(B) Additional components <strong>for</strong> Projectized Approach:<br />

Providing soil amendment (Gypsum/Pyrite) @ 50% <strong>of</strong> Gypsum required value<br />

or maximum <strong>of</strong> 15 tonnes per ha. in addition, it’s application/mixing with when<br />

temperature is around 40 degree centigrade.<br />

Boring and installation <strong>of</strong> pump sets (if does not exist) <strong>for</strong> four ha. each,<br />

Providing critical inputs like seed high yielding variety, fertilizer, insecticides,<br />

pesticides etc. <strong>for</strong> summer and winter crop <strong>for</strong> two years.<br />

Providing green manure seed @ 60 kg. per ha. <strong>for</strong> two years<br />

Plantation <strong>of</strong> fruit trees/ fuel wood/fodder species @ 160 plants per ha.<br />

Maintenance <strong>of</strong> planted area <strong>for</strong> three years on minimum cost basis.<br />

Overall unit cost <strong>of</strong> reclamation under Projectized Approach is Rs.57300.00 per ha.<br />

7. Monitoring Mechanism:<br />

The <strong>Programme</strong> is being implemented by the Multidisciplinary team <strong>of</strong> Officers<br />

<strong>of</strong> State Governments on Watershed basis. The data in prescribed pro<strong>for</strong>ma are<br />

collected at project and State level and periodically reported to Government <strong>of</strong> India.<br />

At national level the progress <strong>of</strong> the implementation is reviewed in meeting <strong>of</strong> Standing<br />

Committee constituted <strong>for</strong> this purpose beside periodic visit <strong>of</strong> regional, State and<br />

National level functionaries.<br />

At national level, the programme is reviewed by holding Annual Desk Review,<br />

Quarterly Desk Review to assess the actual implementation and suggest plan <strong>of</strong> action<br />

<strong>for</strong> the improvement in the implementation.<br />

At State level also, the progress <strong>of</strong> implementation <strong>of</strong> programme is monitored<br />

by Project and State Level Committees constituted <strong>for</strong> this purpose.<br />

8. Impact <strong>of</strong> <strong>Programme</strong>:<br />

The programme implementation has been evaluated by different outside<br />

agencies. The evaluation study conducted <strong>for</strong> the area reclaimed in selected districts<br />

<strong>of</strong> Haryana and Uttar Pradesh by Central <strong>Soil</strong> Salinity Research Institute, Karnal,<br />

Haryana, has indicated following impacts :<br />

pH <strong>of</strong> reclaimed soil decreased from 9.4 – 10.5 to 8.9 – 9.2<br />

increased organic carbon from 0.15 to 0.38%<br />

increased paddy yield from 19-41 Q/ha.<br />

76% increase in income <strong>of</strong> farming families in the reclaimed areas<br />

enhancement in land values, average crop yield and cropping intensity and<br />

created additional employment <strong>for</strong> the farmers in rural areas itself.<br />

9. Achievements <strong>of</strong> X Five Year Plan:<br />

Since inception upto IX Plan, an area <strong>of</strong> 5.81 lakh ha. has been reclaimed with<br />

expenditure <strong>of</strong> Rs.76.39 crore. During first three years <strong>of</strong> X Plan (2002-05) an area <strong>of</strong><br />

0.78 lakh ha. has been reclaimed with expenditure <strong>of</strong> Rs.20.25 crore. Since inception<br />

upto end <strong>of</strong> 2004-05, an area <strong>of</strong> 6.59 lakh ha. has been reclaimed with an expenditure<br />

<strong>of</strong> Rs.96.64 crore. During 2005-06, an amount <strong>of</strong> Rs.760.00 lakh has been allocated<br />

under MMA by 7 States <strong>for</strong> reclamation <strong>of</strong> 45,500 ha. area. The State-wise details <strong>of</strong><br />

extent <strong>of</strong> alkali lands, achievements upto 2004-05 and allocation <strong>of</strong> funds <strong>for</strong> 2005-06<br />

are at Annexure-I.