Hc will receive the equipment, materials and supplies in Bamako, unpnekage<br />

and inspect it, place it in operation and deliver it to and<br />

install it in its proper project site.<br />

e. Construction. Upon GRM approval of relevant plans and the arrival<br />

of necessary materials and equipment, the Contractor will construct the<br />

two feedlots (S(.gou and Tienfalla), including two temporary feedlots on<br />

the sites, and the two managed grazing areas (Doukolomba <strong>Par</strong>k and Tienfalla<br />

Forect) in accordance with the approved plans. In the case of<br />

Doukolomba <strong>Par</strong>k, "construction" will include clcaring the range of unnecessary<br />

brush and trues end rcseeding it with highiquality forage grass<br />

f Credit activity. Working in the context of ECIBEV, with the GRM<br />

Ministry of Poduction and Finance, and with the Malian Development B'?nk,<br />

the Contractor will organize thj system for administration of small loans<br />

to support purchases of seed, fertilizer and cattle in each of the direct<br />

livestock activities. This will include criteria for borrowing eligibility,<br />

interest rate schedules, evaluation of credit -. worthiness,<br />

Ppproval procedures<br />

g Organization of the sedentar famers. Working in the context of<br />

ECIBEV and in close cooperation with the GRM Veterinary Service and the<br />

Peanut Corporation (Opeation Arachides), the Contractor will review the<br />

existing lists of small farmers who have expressed willingness to participate<br />

in the program to fatten beef cattle for the meat market. The<br />

Contractor will organize the administration of fertilizer and seed purchase,<br />

cattle purchase, credit administration, livestock extension advice,<br />

and veterinary services required to initiate this activity in the Koulikoro<br />

area and in the Douna area<br />

h Project management advice, Working in close coordination with the<br />

GRM, the Contractor will provide overall project coordinating, scheduling<br />

and administrative advice for the successful and timely completion of the<br />

above preliminary activitis and for the coordinated transition of the<br />

project to livestock production operations.<br />

2. Phase II<br />

a. Livestock Production Operations. The second major increment of work<br />

in the project is the provision of long-term administrative, and managemeLt<br />

advice to the GRM for the operation of each of the subproject activitiec<br />

described above in Phase I. It is recognized that certain prrtions of<br />

Phasc II will begin before some Phase I subproject activities are complct.d.<br />

3. Contractor-personnel administration. The Contractor will be fully<br />

responsible for the administration, including housing, transportation,<br />

pay, etc., of his own personnel.