12.07.2013 Views

HOT MIX ASPHALT (HMA) QUALITY CONTROL PLAN

HOT MIX ASPHALT (HMA) QUALITY CONTROL PLAN

HOT MIX ASPHALT (HMA) QUALITY CONTROL PLAN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SIGNATURE PAGE<br />

As attested below, this plan will be adhered to during Hot Mix Asphalt (<strong>HMA</strong>) production:<br />

Prime Contractor Signature: ______________________________Date:____________<br />

<strong>HMA</strong> Producer Signature:________________________________ Date:____________<br />

Reviewed and Approved by:<br />

Resident Engineer Signature:______________________________ Date:____________<br />

Approved by:<br />

Engineer of Construction & Materials: _________________________Date:___________<br />

I.D.O.T., Division of Aeronautics

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!