18.06.2013 Views

Project Document Cover Sheet David Kernohan Tim Cappelli ...

Project Document Cover Sheet David Kernohan Tim Cappelli ...

Project Document Cover Sheet David Kernohan Tim Cappelli ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Project</strong> Acronym: CRAMPON Contact: <strong>Tim</strong> <strong>Cappelli</strong><br />

Version: 1.1 Date: 20 th June 2008<br />

17. Quality Plan<br />

Output CRAMPON Knowledgebase<br />

<strong>Tim</strong>ing Quality<br />

criteria<br />

Initial<br />

Release<br />

Each<br />

Iteration<br />

Each<br />

Iteration<br />

Each<br />

Iteration<br />

Beta<br />

Release<br />

Fitness for<br />

Purpose<br />

Standards<br />

Compliance<br />

(See Section<br />

8)<br />

Interoperability<br />

with the front<br />

end<br />

QA method(s) Evidence of<br />

compliance<br />

Domain expert<br />

Evaluation –<br />

Acceptance<br />

Testing<br />

Compliance<br />

Testing of each<br />

iteration<br />

Integration<br />

Testing<br />

Accessibility Compatability<br />

testing and User<br />

Stability/<br />

Performance<br />

issue log<br />

Page 12 of 21<br />

<strong>Document</strong> title: JISC <strong>Project</strong> Plan CRAMPONprojectplantV1.1.doc<br />

Last updated: 20/08/2008 16:11<br />

User (Domain<br />

Experts)<br />

Evaluation<br />

Reports<br />

Iteration Test<br />

Results<br />

Iteration Test<br />

Results<br />

User Evaluation<br />

Reports<br />

Quality<br />

responsibilities<br />

Systems Analyst<br />

(HD)<br />

Developer<br />

Developer<br />

<strong>Project</strong> Manager<br />

(TC)<br />

Load Testing Test results <strong>Project</strong> Manager<br />

(TC)<br />

Output CRAMPON user interface<br />

<strong>Tim</strong>ing Quality criteria QA method(s) Evidence of<br />

compliance<br />

Each<br />

Iteration<br />

Each<br />

Iteration<br />

Interoperability<br />

with the<br />

knowledgebase<br />

Integration<br />

Testing<br />

Accessibility Compatability<br />

testing and<br />

User issue log<br />

Support Feedback<br />

OSMM<br />

Support<br />

Template<br />

eMM<br />

Quality<br />

responsibilities<br />

Iteration Test Results Developer (RU)<br />

User Evaluation<br />

Reports<br />

Positive feedback from<br />

users<br />

Appropriate OSMM<br />

score<br />

Improved practices in<br />

the domain of User<br />

support.<br />

<strong>Project</strong> Manager<br />

(TC)<br />

<strong>Project</strong> Manager<br />

(TC)<br />

Output Training and User Guide<br />

<strong>Tim</strong>ing Quality QA method(s) Evidence of Quality<br />

criteria<br />

compliance responsibilities<br />

Fitness for User Feedback Positive Feedback <strong>Project</strong> Manager<br />

purpose<br />

and reducing (TC)<br />

User Issue Log issues (as training<br />

is implemented/<br />

improved)<br />

Sustainability OSMM Training Relevant OSMM <strong>Project</strong> Manager<br />

Template score<br />

(TC)<br />

Quality tools<br />

(if<br />

applicable)<br />

JMeter<br />

Quality<br />

tools<br />

(if<br />

applicable)<br />

eMM<br />

Quality tools<br />

(if applicable)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!