13.07.2013 Views

CFRD - Relato - Yang Zeyan

CFRD - Relato - Yang Zeyan

CFRD - Relato - Yang Zeyan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dam River Design stage<br />

Gushui Lancang<br />

Cihaxia<br />

Yellow<br />

River<br />

Preliminary<br />

feasibility<br />

Preliminary<br />

feasibility<br />

3.5 Projects relied on<br />

height<br />

(m)<br />

240~<br />

310<br />

crest<br />

length<br />

(m)<br />

discharg<br />

e flood<br />

(m 3 /s)<br />

Normal<br />

water<br />

level (m)<br />

reservoir<br />

capacity<br />

(10 8 m 3 )<br />

Installed<br />

capacity<br />

(MW)<br />

540 14300 2340 40 2600<br />

Design<br />

seismic<br />

intensity<br />

8 degree<br />

/0.268g<br />

253 700 9110 2980 41 2000 8 degree<br />

Maji Nujiang Programming 270 800 14100 1570 47 4200<br />

Rumei Lancang Programming 315 800 13400 2900 37 3000<br />

8 degree/<br />

0.227g<br />

8 degree/<br />

0.1g<br />

- 25 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!