of each item should be written in figures and total amount of tender<br />

should be written in figure and word.<br />

Note – 3 : Rates quoted include clearance of site (prior commencement of work and at<br />

its close) in all respects and hold good for work under all conditions of site<br />

and all weather conditions. No extra payment shall be paid for dewatering<br />

and extra excavation.<br />

85


SECTION: B-4<br />

GENERAL INSTRUCTIONS<br />

86


B – 4: GENERAL INSTRUCTIONS<br />

B.4.1 The work shall be completed within specified time as mentioned in Section A2 of Volume-<br />

I after the order to start the work.<br />

B.4.2 The details of supply, installation, testing & commissioning of electrical & mechanical<br />

work shall be as per design and instructions of <strong>Municipal</strong> Commissioner, AMC and his<br />

order will be considered final.<br />

B.4.3 The Contractor shall have to properly store the material brought by him on site. This shall<br />

be kept open for inspection by AMC staff.<br />

B.4.4 The Contractor shall remain responsible for workmen’s compensation, if any, when such<br />

case occurs. The contractor shall arrange for red lamps at night and fencing and pagi and<br />

shall be responsible for any damage of life and limb or property, if any happens, during the<br />

execution of work. In case of dispute for unseen or overlooked items, the decision of<br />

<strong>Municipal</strong> Commissioner, AMC shall be final. The Contractor shall have to give site clean<br />

of all rubbish on completion of work and hand over the site with final finishing of the work<br />

as directed. All the rejected materials shall be removed from site within 24 hours by<br />

Contractor at his risk and cost.<br />

B.4.5 The contractor shall have to build a store at his own, however the space for the same will<br />

be provided by AMC.<br />

B.4.6 The Contractor shall have to make his own arrangement for water and power required for<br />

the work during execution stage.<br />

B.4.7 If any extra item crops up during the progress of works, the same shall be carried out by the<br />

contractor, after approval of <strong>Municipal</strong> Commissioner, AMC and he shall be paid at the<br />

rate fixed by the <strong>Municipal</strong> Commissioner, AMC as per the rate analysis based on current<br />

market rates or current SOR whichever is less.<br />

B.4.8 If in the interest of the AMC it is necessary to change either any site or the design of the<br />

proposed work the Contractor shall carry out the same at his quoted rates without charging<br />

any extra and he will be paid at the rates quoted by him and no claim for extra amount for<br />

subsequent changes made will be entertained.<br />

B.4.9 The work shall not be done on Sunday and holiday except in emergency or when technical<br />

requirements are such that continuity of work should be maintained and that too will be<br />

with prior permission of the competent authority<br />

B.4.10 All the materials required for the execution of works shall have to be brought by the<br />

contractor from open market.<br />

B.4.11 Octroi exemption passes shall not be given for any material required for this work.<br />

B.4.12 Contractor will be fully responsible for compliance of the various provisions under<br />

Contract Labor Act, 1970 and the Rules frames there under. The Contractor should obtain<br />

necessary permissions, license & registrations from labour commissioner, as per labour<br />

law.<br />

B.4.13 The bidder shall note that if the information required to be furnished by him either at the<br />

stage of pre-qualification or at the stage of bidding are not provided in time and its<br />

87


deliberated concealed and such information has come to the notice of AMC at any stage<br />

prior to award of Work and whether or not negatively affecting bidders competency the<br />

AMC reserve the right to out rightly reject the bid, though he is pre-qualified in the absence<br />

of such information.<br />

B.4.14 Contractor has to carryout initial survey before starting of the work and has to take<br />

necessary actions to protect and restore existing service lines. Any damage to such lines<br />

are to be repaired or reinstate by contractor at his own cost. In case of failure to carryout<br />

such repair or reinstatement of such damaged line by contractor AMC will carryout the<br />

same at the risk and cost of the contractor. No claim of contractor for such recovery work<br />

will be admissible. Any such service line is required to be shifted in the interest of the this<br />

work, same will be carried out by the contractor and the cost of same will be reimburse by<br />

AMC as per actual expenditure or prevailing market rate whichever is less.<br />

B.4.15 AMC has all right to alter or omit any item or part thereof<br />

B.4.16 All the precautionary measures for safety are to be taken by the contractor during execution<br />

of work at site.<br />

B.4.17 All necessary actions for any diversion of traffic shall be arranged by the contractor with<br />

all indicating signboards and fluorescent lighting system during night period.<br />

Signature of Tenderer : Additional Chief Engineer (S.O.E&M)<br />

Name : Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal :<br />

Date : Date :<br />

88


SECTION: B-5<br />

ANNEXURES<br />

89


B – 5: ANNEXURES<br />

• ANNEXURE - B.5 (A) : RULES FOR GRANT OF ADVANCE AGAINST MACHINERY ETC. - DELETED<br />

• ANNEXURE - B.5 (B) : RULES FOR GRANT OF MOBILISATION ADVANCE - DELETED<br />

• ANNEXURE - B.5 (C) : CAUSE FOR ARBITRATION - DELETED<br />

• ANNEXURE - B.5 (D) : PRICE ESCALATION - DELETED<br />

90


ANNEXURE –- B.5 (E)<br />

LIQUIDATED DAMAGES<br />

1. If the contractor fails to complete work or a designated part their of by stipulated completion<br />

date, he shall pay liquidated damages, at the rate 0.2% of balance work value per day from the<br />

date of delaying the same work up to the date of completion and handing over to AMC.<br />

2. The amount of liquidated damages shall, however be subjected to a maximum limit of 10 (ten)<br />

percent of quoted amount put to tender.<br />

3. Delay to the extent of payment of liquidated damages at 10% of the quoted amount shall be<br />

sufficient cause for termination of the contract and forfeiture of all security deposit and<br />

performance bond as well as contractor may be black listed<br />

Signature of Tenderer : Additional Chief Engineer (S.O.E&M)<br />

Name : Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal :<br />

Date : Date :<br />

91


ANNEXURE - B.5 (F)<br />

STAR RATE<br />

(DELETED)<br />

92


SECTION: B-6<br />

SCHEDULES<br />

93


B – 6: SCHEDULES<br />

DELETED<br />

PLEASE REFER THE SECTION A-2 FOR B-6 SCHEDULES INDICATING FROM FORMAT A<br />

2.1 TO A 2.8 WHICH ARE MANDATORY TO FILL BY ALL BIDDERS.<br />

94


SECTION: C<br />

C-1: GENERAL SPECIFICATIONS-NON TECHNICAL<br />

C-2: ADDITIONAL GENERAL CONDITIONS<br />

C-3: SAFETY PROVISIONS<br />

95


Sr.<br />

No.<br />

SECTION - C : SPECIFICATIONS : NON - TECHNICAL<br />

C.1 General Specifications<br />

CONTENTS<br />

Description Page No.<br />

C.1.1 Location and Description of Works 109<br />

C.1.2 Drawings 109<br />

C.1.3 Issue and Return of Contract Document 109<br />

C.1.4 Programme of Work 109<br />

C.1.5 Progress 110<br />

C.1.6 Time for Completion 110<br />

C.1.7 Certificates of Completion 110<br />

C.1.8 Patents, Rights and Royalties 110<br />

C.1.9 The Site 111<br />

C.1.10 Access to The Site 111<br />

C.1.11 Geological Information 111<br />

C.1.12 Setting Out The Works 111<br />

C.1.13 Temporary Works 111<br />

C.1.14 Amenities to Be Preserved 111<br />

C.1.15 Works to Be Kept Clear of Water (Not Applicable) 112<br />

C.1.16<br />

Discharge of Water into Existing Water Courses (Not<br />

Applicable)<br />

C.1.17 Preventive Measures of Pollution 112<br />

C.1.18 Effects of Weather 112<br />

C.1.19 Site to Be Kept Tidy 113<br />

C.1.20 Safety Measures and Services 113<br />

C.1.21 Claims for Damage to Persons or Property 114<br />

C.1.22 Assistance for The Engineer’s Staff 114<br />

C.1.23 Publicity Notice Board 115<br />

C.1.24 Clearing Site on Completion 115<br />

C.1.25 Forms of Monthly Statements 115<br />

C.1.26 Production of Vouchers, ETC 115<br />

C.1.27 Day-Work 115<br />

C.1.28 Claims 115<br />

C.1.29 Engineer’s Representative 116<br />

112<br />

96


Sr.<br />

No.<br />

Description Page No.<br />

C.1.30 Defects in Work 116<br />

C.1.31 Qualification and Experience of Tender 116<br />

C.1.32 Payment of Items on Lump sum Basis 117<br />

C.1.33 Interpretation of Documents 117<br />

C.1.34 Errors and Discrepancies in Tenders 117<br />

C.1.35 Information Furnished 117<br />

C.1.36 Payment Terms 117<br />

C.1.37 Brand Names 118<br />

C.1.38 Equipment for Execution 118<br />

C.1.39 Inspections and Tests 118<br />

C.1.40 Packing 119<br />

C.1.41 Delivery and Documents 119<br />

C.1.42 Insurance 119<br />

C.1.43 Transportation 119<br />

C.1.44 Spare Parts 119<br />

C.1.45 Warranty 120<br />

C.1.46 Record of Labour Employed 120<br />

C.1.47 Extra Item of Work 120<br />

C.1.48 Disputes 120<br />

C.1.49 (A) Annexure 121<br />

C.1.49 C.1.49 (B) Annexure 122<br />

C2 Additional General Conditions<br />

C.2.1 Taxes and Duties on Indigenous Material 124<br />

C.2.2 Rates for Extra Item 124<br />

C.2.3 Financial Bid 124<br />

C.2.4 Child Labour 124<br />

C-3 Safety Provisions 126<br />

97


SECTION: C-1<br />

GENERAL SPECIFICATIONS<br />

98


SECTION – C: SPECIFICATIONS: NON – TECHNICAL<br />

C – 1: GENERAL SPECIFICATIONS<br />

C.1.1 LOCATION AND DESCRIPTION OF WORKS<br />

C.1.1.1 SITC of Hydraulically operated Grit Mechanism with related Electrical work at E, E3, W<br />

& W5 sites with one year of Operation & Maintenance period for Sabarmati River Front<br />

Development <strong>Corporation</strong> Ltd. of Amdavad <strong>Municipal</strong> <strong>Corporation</strong>.<br />

C.1.2 DRAWINGS<br />

C.1.2.1 The work shall agree in all particulars with the contract drawings and amendments to<br />

drawings which shall be read in conjunction with the specification. A Schedule of<br />

Drawings accompanying the Specifications is given in Section G. Further drawings may<br />

be issued by the Engineer, if necessary, as the work proceeds.<br />

C.1.2.2 The enclosed drawings are for the reference of Tenderer and information only, as they are<br />

preliminary in nature. Owner/Engineer reserves the right to change the plans, locations,<br />

delete or add some parts of the work, etc. if warranted at the time of preparation of<br />

detailed drawings or as work proceeds. Contractor will have no claims on Owner/Engineer<br />

on this account. Contractor shall carefully scrutinize the drawings and he shall be<br />

responsible to point out discrepancy or anomalies if any to the Engineer before execution<br />

of the work affected thereby.<br />

C.1.2.3 Contractor, his employees and agents shall not disclose to anyone any information<br />

contained on drawings, or otherwise furnished to him by Owner / Engineer including all<br />

drawings, reports etc. prepared by Consultant / Contractor either individually or jointly for<br />

the execution of the works without prior approval of Engineer. No photographs of the<br />

works or plant within the site premises shall be taken without prior written approval of<br />

Owner / Engineer.<br />

C.1.3 ISSUE AND RETURN OF CONTRACT DOCUMENTS<br />

C.1.3.1 The original copy of signed contract document (including drawings will be retained by the<br />

AMC). The Contractor will be furnished with two sets of contract drawings and the<br />

certified copy of the accepted tender along with the Work Order free of cost. He will also<br />

be issued two sets of working drawings, free of cost, which will be issued progressively<br />

during the execution of the contract. Further copies of the contract drawings and working<br />

drawings if required by him shall supplied at the rate of Rs. 1500 per set of contract<br />

drawings and Rs. 500 per working drawing. The above contract drawings, working<br />

drawings and tender documents issued to Contractor shall remain as the property of the<br />

AMC and hence the Contractor shall have to return the same to the Engineer’s<br />

Representative not later than the end of the Defects Liability Period.<br />

C.1.4 PROGRAMME OF WORK<br />

C.1.4.1 The major works to be carried out under this contract form an important part of the AMC<br />

Sewage Scheme. Importance is placed on the proper programming of the electrical &<br />

mechanical work with adequate provision for all delays normally encountered.<br />

99


C.1.4.2 Notwithstanding the provisions of Clause B.2.6 of the Conditions of Contract, no<br />

extension of time will be granted by the Engineer in respect of inclement weather or its<br />

effects (such as floods or droughts), fire or industrial disputes unless such events could not<br />

reasonably have been foreseen by an experienced Contractor. All allowances to guard<br />

against such delays shall be clearly indicated in his programme.<br />

C.1.4.3 As soon as practicable after acceptance of his tender and in any case before starting work<br />

on site, the Contractor shall submit for the Engineer’s approval a detailed programme of<br />

work in the form of a PERT / CPM Network and a bar chart together with a description of<br />

his proposed methods of working. The programme shall take into account, the importance<br />

of completing the various parts of the works in accordance with Clause for time for<br />

completion of the Contract.<br />

C.1.5 PROGRESS<br />

C.1.5.1 The Contractor shall regularly review his programme in the light of the progress actually<br />

achieved and shall submit for approval updated PERT/CPM Network and bar charts at<br />

intervals to be agreed with the Engineer’s Representative. If progress falls behind that<br />

needed to ensure timely completion of the various parts of the works, the Contractor shall<br />

submit proposals for improving his methods and pace of working to the satisfaction of<br />

Engineer’s Representative and shall carry out such measures as are needed to ensure that<br />

the works are completed on time.<br />

C.1.6 TIME FOR COMPLETION<br />

C.1.6.1 The time limit for this Contract is as per Section-A2 “Memorandum of Work” is<br />

inclusive of monsoon period. The Contractor shall commence the works on site when<br />

ordered by the Engineer and shall proceed with the same with due expedition and without<br />

delay except as may be expressly sanctioned or ordered by the Engineer or be wholly<br />

beyond the Contractor’s control.<br />

C.1.7 CERTIFICATES OF COMPLETION<br />

C.1.7.1 If the Engineer issues a Certificate of Completion of a part of the works pursuant to Clause<br />

B.2.7 of the Conditions of Contract. The Contractor shall as far as practicable finish all<br />

outstanding work in that part of the works during the relevant Defects Liability Period. No<br />

Certificates of Completion shall relieve the Contractor or any of his obligations in<br />

connection with other Contractors whose work is carried out after the issue if such a<br />

certificate.<br />

C.1.8 PATENTS, RIGHTS AND ROYALTIES<br />

C.1.8.1 The Contractor shall save harmless and indemnify the <strong>Municipal</strong> Commissioner and the<br />

AMC from and against all claims and proceedings for or on account of infringement of<br />

any patents, rights, design, trade mark or name of other protected rights on respect of any<br />

Constructional plant, machine, work or material used for or in connection with the works<br />

or temporary works or any of them and from and against all claims, demands, proceedings,<br />

damages, costs, charges, and expenses whatsoever in respect thereof or in relation thereto.<br />

Except where otherwise specified, the Contractor shall pay all tonnage and other royalties,<br />

rent and other payments or compensation if any for getting stone, sand, gravel, clay or<br />

other materials required for the works or temporary works or any of them.<br />

100


C.1.9 THE SITE<br />

C.1.9.1 Tenderer must visit the work site and see for himself the site and ground conditions in all<br />

respects including availability of labour (skilled and unskilled), approaches, availability of<br />

water, electricity, materials, and all other matters affecting the work before submitting the<br />

tender.<br />

C.1.9.2 The submission of the tender by Tenderer implies that he had visited the work site, read<br />

the entire tender document and has made himself aware of the scope of specification of<br />

work to be performed and of the conditions and rates at which materials will be issued to<br />

him and local conditions and other factors which have a bearing on the execution of work.<br />

C.1.9.3 Owner will not, therefore, after acceptance of the tender, pay any extra charges for any<br />

reason whatsoever in case Contractor find later on to have misjudged the site and other<br />

conditions.<br />

C.1.10 ACCESS TO THE SITE<br />

C.1.10.1 The Contractor shall arrange to construct, maintain and afterwards remove and reinstate<br />

any temporary access required for and in connection with the execution of the works.<br />

Reinstatement shall include restoring the area of the access route to at least the degree of<br />

safety, stability, drainage and appearance that existed before the Contractor entered the<br />

site.<br />

C.1.11 GEOLOGICAL INFORMATION<br />

C.1.11.1 Bore hole data available with AMC can be inspected by the Contractor. The AMC accepts<br />

no responsibility, whatsoever for inferences drawn from this data and the Contractor is<br />

deemed to have satisfied himself on his own responsibility as to the extent to which this<br />

information represents the conditions to be encountered.<br />

C.1.12 SETTING OUT THE WORKS<br />

C.1.12.1 The Contractor shall be responsible for the true and proper setting out of the works in<br />

relation to original points, lines and levels of reference given by the Engineer in writing or<br />

shown on the Drawings and for correctness, subject as above mentioned in the position,<br />

levels, dimensions and alignment of all parts of the works and for the provision of all<br />

necessary instruments, appliances and labour in connection therewith.<br />

C.1.12.2 The checking of any setting out of any line or level by the Engineer’s Representative shall<br />

not in any way relieve the Contractor of his responsibility for the correctness thereof.<br />

C.1.13 TEMPORARY WORKS<br />

C.1.13.1 A reasonable time (in any case not less than 28 days) before he intends to commence<br />

construction of any temporary works, the Contractor shall submit full particulars including<br />

drawings of the same for the approval of the Engineer’s Representative. Submission to an<br />

approval by the Engineer’s Representative of any such particulars shall not relieve the<br />

Contractor of any of his responsibilities under the Contract.<br />

C.1.14 AMENITIES TO BE PRESERVED<br />

C.1.14.1 The Contractor shall cause the least possible interference with the existing amenities,<br />

whether natural of man made. No tree shall be felled without permission of the Engineer’s<br />

101


Representative and clearance of the site shall generally be kept to the minimum necessary<br />

for the works and temporary works. Temporary works shall be sited so as minimize the<br />

number of trees to be felled.<br />

C.1.15 WORKS TO BE KEPT CLEAR OF WATER – (NOT APPLICABLE)<br />

C.1.15.1 The Contractor shall keep the works well drained until the Engineer certifies that the<br />

whole of the works is substantially complete and shall ensure that so far as is practicable,<br />

all work is carried out in the dry. Excavated areas shall be kept well drained and free from<br />

standing water.<br />

C.1.15.2 The Contractor shall construct, operate and maintain all temporary dams, watercourses and<br />

other works of all kinds including pumping and well-point dewatering that may be<br />

necessary to exclude water from the works while they are in progress and till they are<br />

handed over to the AMC. This refers mainly to surface water that may enter into the<br />

excavated construction work. No separate payment will be made for such dewatering<br />

works / measures. Unit rates quoted by Contractor will be deemed to have covered<br />

expenses for such dewatering works. Such temporary works shall not be removed without<br />

the approval of the Engineer’s Representative.<br />

C.1.15.3 Notwithstanding any approval by the Engineer’s Representative of the Contractor’s<br />

arrangements for the exclusive of water, the Contractor shall be responsible for the<br />

sufficiency thereof and for keeping the Works safe at all times, particularly during any<br />

floods and for making good at his own expense any damage to the works including any<br />

that may be attributable to floods. Any loss of production or additional costs of any kind<br />

that may result from floods shall be at the Contractor’s own risk.<br />

C.1.16 DISCHARGE OF WATER INTO EXISTING WATER COURSES - (NOT<br />

APPLICABLE)<br />

C.1.16.1 The Contractor shall make provision for the discharge or disposal from the works and<br />

temporary works of all water and waste products howsoever arising and the methods of<br />

disposal shall be to the satisfaction of the Engineer’s Representative and of any Authority<br />

of person having an interest in any land or watercourse or in which waste may be so<br />

discharged. The requirements of this clause shall not limit any of the Contractor’s<br />

obligations or liabilities.<br />

C.1.17 PREVENTIVE MEASURES OF POLLUTION<br />

C.1.17.1 The Contractor shall ensure that all times during the construction of the works all<br />

reasonable precautions are taken to the satisfaction of the Engineer’s Representative to<br />

prevent pollution of the site and of the environment. In particular, the Contractor shall<br />

prevent pollution arising from the disposal or spillage of sewage, diesel fuel, oil, liquid<br />

mud, or from the disturbance of natural dust, aggregate dust or cement dust.<br />

C.1.18 EFFECTS OF WEATHER<br />

C.1.18.1 The Contractor shall ensure that no damage occurs to the works during construction by<br />

arranging adequate protection for excavation or building work against the effects of<br />

drought, sunshine, wind or rainfall (including erosion and flooding). No work shall be<br />

performed when in the opinion of the Engineer’s Representative such work is liable to be<br />

injuriously affected by the weather. The Contractor shall have no claim against the AMC<br />

on account of loss alleged to have been sustained directly or indirectly by reason of the<br />

102


Engineer’s Representative declining to permit such work to start or continue, or ordering<br />

any work damaged by the weather to be made good or removed and re-executed.<br />

C.1.19 SITE TO BE KEPT TIDY<br />

C.1.19.1 The Contractor shall keep the site and all working areas in a tidy and workman like<br />

condition and free from rubbish waste materials. Any temporary works, constructional<br />

plant, materials or other things which for the time being are not required for use by the<br />

Contractor may with the consent of the Engineer’s Representative be removed from the<br />

site but otherwise shall be dispersed about the site in an orderly fashion and shall be<br />

properly and securely stored thereon.<br />

C.1.20 SAFETY MEASURES AND SERVICES<br />

C.1.20.1 The Contractor shall be responsible for the safety of all workmen and other persons<br />

entering or in the works and shall take all measures necessary to ensure their safety to the<br />

approval of the Engineer’s Representative. Reference in these respects shall also be made<br />

to the Conditions of Contract and safety provisions but in particular, such measures shall<br />

include the following:<br />

(a) Provision of proper safety and emergency regulations’ fire, gas and electric shock<br />

precautions, stretchers, first-aid box and fire extinguisher together with rescue<br />

facilities generally for each place of working :<br />

(b) Provision of efficient safety helmets for all personnel including the Engineer’s<br />

Representative and each of his staff and any authorized visitors to site;<br />

(c) Safe control of water including provision of ample standby generating and pumping<br />

plant;<br />

(d) Provision and maintenance of suitable lighting to provide adequate illumination of<br />

works with appropriate spares and standby equipment;<br />

(e) Provision and maintenance of safe, sound mechanical equipment, each item of plant<br />

having an up-to-date testing certificates ;<br />

(f) Provision and maintenance of safe, sound, ropes, slings, pulleys and other lifting<br />

tackle, each appliance having an up-to-date testing certificate where appropriate;<br />

(g) Provision of notices 1.25 m x 1.5 m size written in bold letters in English, Gujarati<br />

and Hindi to be erected on existing footpaths and at points of access likely to be<br />

used by the pubic, which shall warn the public of the Works. These notices shall be<br />

in addition to any statutory requirements demanded of the Contractor.<br />

C.1.20.2 The Contractor shall submit for the approval of the Engineer’s Representative detailed<br />

proposals under (a) above. When the regulations have been approved and before the work<br />

started, the Contractor shall distribute copies in English or in other languages as<br />

appropriate to all his employees and to the Engineer’s Representative.<br />

C.1.20.3 The Contractor shall ensure that all his employee are fully conversant with the regulation,<br />

emergency and rescue procedures, etc. and the Contractor shall enforce the rule that any<br />

employee committing a serious breach of such a regulations shall be instantly dismissed<br />

and shall no be re-employed.<br />

C.1.20.4 Contractor shall provide and maintain at his own expenses all lights, guards, fencing and<br />

necessary watchmen when and where necessary or ad required by Owner / Engineer for<br />

103


the protection of the works or for the safety and convenience of those employed on the<br />

works and the public. Contractor shall also provide at his cost traffic barricades, men for<br />

diverting and controlling traffic, necessary sign boards for diversion of traffic. In the event<br />

of failure on the part of Contractor, Owner man with or without notice to Contractor put<br />

up a fence or improve a fence already put up or provide and/or improve the lighting or<br />

adopt such other measures as he may deem necessary, and all the cost of such work and<br />

procedures as may be adopted by Owner / Engineer shall be borne by Contractor.<br />

Maintenance of adequate warning and general lighting at nights a t place of work is<br />

essential.<br />

C.1.20.5 Contractor shall take the necessary permission and clearance of all the authorities like<br />

department of Roads, traffic, Water Supply and Drainage; Electricity Board, Telephone<br />

Company, etc. Wherever necessary and observe the regulations regarding the execution of<br />

work in congested areas, heavy traffic areas, etc.<br />

C.1.21 CLAIMS FOR DAMAGE TO PERSONS OR PROPERTY<br />

C.1.21.1 Any claim received by the AMC or the Engineer’s Representative in respect of matters in<br />

which the Contractor is required under the Contract to indemnify the AMC will be passed<br />

to the Contractor who shall likewise inform the AMC and the Engineer’s Representative<br />

of any such claim which is submitted directly to him by a claimant. The Contractor shall<br />

do everything necessary, including notifying the insures of claims received, to ensure that<br />

all claims are settled properly and expeditiously and shall keep the AMC and the<br />

Engineer’s Representative informed as to the progress made towards settlement, failing<br />

which the AMC shall be entitled to make direct payment to claimants of all outstanding<br />

amounts due to them in the AMCs. Opinion and without prejudice to any other method of<br />

recovery to deduct by way of offset the amounts so paid from any sums due or which<br />

become due from the AMC to the Contract.<br />

C.1.21.2 If the Contractor receives a claim which he considers to be in respect of matters in which<br />

he is indemnified by the AMC under the Contract, he shall immediately pass such claims<br />

to the AMC.<br />

C.1.21.3 Contractor will be solely responsible for any loss to life or limbs of workmen or the public<br />

arising out of inadequate protective and/or safety measures taken by Contractor and<br />

irrespective of whether or not Engineer has ordered Contractor to take protective and<br />

safety measures.<br />

C.1.22 ASSISTANCE FOR THE ENGINEER’S STAFF<br />

C.1.22.1 The Contractor shall provide all necessary assistance to the Engineer’s Representative and<br />

his staff in carrying out their duties of checking the setting out, inspecting and measuring<br />

the work. The Contractor shall provide necessary assistance including labourers as may be<br />

needed from time to time by the Engineer’s Representative.<br />

C.1.22.2 The Contractor shall provide for the Engineer’s Representative and his staff such<br />

protective clothing, safety helmets and rubber boots of suitable sizes as may reasonably be<br />

required by them. These articles shall remain the property of the Contractor. No separate<br />

payment shall be made on this account.<br />

C.1.23 PUBLICITY NOTICE BOARD<br />

104


C.1.23.1 In addition to Clause C.1.20.1 (g) above, the Contractor shall provide, maintain and<br />

remove at the end of the Defects Liability Period a publicity notice board constructed<br />

according to the requirements of the AMC.<br />

C.1.24 CLEARING SITE ON COMPLETION<br />

C.1.24.1 On completion of the Works, the Contractor shall clear away and remove from the site all<br />

Constructional Plant, surplus materials, rubbish, Temporary Works of every kind and<br />

leave the whole of the site and the works clean and in a workmanlike condition to the<br />

satisfaction of the Engineer.<br />

C.1.24.2 The Contractor shall comply with the above requirements before the start of the Defects<br />

Liability Period and by the end of that period shall clear, regrade terrace, level topsoil and<br />

grass all his working areas as instructed by the Engineer’s Representative. No separate<br />

payment shall be made on his account.<br />

C.1.25 FORMS OF MONTHLY STATEMENTS<br />

C.1.25.1 The Contractor shall raise the monthly bill as per Clause No. 10 of Section ‘B-2’.<br />

C.1.26 PRODUCTION OF VOUCHERS, ETC.<br />

C.1.26.1 The Contractor shall when required by the Engineer produce all quotations, invoices,<br />

vouchers, and accounts or receipts in connection with expenditure in respect of provisional<br />

sums.<br />

C.1.26.2 The contractor shall furnish to the Engineer’s Representative such receipts or other<br />

vouchers as may be necessary to provide the amounts paid and before ordering materials<br />

shall submit to the Engineer quotations for the same for his approval.<br />

C.1.27 DAY-WORK<br />

C.1.27.1 In respect of all work executed on a day work basis, the Contractor shall during the<br />

continuance of such work deliver each day to the Engineer’s Representative an exact list<br />

in duplicate of the names, occupations and time of all workmen employed on such work<br />

and a statement also in duplicate showing the description and quantity of all materials and<br />

plant used thereon or therefore (other the Schedule here in above referred to). One copy of<br />

each list and statement will if correct or when agreed to, be signed by the Engineer’s<br />

Representative and returned to the Contractor. At the end of each month, the Contractor<br />

shall deliver to the Engineer’s Representative a priced statement of the labour, materials<br />

and plant (except as aforesaid) used and the Contractor shall not be entitled to any<br />

payment unless such lists and statements have been fully and punctually rendered.<br />

Providing always that is the Engineer shall consider that for any reason the sending of<br />

such list of statement by the Contractor in accordance with the foregoing provision was<br />

impracticable, he shall nevertheless be entitled to authorize payment for such work either<br />

as day work (on being satisfied as to the time employed and plant and materials used on<br />

such work), or at such value therefore as shall in his opinion be fair and reasonable.<br />

C.1.28 CLAIMS<br />

C.1.28.1 The Contractor shall send to the Engineer’s Representative once in every month an<br />

account giving particulars (as full and detailed as possible) of all claims for any additional<br />

expense to which the Contractor may consider himself entitled and of all extra or<br />

additional work ordered by the Engineer which he has executed during the preceding<br />

105


month and no claim for payment for any such work will be considered which has not been<br />

included in such particulars. Provided always that the Engineer shall be entitled to<br />

authorize payment to made for any such work notwithstanding the Contractor’s failure to<br />

comply with this condition if the Contractor has at the earliest practicable opportunity<br />

notified the Engineer that he intends to make claim for such work.<br />

C.1.29 ENGINEER’S REPRESENTATIVE<br />

C.1.29.1 Where reference in the specification is made to the Engineer, the powers as described shall<br />

be deemed to be delegated to the Engineer’s Representative.<br />

C.1.30 DEFECTS IN WORK<br />

C.1.30.1 If any subsidence or breakdown or any defects take place in any part of the mechanical &<br />

electrical work whatsoever during defects liability period from the completion of the<br />

contracted work, Contractor shall make good the same at his own cost, or Owner /<br />

Engineer may without notice to Contractor make good the same in any and with any<br />

material that he may think proper and at the expense of Contractor. Owner / Engineer may<br />

also of he anticipates the occurrence of any subsidence, employ watchmen to look after the<br />

same unless it has been set right. The expenses of such watchmen shall be charged to<br />

Contractor.<br />

C.1.31 QUALIFICATION AND EXPERIENCE OF TENDERER<br />

C.1.31.1 Engineer will review the qualification and experience of the Tenderers in respect of<br />

(a) Past experience<br />

(b) Major works on hand<br />

(c) Technical personnel<br />

(d) Financial capacity<br />

(e) Method of execution proposed to be used<br />

(f) Any other relevant information.<br />

C.1.31.2 For this purpose, tenderers are requested to furnish information, in the Schedules 1 to 8<br />

enclosed. The above information shall be specific, self-explanatory and must bring out the<br />

qualifications and experience of the tenderer intending to carry out this Contract. Engineer<br />

reserves the right to reject any offer which, in the opinion of the Engineer, has been made<br />

by a Tenderer who does not qualify to meet the standards by way of experience, resources,<br />

and technical skills, expected of him.<br />

C.1.31.3 If the tender is submitted by a group of firms, it is necessary that the sponsoring firm<br />

submits separate and complete information about each firm in the group and identify those<br />

who have the responsibility for the execution of the work. It shall be clearly established in<br />

the tender as to who will be the lead firm and the expected participation or share of each of<br />

the members of the group.<br />

C.1.32 PAYMENT OF ITEMS ON LUMPSUM BASIS<br />

C.1.32.1 Items to be paid on “Lump sum” basis shall be paid only after these items are accepted by<br />

Engineer as 100% complete.<br />

106


C.1.33 INTERPRETATION OF DOCUMENTS<br />

C.1.33.1 Tenderers shall carefully examine the Tender documents and fully inform themselves as to<br />

all the conditions and matters which may in any way affect the work or the cost thereof.<br />

Should a tenderer find discrepancies in or omission from the specification or other<br />

document, or should he be in doubt as to their meaning, he should at once address a query<br />

to the <strong>Municipal</strong> Commissioner, AMC. Any resulting interpretation of the Tender<br />

Documents will be issued to all tenderers as an addendum. Verbal clarification and/or<br />

information given by the <strong>Municipal</strong> Commissioner, AMC shall not be binding on the<br />

AMC.<br />

C.1.34 ERRORS AND DISCREPANCIES IN TENDERS<br />

C.1.34.1 Should the Schedule of Quantities and Rates submitted with the tender be found to contain<br />

errors such as adding mistakes, incorrect transference and discrepancies between rates and<br />

amounts, the Engineer will advise the tenderer of any errors and discrepancies as a<br />

aforesaid which may have been found in the Schedule of Quantities and Rates and after<br />

discussions with the Tenderer, will make such amendments (and no others) as are proper<br />

to resolve the errors and discrepancies as aforesaid and will retotal the amount in Schedule<br />

of Quantities and Rates.<br />

C.1.34.2 In general the quoted unit price in the original tender will apply when discrepancies arise<br />

with the extended price.<br />

C.1.34.3 The foregoing procedure may be applied at any time prior to the acceptance of a tender,<br />

but the Engineer undertakes no responsibility towards any tenderer for any error or<br />

discrepancy which is not discovered during Engineer’s Examination of tenders.<br />

C.1.35 INFORMATION FURNISHED<br />

C.1.35.1 The information given to Tenderers in this tender document comprising of all parts is<br />

given in good faith and meant to serve only as a guide. Owner / Engineer will not hold<br />

himself responsible if any such information given for the guidance of Contractor is found<br />

to be incorrect, partly or in whole and or any deductions, conclusions or interpretation<br />

drawn by Contractor. It is, therefore, imperative that Tenderer must obtain and examine<br />

for himself all data, information and particulars required for the satisfactory execution of<br />

the work.<br />

C.1.36 PAYMENT TERMS<br />

Payment for goods & Services shall be made in Indian Rupees as follows:<br />

C.1.36.1 On supply & delivery at site: 70% of the quoted sanctioned price shall be paid on receipt<br />

of Goods and upon submission of the documents except O&M & spares & tools price.<br />

C.1.36.2 On erection at site: 20% of the quoted sanctioned price shall be paid on completion of<br />

erection work of major electrical equipments or major mechanical equipments except<br />

O&M & spares & tools price.<br />

C.1.36.3 On Testing & Commissioning at site: 7% of the quoted sanctioned price shall be paid after<br />

successful commissioning & remaining 3 % of the quoted sanctioned price shall be paid<br />

after commissioning & satisfactory Operation & Maintenance of six months & on<br />

107


submission of performance certificate of TPI & Design consultants & dully submission of<br />

spare, tools & tackles to AMC store.<br />

C.1.36.4 Not Applicable<br />

C.1.36.5 For spares & tools payment, shall be made within 15 days from raising of bill after<br />

handing over of spares & tools to the Client.<br />

C.1.36.6 If due to any reason, payment not paid within 30 days then tenderer not eligible to claim /<br />

demand any compensation for loss of interest thereof.<br />

C.1.37 BRAND NAMES<br />

C.1.37.1 The make of equipments shall be as per attached list. If make of a particular item is not<br />

given in the tender, it shall as approved by AMC.<br />

C.1.38 EQUIPMENT FOR EXECUTION<br />

C.1.38.1 To expedite the execution work, the contractor has to submit a complete list of equipment<br />

he proposes to deploy on this work along with the tender. Tenderer not complying with<br />

this requirement may be considered non-responsive and his tender is liable to be rejected.<br />

C.1.39 INSPECTIONS AND TESTS:<br />

C.1.39.1 The Purchaser or its representative shall have the right to inspect and / or to test the Goods<br />

to confirm their conformity to the Contract. The special conditions of contract and / or the<br />

Technical Specification shall specify what inspections and tests the Purchaser requires and<br />

where they are to be conducted. The Purchaser shall notify the Supplier in writing of the<br />

identifying of any representatives retained for these purposes. All the expenses related to<br />

inspection viz. lodging & boarding, transportation, all facilities including third party<br />

inspection (TPI) fees and other related commercial expanses as and where required shall<br />

be borne by the successful tenderer. Offered items for testing at manufacturer’s premises<br />

shall be done by third party inspection and owner’s (client’s) representative deputed by<br />

purchasers. TPI firms are CEIL/TCE/RITES/LLOYDS or any other firm decided by<br />

Purchaser (<strong>Ahmedabad</strong> Mun. <strong>Corporation</strong>) and contractor have to correlate with TPI and<br />

purchaser to carry out inspection and testing within stipulated time period so that project<br />

schedule time can be adhered to.<br />

Grit Mechanism shall be tested at manufacturer’s works in presence of third party<br />

inspection agency and AMC representative.<br />

After completing installation & commissioning work, performance test of the Grit<br />

Mechanism at actual site condition to be carried out by TPI agency and consultant.<br />

C.1.39.2 The inspections and tests may be conducted on the premises of the Supplier or its<br />

subcontractor(s), at point of delivery and / or at the Good’s final destination.<br />

C.1.39.3 Should any inspected or tested Goods fail to conform to the Specifications, the Purchaser<br />

may reject them and the Supplier shall either replace the rejected Goods or make all<br />

alterations necessary to meet specification requirements free of cost to the Purchaser.<br />

C.1.39.4 The Purchaser’s right to inspect, test and, where necessary, reject the Goods after the<br />

Good’s arrival in India shall in no way be limited or waived by reason of the Goods<br />

108


having previously been inspected, tested and passed by the Purchaser or its representative<br />

prior to the Goods’ shipment from the country of origin.<br />

C.1.39.5 Nothing in Clause 7 shall in any way release the Supplier from any warranty or other<br />

obligations under this Contract.<br />

C.1.40 PACKING:<br />

C.1.40.1 The Supplier shall provide such packing of the Goods as is required to prevent their<br />

damage or deterioration during transit to their final destination as indicated in the<br />

Contract. The packing shall be sufficient to withstand, without limitation, rough handling<br />

during transit and exposure to extreme temperatures, salt and precipitation during transit<br />

and open storage. Packing case size and weights shall take into consideration, where<br />

appropriate, the remoteness of the Good’s final destination and the absence of heavy<br />

handling facilities at all points in transit.<br />

C.1.40.2 The packing, marking and documentation within and outside the package shall comply<br />

strictly with such special requirements as shall be expressly provided for in the Contract<br />

and, subject to Clause 16, in any subsequent instructions ordered by the Purchaser<br />

C.1.41 DELIVERY AND DOCUMENTS:<br />

Delivery of the Goods shall be made by the Supplier in accordance with the terms<br />

specified by the Purchaser in its Scope of Work and the Special Conditions of Contract.<br />

C.1.42 INSURANCE:<br />

The Goods supplied under the Contract shall be fully insured against loss or damage<br />

incidental to manufacture or acquisition, transportation, storage and delivery in the manner<br />

specified in the Special Conditions of Contract.<br />

C.1.43 TRANSPORTATION:<br />

C.1.43.1 Where the Supplier is required under the Contract to deliver the Goods, FOB, transport of<br />

the Goods, up to ad including the point of putting the Goods, up to and including the point<br />

of putting the Goods on board the vessel at the specified port of loading, shall be arranged<br />

and paid for by the Supplier, and the cost thereof shall be included in the Contract Price.<br />

C.1.43.2 Where the Supplier is required to effect delivery under any other terms, for example, by<br />

post or to another address in the source country, the Supplier shall be required to meet all<br />

transport and storage expenses until delivery.<br />

C.1.44 SPARE PARTS:<br />

C.1.44.1 As specified in the Special conditions of Contract, the Supplier may be required to provide<br />

any or all of the following materials and notifications pertaining to spare parts<br />

manufactured or distributed by the Supplier if called for in Price schedule;<br />

(a) Such spare parts as the Purchaser may elect to purchaser from the Supplier, provided<br />

that this election shall not relieve the Supplier of any warranty obligations under the<br />

Contract; and<br />

(b) In the event of termination of production of the spare parts:<br />

109


(i) advance notification to he Purchaser of the pending termination, in sufficient time to<br />

permit the Purchaser to procure needed requirements; and<br />

(ii) Following such termination, furnishing at no cost to the Purchaser, the blue-prints,<br />

drawings and specifications of the spare parts, if an when requested.<br />

C.1.45 WARRANTY:<br />

C.1.45.1 The Supplier warrants that the Goods supplied under the Contract are new, unused, of the<br />

most recent or current models & incorporate all recent improvements in design &<br />

materials unless provided otherwise in the Contractor. The Supplier further warrants that<br />

the Goods supplied under this Contract shall have no defect arising from design, materials<br />

or workmanship (except insofar as the design or material is required by the Purchaser’s<br />

Specifications) or from any act or omission of the Supplier, that may develop under<br />

normal use of the supplied Goods in the conditions obtaining in India.<br />

C.1.45.2 This warranty shall remain valid for 60 months after the Goods, or any portion thereof as<br />

the case may be, have been delivered, erected and commissioned to the final destination<br />

indicated in the Contract, unless specified otherwise in the Special Conditions of<br />

Contractor.<br />

C.1.45.3 The Purchaser shall promptly notify the Supplier in writing of any claims arising under<br />

this warranty.<br />

C.1.45.4 Upon receipt of such notice, the Supplier shall, with all reasonable speed, repair or replace<br />

the defective Goods or parts thereof, without additional costs to the Purchaser other than,<br />

where applicable, the cost of inland delivery of the repaired or replaced Goods or parts<br />

from the port of entry to the final destination.<br />

C.1.45.5 If the Supplier, having been notified, fails to remedy the defect(s) within a reasonable<br />

period, the Purchaser may proceed to take such remedial action as may be necessary, at the<br />

Supplier's risk and expense and without prejudice to any other rights which the Purchaser<br />

may have against the Supplier under the Contract.<br />

C.1.46 RECORD OF LABOUR EMPLOYED<br />

C.1.46.1 Contractor shall keep record in the form of daily registers for the labourers and other<br />

working staff employed on the work site. The same should be kept open for the inspection<br />

of AMC.<br />

C.1.47 EXTRA ITEM OF WORK<br />

C.1.47.1 The extra work beyond tender item, if required to be executed during course of execution<br />

of regular work that shall have to be carried out by the contractor as per the instructions<br />

and satisfaction of the Engineer–in-charge. This will be paid separately as per detail rate<br />

analysis made by the department based on market rate or prevalent SOR whichever is less.<br />

C.1.48 DISPUTES<br />

C.1.48.1 Any legal dispute with the Contractor(s) will be settled with court of law within the area<br />

subject the <strong>Ahmedabad</strong> jurisdiction.<br />

110


1.0 ELECTRICITY<br />

C.1.49 ANNEXURES<br />

ANNEXURE – C.1.49 (A)<br />

ELECTRICITY<br />

Contractor shall make all arrangements for obtaining power connection, the installation,<br />

operation, maintenance and subsequent removal of temporary supply of electricity. AMC shall<br />

issue only authorization letter to Contractor for obtaining power connection, and yet if power<br />

is not available in time, the work shall not be postponed and the Contractor shall have to<br />

arrange for diesel generating set (s) at his own cost.<br />

Signature of Tenderer : Additional Chief Engineer (S.O.E&M)<br />

Name : Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal :<br />

Date : Date:<br />

111


ANNEXURE – C.1.49 (B)<br />

DEFECTS LIABILITY PERIOD AND REFUND OF SECURITY DEPOSIT<br />

The Defects Liability Period shall be as under and the amount of Security Deposit in the form of Bank<br />

Guarantee for the works under different items of contract after completion of the works shall be<br />

refunded as under:<br />

Sr. Security Deposit<br />

1<br />

2<br />

3<br />

5% of Contract<br />

value as Security<br />

Deposit.<br />

Defects Liability<br />

Period<br />

5% of contract value<br />

as Performance<br />

Bond<br />

Amount of Security deposit to be<br />

refunded on completion of work<br />

and certification issued by<br />

Engineer -In – Charge that effect<br />

Contractor shall provide a Bank<br />

Guarantee of 5% of Contract<br />

value, valid for 12 months, before<br />

start of work as security deposit.<br />

18 months from the date of supply<br />

or 12 months from the date of<br />

delivery of equipment at site<br />

whichever is later.<br />

Performance Bond shall be<br />

submitted by the contractor after<br />

completion and handing over of<br />

work. Security deposit may also be<br />

converted into performance bond<br />

and shall be released after the<br />

Operation & Maintenance Period of<br />

One year.<br />

Remarks<br />

The contractor shall be responsible to make good and remedy at his own expense any defect; which<br />

may develop or may be noticed before the defect liability period from the date of issue of completion<br />

certificate. The engineer-in-charge shall give the contractor a written notice about the defects and the<br />

contractor shall make good the same within 15 days of receipt of such notice. In case of failure on the<br />

part of the contractor, the engineer-in-charge may rectify or remove or re-execute the work at the risk<br />

and cost of the contractor. The engineer-in-charge shall be entitled to appropriate the whole of any<br />

part of the amount of security deposit towards the expense, if any, incurred by him in rectification,<br />

removal or re-execution.<br />

112


SECTION: C-2<br />

ADDITIONAL GENERAL CONDITIONS<br />

113


C – 2: ADDITIONAL GENERAL CONDITIONS<br />

C.2.1 TAXES AND DUTIES ON INDIGENOUS MATERIAL<br />

C.2.1.1 All charges on account of Octroi, Terminal Entry Tax, Sales Tax, Excise Duty, etc and<br />

other duties on indigenous material obtained for the works from any source shall be borne<br />

by the contractor (subject to provisions made in the tender). As per the amendment of Sales<br />

Tax Act which came into force from Aug. 1985, Sales Tax on Works Contracts shall be<br />

paid by the Contractor and no reimbursement will be made by the AMC for the same.<br />

C.2.2 RATES FOR EXTRA ITEM<br />

Please refer Clause No. 14.4 of Section – B2.<br />

C.2.3 FINANCIAL BID<br />

C.2.3.1 Financial bid should not contain any condition or enclosures except the quoted item-wise<br />

rates and the total amount for the work.<br />

C.2.4 CHILD LABOUR<br />

The contractor shall not employ any child below 15 years of age. It is prohibited by Child<br />

Labour Prohibition and Regulation Act. 1986. Honorable Supreme Court has given<br />

guidelines and as per those guidelines, if child labour is employed on the work site, the<br />

contractor shall have to deposit Rs. 20000 (Rupees Twenty Thousand Only) in the child<br />

labour welfare fund. If the contractor refuses to deposit this sum, then the action will be<br />

taken for contempt of Supreme Court Judgment and also will be prosecuted by the<br />

concerned authority.<br />

In case of provision of Child Labour Prohibition and Regulation Act, 1986 by the<br />

contractor and to that AMC shall recover the amount from the contractor.<br />

I/We hereby do certify that I/We have taken the above “Additional General & Technical<br />

Conditions” into account while bidding and have quoted our firm percentage accordingly.<br />

Signature of Tenderer : Additional Chief Engineer (S.O.E&M)<br />

Name : Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal :<br />

Date: Date:<br />

114


SECTION: C-3<br />

SAFETY PROVISIONS<br />

115


C – 3: SAFETY PROVISIONS<br />

C.3.1 Suitable scaffolds shall be provided for workmen for all that cannot safely be done from<br />

the ground, or from solid construction except such short period work as can be done safely<br />

from ladders. When a ladder is used, an extra mazdoor shall be engaged for holding the<br />

ladder and if the ladder is used for carrying materials as well, suitable footholds and<br />

handholds shall be provided on the ladder and the ladder shall be given an inclination not<br />

steeper than ¼ to 1 (¼ horizontal and 1 vertical).<br />

C.3.2 Scaffolding or staging more than 3.25 meters above the ground or floor, swung or<br />

suspended from an overhead support, or erected with stationery support, shall have a guard<br />

rail properly attached, bolted, braced, and otherwise secured at least 1 meter high above the<br />

floor or platform of such scaffolding or stating and extending along the entire length of the<br />

outside and ends thereof with only such openings as may be necessary for the delivery of<br />

materials. Such scaffolding or stating shall be so fastened as to prevent it from swaying<br />

form the building or structure.<br />

C.3.3 Working platforms, gangways, and stairways shall be so constructed that they do not sag<br />

unduly or unequally, and if height of a platform or gangway or stairway is more than 3.25<br />

meters above ground level or floor level, it shall be closely boarded, have adequate width<br />

and be suitably fenced as described in 2 above.<br />

C.3.4 Every opening in floor of a building or in a working platform shall be provided with<br />

suitable means to prevent fall of persons or materials by providing suitable fencing or<br />

railing with a minimum height of 1 meter.<br />

C.3.5 Safe means of access shall be provided to all working platforms and other working places.<br />

Every ladder shall be securely fixed. No portable single ladder shall be over 3 metres in<br />

length. Width between side rails in a rung ladder shall in no case be less than 30 cm for<br />

ladder up to and including 3 meters in length. For longer ladders, this width shall be<br />

increased by at least 6 mm for each additional 30 cm of length. Uniform step spacing shall<br />

not exceed 30 cm.<br />

C.3.6 Adequate precautions shall be taken to prevent danger from electrical equipment. No<br />

material on any of the sites shall be so stacked or placed as to cause danger or<br />

inconvenience to any person or the public. The Contractor shall provide all necessary<br />

fencing and lights to protect public from accidents and shall be bound to bear expenses of<br />

defense of every suit, action or other proceedings at law that may brought by any person<br />

for injury sustained owing to neglect of the above precautions and to pay all damages and<br />

costs which may be awarded in any suit, action or proceedings to any such person or which<br />

may with the consent of the AMC be paid to compromise any claim by any such person.<br />

C.3.7 Excavation and Trenching: All trenches, 1.5 meters or more in depth, shall at all time be<br />

supplied with at least one ladder for each 30 meters in length or fraction thereof. Ladder<br />

shall be extended from bottom of trench to at least 1 meter above surface of the ground.<br />

Sides of a trench which is 1.5 meters or more in depth shall be stepped back to give<br />

suitable slope, or securely held by timber bracing, so as to avoid the danger of sides<br />

collapsing. Excavated material shall not be placed within 1.5 meters of edge of trench or<br />

half of depth of trench, whichever is more. Cutting shall be done from top to bottom.<br />

Under no circumstance shall undermining or undercutting be done.<br />

C.3.8 Demolition: Before any demolition work is commenced and also during the process of the<br />

work:<br />

116


(a) All roads and open area adjacent to the work site shall either be closed<br />

or suitably protected.<br />

(b) No electric cable or apparatus which is liable to be a source of danger<br />

over a cable or apparatus used by operator shall remain electrically<br />

charged.<br />

(c) All practical steps shall be taken to prevent danger to persons employed,<br />

from risk or fire or explosion, or flooding. No floor, roof, or other part of<br />

a building shall be so over-loaded with debris or materials as to render it<br />

unsafe.<br />

C.3.9 All necessary personal safety equipment as considered adequate by the Engineer shall be<br />

available for use of persons employed on the site and maintained in a condition suitable for<br />

immediate use, and the Contractor shall take adequate steps to ensure proper use of<br />

equipment by those concerned.<br />

(a) Workers employed on mixing asphaltic materials, cement and lime<br />

mortars/concrete shall be provided with protective footwear, hand<br />

gloves and goggles.<br />

(b) Those engaged in handling any material which is injurious to eyes shall<br />

be provided with protective goggles.<br />

(c) Those engaged in welding works shall be provided with welder’s<br />

protective eye-shields.<br />

(d) Stonebreakers shall be provided with protective goggles and protective<br />

clothing and seated at sufficiently safe intervals.<br />

(e) When workers are employed in sewers and manholes, which are in use,<br />

the Contractor shall ensure that manhole covers are opened and<br />

manholes are ventilated at least for an hour before workers are allowed<br />

to get into them. Manholes so opened shall be cordoned off with suitable<br />

railing and provided with warning signals or boards to prevent accident<br />

to public.<br />

(f) The Contractor shall not employ men below the age of 18 and women<br />

on the work of painting with products containing lead in any form.<br />

Whenever men above the ages of 18 are employed on the work of lead<br />

painting, the following precautions shall be taken :<br />

i. No paint containing lead or lead products shall be used except in<br />

the form of paste or ready made paint.<br />

ii. Suitable face masks shall be supplied for use by workers when<br />

paint is applied in the form of spray or a surface having lead<br />

paint dry rubbed and scraped.<br />

iii. Overalls shall be supplied by the Contractor to workmen and<br />

adequate facilities shall be provided to enable working painters<br />

to wash during and on cessation of work.<br />

117


C.3.10 When work is done near any place where there is a risk of drowning, all necessary<br />

equipment shall be provided and kept ready for use and all necessary steps taken for<br />

prompt rescue of any person in danger and adequate provision made for prompt first aid<br />

treatment of all injuries likely to be sustained during the course of the work.<br />

C.3.11 Use of hoisting machines and tackle including their attachments, anchorage, and supports<br />

shall conform to the following:<br />

C.3.11.1 (i) These shall be of good mechanical construction, sound material and adequate strength<br />

and free from patent defects and shall be kept in good repair and in good working<br />

order.<br />

(ii) Every rope used in hoisting or lowering materials or as a means of suspension shall be<br />

durable quality and adequate strength, and free from patent defects.<br />

C.3.11.2 Every crane driver or hoisting appliance operator shall be properly qualified and no person<br />

under the age of 21 years shall be in charge of any hoisting machine including any scaffold<br />

winch or give signals to operator.<br />

C.3.11.3 In case of every hoisting machine and of every chain ring hook, shackle, swivel and pulley<br />

block used in hoisting or lowering or as means of suspension, safe working load shall be<br />

ascertained by adequate means. Every hoisting machine and all gear referred to above shall<br />

be plainly marked with safe working load. In case of a hoisting machine having a variable<br />

safe working load, each safe working load and the conditions under which it is applicable<br />

shall be clearly indicated. No part of any machine or of any gear referred to above in this<br />

paragraph shall be loaded beyond safe working load except for the purpose of testing.<br />

C.3.11.4 In case of departmental machine, safe working load shall be notified by the Engineer. As<br />

regards Contractor’s machine, the Contractor shall notify safe working load of each<br />

machine to the Engineer whenever he brings it to site of work and get it verified by the<br />

Engineer.<br />

C.3.12 Motors, gearing, transmission, electric wiring and other dangerous parts of hoisting<br />

appliances shall be provided with efficient safeguards, hoisting appliances shall be<br />

provided with such means as will reduce to the minimum risk of accidental descent of load<br />

adequate precautions shall be taken to reduce to the minimum risk of any part of a<br />

suspended load becoming accidentally displaced. When workers are employed on electrical<br />

installations which are already energized, insulating mats, wearing apparel such as gloves,<br />

sleeves and boots, as may be necessary, shall be provided. Workers shall not wear any<br />

rings, watches and carry keys or other materials which are good conductors of electricity.<br />

C.3.13 All scaffolds, ladders and other safety devices mentioned or described herein shall be<br />

maintained in a safe condition and no scaffold, ladder or equipment shall be altered or<br />

removed while it is in use. Adequate washing facilities shall be provided at or near places<br />

of work.<br />

C.3.14 These safety provisions shall be brought to the notice of all concerned by display on a<br />

notice board at a prominent place at the work spot. Persons responsible for ensuring<br />

compliance with the Safety Provisions shall be named therein by the Contractor.<br />

C.3.15 To ensure effective enforcement of the rules and regulations relating to safety precautions,<br />

arrangements made by the Contractor shall be open to inspection by the Engineer or his<br />

representative and the Inspecting Officers.<br />

118


C.3.16 Notwithstanding the above provisions 1 to 15, the Contractor is not exempted from the<br />

operation of any other Act or Rule in force.<br />

Signature of Tenderer : Additional Chief Engineer (S.O.E&M.)<br />

Name : Amdavad <strong>Municipal</strong> <strong>Corporation</strong><br />

Company’s seal :<br />

Date: Date:<br />

119


PART – II<br />

TECHNICAL SPECIFICATIONS<br />

120


SECTION: D<br />

TECHNICAL SPECIFICATIONS<br />

FOR<br />

MECHANICAL WORK<br />

121


PROJECT :<br />

DOCUMENT : INDEX<br />

SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM AT E, E3,<br />

W & W5 SITES OF SABARMATI RIVER FRONT DEVLOPMENT<br />

CORPORATION LTD. FOR AMDAVAD MUNICIPAL CORPORATION<br />

SECTION – D : MECHANICAL<br />

SR. NO. TITLE PAGE NOS.<br />

1.0 MATERIALS AND WORKMANSHIP 126<br />

2.0 LIST OF STANDARDS 135<br />

3.0 GRIT MECHANISM 137<br />

4.0 TESTING, ERECTION AND COMMISSIONING 139<br />

5.0 LIST OF APPROVED VENDORS 146<br />

122


SECTION: D<br />

TECHNICAL SPECIFICATIONS FOR MECHANICAL WORK WITH DATA SHEETS<br />

1.0 INTRODUCTION :<br />

1.0 MATERIALS AND WORKMANSHIP<br />

This part of the Specification sets out the general standards of materials to be supplied and the<br />

workmanship required to be ensured by the Contractor and mention of any specific material or<br />

Plant does not necessarily imply that such is included in the Works. All component parts of the<br />

Works shall, unless otherwise specified, comply with the provisions of this part or be subject to<br />

the approval of the Engineer.<br />

The names of the manufacturers of materials and equipment proposed for incorporation in the<br />

Works together with performance, capacities, certified test reports and other significant<br />

information shall be furnished by the Contractor.<br />

1.1 COMPLIANCE WITH STANDARDS :<br />

Where reference is made in the Specification to a British Standard Specification (hereinafter<br />

abbreviated to ‘B.S.’) issued by the British Standards Institution of 2, Park Street, London<br />

W.I., or to an Indian Standard Specification (I.S.) issued by the Bureau of India Standards,<br />

(earlier known as Indian Standard Institution), Manak Bhavan, 9 Bahadur Shah Zafar Marg,<br />

New Delhi 110 002, American Society for Testing and Materials (ASTM) issued by ASTM<br />

1916 Race Street, Philadelphia, P.A., 19103, U.S.A. or American national Standards Institute<br />

(ANSI) issued by ANSI 1430, Broadway, New York, N.Y., 10018, U.S.A. or to any other<br />

equivalent standard it shall be to the latest revision of that standard at the tender opening date.<br />

The Contractor may propose at no extra cost to the Employer, the use of any relevant<br />

authoritative Internationally recognized Reference Standard, including Indian Standard.<br />

All details, materials and equipment supplied and workmanship performed shall comply with<br />

these standards. If Contractors offer equipment to other standards, the equipment / material<br />

should be equal or superior to those specified and full details of the difference shall be<br />

supplied.<br />

In the event of conflict between this specification and the codes for equipment, provisions of<br />

this specification shall govern.<br />

1.2 MATERIALS – GENERAL<br />

All materials incorporated in the Works shall be the most suitable for the duty concerned and<br />

shall be new and of reputed make / approved quality, free from imperfections and selected for<br />

long life and minimum maintenance. Nondestructive tests, if called for in the specification,<br />

shall be carried out.<br />

All submerged moving parts of the Plant, or shafts, spindles, etc. of the submerged moving<br />

parts or faces etc. in contact with them shall be of corrosion resistant materials. All parts in<br />

direct contact with various chemicals, shall be completely resistant to corrosion, or abrasion by<br />

these chemicals, and shall maintain their properties without aging due to the passages of time,<br />

exposure to light or any other cause.<br />

123


1.3 WORKMANSHIP – GENERAL<br />

1.3.1 Workmanship and general finish shall be of first class quality and in accordance with best<br />

workshop practice.<br />

1.3.2 All similar items of the Plant and their component parts shall be completely interchangeable.<br />

Spare parts shall be manufactured from the same materials as the originals and shall fit all<br />

similar items. Machining fits on renewable parts shall be accurate and to specified tolerances<br />

so that replacements made to may be readily installed.<br />

1.3.3 All equipment shall operate without excessive vibration and with minimum noise. All<br />

revolving parts shall be truly balanced both statically and dynamically so that when running at<br />

normal speeds at any load up to the maximum there shall be no vibration due to lack of<br />

balance.<br />

1.3.4 All parts which can be worn or damaged by dust shall be totally enclosed in dust proof<br />

housings.<br />

1.3.5 All materials incorporated in the work shall be most suitable for duty concerned, free from<br />

imperfections, selected for long life and minimum maintenance.<br />

1.3.6 All necessary accessories required for satisfactory and safe operation of the Plant shall be<br />

supplied by the Contractor unless it is specifically excluded from his scope.<br />

1.3.7 All flanges shall be drilled in accordance with requirements of IS: 1538.<br />

1.3.8 All flanges shall be full or spot faces on the back side. The flange thickness shall be uniform<br />

throughout.<br />

1.3.9 Flange outside periphery shall be concentric with the bore. Flanges shall be finished smooth on<br />

periphery also.<br />

1.3.10 Castings and fabricated materials shall be finished smooth all over.<br />

1.4 WELDING<br />

1.4.1 Design Approval<br />

Welding shall comply with the latest revision of the BS 5135 code. In all welded fabrications,<br />

the Contractor shall submit to the Engineer’s Representative before fabrication commences,<br />

detailed drawings of fabrication with sizes of weld and weld preparation together with the<br />

details of the application codes. No welding shall be carried out before approval of the details<br />

by the Engineer’s Representative. No alternations shall be made to any previously approved<br />

details of weld preparation or size without prior approval of the Engineer’s Representative.<br />

1.4.2 Qualification of Welders and Procedures<br />

Welders shall be qualified in accordance with the requirement of the appropriate <strong>section</strong> of BS<br />

4871 part1. The Engineer shall have the right to call for further Qualification from time to time<br />

from any welder who in the opinion of the Engineer, does not produce weld in accordance with<br />

the qualification. Each welder shall be assigned a number and letter. Each weld shall clearly be<br />

identified as to its welder marking the welder’s code adjacent to the welds. A record chart shall<br />

be maintained for each welder showing the procedure for which he has qualified, the date of<br />

such qualification, the type of defects produced and their frequency. The Engineer’s<br />

124


Representative shall disqualify the welder whose work requires a disproportionate amount of<br />

repairs. All procedures where required shall be qualified as per BS 4870 Part 1.<br />

1.4.3 General Welding Requirements<br />

A) Inspection and quality of surveillance shall not be limited to the examination of finished welds.<br />

All aspects of materials, fabrication procedures and examination procedures shall be subject to<br />

the approval of the Engineer’s Representative. The equipment used shall be suitable for the<br />

quality of work specified. The techniques employed shall be based on methods which are<br />

known to produce good results and which have been verified at Site by actual demonstration.<br />

B) Haphazard striking of the electrodes for establishing arc shall not be permitted. The arc shall be<br />

struck either on the joint or on a starting tag. The starting tag shall be of the same material or a<br />

material compatible with the base metal being welded. In case of any inadvertent strike on<br />

place other than the welding, the area affected shall be ground flushed and examined by liquid<br />

penetration method.<br />

C) Generally, a stringer bead technique shall be used with a slight oscillation if necessary to avoid<br />

slag and to minimize the number of beads needed to fill the joint. However, the width of the<br />

deposited pass shall not exceed 3 times the wire diameter. Vertical welds shall be made in<br />

upward direction. For whenever possible, by 2 welders working simultaneously along both<br />

sides of the pipe.<br />

D) All joint fit ups shall comply with the tolerances specified on the manufacturing drawings. The<br />

root pass shall have less than 1.5 mm internal reinforcement. Defects like icicles, burn through<br />

and excessive “suck bak”, etc. shall be cause for rejection of welds.<br />

E) Final welds shall be suitable for appropriate fabrication of the non-destructive examination of<br />

the weld. If grinding is necessary, the weld shall be blended into the parent metal without<br />

gouging or thinning of the parent metal in any way. Uneven and excessive grinding may be a<br />

cause for rejection. Fillet weld shall preferably be convex and free from Fillet weld shall<br />

preferably be convex and free from undercutting and overlap at the toe of weld. Convexity and<br />

concavity shall not exceed 1.5 mm. The leg length shall not exceed the specified size by more<br />

than 1.5 mm.<br />

F) All attachments such as lugs, brackets and other non pressure parts shall also be done by<br />

qualified welders in accordance with the design details and materials specifications. Temporary<br />

attachments shall be removed in a manner that will not damage the parent metal. Areas of<br />

temporary attachments shall be dressed smooth and examined by ultrasonic or liquid<br />

penetration methods.<br />

G) All tack welds shall be made using qualified procedure and welders, the number of size of tack<br />

welds shall be kept as small as to consist of adequate strength and joint alignments. All tack<br />

welds shall be examined visually for defects and if found defective shall be completely<br />

removed. As welding proceeds, tack welds shall be either removed completely or shall be<br />

properly prepared by grinding or filling their starting ends so that they may be satisfactorily<br />

incorporated in the welds. Unacceptable defects shall be removed by grinding machine or<br />

chipping or gouging. Flame gouging may be permitted provided gouged surfaces are ground at<br />

least by 1.0 mm below the deepest indentation.<br />

H) All weld repairs shall be carried out using the approved welding procedures and welders.<br />

Preparation of weld repair shall have the prior approval of the Engineer’s Representative. Rewelded<br />

areas shall be re-examined by the methods specified for the original welds and repair<br />

procedures shall be duly qualified by the Engineer’s Representative.<br />

125


1.4.4 Pre-heating and Post-heating Treatment<br />

Pre-heating and post heating treatment shall conform to the relevant application codes. Pre -<br />

heating not exceeding 121 deg. C for all carbon steel construction above 25 mm thickness<br />

would be mandatory. Such pre-heating would be maintained during flame cutting, flame or arc<br />

gouging, welding and repairs and may be done by gas heating by gas torches / gas rings with<br />

neutral flame. The temperature shall be checked by temperature will not be necessary for welds<br />

less than 6 mm size. In large diameter pipe fabricated out of plate materials, production control<br />

test plates in accordance with the BS 4870 Part 1 Table 6 to represent 30% of the long seams<br />

ad each welder’s performance would be mandatory.<br />

1.4.5 Electrodes<br />

The makes and types of electrodes to be used shall be submitted for approval of the Engineer.<br />

All electrodes shall be stored in their original sealed containers under dry conditions.<br />

Electrodes shall remain identified until consumed. All electrodes shall be dried before use.<br />

Drying ovens shall be provided in work areas for drying purposes. Electrodes withdrawn from<br />

oven shall be promptly used and excess unused electrodes shall be promptly returned to oven.<br />

1.4.6 Examination / NDT / Radiography<br />

The various stages of examination and types shall be as stipulated in the respective fabrication<br />

codes. Radiographic examination shall be carried out as per provisions of BS 2600 or BS 2910:<br />

ultrasonic tests where called for shall be carried out as per provisions of BS 3923: magnetic<br />

particle tests shall be carried out as per BS 6072. Liquid penetration tests shall be carried out as<br />

per BS 6443.<br />

1.4.7 Stainless Steel Welding<br />

All welding consumables such as electrodes, filler wires, argon gas for shieling and purging<br />

shall be of high quality and the proposed brand shall be furnished for approval of the Engineer.<br />

Weld deposits shall have similar or higher physical properties and similar chemical<br />

composition o the members joined.<br />

All electrodes shall be purchased in sealed containers only and stored in their packing intact.<br />

The packets opened shall be consumed as early as possible. The electrodes removed from the<br />

containers shall be kept in holding ovens at temperatures recommended by electrode<br />

manufacturer. Special care shall be taken in avoiding mixing of electrodes in the oven.<br />

The electrodes and filling wires shall be free from rust, oil, grease, earth and other foreign<br />

matter.<br />

Argon gas with purity 99.5% shall be used for shielding and purging. The purity of gas shall be<br />

certified by the gas manufacturers.<br />

Non destructive examination of the welds shall be carried out to ensure quality of weld.<br />

The electric current for welding shall be direct current, straight polarity (electrode negative).<br />

The welding current shall be kept minimum possible to ensure minimum heat affected zone in<br />

the parent material. Other side of the weld joint shall be periodically flushed with argon gas.<br />

1.5 CASTINGS<br />

126


1.5.1 Cast iron shall be of standard grey close-grained quality. The structure of the castings shall be<br />

homogeneous and free from non-metallic inclusions and other injurious defects. All surfaces of<br />

castings which are not machined shall be smooth and shall be carefully fettled to remove all<br />

foundry irregularities.<br />

1.5.2 Minor defects in depth not exceeding 12.5 percent of total metal thickness and which will not<br />

ultimately affect the strength and serviceability of the casting may be repaired by approved<br />

welding techniques. The Engineer’s Representative shall be notified of large defects and no<br />

repair welding of such defects shall be carried out without prior approval of the Engineer / his<br />

representative. If the removal of metal for repair should reduce the stress 25 percent, or to such<br />

an extent that the computed stress in the remaining metal exceeds the allowable stress by more<br />

than 25 percent, then that casting shall be rejected. Test coupons cast simultaneously with the<br />

main castings shall be identified by the Engineer / or his Representative to check physical,<br />

chemical analysis of casting.<br />

1.5.3 Major defects on casting are not acceptable. Castings repaired by welding for minor defects<br />

shall be stress-relieved after such welding. Castings subject to hydraulic pressure shall be<br />

pressure tested to 1 ½ times the rated pressure or, twice the working test reports shall be<br />

forwarded to the Engineer’s Representative as soon as each test has been completed. Nondestructive<br />

tests as directed by the Engineer’s Representative will be required for any casting<br />

containing defects whose extent cannot otherwise be judged, or to determine where repair<br />

welds have been properly made.<br />

1.5.4 Unless otherwise specified casting shall produced to the following standards or equal:<br />

(a) Grey Iron : BS 1452 Grade 220<br />

(b) Carbon Steel : BS 3100 Steel Alloy<br />

(c) Stainless Steel : BS 3100 Steel 316 C16<br />

(d) Copper & Copper Alloy : BS 1400<br />

Group A Grade LG2<br />

Group B Grade CT1, AB2<br />

Group C Grade G1<br />

1.6 FORGINGS<br />

All major stress-bearing forgings shall be made to a standard specification. Forgings shall be<br />

subjected to magnetic particle testing or dye penetration test at the areas of fillets and change in<br />

<strong>section</strong>. The testing shall be conducted after rough machining (10 microns). Any defect which<br />

will not machine out during the final machining, will be gouged out fully, inspected by dye<br />

penetration or magnetic particle inspection to ensure that the defect I fully removed and<br />

repaired using an approved repair procedure. An indication, which proves to penetrate deeper<br />

than 2.5 % of the finished thickness of the component, shall be reported to the Engineer giving<br />

the details like location, length, width and depth. For the magnetic particle inspection the<br />

choice of wet or dry particles shall be at the Contractor’s discretion. All forgings shall be<br />

demagnetized after test and shall be heat treated for the relief of residual stresses. The name of<br />

the maker and particulars of the heat treatment proposed for each such forging shall be<br />

submitted to the Engineer’s Representative. The Engineer’s Representative or the Inspector<br />

may inspect such forgings and identify test coupons to check physical and chemical analysis<br />

and witness such tests at the place of manufacture with a representative of the Contractor.<br />

1.7 DESIGN LIFE<br />

1.7.1 The works as a whole shall be new, of sound workmanship, robustly designed for a long<br />

reliable operating life and shall be capable of 24 hours per day continuous operation for<br />

127


prolonged period in the climatic and working conditions prevailing the site, and with the<br />

minimum of maintenance. Particular attention shall be given to temperature changes, the<br />

stability of paint finish for high temperatures, the rating of engines, electrical machinery,<br />

thermal overload services, cooling systems and the choice of lubricants for possible high and<br />

prolonged operating temperatures. The Contractor shall be called upon to demonstrate this for<br />

an component part either by service records, or evidence of similar equipment already installed<br />

elsewhere or relevant type tests. Routine maintenance and repair shall as far as possible not<br />

require the services of highly skilled personnel.<br />

1.7.2 The Plant shall be designed to provide easy access to and replacement of component parts,<br />

which are subject to wear, without the need to replace whole units. No parts in the contact with<br />

sewage shall have a life from new to replacement or repair of less than five years. Where major<br />

dismantling is unavoidable to replace a part, the life of such part shall not be less than ten<br />

years.<br />

1.7.3 Design features shall include the protection of Plant against damage caused by vermin, dirt,<br />

dust and dampness and to reduce risk of fire. Plant shall operate without undue vibration, and<br />

parts shall be designed to withstand the maximum stresses under the most severe condition of<br />

normal service. Materials shall have a high resistance to change in their properties due to the<br />

passage of time, exposure to light, temperature and any other cause which may have a<br />

detrimental effect upon the performance or life of the Works.<br />

1.7.4 Plant located outside lockable areas/buildings shall have additional features to prevent<br />

unauthorized operation.<br />

1.8 LUBRICATION<br />

1.8.1 A complete schedule of recommended oils and other lubricants shall be furnished by the<br />

Contractor. The number of different types of lubricants shall be kept to a minimum. The<br />

schedule and the name of the supplier of the lubricants shall be submitted to the Engineer’s<br />

Representative for approval before incorporation in the Instruction Manuals. In he case of<br />

grease lubricated roller type bearings a lithium base grease is preferred.<br />

1.8.2 Contractors shall indicate indigenously available equivalent lubricants, with complete duty<br />

specification, to enable the <strong>Corporation</strong> to arrange for regular supply.<br />

1.8.3 Where lubrication is effected by means of grease, preference shall be given to a pressure<br />

system which does not require frequent adjustment or recharging. Frequent, for this purpose,<br />

means more than once in a month and grease systems having shorter periods between greasing<br />

should be avoided. Where necessary for accessibility grease nipples shall be placed at the end<br />

of the extension piping, and when a number of such points can be grouped conveniently, the<br />

nipples shall be brought to a battery plate mounted in a convenient position. All grease nipples<br />

shall be of the same size and type for every part of the Plant. Arrangements shall be provided<br />

to prevent bearings being overfilled with either grease or oil.<br />

1.8.4 Where more than one special grease is required, a grease gun for each special type shall be<br />

supplied and permanently labeled.<br />

1.8.5 Oil containers shall be supplied complete with oil level indicators of the sight glass type, or<br />

where this is not practicable, with dipsticks. The indicators shall show the level at all<br />

temperatures likely to be experienced in service. The levels shall be clearly visible in the sight<br />

glass type from the normal access floor to the particular item of Plant and they shall be easily<br />

dismantled for cleaning. All sight glasses shall be firmly held and enclosed in metal protection<br />

128


in such firmly held and enclosed in metal protection in such manner that they cannot be<br />

accidentally dislodged.<br />

1.8.6 All lubrication systems shall be designed so as not to cause a fire or pollution hazard and<br />

particular care shall be taken to prevent leakage of lubricants and to avoid leaking lubricants<br />

coming into contact with any electrical equipment, heated surfaces or any other potential<br />

source of fire.<br />

1.8.7 The Contractor shall supply flushing oil for each lubrication system when an item of Plant is<br />

ready for preliminary running and a sufficient quantity of the approved lubricants for the<br />

commercial operation of the Plant for one year after the Taking-over Certificate has been<br />

issued.<br />

1.9 NAME PLATES<br />

1.9.1 Each item of the Plant shall have permanently attached to it in a conspicuous position, a<br />

nameplate and rating plate, each of stainless steel. Upon these shall be engraved or stamped,<br />

the manufacturer’s name, type and serial number of Plant, details of the loading and duty at<br />

which the item of Plant has been designed to operate, and such diagrams as may be required by<br />

the Engineer’s Representative. All indicating and operating devices shall have securely<br />

attached to them or marked upon them designations as to their function and proper manner of<br />

use.<br />

1.9.2 Details of proposed inscriptions shall be submitted to the Engineer’s Representative for<br />

approval before any labels are manufactured. Such nameplates, rating plates and designations<br />

shall be of stainless steel with engraved or stamped.<br />

1.9.3 Nameplates, rating plates and labels shall be of a non-flame propagating materials, either nonhygroscopic<br />

or transparent plastic with engraved lettering of a contrasting colour. Fixing shall<br />

be by means of non-corrosive screws; drive rivets or adhesives shall not be used.<br />

1.9.4 Warning labels shall be provided where necessary to warn of dangerous circumstances or<br />

substances. Inscriptions or graphic symbols shall be black on a yellow background and to<br />

internationally recognized standards.<br />

1.9.5 Instruction labels shall be provided where safety procedures such as wearing of protective<br />

clothing are essential to protect personnel from hazardous or potentially hazardous conditions.<br />

These labels shall have inscriptions or graphic symbols in white on a blue background.<br />

1.10 NUTS, BOLTS, STUDS AND WASHERS<br />

1.10.1 Nuts, Bolts, Studs and Washers for incorporation in the Plant shall conform to the requirements<br />

of the appropriate standard. Nuts and bolts shall be of the best quality of specified grade,<br />

machined on the shank and under the head and nut. Bolts shall be of one piece construction and<br />

shall be of sufficient length so that only one thread shall show through the nut in the fully<br />

tightened condition.<br />

1.10.2 Fitted bolts shall be a light driving fit in the reamed holes they occupy, shall have the screwed<br />

portion of such a diameter that it will not be damaged in driving and shall be marked in a<br />

conspicuous position to ensure correct assembly at site.<br />

1.10.3 Washers, locking devices and anti-vibration arrangements shall be provided where necessary<br />

and shall be subject to the approval of the Engineer’s Representative. Jointing hardware for the<br />

entire Plant shall be provided with sufficient spares to cater for site losses.<br />

129


1.10.4 Where bolts pass through structural members taper washers shall be fitted, where necessary, to<br />

ensure that no bending stress is caused in the bolt. Where there is a risk of corrosion, bolts,<br />

nuts and studs shall be designed so that the maximum stress does not exceed half the yield<br />

stress of the material under any conditions. All bolts, nuts and washers which are subject to<br />

frequent adjustment or removal in the course of maintenance and repair shall be made of<br />

nickel-bearing stainless steel.<br />

1.10.5 The Contractor shall supply all holding down, alignment and leveling bolts complete with<br />

anchorages, nuts, washers and packings required to attach the Plant to its foundations, and all<br />

bed plates, frames and other structural parts necessary to spread the loads transmitted by the<br />

Plant to concrete foundations without exceeding the design stresses.<br />

1.11 ALLOWANCE FOR WASTAGE<br />

The Contractor shall supply to the satisfaction of the Engineer’s Representative reasonable<br />

excess quantities to cover wastage of those consumables which will be normally subject to<br />

waste during erection, commissioning and setting to work.<br />

1.12 PAINTING – GENERAL<br />

1.12.1 The Contractor shall be responsible for the cleaning, preparation for painting, and priming or<br />

otherwise protecting, as specified, all parts of the Plant at the place of manufacture prior to<br />

packing.<br />

1.12.2 Parts may be cleaned but surface defects may not be filled in before testing at the<br />

manufacturer’s works. Parts subject to hydraulic test shall be tested before any surface<br />

treatment. After test, all surfaces shall be thoroughly cleaned and dried out if necessary by<br />

washing with an approved dewatering fluid prior to surface treatment. Except where the<br />

specification provides to the contrary all painting materials shall be applied in strict accordance<br />

with the paint manufacturer’s instructions.<br />

1.12.3 All protective coatings shall be suitable for use in warm humid climates.<br />

1.13 PAINTING AT PLACE OF MANUFACTURE<br />

1.13.1 All stages in painting including cleaning and surface treatment in the manufacturer’s works<br />

shall be available for inspection.<br />

1.13.2 Steel and cast iron parts shall be sand blasted to near white cleaning before painting. Edges,<br />

sharp covers etc. shall be ground to a curve before sand blasting.<br />

1.13.3 A primer coat of a zinc rich epoxy resin based coating with at least 75 microns dry film<br />

thickness is to be provided. In addition the parts are to be provided with adequate number coast<br />

of coal tar epoxy polyamine coating to a dry film thickness of 175 microns including primer<br />

coating.<br />

1.14 PAINTING AT SITE<br />

1.14.1 Immediately on arrival at the Site, all items of Plant shall be examined for damage to the paint<br />

coat applied at the manufacturer’s works, and any damaged portions shall be cleaned down to<br />

the bare metal, all rust removed, and the paint coat made good with similar paint.<br />

1.14.2 Steel and cast iron parts received at site shall be provided with adequate number of further<br />

coats of coal tar epoxy polyamine coating to a total dry film thickness of 275 microns<br />

including the primer coats. All sharp edges, nuts, bolts and other items difficult to be painted<br />

130


shall receive a brush coat of specified paint before application of each coat of epoxy based coal<br />

tar paint giving a total dry film thickness of at least 275 microns. In the case of fabricated steel<br />

work this work shall be done after assembly.<br />

1.14.3 Before painting is commenced the Contractor shall submit for the approval of the Engineer’s<br />

Representative, full details of the paints he proposes to use together with colour charts for the<br />

gloss finishes.<br />

1.14.4 All paint and coating thickness shall be measured by approved Elcometer or coating thickness<br />

gauge.<br />

131


2.0 LIST OF STANDARDS<br />

The titles of various standards referred to in the Specification are indicated hereunder for ready<br />

reference. This list does not necessarily covers all the Standards referred to:<br />

STANDARD<br />

NO.<br />

TITLE<br />

IS 5 Colours for ready mixed paints and enamels<br />

IS 210 Grey Iron Castings<br />

IS 318 Leaded Tin Bronze Ingots and Castings.<br />

IS 325 Three Phase Induction Motors.<br />

IS 780 Cast Iron Sluice Valve upto 300mm<br />

IS 807<br />

Code of Practice for design, manufacture, erection and testing<br />

(structural portion) of cranes and hoists.<br />

IS 1239 Mild steel tubes, tubular and other wrought steel fittings.<br />

IS 1536<br />

Centrifugally cast (spun) iron pressure pipe for water, gas and<br />

sewage.<br />

IS 1537 Vertically cast iron pressure pipes for water, gas and sewage.<br />

IS 1538<br />

Specification for cast iron fittings for pressure pipes for water, gas<br />

and sewage.<br />

IS 1554 PVC insulated (heavy duty) electric cables.<br />

IS 2062 Steel for general structural purposes.<br />

IS 2147<br />

Degrees of protection provided by enclosures for low voltage switch<br />

gear and control gear.<br />

IS 2906 Cast Iron Sluice Valve above 300 mm<br />

IS 3109 Short link chain, Grade M(4)<br />

IS 3177<br />

Code of practice for electric overhead traveling cranes and gantry<br />

cranes other than steel work cranes.<br />

IS 3618<br />

Phosphate treatment for iron and steel for protection against<br />

corrosion.<br />

IS 3624 Vacuum and Pressure gauges.<br />

IS 3815 Point hooks with shank for general engineering purposes.<br />

IS 3938 Electric wire rope hoists.<br />

IS 4029 Guide for testing three phase induction motors.<br />

IS 4460 Method for rating of machine cut spur and helical gears.<br />

IS 4691<br />

Degrees of protection provided by enclosure for rotating electrical<br />

machinery.<br />

IS 5312 Swing type Non Return Valve.<br />

IS 6005 Code of practice for phosphate of iron and steel<br />

IS 8329<br />

Centrifugally cast (spun) ductile iron pressure pipes for water, gas<br />

and sewage.<br />

IS 11592 Code of practice for selection and design of belt conveyors.<br />

IS 13349 Cast Iron Single faced thimble mounted sluice gates.<br />

BS 436 Spur and helical gears<br />

BS 466<br />

Specification for power driven overhead traveling crane, semi goliath<br />

and goliath cranes for general use.<br />

BS 545 Specification for bevel gears(machine cut)<br />

BS 721 Specification for worm gearing<br />

BS 970 Wrought steels for mechanical and allied engineering purposes.<br />

BS 1397 Specification for industrial safety belts, Harnesses and safety<br />

132


STANDARD<br />

NO.<br />

TITLE<br />

BS 1400 Specification for copper castings.<br />

BS 1452 Specification for flake graphite cast iron<br />

BS 1663<br />

Specification for higher tensile steel chain Grade 40 (Short link and<br />

pitched or calibrated) for lifting purpose.<br />

BS 2573<br />

Specification for classification, stress calculations and design of<br />

mechanisms.<br />

BS 2600 Radiographic examination of fusion welded butt joints in steel<br />

BS 2903<br />

Specification for higher tensile steel hooks for chains, slings, blocks<br />

and general engineering purposes.<br />

BS 2910<br />

Methods for radiographic examination<br />

circumferential butt joints in steel pipes.<br />

of fusion welded<br />

BS 3017 Specification for mild steel forged ram short hooks.<br />

BS 3100 Specification for steel castings for general engineering purposes.<br />

BS 3923 Methods for ultrasonic examination of welds.<br />

BS 4360 Specification for weld able structure steels.<br />

BS 4772 Specification for ductile iron pipes and fittings.<br />

Specification for approval testing of welders working to approved<br />

BS 4870 welding procedures.<br />

Part – I : Fusion Welding of Steel<br />

BS 4871<br />

Specification for approval testing of welding procedures<br />

Part – I : Fusion Welding of Steel<br />

BS 4942 Short Chain link for lifting purpose.<br />

BS 5135 Specification for arc welding of carbon and manganese steels.<br />

BS 5155 Specification for butterfly valve.<br />

Specification for acceptance tests<br />

BS 5316 Part – 2 for centrifugal, mixed flow and axial pumps – Test for<br />

performance and efficiency.<br />

BS 6072 Method for magnetic particle flaw detection<br />

BS 6405<br />

Specification for non-calibrated short link steel chain<br />

( grade 30) for general engineering purposes : Class 1 & 2<br />

BS 6443 Method for penetrate flaw detection.<br />

ASTM A-36 Specification for Structural steel<br />

ASTM A-216<br />

Specification for steel castings, carbon suitable for fusion welding for<br />

high temperature service.<br />

ASTM A -276 Specification for stainless steel and heat resting steel bars and shapes.<br />

ASTM A -351<br />

Specification for castings, Austenitic – Ferrite (Duplex), for pressure<br />

Containing Parts.<br />

ASTM A -743<br />

Specification for castings, Iron-Chromium, Iron – Chromium-Nickel,<br />

and Nickel Base corrosion Resistant for General Application.<br />

ASTM A -744 Specification for casting, Iron Chromium-Nickel, Corrosion Resistant<br />

ASTM A -14 B Specification for Aluminum-Bronze Castings.<br />

IEC – 189<br />

Low frequency cables and wires with Part 1 & 2 PVC insulation and<br />

PVC sheath.<br />

AWWA C 501 Cast Iron Sluice Gates.<br />

API 594 / API 598 Specification for Non Slam Dual Plate Check Valve.<br />

MSS SP – 81 Specification for Knife Gate Valve<br />

133


3.1 SCOPE OF SERVICES<br />

3.0 GRIT MECHANISM<br />

The scope includes design, manufacture, supply at site, painting, installation, testing &<br />

commissioning of 0.25 m 3 Hydraulically Operated Grab Bucket Mechanism with crane<br />

conforming to the latest applicable Indian Standards as per data sheet & Technical<br />

Specifications with all accessories & hardwares with related Civil, Electrical & Mechanical<br />

work to complete the system with One year of O & M Period for various sites as E, E3, W &<br />

W5 for Sabarmati River Front Development <strong>Corporation</strong> Ltd. of Amdavad <strong>Municipal</strong><br />

<strong>Corporation</strong>.<br />

3.2 GRIT REMOVAL MECHANISM<br />

• The crane shall be double girder grabbing EOT crane with 2 ton capacity and 4.5 m span<br />

(OR as per actual site condition for each site) confirming to Class II as per IS 807:1976 and<br />

IS 3177:1977 with a capacity of 0.25 M 3 operated by suitable hydraulic system.<br />

• The Contractor shall refer to the attached data sheet for the equipment details and<br />

specifications.<br />

3.3 DESIGN REQUIREMENTS :<br />

3.3.1 Crane girder shall be double girder and will have wheeled trolley. Steel used by vendor shall<br />

be tested quality steel confirming to IS: 226. Where plate more than 20 mm thick used shall<br />

confirm to IS: 2062. All material used shall be of recent manufacture, free from defects, mill<br />

scales, laminations, pittings, rust, etc. All welds shall be free from defects like blow holes, lack<br />

of penetration, slag intrusion etc.<br />

Electric hoist shall be complete with hoisting motor, wire rope drum, wire rope, hook<br />

necessary gearing, sleeves electromagnetic brakes for hoisting and travel motions, weather and<br />

dust-proof push button station, contactor panel, all wiring, flexible trailing cable, limit<br />

switches, travel stops, earthing terminals and other accessories to meet the full requirements of<br />

the client. The client will provide electric supply at one point on wall at Pump house, thereafter<br />

necessary switches are also in the scope of contractor. Further suitable M.S. ladder to climb on<br />

fixed girder from floor should also be supplied by the contractor.<br />

The hoist will be required to operate in the local climatic conditions. All the parts of the hoist<br />

and trolley shall be designed to withstand such atmospheric conditions without any<br />

deterioration.<br />

The wheel diameter and rail size shall be suitable to take the wheel load.<br />

3.4 FEATURES OF CONSTRUCTION :<br />

The hoist shall have the following requirements:<br />

3.4.1 DRUMS :<br />

Rope drums shall be either cast steel or welded steel to sustain concentrated loads resulting<br />

from rope pull. Drums shall be machine grooved right and left with grooves of a proper shape<br />

for the rope used. Grooving shall be of proper length to handle all rope needed to make the<br />

required lift plus the two dead laps at each anchor point, without overlapping.<br />

3.4.2 SHEAVES :<br />

Rope sheaves shall be rolled or cast steel. Grooves shall be machined to the proper shape for<br />

the rope used. Sheaves shall be equipped with anti-friction type bearings. Sheaves shall be<br />

fully guarded so that the rope cannot come off.<br />

134


3.4.3 GEARS :<br />

Gears shall be from solid cast or forged steel blanks or shall be of stress-relieved welded steel<br />

construction or built-up from steel billets and welded together to form a one piece gear <strong>section</strong>.<br />

Gears shall of the make ELECON / NU-TECK / SAFEX only.<br />

3.4.4 BEARINGS :<br />

All anti-friction bearings are to be of SKF make only. Bearings shall have a minimum life<br />

expectancy of 8000 hours and may be ball, roller, or removable bronze- bushing type except<br />

that motor bearings shall be of the ball or roller type.<br />

3.4.5 ROTATING AND STATIONARY SHAFTS :<br />

Shafts and axles shall have ample strength and rigidity and adequate bearing surfaces for their<br />

duties.<br />

3.4.6 LUBRICATION :<br />

A hand operated grease pump shall be provided for lubrication of anti-friction bearings.<br />

3.4.7 HOIST ROPE :<br />

Hoist ropes shall be extra flexible, improved plough steel rope with a well lubricated hemp<br />

core and having six strands of 36 wires per strand. The rope shall be fastened to the drum with<br />

an attachment having strength equal to that of the rope. The rope shall be of sufficient length so<br />

that two full laps shall remain on the drum at the extreme low position of the hook. Reverse<br />

bends or cross bends are to be avoided. The breaking loads for the hoist ropes shall not be less<br />

than six times the calculated load in the ropes at the drum, based on rated load on hooks, plus<br />

the weight of the bottom block, plus the weight of rope.<br />

3.4.8 WHEELS :<br />

The long travel bridge wheels shall be rim toughened, heat treated carbon or alloy steel. They<br />

shall be double flanged. The wheels shall have antifriction bearings. The wheels shall be<br />

machined on their treads to match the runway rail <strong>section</strong>.<br />

Axle and shaft shall be made of carbon steel and accurately machined and properly supported.<br />

3.4.9 HOOKS :<br />

Hooks shall be solid, forged, heat treated alloy or carbon steel of rugged construction and<br />

provided with a standard depress type safety latch. They shall have swivels and operate on ball<br />

or roller thrust bearings with hardened races. Lock to prevent hooks from swiveling shall be<br />

furnished.<br />

3.4.10 BRAKES :<br />

Trolley and hoisting motors each shall be equipped with electrically released, spring set,<br />

friction, shoe type brakes having torque capable of holding 125% of the full rated hook load.<br />

Brakes shall apply when either the motor controller or the main power switch is in “OFF”<br />

position, or in the event of power failure. Brakes shall be of the make PATHE / BCH /<br />

ELECTROMECH / SAFEX only.<br />

3.4.11 ELECTRICAL REQUIREMENTS :<br />

Drive motors shall be as per IS - 325 and companion specification enclosed. Motor shall be<br />

designed for frequent reversal, braking, inching and acceleration. Pullout torque shall be 2.15<br />

times the rated torque. Motors shall be of make CROMPTON / BHARAT BIJLEE / KEC /<br />

ABB only. Pendant control switch, controllers and resistors, controls, electrical protective<br />

devices, cables and conductors, earthing guards etc. shall be as per IS : 3938. Limit switches<br />

shall be provided for over hoisting and over-lowering and of two extreme ends of trolley travel.<br />

i.e., cross as well as long travel.<br />

135


3.4.12 TESTS AND TEST CERTIFICATES :<br />

Overload tests at 125% of the rated load shall be carried out and test certificates shall be<br />

furnished for hook, wire rope, brake and complete crane.<br />

3.4.13 FOLLOWING ACCESSORIES SHALL BE PROVIDED WITH E.O.T. CRANE.<br />

1. Mechanical stoppers for long travel & cross travel shall be provided.<br />

2. Pendant push button station shall be located at maximum 1.0 Mt. from operating floor<br />

elevation.<br />

3. Earthing terminals shall be provided.<br />

4. Limit switches for over hoist, over lower, over cross travel & over long travel shall be<br />

provided.<br />

5. Flexible trailing cable system shall be provided with sufficient number of loops for<br />

specified cross travel.<br />

6. The control panel shall be provided.<br />

7. Isolation on switch to receive the power from Electrical Panel.<br />

8. M.S. ladder shall be provided by the contractor for maintenance.<br />

3.4.14 FOLLOWING INFORMATION SHALL BE PROVIDED AFTER THE AWARD OF<br />

CONTRACT :<br />

1. Detail dimensional outline drawings.<br />

2. Material test certificates<br />

3.5 DATA SHEET:<br />

136


PRO :<br />

SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM WITH<br />

RELATED ELECTRICAL WORK AT E, E3, W & W5 SITES WITH ONE<br />

YEAR OF O & M PERIOD FOR SRFDCL OF AMC<br />

DOC : DATA SHEET FOR HYDRAULICALLY OPERATED GRIT MECHANISM<br />

SR. NO. DESCRIPTION PARTICULARS<br />

1.0 Type of Crane Double girder<br />

2.0 No. of Unit 1 no.<br />

3.0 Crane Capacity 2.0 Ton.<br />

4.0 Class S2, hoist duty<br />

5.0 Cross Traverse Speed 10 mtr./min.<br />

6.0 Hoisting Speed 3.5 mtr./min.<br />

7.0 Location Outdoor at Grit Chamber<br />

8.0<br />

Capacity of Grab Bucket<br />

Range Protection<br />

9.0 Grab Duty 2 Rope type<br />

10.0 Wire Rope<br />

11.0 LT Drive Twin Drive<br />

0.25 mtr 3 / Hydraulic<br />

Operated Grab<br />

10 mm , 2 + 2, 6 x 36 Fibre<br />

Breaking Strength 180 Kg/<br />

MM 2<br />

12.0 Bearing Ball / Roller Bearing<br />

13.0 Limit Switches Required<br />

14.0 Brake<br />

15.0 Rope Drum<br />

16.0 Control Panel<br />

Electro mechanics disc type<br />

for hoist motion<br />

Fabricated and Stress relived<br />

to accommodate complete<br />

length of wire rope in single<br />

layer<br />

17.0 Accessories Required<br />

18.0 Hardwares Required<br />

19.0 Rail & Gantry Girder Required<br />

20.0 Cabling System Required<br />

Provided on crane, consisting<br />

of main contactor, motor<br />

contactor, single phase<br />

preventer with over load<br />

relay fuses, connector,<br />

transformer etc.<br />

DATA TO BE FILLED<br />

BY BIDDER<br />

137


PRO :<br />

SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM WITH<br />

RELATED ELECTRICAL WORK AT E, E3, W & W5 SITES WITH ONE<br />

YEAR OF O & M PERIOD FOR SRFDCL OF AMC<br />

DOC : DATA SHEET FOR HYDRAULICALLY OPERATED GRIT MECHANISM<br />

SR. NO. DESCRIPTION PARTICULARS<br />

21.0 Cross Travel<br />

22.0 Longitudinal Travel<br />

23.0 Lift<br />

24.0 Electrical Motors<br />

25.0 Hoisting Motor HP Pl. furnish<br />

26.0<br />

Grab Mechanism, Motor<br />

HP<br />

4.5 mtr. Approx. / As per<br />

actual site condition<br />

15.0 mtr. Approx. / As per<br />

actual site condition<br />

16.0 mtr. Approx. / As per<br />

actual site condition<br />

All motors, high torque,<br />

crane duty, 40 % cdf, TEFC<br />

sq. Cage, as per IS – 325<br />

Pl. furnish<br />

27.0 C.T. Motor HP Pl. furnish<br />

28.0 L.T. Motor HP Pl. furnish<br />

29.0<br />

Hardwares in contact<br />

with sewage<br />

30.0 Motor for Grit Mechanism<br />

SS 304<br />

30.1 Application E.O.T. Crane<br />

30.2 Type of motor Hoist duty<br />

30.3 Supply neutral Effectively earthed<br />

30.4 Rated voltage 415 V<br />

30.5<br />

No. of phases &<br />

frequency<br />

3 Phase & 50 HZ.<br />

30.6 Motor rating To be furnished by vendor<br />

30.7 Supply condition<br />

415 V ± 10% Voltage<br />

variation<br />

50 Hz. ± 5% Frequency<br />

variation<br />

± 10% Combined voltage &<br />

frequency<br />

DATA TO BE FILLED<br />

BY BIDDER<br />

138


PRO :<br />

SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM WITH<br />

RELATED ELECTRICAL WORK AT E, E3, W & W5 SITES WITH ONE<br />

YEAR OF O & M PERIOD FOR SRFDCL OF AMC<br />

DOC : DATA SHEET FOR HYDRAULICALLY OPERATED GRIT MECHANISM<br />

SR. NO. DESCRIPTION PARTICULARS<br />

30.8<br />

Synchronized Speed in<br />

R.P.M.<br />

Max. 1500<br />

30.9 Motor standard As per IS – 325<br />

30.10 Method of starting Direct on line<br />

30.11<br />

Class of insulation &<br />

temp. Rise by<br />

thermometer resistance<br />

30.12 Ambient 50° C.<br />

Class-B. 65° C.<br />

75° C.<br />

31.0 Location Outdoor<br />

32.0 Hazardous area division N.A.<br />

33.0 Atmosphere Dusty and humid at times<br />

34.0 Type of cooling Fan cooled<br />

35.0 Degree of protection IP – 55<br />

36.0 Starter Panel Required<br />

37.0<br />

• NOTE:-<br />

Cable form crane / hoist<br />

motors to starter panel<br />

1) M – Denotes material test certificate required.<br />

To be provided by the<br />

Mechanical contractor<br />

DATA TO BE FILLED<br />

BY BIDDER<br />

139


4.1 TESTING – GENERAL<br />

4.0 TESTING, ERECTION, AND COMMISSIONING<br />

Tests of the plant at the manufacturer’s premises will be required in accordance with the<br />

conditions of contract. All inspection, examination and testing shall be carried out in<br />

accordance with appropriate standards.<br />

Cut in any type of cable is not acceptable. Quantity shall be verified as per actual site<br />

condition. In case of any item to be bring, before that actual measurement has to be taken from<br />

actual site. Maximum + 2 % to 3 % variation in measurement is allowed. Bidder shall be paid<br />

only for installed quantity as per actual measurement of site. In case of cable is not used or<br />

installed, bidder will not be paid for the same<br />

In case of tender quantity is less than the actual, bidder has to arrange for the excess quantities<br />

and rate for the same shall be as per quoted amount.<br />

The scope covers installation, testing & commissioning of electro-mechanical work for<br />

supplied item with necessary supply of hardware and testing tool as required during<br />

installation, testing and commissioning of item.<br />

Tests of the plant at the manufacturer’s premises will be required in accordance with the<br />

conditions of contract. All inspection, examination and testing shall be carried out in<br />

accordance with appropriate standards.<br />

In case of tender quantity is less than the actual, bidder has to arrange for the excess quantities<br />

and rate for the same shall be as per quoted amount.<br />

All instruments used for such tests shall be calibrated and certified by an approved independent<br />

testing authority not more than 3 months prior the test in which they are used. The engineer’s<br />

representative reserves the right to impound any instrument immediately after test for<br />

independent testing. A certificate shall be produced by the contractor prior to carrying out<br />

every test showing the readings obtained, calculations and full details of the calibration<br />

certificates referred to. Cut in any type of cable (instrumentation) is not acceptable.<br />

Quantity shall be verified as per actual site condition. In case of any item to be bring, before<br />

that actual measurement has to be taken from actual site. Maximum + 2 % to 3 % variation in<br />

measurement is allowed. Bidder shall be paid only for installed quantity as per actual<br />

measurement of site. In case of cable is not used or installed, bidder will not be paid for the<br />

same<br />

4.2 TESTING, ERECTION, AND COMMISSIONING<br />

In addition to the progressive supervision and inspection by the Engineer-in-Charge the<br />

Contractor shall offer for inspection to Engineer in Charge, the complete, erected Transmission<br />

System of Water Supply Project or its Parts on which tests are to be carried out. After such<br />

inspection by Engineer in Charge, each equipment/subsystem shall be tested by the Contractor<br />

in accordance with the applicable standards in the presence of Engineer in Charge.<br />

It is not the intent to specify herein all details about the commissioning activities. However the<br />

commissioning checks in brief are given as guidance.<br />

The pre-commissioning test results shall be documented for record purposes and compared<br />

with the shop test certificates.<br />

4.3 INSPECTION AT MANUFACTURER’S PREMISES<br />

140


4.3.1 The inspection of all equipment required to be supplied to complete the works shall be done as<br />

detailed in this specification. Only defect free and sound material meeting the technical<br />

requirements of this specification and in accordance with a high standard of engineering would<br />

be acceptable to the engineer's representative.<br />

4.3.2 For meeting these requirements of inspection, testing (including testing for chemical analysis<br />

and physical properties) shall be carried out by the contractor and certificates submitted to the<br />

engineer's representative who will have the right to witness or inspect the above mentioned<br />

testing/inspection at any stage desired by him. Calibration certificates or test instruments shall<br />

be produced for the engineer’s consent in advance of testing and if necessary instruments shall<br />

be recalibrated or substituted before the commencement of the test. Items of plant or control<br />

systems not covered by standards shall be tested in accordance with the details and program<br />

agreed between the engineer and contractor.<br />

4.3.3 If during or after testing, any item of the plant fails to achieve its intended duty or otherwise<br />

prove defective it shall be modified or altered as necessary, retested and re-inspected as<br />

required by the engineer.<br />

4.3.4 At least 21 days notice shall be given to the engineer before the specified tests are carried out.<br />

4.3.5 No material is to be delivered to site without the above described inspection having been<br />

carried out or officially waived in writing by the engineer’s representative.<br />

4.3.6 All inspection charges viz. lodging, boarding & local transportation etc. shall be born by the<br />

Contractor.<br />

4.4 ERECTION – GENERAL<br />

The scope covers installation, testing & commissioning of electro-mechanical work for<br />

supplied item with necessary supply of hardware and testing tool as required during<br />

installation, testing and commissioning of item.<br />

4.4.1 The contractor’s staff shall include at least one competent erection engineer with proven<br />

suitable, previous experience on similar contract to supervise the erection of the works and<br />

sufficient skilled, semiskilled and unskilled labour to ensure completion of the works in time.<br />

The contractor shall not remove any representative, erector or skilled labour from the site<br />

without the prior approval of the engineer’s representative.<br />

4.4.2 One erection engineer who shall be deemed to be the contractor’s representative shall be<br />

conversant with the erection and commissioning of the complete works. Should there be more<br />

that one erector, one shall be in charge and the contractor shall inform the engineer’s<br />

representative in writing which erector is designated as his representative and is in charge.<br />

Erection engineer is to report to Project Manger.<br />

4.4.3 The contractor’s erection staff shall arrive o the site on date to be agreed by the engineer’s<br />

representative before they proceed to the site, however, the contractor shall first satisfy<br />

himself, as necessary, that sufficient plant of his (or his sub-contractor’s) supply has arrived on<br />

site so that there will be no delay on this account.<br />

4.4.4 The contractor shall be responsible for setting up and erecting the plant to the line and levels of<br />

reference given by the engineer in writing, and for the correctness (subject as above<br />

mentioned) of the positions, levels dimensions and alignment of all parts of the works and for<br />

141


provision of all necessary instruments, appliances and labour in connection therewith. The<br />

checking of setting out of any line or level by the engineer or engineer’s representative shall<br />

not in any way relieve the contractor of his responsibility for the correctness thereof.<br />

4.4.5 Erection of plant shall be phased in such a manner so as to obstruct the work being done by<br />

other contractors or operating staff who may be present at the time. Before commencing any<br />

erection work, the contractor shall check the dimensions of structures where the various items<br />

of plant are to be installed and shall bring any deviations from the required positions, lines or<br />

dimensions to the notice of the engineer. Plant shall be erected in a net and workmanlike<br />

manner on the foundations and at the locations shown on the approved drawings. Unless<br />

otherwise directed by the engineer, the contractor shall adhere strictly to the aforesaid<br />

approved drawings. If any damage is caused by the contractor during the course of erection to<br />

new or existing plant or buildings or any part thereof, the contractor shall, at no additional cost<br />

to the employer, make good, repair or replace the damage, promptly and effectively as directed<br />

by the engineer and to the engineer’s satisfaction.<br />

4.4.6 During erection of the plant the engineer will inspect the installation from time to time in the<br />

presence of the contractor’s site representative to establish conformity with the requirements of<br />

the specification. Any deviations and deficiencies found or evidence of unsatisfactory<br />

workmanship shall be corrected as instructed by the engineer.<br />

4.5 RECORD, PROCEDURES AND REPORTS<br />

4.5.1 The contractor shall maintain records pertaining to the quality of installation/erection work and<br />

inspection, testing, compliance with all technical requirements in respect of all his works as<br />

described in the previous paragraphs. The reporting formats shall be in the approved formats.<br />

The contractor shall submit such records to the engineer after the completion of any particular<br />

work before submitting the bill of supply/progress of work. Such report shall comprise of shop<br />

inspection reports, shop testing reports, material test reports, based on which dispatch<br />

clearances are provided, all the quality control reports of welding, erection and alignment<br />

records.<br />

4.5.2 All the above mentioned records shall be submitted in the final form duly countersigned by the<br />

engineer’s representative attesting conformity to specifications and is approval of installation<br />

and duly incorporating all the additions, alternations and information as required by the<br />

engineer, on the basis of preliminary reports giving the progress of the work. Such records<br />

notwithstanding any records submitted earlier with bill of supply/progress etc. shall be duly<br />

bound and submitted to the engineer in six copies by the contractor on his notification of the<br />

mechanical completion of erection.<br />

4.6 COMPLETION OF ERECTION<br />

4.6.1 The completion of plant under erection by the contractor shall be deemed to occur, if all the<br />

units of the plant are structurally and mechanically complete and will include among other<br />

such responsibilities the following:<br />

(a) Plant in the scope of the contractor has been erected, installed and grouted as per<br />

specifications.<br />

(b) Installation checks are completed and approved by the engineer.<br />

(c) The erected plant is totally ready for commissioning checks.<br />

142


4.6.2 At the stage of completion of erection, the contractor shall ensure that all the physical,<br />

aesthetic and workmanship aspects are totally complete and the plant is fit and bound to<br />

undergo commissioning checks/tests on completion.<br />

4.6.3 Upon achieving the completion as described above, the contractor shall notify the engineer by<br />

a written notice intimating such mechanical completion of units and notify the engineer for<br />

inspection and acceptance of mechanical completion. The engineer/engineer’s representative<br />

shall proceed with the inspection of such units within 14 days of such a notice. Thereafter:<br />

(a) The engineer shall certify completion when there are no defaults in the works and the<br />

plant is acceptable or<br />

(b) The engineer shall inform the contractor list of deficiencies for rectification hereinafter<br />

referred as Punch List and the contractor shall complete the rectification work within a<br />

jointly agreed period before tests on or approval of the same before proceeding with the<br />

Tests on Completion or<br />

(c) The engineer may inform the contractor that the works are accepted with the ‘punch’<br />

list (Items which do not hamper operability, safety or maintainability) and allow the<br />

contractors to proceed with the pre - commissioning checks followed by Test on<br />

Completion when the contractor undertakes to complete such outstanding works within<br />

an agreed during Defects Liability Period.<br />

4.6.4 Taking over shall be based on rectification of all deficiencies as advised by punch lists.<br />

4.6.5 The erection period indicated by the contractor would be deemed to cover all the activities upto<br />

completion as stipulated in previous paragraphs, notice of completion by the contractor,<br />

inspection by the engineer for completion, and contractor rectification of all deficiencies as<br />

noticed by the deficiency/punch list, and acceptance by the engineer of such rectification, prior<br />

to Test on Completion.<br />

4.6.6 Minor defects, which in the opinion of engineer which do not hamper operability and<br />

maintainability will not be taken in to account for deciding mechanical completion. Such<br />

defects shall be rectified concurrent to commissioning checks before Test on Completion.<br />

However, the engineer’s decision in this regard is final.<br />

4.6.7 The commissioning period as notified by the contractor shall be deemed to occur beyond the<br />

date of completion and shall include all period of pre-commissioning, trials and Test on<br />

Completion.<br />

4.6.8 It is in the contractor’s interest to offer the <strong>section</strong>s/units/systems, progressively under<br />

identified milestones within overall erection period, duly completed for inspection by the<br />

engineer’s representative, obtain his ‘punch’ list, for rectification of any deficiencies pointed<br />

out by the engineer and to achieve mechanical completion before undertaking the Test on<br />

Completion within the specified erection period. The engineer also reserves a right to withhold<br />

the cost as estimated to be equivalent to the rectification of deficiencies pointed out to the<br />

contractor until such a time such deficiencies are rectified to the satisfaction of the engineer.<br />

4.7 SETTING TO WORK<br />

4.7.1 On completion of erection the contractor shall request the engineer’s representative to carry out<br />

the installation inspection.<br />

143


4.7.2 After the plant has been set to work the contractor shall continue to operate the plant for a<br />

period of one week.<br />

4.8 INSTALLATION INSPECTION<br />

4.8.1 In addition to the progressive supervision and inspection by the purchaser the contractor shall<br />

offer for inspection to engineer, the completely erected plant / part of plant on which tests are<br />

to be carried out. After such inspection by engineer, each equipment / sub-system shall be<br />

tested by the contractor in accordance with the applicable standards in the presence of<br />

engineer. Such tests shall include but not be limited to the tests specified in following clauses.<br />

4.8.2 Mechanical<br />

The erection, piping and wiring of each item shall be checked as per approved drawings,<br />

vendors drawings, wiring schematics and cable terminations. If any minor modifications are<br />

noted, they shall be incorporated in the appropriate “as built” drawings.<br />

4.9 Performance Tests at Site<br />

4.9.1 Execution of the tests<br />

As soon as possible after the equipment has been installed and after physical completion of the<br />

work, performance tests shall be carried out as per relevant test requirements and mutually<br />

agreed/specified Codes and Standards. These tests may repeat the tests carried out at the<br />

manufacturer's works and/or his sub-vendor/sub-contractor's works and any other tests the<br />

Engineer in Charge may require in order to determinate that the equipment and works are in<br />

accordance with the specifications and guarantees.<br />

Performance tests for individual items of Equipment, shall be conducted on all equipment<br />

supplied by the Contractor.<br />

Performance test to determine the percentage losses in the filter plant shall be conducted after<br />

performance tests for individual item has been done. The procedure to carry out the tests shall<br />

be got approved from Engineer-in-Charge.<br />

A program for conducting the performance tests shall be submitted to the Engineer in Charge,<br />

for approval, at least fourteen days before the commencement of the tests.<br />

If the Contractor so desires, the equipment may be run for a reasonable time, immediately<br />

before the performance test is conducted. A request for this run, stating duration and operating<br />

point must be made, in writing to the Engineer in Charge at least three days before the<br />

performance test.<br />

During the period of any test, the conditions shall be held as steady as possible, compatible<br />

with safe and effective operation.<br />

The power consumption of all continuously running auxiliary equipment shall also be<br />

measured and recorded during the performance tests.<br />

After the results of the performance tests have been submitted to and approved by the Engineer<br />

in Charge, a summary of the test readings and the performance calculations shall be<br />

incorporated in the final version of the Operating and Maintenance Instruction Manuals.<br />

4.9.2 Rejection of the system or system components<br />

If the performance tests indicate the computed values of performance parameters have deviated<br />

from the guaranteed values and the Contractor is unable, within 21 days or such extension of<br />

time as may be allowed by the Engineer in Charge, to remedy such deficiency, then the<br />

Engineer-in-Charge shall have the right to reject the component or the system.<br />

4.10 Commissioning<br />

144


4.10.1 General<br />

After successful checks and after erection and pre-commissioning tests, the entire system shall<br />

be commissioned by the Contractor.<br />

During commissioning, the Contractor shall supply all material and labour to supervise,<br />

operate, keep in operation, adjust, test, service, repair and do all things necessary to keep the<br />

System running to the satisfaction of the Engineer in Charge. This shall include labour on a 24<br />

hour-a-day basis during the test period and for such other period of continuous operation, as<br />

the Engineer in Charge may consider necessary to establish the efficient operation of the<br />

System.<br />

Vibration, noise levels and alignments shall be checked and noted for record purposes.<br />

If any test results/operations show noticeable variation from the Specification requirements for<br />

the System or any particular item of the System, the Contractor shall immediately take steps to<br />

rectify the deficiency without any extra cost to Department.<br />

4.11 Trial Runs<br />

The Contractor shall run and maintain the System for two months at a stretch, or any other<br />

stipulated periods and conditions prescribed by the Engineer-in-Charge, from the date of<br />

commissioning. During the trial run all components of the system must function in a<br />

synchronized manner so as to give all desired outputs at efficiencies guaranteed or as stipulated<br />

in the specifications, failing which the Engineer-in-Charge may extend the period of trial run,<br />

till a date the entire system functions to the complete satisfaction of Engineer-in-Charge.<br />

Standard test reports shall be compiled at all stages of installation, pre-commissioning and<br />

commissioning. Any modifications or changes shall be incorporated and marked on the<br />

respective reference drawings and the Engineer in Charge shall be advised.<br />

The necessary protocol must be maintained for record purposes, jointly with Engineer in<br />

Charge and/or the authorized Representative of the Department.<br />

At the time of commissioning, the engineer will appoint his representative as commissioning<br />

engineer. The contractor shall carry out commissioning tests in the presence of the<br />

commissioning engineer. Though the mechanical completion may have been checked and<br />

clarified by the site engineers, the commissioning engineer may verify any mechanical<br />

completion checks to satisfy himself that the plant is fit and sound, if such checks had not been<br />

witnessed by him. It will be the responsibility of the contractor to make all arrangements for<br />

carrying out these tests. The evaluation of test results and decision passed by the<br />

commissioning engineer regarding the test results will be final and binding on the contractor.<br />

Any additional tests or repetition of tests to establish satisfactory operation of any equipment<br />

shall be carried out by the contractor at no extra cost.<br />

All flow, level process measurement controllers, transmitters, recorders, indicators, vacuum<br />

and pressure gauges shall be subject to routine in accordance with BS8, BS1780 and BS3680.<br />

Test certificate shall be provided against each item of equipment.<br />

4.12 MISCELLANEOUS<br />

Completion checks and commissioning tests on items not covered under above shall be carried<br />

out by the contractor as per the instructions of the engineer’s representative.<br />

4.13 TAKING OVER<br />

145


4.13.1 No item of plant will be certified for taking over by the purchaser unless it has successfully<br />

passed all the tests called for under the contract. If nevertheless the employer uses any part of<br />

the works, that part which is used shall be deemed to have been taken over at the date of such<br />

use.<br />

Taking over Certificate for plant shall not be issued unless the following documentation are<br />

duly compiled and submitted in final formats in duly bound volumes.<br />

(a) A compilation of all shop inspection results/reports of the plant/machinery with due<br />

attestation that the plants have been manufactured to specified standards (5 copies).<br />

(b) All erection/construction quality control checks in appropriate approved formats for all<br />

installation works with attestation that installation has been carried out as per<br />

acceptable / stipulated standards (6 copies).<br />

4.14 TENDER / CONTRACT DRAWINGS<br />

SR.<br />

NO.<br />

DESCRIPTION<br />

PRELIMINARY<br />

DRAWINGS TO<br />

BE<br />

SUBMITTED<br />

DRAWINGS TO BE<br />

SUBMITTED AFTER<br />

AWARD OF WORK<br />

1.0 Outline dimensional drawing<br />

(a) Grit Mechanism * *<br />

2.0<br />

GA drawing of the pumping plants with<br />

all dimensions<br />

(a) ‘As built’ GA drawing *<br />

3.0 Catalogues for all the instruments *<br />

Note: * Indicates the document required to be submitted.<br />

*<br />

146


SR.<br />

NO.<br />

1. GRIT MECHANISM<br />

6.0 LIST OF APPROVED VENDORS<br />

ITEM APPROVED MAKE<br />

WH BRADY / SAFEX / INDEF /<br />

ELECTROMECH / JAPS / MORRIES<br />

147


SECTION: E<br />

TECHNICAL SPECIFICATIONS<br />

FOR<br />

ELECTRICAL WORK<br />

148


PROJECT :<br />

DOCUMENT : INDEX<br />

SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM AT E,<br />

E3, W & W5 SITES OF SABARMATI RIVER FRONT DEVLOPMENT<br />

CORPORATION LTD. FOR AMDAVAD MUNICIPAL CORPORATION<br />

SECTION - E : ELECTRICAL<br />

SR. NO. TITLE PAGE NO.<br />

1.0 MEDIUM VOLTAGE PANEL BOARD 149<br />

2.0 LOCAL PUSH BUTTON STATION 163<br />

3.0 MEDIUM VOLTAGE CABLES 165<br />

4.0 EARTHING 173<br />

5.0<br />

ERECTION, TESTING & COMMISSIONING OF<br />

ELECTRICAL INSTALLATIONS.<br />

6.0 LIST OF APPROVED VENDORS 188<br />

175<br />

149


1.0 SCOPE<br />

1.0 MEDIUM VOLTAGE PANEL BOARD<br />

This scope shall cover design, manufacture, check test, and supply, installation, testing and<br />

commissioning of Control Panel as described.<br />

Medium voltage Panel Board will be installed outdoor and is connected through the cables.<br />

1.1 SERVICE CONDITIONS AT SITE<br />

Ambient Temperature : Max. / Min. = 45° C. / 6° C.<br />

Design temperature : 50 Degree C.<br />

Relative humidity : 95% max.<br />

Voltage : 415+/- 10%, TPN<br />

Frequency : 50 Hz. + 5% to -5%<br />

Neutral : Solidly / earthed neutral.<br />

Fault level : 25KA, Symmetrical at 415V solidly earthed.<br />

Required Ingress Protection : IP – 56 Minimum<br />

1.2 DOCUMENTATION<br />

Vendor shall furnish drawings, data and manuals in six sets alongwith equipment supplied.<br />

i.) General arrangement drawing indicating accessories and dimensions.<br />

ii.) Termination arrangement with dimensions.<br />

iii.) Three phase wiring diagrams<br />

iv.) SLDs and control schemes<br />

v.) Terminal plans<br />

vi.) Bill of quantity for each panel.<br />

Documents to be submitted after placement of order.<br />

Schematic and <strong>section</strong>al drawing.<br />

Final documents:<br />

As built drawings with AutoCAD soft copy.<br />

Instruction and maintenance manual – Six copies.<br />

Test certificates – Six copies.<br />

1.3 STANDARDS AND CODES<br />

The Panels shall comply with the latest edition of relevant Indian Standards and Indian<br />

Electricity Rules and Regulations. The following Indian standards shall be complied with:<br />

STANDARD<br />

NO.<br />

IS : 4237<br />

PARTICULAR<br />

General requirements for switchgear and control gear for voltages not<br />

exceeding 1000 V A.C. or 1200 V D.C.<br />

IS : 5578 Guide for marking of insulated conductors.<br />

150


STANDARD<br />

NO.<br />

IS : 11353<br />

PARTICULAR<br />

Guide for uniform system of marking and identification of conductors and<br />

apparatus Terminals.<br />

IS : 13947 Low voltage switchgear and control gear.<br />

IS : 8197<br />

Terminal marking for electrical measuring instrument and their<br />

accessories.<br />

IS : 2551 Danger notice plates<br />

IS : 10118<br />

IS : 8623<br />

Code of Practice for selection, installation and maintenance of switchgear<br />

and control gear.<br />

Specification for factory built assemblies of switchgear and control gear<br />

for voltage up to and including 1000 V A.C. and 1200 V D.C.<br />

IS : 8828 Miniature circuit breakers.<br />

IS : 9224 HRC fuse links<br />

IS : 3231 Electrical relay for protection<br />

IS : 1248 Indicating instrument<br />

IS : 722 Integrating instrument<br />

IS : 6875 Control switches and push buttons<br />

IS : 1822 A.C. motor starters of voltage not exceeding 1000 V<br />

Indian Electricity Act and Rules (as amended up to date) and approval of FIA of India.<br />

The Panels also require approval of the consultant at various stage of their manufacture such as<br />

design, selection, construction, testing, shipping etc.<br />

1.4 SHOP DRAWINGS<br />

Prior to fabrication of the Panels the supplier / contractor shall submit for consultant’s<br />

approval the shop / vendor drawing consisting of G.A. drawing, <strong>section</strong>al elevation, single<br />

line diagram, bill of material etc. and design calculations indicating type, size, short<br />

circuiting rating of all the electrical components used, busbar size, internal wiring size,<br />

Panels dimension, colour, mounting details etc. in 6 sets.. The contractor shall also submit<br />

manufacturer’s catalogues of the electrical components installed in the Panels along with the<br />

drawing.<br />

1.5 CONTROL PANELS :<br />

All power auxiliary contactors, thermal overload relays etc. should be mounted in sheet<br />

cubicles with lockable hinged doors. The door hinges should be such that during repair<br />

works inside the panel, the entire door can be lifted out and placed away enabling better<br />

access inside the panel. All ventilating openings should have screen protection. Interior of<br />

the panel should be dust and vermin proof.<br />

151


Panels should be front wired with readily accessible terminal blocks for making connection<br />

to the external equipment. All equipment is to be mounted in front of the panel. Rear panel<br />

mounting is not permitted. All cable entry should be from bottom only. Removable plate is to<br />

be provided at the bottom of the panels for marking holes, providing cable gland for cables.<br />

Panels should be pre– wired up to terminal strip.<br />

All contactors etc. should be mounted securely in a vertical arrangement with due<br />

consideration to the vibration encountered in the operation of the crane. The bottom most<br />

row of equipment mounted inside the panel cover to facilitate inspection and repair. Terminal<br />

strip should be fixed inside the panel referable in horizontal manner leaving enough space<br />

underneath the panel for termination of cables in a convenient manner. Power and control<br />

terminals should be segregated. Terminal blocks should have enough clearance to avoid<br />

tracking.<br />

At least 10 % extra terminals in each of power and control groups must be provided. All<br />

equipment inside the panel should have permanent identification labels in accordance with<br />

circuit diagram as also the power and control terminals. Terminal blocks should be robust<br />

and of such construction as to preclude possibility of cable connections getting loose due to<br />

vibration on crane.<br />

Sheet steel used for fabrication of panel should have minimum thickness of 1.6 mm. panels<br />

should be mounted such that bottom of panel is at least 200 mm above the floor.<br />

Clearance and creep age distance for the control gear should proper respectively.<br />

Contactor panels should be well braced to the crane structure and each panel should be<br />

provided with adequate number of lifting lugs.<br />

1.6 CONTACTORS<br />

The current rating of all contactors should be at least 25 % higher than the respective motor<br />

full load current at the specified duty cycle.<br />

1.7 ELECTRICAL INTERLOCKS<br />

An isolator fitted on the crane bridge which cannot be operated from the floor shall be<br />

provided to prevent inadvertent operation of the crane from the floor while maintenance<br />

work is being carried on the crane. Power supply (415 V AC, 3 phase, 4 wire, 50 Hz) to the<br />

crane shall be provided by the owner at centre of DSL (Down Shop Lead Arrangement).<br />

152


2.1 CONSTRUCTION FEATURES :<br />

2.0 LOCAL PUSH BUTTON STATION<br />

The constructional features of the local push bottom stations shall be as follows:<br />

2.1.1 Metal enclosed, weather proof, suitable for mounting on wall or steel structures. The<br />

enclosure shall be die cast aluminium or sheet metal of 2 mm thickness.<br />

2.1.2 Outdoor type push buttons shall be completely weather, dust and vermin proof and shall be<br />

provided with canopy. Degree of protection shall be IP: 55.<br />

2.1.3 Metal parts shall be given tropicalising treatment as per standards and painted with one coat<br />

of epoxy primer and two coats of light grey epoxy paint.<br />

2.1.4 Provided with inscription plates of rear engraved perplex with white letters on black<br />

background. The letter size shall be 6 mm.<br />

2.1.5 Provided with two earthing terminals suitable for 14 SWG G.I. wire.<br />

2.1.6 Provided with removable undrilled gland plate and cable glands for appropriate sizes of<br />

cable. The cable entry shall be from the bottom.<br />

2.1.7 Push button contacts shall be designed for extra robust both mechanical and electrical<br />

operation. High quality material shall be used in their construction to ensure mechanical life<br />

exceeding 10 million switching operations. The contact shall be of silver alloy of 10 A<br />

continuous current rating.<br />

2.2 PUSH BUTTONS<br />

2.2.1 All push buttons shall be:<br />

i.) Fitted with two (2) normally open and two (2) normally closed contacts rated to carry<br />

and break 6 Amps at 415 Volts (10 A at 240 V AC)<br />

ii.) Provide integral escutcheon plates marked with its function.<br />

iii.) Main pump motor push button shall have ON-OFF with Ammeter<br />

2.2.2 The open/close/start push buttons shall be of the momentary contact push to actuate type and<br />

shall be green in colour.<br />

2.2.3 The stop push buttons shall be stay put type with mushroom knob and shall be red in colour.<br />

2.3 TYPE OF PUSH BUTTON STATIONS<br />

The following types of push button stations shall be supplied :<br />

2.3.1 Push button station type-A – Each P.B. station suitable for indoor installation and shall<br />

comprise two push buttons viz. ‘START’ and ‘STOP’ with on/off indicating lamps for<br />

control of non reversible motors.<br />

2.3.2 Push button station type-B – Each P.B. station for indoor installation and shall be comprise<br />

of three push buttons viz. ‘OPEN’, ‘CLOSE’ and ‘STOP’ with on/off indicating lamps for<br />

control of reversible motor.<br />

153


2.4 APPLICABLE STANDARDS<br />

All applicable standards and code of practices referred to shall be the latest editions including<br />

all official amendments and revisions.<br />

Push buttons and related control switches: IS-6875.<br />

2.5 INSPECTION & TESTING<br />

The local push button stations shall be offered for inspection after assembly. Routine and<br />

acceptance tests and shall be carried out during inspection.<br />

2.6 TEST EQUIPMENT<br />

Vendor shall ensure to use calibrated test equipment having valid calibration test certificates<br />

from standard laboratories traceable to National Standards.<br />

2.7 DRAWINGS<br />

On award of the contract, the contractor shall submit the fully dimensioned general<br />

arrangement drawings complete with plan, elevation and <strong>section</strong>al views.<br />

154


3.1 SCOPE<br />

3.0 MEDIUM VOLTAGE CABLES<br />

This <strong>section</strong> shall cover supply of medium voltage cables.<br />

3.2 STANDARDS<br />

The following standards and rules shall be applicable :<br />

IS: 1554 PVC insulated electric cables (heavy duty).<br />

IS: 3961 Recommended current ratings for cables.<br />

IS: 8130 Aluminium conductors for insulated cables<br />

Indian Electricity Act and Rules.<br />

3.3 MEASUREMENTS<br />

The cables will be measured in meters. The unit rate shall include cutting the cable into<br />

required lengths, packing, loading, unloading, insurance, transportation, delivery to<br />

stores/site as per work order, stocking in stores, testing of cables at stores etc. of medium<br />

voltage cable.<br />

3.4 GENERAL<br />

The medium voltage cables shall be supplied, laid, connected, tested and commissioned in<br />

accordance with the drawings, specifications, relevant Indian Standards specifications,<br />

manufacturer’s instructions. The cables shall be delivered at site in original drums with<br />

manufacturer’s name, size, and type, clearly written on the drums.<br />

3.5 MATERIAL<br />

3.5.1 TYPE<br />

Medium voltage cable shall be PVC insulated. PVC sheathed, aluminium or copper<br />

conductor, armoured and unarmoured heavy duty, conforming to IS : 694 Part I & II, IS :<br />

1554 Part I.<br />

The cables shall be circular, multi core, annealed copper, PVC insulated and PVC sheathed,<br />

armoured.<br />

3.5.2 CONDUCTOR<br />

Uncoated, annealed copper / Aluminum of high conductivity, upto 4 mm.² size the conductor<br />

shall be solid and above 4 mm.² conductors shall be concentrically stranded as per IEC: 228.<br />

3.5.3 INSULATION<br />

Polyvinyl chloride (PVC) rated 70° c. extruded insulation as per IEC: 502.<br />

155


3.5.4 CORE IDENTIFICATION<br />

Two core : Red and Black<br />

Three core : Red, Yellow and Blue<br />

Four core : Red, Yellow, Blue and Black<br />

Single core : Green, Yellow for earthing<br />

Black shall always be used for neutral.<br />

3.5.5 ASSEMBLY<br />

Two, three or four insulated conductors shall be laid up, filled with non-hygroscopic material<br />

and covered with an additional layer of thermoplastic material.<br />

3.5.6 ARMOUR<br />

Galvanised steel flat strip / round wires applied helically in single layers complete with<br />

covering the assembly of cores.<br />

For cable size upto 25 Sq. mm: Armour of 1.4 mm dia G.I. round wire<br />

For cable size above 25 Sq. mm: Armour of 4 mm wide 0.8 mm thick G.I. strip<br />

3.5.7 SHEATH<br />

i.) Polyvinyl chloride (PVC), 70 deg.c. rated extruded as per IEC: 502.<br />

ii.) Inner sheath shall be extruded type and shall be compatible with the insulation provided<br />

for the cables.<br />

iii.) Outer sheath shall be of an extruded type layer of suitable synthetic material compatible<br />

with the specified ambient and operating temperature of cables. The sheath shall be<br />

resistant to water, ultraviolet radiation, fungus, termite and rodent attacks. The colour<br />

of outer sheath shall be black.<br />

3.5.8 RATING<br />

Upto and including 1100 Volts.<br />

3.6 GENERAL<br />

All cables shall be adequately protected against any risk of mechanical damage to which they<br />

may be liable in normal conditions of handling during transportation, loading, unloading etc.<br />

The cable shall be supplied in single length i.e. Without any intermediate joint or cut unless<br />

specifically approved by the client.<br />

The cable ends shall be suitably sealed against entry of moisture, dust, water etc. with cable<br />

compound as per standard practice.<br />

156


3.7 TESTING<br />

3.7.1 FINISHED CABLE TESTS AT MANUFACTURER’S WORKS<br />

The finished cables shall be tested at manufacturer’s works by TPI along with client<br />

representative, if required by client. Following routine tests for each and every length of<br />

cable and copy of test results shall be furnished for each length of cable along with supply.<br />

A) VOLTAGE TEST<br />

Each core of cable shall be tested at room temperature at 3 KV A.C. R.M.S. for<br />

duration of 5 minutes.<br />

B) CONDUCTOR RESISTANCE TEST<br />

The D.C. Resistance of each conductor shall be measured at room temperature and the<br />

results shall be corrected to 20° c. to check the compliance with the values specified in<br />

IS 8130 – 1976.<br />

Prior to dispatching cables, and at the time of delivering the cables at stores, following<br />

tests shall be carried our :-<br />

i.) Insulation Resistance test between phases and phase to Neutral and phase to earth.<br />

ii.) Continuity test of all the phases, neutral and earth continuity conductor.<br />

iii.) Sheathing continuity test.<br />

iv.) Earth resistance test of all the phases and neutral.<br />

All tests shall be carried out in accordance with relevant Indian Standard Code of practice<br />

and Indian Electricity Rules. The Vendor shall provide necessary instruments, equipments<br />

and labour for conducting the above tests and shall bear all expenses in connection with such<br />

tests. All tests shall be carried our in the presence of the client and results shall be recorded in<br />

the prescribed forms.<br />

3.8 CABLE MARKING<br />

3.8.1 EMBOSSING ON OUTER SHEATH<br />

The outer sheath shall be legibly embossed with following legend:<br />

ELECTRIC CABLE: 1100 V, SIZE: 3.5 C x ----- mm ².<br />

Manufacturer’s Name & year of manufacturing.<br />

3.9 SEALING, DRUMMING & PACKING:<br />

3.9.1 After tests at the manufacturer’s works, both ends of the cable shall be sealed to prevent the<br />

ingress of moisture during transportation and storage.<br />

3.9.2 Cable shall be supplied in length of 500 ± 10% meters on packed non-returnable drums of<br />

sufficiently sturdy construction.<br />

157


3.9.3 Cables of length more than 250 meters shall also be supplied on non-returnable drums.<br />

3.9.4 The spindle hole shall be 110 mm minimum diameter.<br />

3.9.5 Each drum shall bear on the outside flange, legibly and indelibly in the English literature, a<br />

distinguishing number, the manufacturer’s name and particulars of the cable i.e. voltage<br />

grade, length, conductor size, cable type, insulation type and gross weight shall also be<br />

clearly visible. The direction for rolling shall be indicated by an arrow. The drum flange<br />

shall also be marked with manufacturer’s name and year of manufacturing etc.<br />

3.10 TRANSPORTATION & DELIVERY:<br />

3.10.1 The cable shall be supplied in the actual length as per detailed purchase order.<br />

3.10.2 The cable shall be dispatched at client’s stores or at site as per detailed instructions given by<br />

client at later stage.<br />

3.10.3 The cable shall be loaded from the main vendor’s store and properly stacked as per<br />

instruction of client’s local representative. All such labour and transportation charges shall be<br />

clearly mentioned in the offer.<br />

3.11 L. V. XLPE CABLE<br />

3.11.1 DESIGN CONDITIONS:<br />

All equipment and materials will be selected and rated for use at the following site<br />

conditions.<br />

3.11.2 SCOPE:<br />

Ambient air temperature 45° C.<br />

Ground temperature 30° C.<br />

Solar gain 1100 w / m2<br />

Earth resistivity 200 deg. C. cm / w<br />

Relative Humidity 95% Max.<br />

Atmospheric condition Corrosive, Humid and Dusty<br />

This <strong>section</strong> shall cover supply, laying, testing and commissioning of medium voltage XLPE<br />

cables.<br />

This specification gives the general requirement of cables. However, it is the responsibility of<br />

the vendor to take the joint measurement and obtain client’s approval before the placement of<br />

orders to the main supplier / manufacturer.<br />

3.11.3 STANDARDS<br />

The following standards and rules shall be applicable:<br />

158


IS: 7098 Part I XLPE Insulated electric cables (heavy duty).<br />

IS: 3961 Recommended current ratings for cables.<br />

IS: 8130 Aluminum conductors for insulated cables<br />

Indian Electricity Act and Rules.<br />

3.11.4 MEASUREMENTS<br />

The cables will be measured in meters. The unit rate shall include cutting the cable into<br />

required lengths, packing, loading, unloading, insurance, transportation, delivery to<br />

stores/site as per work order, stocking in stores, testing of cables at stores etc. of medium<br />

voltage cable. Total quantity in meters shall be measured lug to lug basis.<br />

3.11.5 GENERAL<br />

The low voltage cables shall be supplied, laid, connected, tested and commissioned in<br />

accordance with the drawings, specifications, relevant Indian Standards specifications,<br />

manufacturer’s instructions. The cables shall be delivered at site in original drums with<br />

manufacturer’s name, size, and type, clearly written on the drums.<br />

3.11.6 MATERIAL<br />

3.11.6.1 TYPE<br />

The low voltage cable shall be XLPE insulated. PVC sheathed, aluminium or copper<br />

conductor, armoured conforming to IS: 7098 Part I.<br />

The cables shall be circular, multi core, annealed copper or aluminium conductor, XLPE<br />

insulated and PVC sheathed, armoured.<br />

3.11.6.2 CONDUCTOR<br />

Uncoated, annealed copper / aluminum, of high conductivity up to 4 mm.² size, the conductor<br />

shall be solid and above 4 mm.², conductors shall be concentrically stranded as per IEC:<br />

228A.<br />

3.11.6.3 INSULATION<br />

XLPE rated 70° c. extruded insulation<br />

3.11.6.4 CORE IDENTIFICATION<br />

Two core : Red and Black<br />

Three core : Red, Yellow and Blue<br />

Four core : Red, Yellow, Blue and Black<br />

Single core : Green, Yellow for earthing<br />

Black shall always be used for neutral.<br />

159


3.11.6.5 ASSEMBLY<br />

Two, three or four insulated conductors shall be laid up, filled with non-hygroscopic material<br />

and covered with an additional layer of thermoplastic material.<br />

3.11.6.6 ARMOUR<br />

Galvanized steel flat strip / round wires applied helically in single layers complete with<br />

covering the assembly of cores.<br />

For cable size up to 25 Sq. mm: Armour of 1.4 mm dia G.I. round wire<br />

For cable size above 25 Sq. mm: Armour of 4 mm wide 0.8 mm thick G.I. strip<br />

3.11.6.7 SHEATH<br />

a) XLPE 70 deg.c. rated extruded.<br />

b) Inner sheath shall be extruded type and shall be compatible with the insulation provided<br />

for the cables.<br />

c) Outer sheath shall be of an extruded type layer of suitable PVC material compatible<br />

with the specified ambient temp. 50 deg. C and operating temperature of cables. The<br />

sheath shall be resistant to water, ultraviolet radiation, fungus, termite and rodent<br />

attacks. The colour of outer sheath shall be black.<br />

d) Sequential length marking required at every 1.0 mtr. Interval on outer sheath.<br />

e) Vendor has to furnish resistance / reactance / capacitances of the cable.<br />

3.11.6.8 RATING<br />

Up to and including 1100 Volts.<br />

3.11.7 GENERAL<br />

All cables shall be adequately protected against any risk of mechanical damage to which they<br />

may be liable in normal conditions of handling during transportation, loading, unloading etc.<br />

The cable shall be supplied in single length i.e. without any intermediate joint or cut unless<br />

specifically approved by the client.<br />

The cable ends shall be suitably sealed against entry of moisture, dust, water etc. with cable<br />

compound as per standard practice.<br />

3.11.8 TESTING<br />

3.11.8.1 FINISHED CABLE TESTS AT MANUFACTURER’S WORKS<br />

The finished cables shall be tested at manufacturer’s works. Following routine tests for each<br />

and every length of cable and copy of test results shall be furnished for each length of cable<br />

along with supply. If specified, the cables shall be tested in presence of client’s<br />

representative.<br />

160


a) VOLTAGE TEST:<br />

Each core of cable shall be tested at room temperature at 3 KV A.C. R.M.S. for<br />

duration of 5 minutes.<br />

b) CONDUCTOR RESISTANCE TEST:<br />

The D.C. Resistance of each conductor shall be measured at room temperature and the<br />

results shall be corrected to 20° c. to check the compliance with the values specified in<br />

IS 8130 – 1976.<br />

3.11.8.2 CABLE TEST BEFORE AND AFTER LAYING OF CABLES AT SITE:-<br />

a) Insulation Resistance test between phases and phase to Neutral and phase to earth.<br />

b) Continuity test of all the phases, neutral and earth continuity conductor.<br />

c) Sheathing continuity test.<br />

d) Earth resistance test of all the phases and neutral.<br />

All tests shall be carried out in accordance with relevant Indian Standard Code of<br />

practice and Indian Electricity Rules. The Vendor shall provide necessary instruments,<br />

equipments and labour for conducting the above test and shall bear all expenses in<br />

connection with such tests. All tests shall be carried our in the presence of the client<br />

and results shall be recorded in the prescribed forms.<br />

3.11.9 CABLE MARKING<br />

EMBOSSING ON OUTER SHEATH:<br />

The outer sheath shall be legibly embossed with following legend:<br />

ELECTRIC CABLE: 1100 V, SIZE: 3.5 C x ----- mm ².<br />

Manufacturer’s Name & year of manufacturing.<br />

3.11.10 CABLE LAYING<br />

The cables shall be laid in trenches, trays, racks or conduits/pipes. No cable shall be directly<br />

buried in the ground; The cables of different voltage grade shall be laid in different trays.<br />

Power & control cables shall be laid in different trays.<br />

3.11.11 SEALING, DRUMMING & PACKING<br />

After tests at the manufacturer’s works, both ends of the cable shall be sealed to prevent the<br />

ingress of moisture during transportation and storage.<br />

Cable shall be supplied in length of 500 ± 10% meters, packed non-returnable drums of<br />

sufficiently sturdy construction.<br />

Cables of length more than 250 meters shall also be supplied on non-returnable drums.<br />

161


The spindle hole shall be 110 mm minimum diameter.<br />

Each drum shall bear on the outside flange, legibly and indelibly in the English literature, a<br />

distinguishing number, the manufacturer’s name and particulars of the cable i.e. voltage<br />

grade, length, conductor size, cable type, insulation type and gross weight shall also be<br />

clearly visible. The direction for rolling shall be indicated by an arrow. The drum flange shall<br />

also be marked with manufacturer’s name and year of manufacturing etc.<br />

3.11.12 TRANSPORTATION & DELIVERY<br />

The cable shall be supplied in the actual length as per detailed purchase order.<br />

The cable shall be dispatched at client’s stores or at site as per detailed instructions given by<br />

client at later stage.<br />

The cable shall be loaded from the main vendor’s store and properly stacked as per<br />

instruction of client’s local representative. All such labour and transportation charges shall be<br />

clearly mentioned in the offer<br />

3.11.13 LAYING OF THE CABLES<br />

The cable shall be laid in trenches, trays, racks, or conduit pipes .No cables shall be directly<br />

buried in the ground. The cables of different voltage grade shall be laid in different voltage<br />

grade shall be laid in different trays. Power and control cables shall be laid in different trays.<br />

3.11.14 DRAWINGS AND DATA<br />

a) As a part of the Tender, Tenderer shall furnish the following<br />

i) General information<br />

ii) Principal technical data<br />

Description of insulation, sheathing and screening. This should include data on<br />

resistance to attack by chemicals, fungus, termites, rodents, water and ultra violet<br />

radiation.<br />

iii) Installation and termination instrumentations.<br />

iv) Type/Routine test certificates for all types of cables included in the Tender.<br />

b) After award of contract it shall be the responsibility of Contractor to work out a detailed<br />

layout for the complete plant cable system. The layout drawing shall be furnished for the<br />

approval of Purchaser’s representative before commencement of installation including<br />

cable trays, cable racks, accessories, tray supports, conduits etc.<br />

162


4.1 GENERAL<br />

4.0 EARTHING<br />

All the non-current carrying metal parts of the electrical installation and mechanical<br />

equipments shall be earthed properly. The cables armour and sheath, electric panel boards,<br />

lighting fixtures, ceiling and exhaust fan and all other parts made of metal shall be bonded<br />

together and connected by means of specified earthing system. An earth continuity conductor<br />

shall be installed with all the feeders and circuits and shall be connected from the earth bar<br />

of the panel boards to the conduit system, earth stud of the switch box, lighting fixture, earth<br />

pin of the socket outlets and to any metallic wall plates used. All the enclosures of motors<br />

shall be also connected to the earthing system.<br />

4.2 SCOPE OF WORK<br />

4.2.1 The scope of work shall cover supply, laying, installation, connecting, testing and<br />

commissioning of :<br />

4.2.2 Earthing station with G.I / Copper plate of size as given in BOQ.<br />

4.2.3 Earthing G.I / Copper strips from earthing station to equipotential bar.<br />

4.2.4 Earthing G.I / Copper strips / wires from equipotential bar to power panels, DBs, motors etc.<br />

4.2.5 Bonding of Non-current carrying parts, and metallic parts of the electrical installation.<br />

4.3 STANDARDS<br />

4.3.1 The following standards and rules shall be applicable:<br />

i.) IS: 3043 – 1966 Code of practice for Earthing.<br />

ii.) Indian Electricity Act and Rules<br />

4.3.2 All codes and standards mean the latest. Where not specified otherwise the installation<br />

shall generally follow the Indian Standard Code of Practice or the British Standard Codes<br />

of Practice in absence of Indian standard.<br />

4.4 TYPE OF EARTHING STATION<br />

4.4.1 PLATE EARTHING STATIONS<br />

i.) The Equipment neutral earthing shall be with copper plate earthing station and equipment<br />

body earthing shall be with hot dip galvanized iron earthing station.<br />

i.) The plate electrode shall be 600 x 600 x 3.25 mm copper plate for neutral earthing and<br />

shall be of hot dip galvanized iron plate having dimensions 600 x 600 x 6.3 mm thick for<br />

body earthing.<br />

ii.) The earthing station shall be as shown on the drawing.<br />

iii.) The earth resistance shall be maintained with suitable soil treatment as shown in the<br />

drawing.<br />

iv.) The resistance of each earth station should not exceed 1 ohm.<br />

v.) The earth lead shall be connected to the earth plate through Hot Dip G.I. bolts.<br />

163


vi.) The earthing conductors shall be of copper strip in case of copper earthing and hot dip<br />

galvanized iron strip in case of G.I. earthing.<br />

vii.) G.I. pipe with funnel of approved quality shall be used for watering the earthing<br />

electrodes / stations.<br />

viii.) The block masonry chamber with chequered plate shall be provided for housing the<br />

funnel and the pipe for watering the earthing electrodes / stations.<br />

ix.) The hardware and other consumables for earthing installation shall be of copper/brass<br />

in case of copper earthing and shall be hot dip galvanized iron material in case of G.I.<br />

earthing.<br />

x.) Test link / test pit cover through chequered plate.<br />

4.4.2 PIPE ELECTRODE EARTH STATION<br />

i.) The earth station shall be as shown on the drawing and shall be used for equipment earth<br />

grid and / or street light pole earthing.<br />

ii.) The earth electrode shall be 3 M long 50 mm dia class “B”, Galvanized steel pipe.<br />

iii.) The earth resistance shall be maintained with a suitable soil treatment as shown on the<br />

drawing.<br />

iv.) The resistance of each earth station should not exceed 1 ohm.<br />

v.) The earth lead shall be fixed to the pipe with a nut and safety set screws. The clamp shall<br />

be permanently accessible.<br />

vi.) The earthing grid and the earthing conductor shall be hot dip Galvanized iron strips of the<br />

size as shown in the drawing.<br />

vii.) G.I. pipe with funnel of approved quality shall be used for watering the earth electrode \<br />

station.<br />

viii.) The block masonry chamber with chequered plate shall be provided for housing the<br />

above referred funnel and pipe.<br />

ix.) The hardware and other consumables for earthing installation shall be hot dip Galvanized<br />

iron material as shown on the drawing.<br />

4.5 METHOD OF MEASUREMENT<br />

4.5.1 Provision of earthing station complete with excavation, electrode, watering pipe, soil<br />

treatment, masonry chamber with cast iron cover etc. shall be treated as one unit of<br />

measurement.<br />

4.5.2 The following items of work shall be measured and paid per unit length covering the cost of<br />

the earth wires / strips, clamps, labour etc.<br />

4.5.3 Main equipment earthing grid and connection to the earthing station.<br />

4.5.4 Connection to the switch board, power panels, DB, motors etc.<br />

164


5.0 ERECTION, TESTING & COMMISSIONING OF ELECTRICAL INSTALLATIONS<br />

5.1 SCOPE<br />

The intent of this specification is to define the requirements for the installation, testing and<br />

commissioning of the electrical system like transformer, M.V panels, Cables, earthing<br />

network, Internal and External lighting, Light fixtures etc. Requirement of this project shall<br />

be as specified in bill of quantities / approved drawings / general specifications or as per the<br />

battery limits fixed by the owner / consultant.<br />

Inspection at manufacturers premises: All tests of all major items like HT panel, LT panel,<br />

Transformers, Power cable (in case of more than a drum) shall be conducted at<br />

manufacturer’s work in presence of third party inspection agency and client’ representative<br />

appointed by purchaser’s representative. However, all the expenses like transportation,<br />

loading & boarding shall be borne by contractor.<br />

5.2 STANDARDS<br />

5.2.1 The work shall be carried out in the best workman like manner in conformity with this<br />

specification, the relevant specification / codes of practice of the Indian Standards Institution,<br />

approved drawings and the instructions issued by the authorized representative, from time to<br />

time. Some of the relevant Indian Standards are listed elsewhere in this tender document.<br />

In addition to the standards mentioned in 2.1, all works shall also conform to the requirement<br />

of the following :<br />

i.) Indian Electricity Act and Rules framed there under.<br />

ii.) Fire Insurance Regulations.<br />

iii.) Regulations laid down by the Chief Electrical Inspector of the State / State Electricity<br />

Board / Union Territory.<br />

iv.) Regulations laid down by the Factory Inspector of the State / Union Territory.<br />

v.) Any other regulations laid down by the local authorities.<br />

vi.) Installation & operation manuals of original manufacturers of equipment.<br />

5.3 EQUIPMENT AND ACCESSORIES SPECIFICATIONS<br />

This defines specifications and requirements mainly for the equipment and accessories,<br />

which are generally supplied by the erection agency.<br />

All materials, accessories, consumable to be supplied by the contractor shall be selected from<br />

the list of specified make and shall conform tot he specification given here under. The<br />

equipment shall be manufactured in accordance with current Indian Standard specifications<br />

wherever they exist or with the BS or NEC specifications, if no such IS standards are<br />

available. In the absence of any specification, the materials shall be as approved by the owner<br />

/ consultant or his authorized representative.<br />

All similar materials and removable parts shall be uniform and interchangeable with one<br />

another. Makes of bought out items selected by the contractor must be furnished by him as<br />

per the proforma given in elsewhere in this tender document.<br />

5.3.1 CONTROL CABLES:<br />

165


i.) Control cables for use on 415 V system shall be of 1100 volts grade, copper conductor,<br />

PVC insulated, PVC sheathed, armoured and overall PVC sheathed, strictly as per IS:<br />

1554 (Part-I) 1976. Unarmoured cables to be used only if specifically mentioned in<br />

schedule of quantities.<br />

ii.) The size of these cables shall be as specified in bill of quantities or as per approved<br />

drawing. The minimum conductor size shall be 2.5 sq.mm. (Cu.).<br />

5.3.2 CABLE TRAYS:<br />

These shall be channel type, fabricated from structural steel, hot dip galvanized, complete<br />

with all accessories such as bends, tees and reducers. Only aluminum flat clamps with G.I. /<br />

Chrome plated bolts, nuts/screws to be used for clamping cables. Sizes of these trays shall be<br />

as specified in bill of quantities or approved by client.<br />

5.3.3 CABLE GLANDS:<br />

Cable glands shall be heavy duty compression type of brass, chrome plated. These shall have<br />

a screwed nipple with conduit electrical thread and check nut. These shall be suitable for<br />

armoured/Unarmoured cables, which are being used.<br />

5.3.4 CABLE CONNECTORS:<br />

Cable connectors, lugs/sockets, shall be of copper/aluminum alloy, suitably tinned, solder<br />

less, crimping type. These shall be suitable for the cable being connected and type of<br />

function (such as power, control or connection to instruments etc.).<br />

5.3.5 CABLE INDICATORS<br />

These shall be self sticking type of 2 mm. thick lead strap for overall cable. PVC<br />

identification number, ferrules shall be used for each wire.<br />

5.3.6 G.I. PIPE FOR CABLES:<br />

For laying of cables under floor, G.I. class “A” pipes shall be used. M.S. conduits are not<br />

acceptable for this purpose. All accessories of pipes shall be threaded type. Size of pipe shall<br />

depend upon the overall outer diameter of cable to be drawn through pipe. NO G.I. pipe less<br />

then 40 MM. I.D. shall be used for this purpose. To determine the size of pipe, assume that<br />

40% area of pipe shall be free after drawing of cable.<br />

5.3.7 PUSH BUTTON STATIONS:<br />

These shall be floor / wall mounted type as specified in bill of quantities. These shall be<br />

fabricated from 1.6 mm. thick stainless steel sheets (SS 304). In case of floor mounted<br />

station, these shall be supported on 51 mm. “A” class G.I. pipe. Front cover shall be<br />

removable type with suitable rubber gaskets to make them dust vermin and moisture proof.<br />

Each feeder shall be provided with “ON” (green) push button, “OFF” (red) push button,<br />

name plate (white bakelite), indication lamp etc. Green & red push buttons shall have contact<br />

elements having 1NO + 1NC. “OFF” push button shall be provided with lockable (key<br />

operated) arrangements to prevent accidental starting. No. of feeders shall be specified in bill<br />

of quantities. The indication lamp can be combined with “ON” push button.<br />

166


5.4 ERECTION<br />

The contractor shall make his own arrangement for safe transportation of all the items to the<br />

erection site and also carry out complete loading / unloading during transportation.<br />

Equipment shall not be removed from packing cases unless the floor has been made ready for<br />

installing them. The cases shall be opened in presence of the client / consultant or his<br />

authorized representative. The empty packing cases shall be returned to the stores and any<br />

document if found with the equipment shall be handed over to the client’s representative.<br />

Any damage or shortage noticed shall be reported to the client / consultant in writing<br />

immediately after opening of packing cases.<br />

5.3.1 DELETED<br />

5.3.2 DELETED<br />

5.3.3 INSTALLATION OF CABLE NETWORK:<br />

Cable network shall include power, control and lighting cables which shall be laid in<br />

underground trenches, cable trays, G.I. pipes, or on building structures as detailed in the<br />

relevant drawings, cable schedules or as per the client / consultant’s instructions. Supply &<br />

installation of cable trays, G.I. pipes / conduits, cable glands and sockets of end isolators,<br />

junction boxes, remote push button stations, etc. shall be under the scope of the contractor.<br />

i) GENERAL REQUIREMENTS FOR HANDLING CABLES:<br />

a) Before laying cables, this shall be tested for physical damage, continuity, absence<br />

of cross phasing, insulation resistance to earth and between conductors. Insulation<br />

resistance tests shall be carried out with 500 / 1000 V megger.<br />

b) The cables shall be supplied at site, wound on wooden drums as far as possible. For<br />

smaller length and sizes, cables in properly coiled form can be accepted. The cables<br />

shall be laid by mounting the drum of the cable on drum carriage. Where the<br />

carriage is not available, the drum shall be mounted on a properly supported axle,<br />

and the cable laid out from the top of the drum. In no case the cable will be rolled<br />

on as it produces kinks which may damage the conductor.<br />

c) Sharp bending of cable shall be avoided. The bending radius for PVC insulated and<br />

sheathed, armoured cable shall not be less than 10 D, where “D” is overall diameter<br />

of the cable.<br />

d) While drawing cables through G.I. pipes, conduits, RCC pipes, ensure that size of<br />

pipe is such that, after drawing cables, 40% area is free. After drawing cables, the<br />

end of pipe shall be sealed with cotton / bituminous compound.<br />

e) High voltage (11 kV and above), medium voltage (240 V and above) and other<br />

control cables shall be separated from each other by adequate spacing or running<br />

through independent pipes / trays.<br />

f) Armoured cables shall never be concealed in walls / floors / roads without G.I.<br />

pipes, conduits or RCC pipes.<br />

167


g) Joints in the cable throughout its length of laying shall be avoided as far as possible<br />

and if unavoidable, prior approval of site engineer shall be taken. If allowed, proper<br />

straight through epoxy resin tight joint shall be made, without any additional cost.<br />

h) A minimum loop of 3 mtr. Shall be provided on both ends of the cable, and on both<br />

ends of straight through cable joint. This additional length shall be used for fresh<br />

termination in future. Cable for this loop shall be paid for supply and laying.<br />

i) Cable shall be neatly arranged in the trenches / trays in such manner so that crosscrossing<br />

is avoided and final take off to the motor / switchgear is facilitated.<br />

Arrangement of cable within the trenches / trays shall be the responsibility of the<br />

contractor.<br />

j) All cable routes shall be carefully measured and cable cut to the required lengths<br />

and undue wastage of cables to be avoided. The routes indicated in the drawings are<br />

indicative only and the same may be rechecked with the client / consultant before<br />

cutting of cables. While selecting cable routes interference with structures,<br />

foundations, pipelines, future expansion of buildings etc. should be avoided.<br />

k) All temporary ends of cables must be protected against dirt and moisture to prevent<br />

damage to the insulation. For this purpose, ends of all PVC insulated cables shall be<br />

taped with an approved PVC or rubber insulating tapes. Use of friction type or other<br />

fabric type tape is not permitted. Lead sheathed cables shall be plumbed with lead<br />

alloy.<br />

l) Wherever cable rises from underground / concrete / masonry trenches to motors /<br />

switchgears / push buttons, these shall be taken in G.I. pipes of suitable size, for<br />

mechanical protection upto 300 mm. distance of concerned cable gland or as<br />

instructed by the client / consultant.<br />

m) The cable pass through foundation / walls of other underground structures, the<br />

necessary ducts for opening will be provided in advance for the same. However,<br />

should it become necessary to cut holes in existing foundation of structures the<br />

electrical contractor shall determine the location and obtain approval of the client /<br />

consultant before cutting is done.<br />

ii) LAYING OF CABLES (UNDERGROUND SYSTEM)<br />

a) Cables shall be so laid in trench that this will not interfere with other underground<br />

structure. All water pipes, sewage lines or other structures which become exposed<br />

by excavation shall be properly supported and protected from injury until the filling<br />

has been rammed solidly in places under and around them. Any telephone or other<br />

cables coming in the way are to be properly shielded / diverted as directed by the<br />

owner / consultant.<br />

b) Cable shall be laid at minimum depth of 750 mm. in case of L.T. and 1200 mm. in<br />

case of H.T. from ground level. Excavation will be generally in ordinary soil. The<br />

width of trench shall be sufficient for laying of required no. of cables.<br />

c) Sand bedding 75 mm. thick shall be made below and above the cables. Layer of<br />

bricks (full size) shall be laid above sand bedding on the sides and above the cables<br />

to cover cables completely. More than one cable can be laid in the same trench.<br />

168


However, the relative location of cables in trench shall be maintained till<br />

termination. The surface of the ground after back filling the earth shall be made<br />

good so as to conform in all respects to the surrounded ground and to the entire<br />

satisfaction of the client / consultant.<br />

d) For all underground cables, route markers should be used :<br />

Separate route markers should be used for LT, HT and telephone cables.<br />

Route markers should be grounded in ground with 1:2:4 cement concrete<br />

pedestal size 230 x 230 x 300 mm..<br />

Cable markers should be installed at an interval not exceeding 30 mtr. Along the<br />

straight routes of cables at a distance of 0.5 mtr. Away from centre of cable with<br />

the arrow marked on the cable marker plate indicating the location of cable.<br />

Cable markers should also be used to identify change in direction of cable route<br />

and for location of every joint in underground cable.<br />

RCC Hume pipe for crossing road in cable laying shall be provided by<br />

employer. No deduction shall be made for cable laying in Hume pipe for not<br />

providing bricks, sand and excavation. RCC hump pipe at the ends shall be<br />

sealed by bituminous compound after laying and testing of cables by electrical<br />

contractor without any extra charge.<br />

iii) LAYING OF CABLE IN MASONRY TRENCHES<br />

Masonry / concrete trenches for laying of cables shall be provided by employer.<br />

However, steel members such as M.S. angles / flats etc. shall be provided and grouted<br />

by electrical contractor to support the cables without any extra charge. Cables shall be<br />

clamped to these supports with minimum saddles / clamps. More than one tier of cables<br />

can be provided in the same trench if the no. of cables are more.<br />

Entry of cables in trenches shall be sealed with bituminous MASTIC compound to stop<br />

entry of water in trenches.<br />

iv) LAYING OF CABLES IN CABLE TRAYS<br />

a) Cable trays and steel members such as M.S. angle / channel / flats etc. shall be<br />

provided and fixed by the contractor.<br />

b) Cable shall be fixed in cable trays in single tier formation and cables shall be<br />

clamped with flat clamps and galvanized bolts / nuts.<br />

c) Earthing flat / wire can also be laid in cable tray alongwith cables.<br />

d) After laying of cables, minimum 20% area shall be spare.<br />

v) TERMINATION AND JOINTING OF CABLES :<br />

a) For HT cables suitable size of heat shrinkable type termination kit shall be used.<br />

b) Use of glands :<br />

169


All PVC cables upto 1.1 KV grade, armoured or Unarmoured shall be<br />

terminated at the equipment / junction box / isolators / push buttons / control<br />

accessories, etc. by means of suitable size single compression type cable glands.<br />

Armour of cable shall be connected to earth point. The contractor shall drill<br />

holes for fixing glands wherever necessary. Wherever threaded cable gland is to<br />

be screwed into threaded opening of different size, suitable galvanized threaded<br />

reducing bushing shall be used of approved type.<br />

In case of termination of cables at the bottom of the panel over a cable trench<br />

having no access from the bottom, a close fit holes should be drilled in the<br />

bottom plate for all the cables in one line, then bottom plate should be split in<br />

two parts along the centre line of holes. After installation of bottom plate and<br />

cables with glands, it shall be sealed with cold sealing compound.<br />

vi) USE OF LUGS / SOCKETS :<br />

a) All cable leads shall be terminated at the equipment terminals, by means of crimped<br />

type solder less connectors unless the terminals at the equipment ends are suitable<br />

for direct jointing without lugs / sockets.<br />

b) The following is the recommended procedure for crimped joints and the same shall<br />

be followed :<br />

Strip off the insulation of the cable and with every precaution, not in severe or<br />

damage any strand. All insulation’s to be removed from the stripped portion of<br />

the conductor and ends of the insulation should be clean and square.<br />

The cable should be kept clean as far as possible before assembling it with the<br />

terminal / socket. For preventing the ingress of moisture and possibility of reoxidation<br />

after crimping of the aluminium conductors, the socket should be<br />

filled with corrosion inhibiting compound. This compound should also be<br />

applied over the stripped potion of the conductor and the palm surface of socket.<br />

Correct size and type of socket / ferrule / lug should be selected depending on<br />

size of conductor, and type of connection to be made.<br />

Make the crimped joint by suitable crimping tool.<br />

If after crimping the conductor in socket / lug, some portion of the conductor<br />

remains without insulation the same should be covered sufficiently with PVC<br />

tape.<br />

For HT cable the manufacturer’s recommendation should be followed.<br />

vii) DRESSING OF CABLE INSIDE THE EQUIPMENT :<br />

a) After fixing of cable glands, the individual cores of cable shall be dressed and taken<br />

along the cable ways (if provided) or shall be fixed to the panels with polyethylene<br />

straps. Cable shall be dressed in such a manner that small loop of each core is<br />

available inside the panel.<br />

170


) For motors of 20 HP and above, terminal box if found not suitable for proper<br />

dressing of aluminum cables, the erector shall modify the same without any<br />

additional cost.<br />

c) Cables inside the equipment shall be measured and paid for on lug to lug basis.<br />

viii) IDENTIFICATION OF CABLES / WIRES / CORES :<br />

a) Power cables shall be identified with red, yellow and blue PVC tapes. For trip<br />

circuits identification, additional red ferrules shall be used only in the particular<br />

cores of control cable at the termination points in the switchgear / control panels<br />

and control switches.<br />

b) In case of control cables all cores shall be identified at both ends by their wire<br />

numbers by mean of PVC ferrules or self sticking cable markers, wire numbers<br />

shall be as per schematic / connection drawing. For power circuit also, wire<br />

numbers shall be provided if required as per the drawings of switchgear<br />

manufacturer / supplier.<br />

ix) TESTING OF CABLES :<br />

a) Before energizing, the insulation resistance of every circuit shall be measured from<br />

phase to ground. This requires 3 measurements if one side is grounded and 6<br />

measurements for 3 phase circuits.<br />

b) Where splices or terminations are required in circuits rated above 650 volts,<br />

measure insulation resistance of each length of cable before splicing and/or<br />

terminating. Repeat measurements after splices and/or terminations are complete.<br />

c) DC high voltage test shall be made after installation on the following :<br />

All 1100 volts grade cables in which straight through joints have been made.<br />

All cables above 1100 V grade.<br />

For record purpose test data shall include the measured values of leakage<br />

current versus time.<br />

The DC high voltage test shall be performed as detailed below :<br />

Cables shall be installed in final position with all the straight through joints<br />

complete. Terminations shall be kept unfinished so that motors, switchgear,<br />

transformer etc. are not subjected to test voltage.<br />

The test voltage and duration shall be as per relevant codes and practices of<br />

Indian Standards Institution.<br />

x) PROFORMA FOR TESTING CABLES :<br />

Drum No. from which cable taken.<br />

Cable from to<br />

DATE OF TEST<br />

171


Length of run of this cable<br />

Insulation resistance test<br />

meter<br />

between core-1 to earth mega-ohm<br />

between core-2 to earth mega-ohm<br />

between core-3 to earth mega-ohm<br />

between core-1 to core-2 mega-ohm<br />

between core-2 to core-3 mega-ohm<br />

between core-3 to core-1<br />

duration used : 1 KV<br />

mega-ohm<br />

High voltage test Voltage Duration<br />

Between core an earth.<br />

between individual cores<br />

[This proforma shall be jointly signed by the CLIENT / CONSULTANT and the<br />

contractor in duplicate].<br />

5.3.4 EARTHING NETWORK:<br />

i.) INSTALLATION AND CONNECTION :<br />

a) The plate/pipe electrode, as far as practicable, shall be buried below permanent<br />

moisture level but in no case not less than 2.5 M below finished ground level.<br />

b) The plate/pipe electrode shall be kept clear of the building foundation and in no<br />

case, it shall be nearer by less than 2 M from outer face of the respective building<br />

wall / column.<br />

c) The plate electrode shall be installed vertically and shall be surrounded with 150 mm.<br />

thick layers of Charcoal dust and Salt mixture.<br />

d) 19 mm. dia. G.I. pipe for watering, shall run from top edge of the plate / pipe<br />

electrode to the mid level of block masonry chamber.<br />

e) Top of the pipe shall be provided with G.I. funnel and screen for watering the earth /<br />

ground through the pipe.<br />

f) The funnel with screen over the G.I. pipe for watering to the earth shall be housed in<br />

a block masonry chamber as shown in the drawing.<br />

g) The masonry chamber shall be provided with a Cast Iron hinged cover resting over<br />

the Cast Iron frame which shall be embedded in the block masonry.<br />

h) Construction of the earthing station shall in general be as shown in the drawing and<br />

shall conform to the requirement on earth electrodes mentioned in the latest edition of<br />

Indian Standard IS: 3043, Code of Practice for Earthing Installation.<br />

i) The earth conductors (Strips / Wires copper / Hot dip G.I.) Inside the building shall<br />

properly be clamped / supported on the wall with Galvanized Iron clamps and Mild<br />

172


Steel Zinc Passivated screws / bolts. The conductors outside the building shall be laid<br />

atleast 600 mm. below the finished ground level.<br />

j) The earth conductors shall either terminate on earthing socket provided on the<br />

equipment or shall be fastened to the foundation bolt and / or on frames of the equipment.<br />

The earthing connection to equipment body shall be done after removing paint<br />

and other oily substances from the body and then properly be finished.<br />

k) Over lapping of earth conductors during straight through in joints, where required,<br />

shall be of minimum 75mm. long.<br />

l) The earth conductors shall be in one length between the earthing grid and the<br />

equipment to be earthed.<br />

ii.) EARTH LEADS AND CONNECTIONS :<br />

a) Earth lead shall be bare copper or Galvanized steel as specified with sizes shown on<br />

drawings. Copper lead shall have a phosphor content of not over 0.15 %. G.I strips<br />

buried in the ground shall be protected with bitumen and essian wrap or polythene<br />

faced essian and bitumen coating. At road crossing necessary Hume pipes shall be<br />

laid. Earth lead run on surface of wall or ceiling shall be fixed on saddles so that<br />

strip is at least 8 mm away from the wall surface.<br />

b) The complete earthing system shall be mechanically and electrically bonded to<br />

provide an independent return path to the earth source.<br />

iii.) TEST :<br />

a) The entire earthing installation shall be tested as per requirements of Indian<br />

Standard Specification IS : 3043.<br />

b) The following earth resistance values shall be measured with an approved earth<br />

megger and recorded.<br />

c) Each earthing station<br />

d) earthing system as a whole<br />

e) Earth continuity conductors<br />

f) Earth conductor resistance for each earthed equipment shall be measured which<br />

shall not exceed 5 ohm in each case.<br />

g) Measurements of earth resistance shall be carried out before earth connections are<br />

made between the earth and the object to be earthed.<br />

h) All tests shall be carried out in presence of the client’s representative & test<br />

certificate shall be submitted.<br />

5.5 SURFACE CONDUIT WORKS:<br />

5.3.1 CEILING / WALL OUTLET BOXES FOR LIGHTS / FANS:<br />

173


i.) Outlet boxes shall be of steel with cover and so installed as to maintain continuity<br />

throughout. These shall be protected at the time of laying by filling with jute / earth /<br />

cotton etc. so that no cement mortar finds its way inside during concerning or plastering<br />

etc. In beams conduit socket shall be provided in place of outlet boxes. The same shall<br />

be used for installation of luminaries.<br />

ii.) For fixing light fixtures / brackets, outlet boxes complete with knock out for holding<br />

conduits shall be used. For lighting fixture suitable for 40/20 watts fluorescent tubes /<br />

incandescent lamps / mercury vapour lamps, only one outlet box is required.<br />

iii.) For fixing ceiling fans, circular outlet boxes, 100 mm. diameter, complete with 12 mm.<br />

dia. Mild Steel rod 300 mm. long, for holding 12 mm. dia. Mild Steel cover 125 mm.<br />

dia. At bottom shall be used.<br />

5.3.2 DRAW OUT JUNCTION BOXES:<br />

i.) Steel draw out boxes at angle dimensions shall be provided at a convenient points on<br />

walls / ceilings to facilitate pulling of long runs of cables / wires. The location of these<br />

boxes is to be decided prior to fixing, as per site requirement and following should be<br />

treated as general guidance for deciding the location of these :<br />

ii.) These should be provided at a place where these are not in direct view. Recommended<br />

place is 400 / 450 mm. below ceiling, if conduits are running vertically.<br />

iii.) Junction box in the offset of bottom of RCC beam and vertical wall should not be<br />

provided.<br />

iv.) If junction boxes are coming side by side for two or more conduits, one common M.S.<br />

box of proper size can be used to act as junction box.<br />

v.) If junction box is to be provided in ceiling, its position should be so located that it is in<br />

line with other light / fan points.<br />

vi.) Junction boxes should never be used for splitting one conduit into two or more.<br />

Junction box for such functions is avoidable and for this, number of conduits to be<br />

connected to one switch board should be calculated correctly as per drawing before<br />

laying conduits in ceiling.<br />

vii.) Locating junction boxes on outer surface of exterior walls of building should be<br />

avoided as these are in direct view and are also exposed to weather.<br />

5.3.3 SWITCH BOXES:<br />

i.) Steel boxes of required sizes, shall be provided to house speed regulators of fans,<br />

switches for lights, fans, plug sockets etc. as per requirement of drawings. These should<br />

be so designed that accessories on sheet could be mounted with tapped holes and brass<br />

machine screws, leaving ample space at the back and on the sides for accommodating<br />

wires and check nuts at conduit entries. These shall be attached to conduits by means of<br />

check nuts on all walls of the boxes through which the conduits are entering. These<br />

shall be completely connected leaving edges flush with finished wall surfaces. Cover<br />

should be fixed to these switch boxes by means of brass chrome plated machine screws<br />

and cup washers. Utmost care shall be taken by contractor to ensure that all switch<br />

boxes are in line and level.<br />

174


ii.) Inside each switch box, one bolt shall be welded to receive earthing wire.<br />

5.3.4 SWITCH AND SOCKET:<br />

i.) Switches shall be installed at 1200 mm above finished floor level unless otherwise<br />

indicated on the drawings.<br />

ii.) The switch controlling the light point or fan shall be connect on to the phase wire of the<br />

circuit and neutral shall be continuous, having no fuse or switch installed in the line<br />

except at the D.B. All fan regulators shall be fixed inside the switch boxes<br />

iii.) The cover plates to the switch box shall be fixed by means of sunk head brass cadmium<br />

screws.<br />

iv.) Where two or more switches and fan regulators are installed together, they shall be<br />

provided with one gang cover plate with knockouts to accommodate required number<br />

of switches, sockets and regulators.<br />

v.) The switch controlling the socket outlet shall be on the phase wire of the circuit. The<br />

third pin of the socket shall be connected to the earth continuity conductor of the circuit<br />

vi.) The switch boxes, installed back-to-back in the same wall shall be offset from each<br />

other, 150 mm horizontally, to preclude noise transmission.<br />

5.3.5 CLEANING AND PROTECTION OF CONDUIT SYSTEM:<br />

The entire conduit system including outlet boxes, junction boxes and switch boxes shall be<br />

thoroughly cleaned after completion of erection and tested for not blockage by air / sound or<br />

steel wire prior to finishing of building by air / sound or steel wire prior to finishing of<br />

building and before drawing in of cables / wires to safeguard conduit system against filling<br />

up with the plaster / cement slurry / water etc. all the outlet and switch boxes will have to be<br />

provided with temporary jute / cotton filling, covers and plugs etc.. Within tendered cost<br />

which shall be replaced later on by hylem / sheet cover after wiring as required.<br />

5.3.6 TESTING OF INSTALLATION:<br />

Before a completed installation is put into service, the following tests shall be complied with:<br />

i.) INSULATION RESISTANCE :<br />

a) The insulation resistance shall be measured by applying 500 volt megger with all<br />

fuses in places, circuit breaker and all switches closed.<br />

b) The insulation resistance in gegaohms of an installation, measured shall not be less<br />

than 50 mega ohms divided by the number of points on the circuit.<br />

c) The insulation resistance shall be measured between<br />

EARTH TO PHASE<br />

EARTH TO NEUTRAL<br />

PHASE TO NEURAL<br />

PHASE TO PHASE<br />

175


ii.) EARTH CONTINUITY PATH :<br />

The earth continuity conductors shall be tested for electrical continuity and the electrical<br />

resistance of the same along with the earthing lead but excluding any added resistance or<br />

earth leakage circuit-breaker measured from the connection, with the earth electrode to<br />

any point in the earth continuity conductor in the completed installation and shall not<br />

exceed one ohm.<br />

iii.) POLARITY OF SINGLE POLE SWITCHES :<br />

A test shall be made to verify that every no-linked, single pole switch is connected to one<br />

of the phase of the supply system.<br />

iv.) COMPLETION CERTIFICATES :<br />

a) All the above tests shall be carried out in presence of client and the results shall be<br />

recorded in prescribed forms. Any default during the testing shall be immediately<br />

rectified and that <strong>section</strong> of the installation shall be re tested. The completed test<br />

result from shall be submitted to the client for approval.<br />

b) On completion of an electric installation a certificate shall be furnished by the<br />

contractor, countersigned by the certified supervisor under whose direct supervision<br />

the installation was carried out. This certificate shall be in a prescribed form as<br />

required by the local electric supply authority.<br />

5.6 INSTALLATION OF LIGHTING FIXTURES / FANS:<br />

5.3.1 INSTALLATION OF LIGHTING FIXTURES:<br />

Scope of work under this item shall start from light point, with 3 nos. 1.5 mm.² PVC<br />

insulated wires from connector to the connector inside the lighting fixture, connections,<br />

fixing of lighting fixture complete with all accessories, lamps on wall / roof / steel truss etc.<br />

testing the lighting fixture and commissioning. If wire length of light point is enough to reach<br />

connector of light fitting, connector in light point can be deleted.<br />

5.3.2 INSTALLATION OF EXHAUST FANS :<br />

Scope of work under this system shall start from exhaust fan point, with a ceiling rose, 2 core<br />

2.5 mm.² PVC insulated wire from ceiling rose to connector of exhaust fan, connections,<br />

making fan opening in walls including repair / finishing fixing of exhaust fan complete with<br />

accessories and louvers on walls with hold-fasts, testing the exhaust fans and commissioning.<br />

5.7 COMPLETION TESTS:<br />

After supply and installation of complete project or a particular building / area, following<br />

tests shall be carried out by the contractor before switching on the power to installation and<br />

the results shall be recorded and submitted to the Site-Engineer. If results are not satisfactory<br />

/ as per standards set herewith, the contractor shall identify the defects / short coming and<br />

shall rectify the same. Nothing extra shall be paid for carrying out these tests and contractor<br />

has to arrange all necessary instruments.<br />

5.3.1 INSULATION RESISTANCE TO EARTH :<br />

176


This is to be measured with all fuse links in place, all switches ON, all lamps and appliances<br />

in position by applying a voltage not less than twice the working voltage (subject to a limit of<br />

500 V). Insulation resistance of the whole or any part of the installation to earth must not be<br />

less than 50 mega-ohms divided by the number of outlets (points and switch positions)<br />

except that it need not be less than one mega-ohm for the whole installation.<br />

5.3.2 INSULATION RESISTANCE BETWEEN CONDUCTORS :<br />

Tests to be made between all the conductors connected to one pole or phase conductor of the<br />

supply and all the conductors connected to the middle wire or neutral or the other pole or<br />

phase conductors of the supply. For this test, all lamps shall be removed and all switches put<br />

ON. The result of the test must be 50 mega-ohms divided by the number of outlets (points<br />

and switch positions) but need not less than 1 mega-ohm for the whole installation.<br />

5.3.3 POLARITY OF SINGLE POLE SWITCHES :<br />

Tests shall be made to verify that all non-linked single pole switches are on phase conductor<br />

(live) and not on neutral or earth conductor. This can be done by connecting test lamps<br />

between two terminals of switch and earth. If the lamp lights up when switch is ON and<br />

either terminal is touched, the switch is correctly installed.<br />

5.3.4 RESISTANCE OF METAL CONDUITS / SHEETS (EARTH CONTINUITY TEST) :<br />

i.) In case of cables encased in metal whether conduit of metallic sheathing, the total<br />

resistance of the conduit or sheathing from the earthing point any other position in the<br />

completed installation shall not be more than 2 ohms. This can be carried out by<br />

following circuit :<br />

ii.) One end of the load is connected to the ECC and its connection with the electrode and the<br />

other to the farthest point of the ECC. First, current through the circuit is measured with<br />

the resistance of 2 ohms short circuited by the link. Next, current is measured through the<br />

two ohms resistance by disconnecting the two leads from the ECC and joining them<br />

together. If current is more in the first case, the resistance of ECC is less than 2 ohms.<br />

5.8 HANDING OVER / TAKING OVER:<br />

After completion of works and tests specified above, the various installations of the project<br />

can be taken over by the employer as and when these are ready in all respects. The defect<br />

liability period of 60 months shall start from the date, when all the installations of the project<br />

have been executed, tested as described above, successfully commissioned and handed over.<br />

177


SR.<br />

NO.<br />

6.0 LIST OF APPROVED VENDORS<br />

ITEM APPROVED MAKE<br />

1 INDICTING LAMPS L&T / SIEMENS / IEC / TECHNIK / EE<br />

2 PUSH BUTTON & PUSH BUTTON SET L&T / BCH / SIEMENS / TECHNIK<br />

3 TERMINAL BLOCKS PHOENIX CONTACT / WAGO<br />

4 LUGS DOWELL OR EQUIVALENT<br />

5 L.T CABLES<br />

6 CABLE GLANDS SIEMENS / COMET<br />

7 PVC CONDUITS AND ACCESSORIES PRECISION / CLIPSAL<br />

8 FLEXIBLE WIRE (FRLS)<br />

CCI / GLOSTER / UNIVERSAL / FINOLEX /<br />

TORRENT / POLYCAB / RPG CABLES<br />

FINOLEX / ANCHOR / HAVELL’s / RR KABEL / L<br />

& T<br />

178


SECTION: F<br />

CONDITIONS OF CONTRACT<br />

FOR<br />

OPERATION & MAINTENANCE<br />

179


PROJECT :<br />

DOCUMENT : SECTION - F -<br />

SECTION<br />

NO.<br />

SITC OF HYDRAULICALLY OPERATED GRIT MECHANISM WITH<br />

RELATED ELECTRICAL WORK AT E, E3, W & W5 SITES WITH<br />

ONE YEAR OF OPERATION & MAINTENANCE PERIOD FOR<br />

SABARMATI RIVER FRONT DEVELOPMENT CORPORATION LTD.<br />

OF AMDAVAD MUNICIPAL CORPORATION<br />

CONDITIONS OF CONTRACT FOR OPERATION<br />

& MAINTENANCE<br />

INDEX<br />

TITLE PAGE NO.<br />

1.0 ADMINISTRATIVE PROVISIONS 187<br />

2.0 TECHNICAL PROVISIONS 194<br />

3.0 FINANCIAL PROVISIONS 198<br />

180


SECTION: F<br />

SPECIFICATIONS FOR OPERATION & MAINTENANCE WORK OF GRIT<br />

MECHANISM OF EXISTING DRAINAGE STATIONS FOR A.M.C<br />

1.0 ADMINISTRATIVE PROVISIONS<br />

The following additional clauses shall apply only during the Operation and Maintenance period.<br />

1.1 DEFINITIONS<br />

1.1.1 In this Agreement, the following words and expressions shall have the meanings hereby<br />

assigned to them, except where the context otherwise requires:<br />

1. “Contract” shall mean the agreement between the Client and the Contractor along with<br />

all documents incorporated therein by reference and all documents incorporated by<br />

these Conditions of Contract.<br />

2. “Contractor’s Equipment” shall mean all equipment, instruments, tools, machinery<br />

and other appliances and things of whatsoever nature required for the fulfillment of the<br />

Contract or of the Contractor’s Obligations, but not including those items which are<br />

intended to form, or which form part of the Facility.<br />

3. “Contractor's Obligations” shall mean the obligation to execute the Project in its<br />

entirety and shall, without limitation, include the Contractor’s Operation and<br />

Maintenance.<br />

4. “Taking Over Certificate” shall mean the certificate to be issued when the whole of<br />

the Works or any <strong>section</strong>s or parts of the Permanent works have been substantially<br />

completed and satisfactorily passed the tests on completion in accordance with the<br />

provisions of the Contract.<br />

5. “Date of Taking Over” shall mean the date of issue of the “Taking Over Certificate”<br />

under the construction phase.<br />

6. “Defects Liability Period” shall mean the Defects Liability Period of 1 (One) year for<br />

all works commencing on and from Date of Taking Over during which the Contractor<br />

shall undertake the responsibilities, and have the liability for the facility (including<br />

Civil Works, mechanical and electrical installations including all allied works at<br />

Drainage station(s).<br />

7. “Facility” shall mean the entire system to be designed and constructed in accordance<br />

with the provisions hereof, including the buildings, structures ,ramps, pits, pipes,<br />

fencing, lighting, testing and analysis equipment, tools, mechanical, electrical as well as<br />

safety equipment, plant machinery, supplies, instruments and inventory incorporated<br />

therein, as well as all open areas within the site, and including any additions,<br />

modifications, alterations, replacement and repairs as may be made thereto from time to<br />

time.<br />

8. “Authority" shall mean any municipal corporation, authority or body exercising<br />

executive, legislative, judicial, regulatory or administrative functions, including,<br />

without limitation, any government / semi-government authority, agency, department,<br />

board, commission or instrumentality of Indian or any political subdivision thereof,<br />

court, tribunal, arbitrator or self-regulatory organization.<br />

181


9. “Law” shall mean and include all the provisions of all Indian statutes, regulations,<br />

ordinances, codes, official or other standards, administrative or other rules, zoning and<br />

other plans and restrictions, building and other permits, judgments awards and decrees<br />

of, or agreements with any Governmental, semi-Governmental or quasi-Governmental<br />

Authority, municipal corporation etc. as currently in effect or as may be in effect from<br />

time to time and /or as may be amended or supplemented from time to time.<br />

10. “Maintenance Standard” shall mean the requirements for maintaining, repairing, and<br />

renewing the Facility :<br />

a) As set forth in the O & M Manual;<br />

b) Required pursuant to applicable Law;<br />

c) As may be necessary for keeping the facility in a satisfactory condition such<br />

that the Facility will continuously, comply with the Operation Standard; and<br />

d) As may be necessary to ensure that the Facility shall continuously be in an<br />

optimum condition and state in relation with the lifetime of the Facility.<br />

11. “O & M Manual” shall mean the final Manual for the Operation and Maintenance of<br />

the Facility to be prepared by the Contractor in accordance with the Bid Documents.<br />

12. “Operation and Maintenance Obligations” shall mean the obligation of the<br />

Contractor pursuant to the Agreement to operate and maintain the Facility on and from<br />

the Date of Taking Over until the date of completion of this Agreement.<br />

13. “Operation and Maintenance Period” shall mean the period starting on the Date of<br />

Taking Over and continuing for the term of the Agreement.<br />

14. “Operation and Maintenance Price” shall mean the amount payable by the Client to<br />

the Contractor, for the fulfillment of the Contractor’s Operation and Maintenance<br />

Obligations.<br />

15. “Operation Standard” shall mean :<br />

a) The Performance Guarantees;<br />

b) All applicable Laws;<br />

c) All of the requirements, policies and procedures set forth in the O & M Manual<br />

d) All other operational requirements set forth in this Agreement.<br />

16. “Performance Guarantees” shall mean the List of Guarantees offered/provided by the<br />

Contractor in its Bidder Submission pursuant of the Bid Documents.<br />

17. “Site” shall mean that specific area specified in the Bid Documents and shall include<br />

any other places as may be specifically designated by the Client from time to time as<br />

forming part of the Site.<br />

1.2 OBJECT OF CONTRACT<br />

1.2.1 RISKS AND OBLIGATION OF THE CONTRACTOR<br />

1.2.1.1 For the duration of O & M period, Contractor shall render and make available to the Client<br />

the following services:-<br />

a) During O & M period of 24 hours a day & 7 days a week, minimum one person must<br />

be present on each Sewage Pumping Station. The person must be ITI electrification /<br />

wireman trade passed for Operation & Maintenance work of Grit Mechanism work of<br />

pumping station.<br />

182


) During testing & commissioning work, required sewage and power will be the scope of<br />

Client.<br />

c) Control and Operation of Grit Mechanism of each Sewage Pumping Station with<br />

supply of all necessary spares, tools, consumables, lubricants, etc.<br />

d) Routine Maintenance of Grit Mechanism<br />

1.2.1.2 The Contractor shall take full responsibility for the care of the Facility and materials and<br />

Plant from the date of issue of the Taking-Over Certificate for the Grit Mechanism, until<br />

the date of completion of the Operation and Maintenance period, when the responsibility<br />

for the care shall pass to the Client. The O & M period shall commence after successful<br />

trial of two months.<br />

1.2.1.3 If any loss or damage happens to the Facility, or any part thereof, or materials or Plant for<br />

incorporation therein, during the period for which the Contractor is responsible for the care<br />

thereof, from any cause whatsoever, other than the risks defined in Sub-Clause 1.2, the<br />

Contractor shall, at his own cost, rectify such loss or damage so that the Facility conform in<br />

every respect with the provisions of the Contract to the satisfaction of the Client. The<br />

Contractor shall also be liable for any loss or damage to the Works occasioned by him in<br />

the course of any operations carried out by him for the purpose of complying with his<br />

obligation.<br />

1.2.1.4 In the case of a combination of risks causing loss or damage any such determination shall<br />

take into account the proportional responsibility of the Contractor and the Client.<br />

1.2.2 RISKS AND OBLIGATION OF THE CLIENT<br />

1.2.2.1 For the duration of O & M Contract, Client will supply power only.<br />

1.2.2.2 Provide free access to the site and the plant and all its components free of charge.<br />

1.2.2.3 Make payments to the Contractor according to the terms of this Contract as specified<br />

hereinafter.<br />

1.2.2.4 If the Client shall carry out work on the Site with his own workmen he shall, in respect of<br />

such work:<br />

a) Have full regard to the safety of all entitled to be upon the Site, and<br />

b) Keep the Site in an orderly state appropriate to the avoidance of danger to such<br />

persons.<br />

1.2.2.5 If the Client shall employ other contractors in the Site, he shall require them to have the<br />

same regard for and avoidance of danger.<br />

1.3 COMMENCEMENT AND DURATION OF O & M CONTRACT<br />

1.3.1 The O&M Period shall commence after successful trial of two months or upon issuing of<br />

Taking over Certificate whichever earlier under the construction phase of the project and<br />

shall continue for a period of One (1) year, including defect liability period as mentioned<br />

in the Conditions of Contract.<br />

183


1.3.2 If contractor maintains Operation & Maintenance of the equipment for initial one year<br />

satisfactory then only O&M contract will be extended & the rate will be the same for next<br />

year.<br />

1.3.3 If the Client wishes to propose an extension to the O & M Period, he will give 30 days<br />

prior notice of its intention to exercise such option.<br />

1.3.4 In event of any electrical and mechanical fault, the contractor has to attend the same<br />

immediately.<br />

1.3.5 Extension of the O & M Period beyond a period of One year would involve a negotiated<br />

revision to the Terms and Conditions of the Agreement.<br />

1.4 LIABILITY<br />

1.4.1 The Contractor will not under any circumstances be liable for costs or loss of profit that the<br />

Client may incur as a result of the unavailability of the plant on account of force major.<br />

1.5 INSURANCE<br />

1.5.1 The Contractor shall, without limiting his or the Client’s obligations and responsibilities<br />

insure:<br />

a) The Works, together with materials and Plant for incorporation therein, to the full<br />

replacement cost (term “cost” in this context shall include profit).<br />

b) The Contractor’s Equipment and other things brought onto the Site by the Contractor,<br />

for a sum sufficient to provide for their replacement at the Site.<br />

1.5.2 The insurance detailed above shall be in the joint names of the Contractor and the Client at<br />

the Contractor’s cost and shall cover the Client and the Contractor against all loss or<br />

damage from whatsoever cause arising, other than as provided from the start of the<br />

operation and maintenance until the date of completion of operation and maintenance in<br />

respect of the Facility or any Section or part thereof as the case may be.<br />

1.5.3 Any amounts not insured or not recovered from the insurers shall be borne by the Client or<br />

the Contractor in accordance with their responsibilities.<br />

1.5.4.1.1 The Contractor shall, except if and so far as the Contract provides otherwise, indemnify the<br />

Client against all losses and claims in respect of :<br />

a) Death of or injury to any person, or,<br />

b) Loss of or damage to any property (other than the Works),<br />

Which may arise out of in consequent of the Operation and Maintenance of the<br />

Facility and the remedying of any defects therein, and against all claims<br />

proceedings, damages, costs, charges and expenses whatsoever in respect thereof or<br />

in relation thereto, subject to the exceptions defined above.<br />

1.5.5 The “exceptions” referred to are:<br />

a) The permanent use or occupation of land by the Works, or any part thereof.<br />

b) The right of the Client to execute the Works, or any part thereof, on, over, under, in or<br />

through any land,<br />

184


c) Damage to property which is the unavoidable result of the execution and completion of<br />

the Works, or the remedying of any defects therein, in accordance with the contract,<br />

and<br />

d) Death of or injury to persons or loss of or damage to property resulting from any act or<br />

neglect if the Client, his agents, servants, or other contractors, not being employed by<br />

the Contractor or in respect of any claims, proceedings, damages, costs, charges and<br />

expenses in respect thereof or in relation thereof or, where the injury or damage was<br />

contributed to by the Contractor, his servants or agents, such part of the said injury or<br />

damage as may be just and equitable having regard to the extent of the responsibility of<br />

the Client, his servants or agents or other contractors for the injury or damage.<br />

1.5.6 The Client shall indemnify the Contractor against all claims, proceedings, damages; costs,<br />

charges, and expenses in respect of the matters referred to in the exceptions defined above.<br />

1.5.7 The Contractor shall, without limiting his or the Client’s obligations and responsibilities as<br />

above, issue insurance policy in the joint names of the contractor and the Client, against<br />

liabilities for death of or injury to any person or loss of or damage to any property (other<br />

than the Facility) arising out of the Operation and Maintenance of the project other than the<br />

exceptions defined.<br />

1.5.8 The insurance policy shall include a cross liability clause such that the insurance shall<br />

apply to the Contractor and to the Client as separate insurers<br />

1.5.9 The Client shall not liable for or in respect of any damages or compensation payable to any<br />

workman or other person in the employment of the Contractor or any Subcontractor, other<br />

than death or injury resulting from any act or default of the Client, his agents or servants.<br />

The Contractor shall indemnify and keep indemnified the Client against all such damages<br />

and compensation, other than those for which the Client is liable as aforesaid, and against<br />

all claims, proceedings, damages, costs, charges, and expenses whatsoever in respect<br />

thereof or in relation thereto.<br />

1.5.10 The Contractor shall insure against such liability and shall continue such insurance during<br />

the whole of the time that any persons are employed by him on the Facility. Provided that,<br />

in respect of any persons employed by any Subcontractor, the Contractor’s obligations to<br />

insure as aforesaid under this Sub-Clause shall be satisfied if the Subcontractor shall have<br />

insured against the liability in respect of such persons in such manner that the Client is<br />

indemnified under the policy, but the Contractor shall require such Subcontractor to<br />

produce to the Client, when required, such policy of insurance and receipt for the payment<br />

of the current premium.<br />

1.5.11 In the event that the Contractor or the Client fails to comply with conditions imposed by<br />

the insurance policies effected pursuant to the Contract, each will indemnify the other<br />

against all losses and claims arising from such failure according to the Contract Conditions.<br />

1.6 STAFF<br />

1.6.1 All Contractors’ staff employed at the plant at any time during the period covered by the<br />

present Contract will be provided by him. The Client is not liable for staff in any way and<br />

cannot be held responsible in the event of litigation of any sort between the Contractor and<br />

members of plant staff or their representatives.<br />

1.6.2 All decisions related to staff numbers and qualifications should be approved by the Client.<br />

185


1.6.3 The Contractor undertakes to comply with applicable legislation and the code of labour law<br />

on matters of health, hygiene and safety, and shall assume responsibility for works required<br />

in the event of any change in applicable regulations.<br />

1.6.4 The Contractor will provide for the each water pumping station adequate qualified full time<br />

staffs for the full term of operation, maintenance and training period:<br />

Besides above full time staff, the contractor must have qualified engineer and electrician,<br />

fitter to attend emergency fault any time during 24 hours. Also the contractor shall be<br />

responsible for Minor and Major Electrical-Mechanical work.<br />

1.7 TERMINATION<br />

1.9.1 Termination by the Client<br />

The relevant clause of the General Conditions of Contract shall be applicable in this case.<br />

1.9.2 Termination by the Contractor<br />

The relevant clause of the General Conditions of Contract shall be applicable in this case.<br />

1.8 FORCE MAJURE<br />

The relevant clause of the General Conditions of Contract shall be applicable in this case.<br />

1.9 CONTRACT INTERPRETATION AND DIPUTES SETTLEMENT<br />

1.9.1 The relevant clause for Amicable Settlement of Disputes of the General Conditions of<br />

Contract (Part I) shall apply.<br />

1.10 ASSIGNMENT<br />

1.10.1 The Contractor will not be entitled to sub-contract any part of his obligation to any third<br />

party without prior approval of the Client.<br />

1.11 COMPLETION OF THE CONTRACT<br />

1.11.1 On the date of Contract Completion or if the Contract is terminated, all the installations,<br />

works and equipment placed under the Contractor’s responsibility shall be handed over to<br />

the Client, at no cost, in good working order, except for normal wear and tear. The Client<br />

may perform any inspections, tests or expert appraisals he shall consider necessary with a<br />

view to checking that the property is in good working order.<br />

1.11.2 At the end of O&M period, the Contractor shall be entitled to receive an Operation and<br />

Maintenance Completion Certificate within twenty-one (21) days, of the completion of the<br />

Contract.<br />

1.11.3 The delivery of such Completion Certificate will relieve the Contractor from his<br />

responsibility as regard to the Operation and Maintenance and confirm that the Contractor<br />

has fulfilled all of his obligations under the contract.<br />

186


2.1 Not used.<br />

2.2 MAINTENANCE<br />

2.0 - TECHNICAL PROVISIONS<br />

2.2.1 The Contractor shall be responsible for routine as well as corrective (preventive)<br />

maintenance of Grit Mechanism as described in Conditions of Contract for O&M.<br />

2.2.2 The Contractor shall be responsible for carrying out regular servicing and lubrication of<br />

machines, complying with maintenance instructions as defined in the Operation and<br />

Maintenance manual, and ensuring that electromechanical equipment.<br />

2.2.3 The Contractor shall ensure that measurement systems operate correctly at all times.<br />

2.2.4 The Contractor is responsible for the maintenance of the landscaped areas inside the client’s<br />

plant fences.<br />

Performance Standards<br />

The Contractor will operate and maintain in a state of continuous operational readiness the<br />

Girt Mechanism to meet the incoming flow. It shall remain the Contractor’s responsibility to<br />

ensure that the mechanism is at all times able to operate to the maximum capacity of the<br />

installed duty plant.<br />

The Mechanism shall be operated within their designed limits. The Contractor shall operate<br />

the mechanism strictly within these operating ranges and shall manage the operation of the<br />

mechanism to achieve optimum performance as far as possible.<br />

2.3 CONSUMABLES AND UTILITIES SERVICES - SPARE PARTS - STORES<br />

2.3.1 CONSUMABLES AND UTILITIES SERVICES<br />

2.3.1.1 Unless stipulated otherwise elsewhere in the document, for the duration of the O & M period,<br />

the Contractor will be responsible for the supply and control of lubricants, spare parts, tools<br />

and consumable materials excluding electrical power, necessary for the continuous operation<br />

of the works.<br />

2.3.1.2 The Contractor will manage the consumables and utilities services to ensure their most<br />

economic consumption and to minimize wastage.<br />

2.3.1.3 The quantities of all the unutilized spare parts, tool which have been supplied free of cost<br />

during O&M period (will not be used by those spares and tools as indicated in attached list)<br />

and other consumable materials will be fully handed-over to the client at the end of the O&M<br />

period.<br />

2.3.1.4 Power required for O & M for 1 year will be supplied free of cost by the client from<br />

TORRENT POWER.<br />

2.4 SPARE PARTS AND STORES<br />

2.4.1 The stores inventory, the issuing and recording of spare parts will be the responsibility of the<br />

Contractor.<br />

187


2.4.2 The Contractor is also responsible for providing required spare parts, tools and any other<br />

material required during One year of operation and maintenance period by free of cost, and<br />

also bare the cost of storing and safeguarding also.<br />

2.4.3 The Contractor will make all necessary arrangements to ensure the continuous supply of<br />

spare parts and material for the works as would ensure uninterrupted operation and shall be<br />

supplied free of cost.<br />

2.4.4 Spare parts shall be supplied by the Contractor and the same will be used during one year<br />

operation and maintenance period free of cost. Any spare parts not used during the O&M<br />

period shall be handed over to the Client at no cost.<br />

2.4.5 The quality of spare parts, lubricants etc. required for O & M activities will be checked<br />

frequently by the Engineer-in-charge or his representative and the quality / brand of each will<br />

be approved. The material without approval shall not be allowed to be used and such material<br />

shall be immediately removed from the site in presence of the Client with a letter, addressed<br />

to the Engineer-in-charge as a confirmation.<br />

2.5 MISCELLANEOUS EQUIPMENT – Not Applicable<br />

2.6 INSPECTION<br />

2.6.1 GENERAL PROVISIONS<br />

2.6.1.1 The Client shall check the operation of the plant or designate an organization of his choice to<br />

carry out inspections regularly. The Client or the organization appointed by him shall check<br />

that the Contractor is performing the tasks for which he is responsible with due diligence.<br />

The Contractor shall at his cost provide all the assistance the Client requires to complete<br />

these inspections.<br />

2.6.1.2 Before any inspection, the Employer shall give prior written notice of one day to the<br />

Contractor, indicating the name(s) of the person(s) empowered to carry out such inspection<br />

in the name of the Client.<br />

2.6.2 MEASUREMENT AND ANALYSIS<br />

2.6.2.1 The Client has the right to perform any analysis or inspection he deems necessary. Before<br />

any inspection, the Client shall give a prior written notice of one day to the Contractor and<br />

shall cover the costs of such action.<br />

The quantity of water shall be measured by flow meter of approved make installed at the<br />

plant.<br />

2.7 DRAINAGE PUMPING STATION COMPLEX VISITS<br />

2.7.1 At the end of each month, or at the initiative of the Client, a visit shall be organized so that<br />

both parties can check the condition of the installations at the plant complexes.<br />

2.7.2 A report shall be drawn up to record the opinions of both parties. The Client reserves the<br />

right to call in equipment manufacturers or specialized technicians for these visits.<br />

2.7.3 These visits shall provide an opportunity for examining maintenance programs and operating<br />

procedures and improvements requiring additional investments.<br />

2.8 DOCUMENTS TO BE PROVIDED BY THE CONTRACTOR<br />

188


2.8.1 OPERATION LOG BOOK<br />

2.8.1.1 The Contractor shall keep a permanent record of plant operation (logbook). This log book<br />

shall be kept at the site and shall be presented on request to agents approved by the Client.<br />

2.8.1.2 On a daily basis, the following information shall be recorded in the log book:<br />

a) Report of visits by persons other than those of the Client and the Contractor to the<br />

Facility.<br />

2.8.1.3 The Contractor shall also indicate any significant modifications to the set-up characteristics<br />

of the installation, shut-downs, anomalies or incidents that have occurred with respect to<br />

operation.<br />

2.8.2 MONTHLY REPORT<br />

2.8.2.1 The monthly report shall include but not be limited to :<br />

a) All the problem areas in the facility.<br />

b) The status and progress of the training programs.<br />

c) Electricity consumed totally.<br />

d) List of the parts replaced and quality of other different consumable items consumed<br />

during the month.<br />

e) List of major defects / break down during the month<br />

f) Details of rectification works during the month.<br />

2.8.3 ANNUAL REPORT OF OPERATION<br />

2.8.3.1 The Contractor shall provide the Client by March 31 of the current year (n) with an annual<br />

report for the preceding year (n-1). This report shall include:<br />

a) All technical statistics related to plant operation as supplied by the operation ;<br />

b) A statement of works carried out during the preceding year n-1 in connection with the<br />

Contractor’s maintenance obligation;<br />

189


3.1 FINANCIAL PROVISIONS<br />

3.1.1 METHOD OF PAYMENT<br />

3.0 FINANCIAL PROVISIONS<br />

3.1.1.1 The Client will pay the Contractor for the O&M Price (except spares & tools price) on a<br />

monthly basis subjected to satisfactory performance of the entire system. The payment for<br />

the spares & tools shall be made within 15 days from the date of handing over of the spares<br />

& tools to the Client. The payment for operation and maintenance shall be in as per Price<br />

Schedule of tender document (Volume II). Spares & Tools as per attached list shall be<br />

hand over to AMC before the start of Operation & Maintenance period.<br />

3.1.2 INVOICING<br />

3.1.2.1 The Contractor shall prepare and submit to the Client an invoice each month with all<br />

documents supporting its claim. The invoice shall be submitted between the first and fifth<br />

day of the month.<br />

3.1.2.2 The Client shall have fifteen (15) calendar days from receipt of such invoice to notify in<br />

writing to the Contractor its acceptance thereof or the grounds for disputing such invoice.<br />

The Client shall pay to the Contractor all accepted amounts, within forty-five (45) calendar<br />

days from the date of acceptance.<br />

3.1.3 FLUCTUATION FACTORS<br />

3.1.3.1 Deleted…<br />

3.2 LIQUIDATED DAMAGES<br />

3.2.1 The system shall be capable to deliver the designed capacity of sewage pumping. However in<br />

the initial stage the sewage flow may not get developed fully, due to less population<br />

coverage. However, the bidder shall keep all the installations and system in working<br />

condition throughout the O & M period.<br />

3.2.2 For the non compliance of employment of key staff<br />

3.2.2.1 If the successful bidder does not recruit/depute or in absence of the key staff identified as per<br />

schedule, then liquidated damages will be deducted at Rs.1000/- per day.<br />

3.3 TAXES, LICENSES, PERMITS AND FEES<br />

3.3.1 No extra payment against any taxes, licenses, permits and fees shall be made to the<br />

contractor.<br />

3.4 TRAINING<br />

3.4.1 Before end of the contract, suitable training shall be given to the client’s staff.<br />

3.5 O & M MANUAL<br />

3.5.1 Three sets of O&M manual to be submitted by the contractor for each equipment.<br />