41. In case of water pipe line work , If materials are not available from AMC central stores<br />

,then the time limit delay of providing materials by central stored shall be given to the<br />

contractor.<br />

42. In case of road grouting work tender, if at the time of resurfacing paver work, If paver<br />

gets sucked in grouting work then contractor shall have to rectify the poor grouting<br />

work without any cost.<br />

43. Before quoting the tender contractor should know that , he has seen the site &<br />

understood the item of works, site conditions. He should be in a positions to provide<br />

labours at the time of festivals like Holi,Diwali, Navratri,Marriage season,rainy season<br />

or any other time of the year Contractor can not say that he has no labours due to<br />

festivals.<br />

I have read all above conditions carefully and ready to work as per above conditions.<br />

Contractors Name:- Add.C.E.<br />

and seal (NWZ)<br />

Mobile No :-<br />

Adress :-<br />