12.07.2013 Views

HOT MIX ASPHALT (HMA) QUALITY CONTROL PLAN

HOT MIX ASPHALT (HMA) QUALITY CONTROL PLAN

HOT MIX ASPHALT (HMA) QUALITY CONTROL PLAN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ASTM D 2041 Theoretical Maximum Specific Gravity and Density of<br />

Bituminous Paving Mixtures<br />

ASTM D 2172 Quantitative Extraction of Bitumen from Bituminous Paving<br />

Mixtures<br />

ASTM D 2726 Bulk Specific Gravity of Compacted Bituminous Mixtures<br />

using Saturated Surface Dry Specimens<br />

ASTM D 3203 Percent Air Voids in Compacted Dense and Open<br />

Bituminous Paving Mixtures<br />

ASTM D 2950 Density of Bituminous Concrete in Place by Nuclear<br />

Method<br />

ASTM D 4125 Asphalt Content of Bituminous Mixtures by Nuclear Method<br />

ASTM C 127 Standard Test Method for Specific Gravity and Absorption<br />

of Coarse Aggregate<br />

ASTM C 128 Standard Test Method for Specific Gravity and Absorption<br />

of Fine Aggregate<br />

IDOT Ignition Method for Determining Asphalt Content<br />

There will be a current copy of all applicable ASTM tests available at the field laboratory.<br />

G. Mix Production<br />

At the start of <strong>HMA</strong> mix production or when adjustments are made to the mix, the QC<br />

Officer will coordinate the proportions with plant operator and, periodically throughout the<br />

day, checks will be made on the mix per the sampling frequency set forth in the current<br />

Division of Aeronautics Policy Memo 96-2. The results shall be recorded on the<br />

appropriate forms and faxed to the Division of Aeronautics and the Resident Engineer<br />

immediately upon completion.<br />

H. Laydown<br />

The mix will be laid on the prepared base in accordance with the specifications using the<br />

following equipment:<br />

(Paver and roller equipment made and model)<br />

Should any adverse mix characteristics be observed, the laydown superintendent will<br />

notify the QC Officer to review the manufacture of the mix and make adjustments if<br />

necessary to correct the situation. No changes to the mix shall be made without<br />

concurrence by the Division of Aeronautics.<br />

I. Utilization of Personnel<br />

Listed below are the duties to be performed by the various technical personnel assigned<br />

to the project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!