DIRECTORATE GENERAL OF WORKS CENTRAL PUBLIC ... - CPWD
DIRECTORATE GENERAL OF WORKS CENTRAL PUBLIC ... - CPWD
DIRECTORATE GENERAL OF WORKS CENTRAL PUBLIC ... - CPWD
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>DIRECTORATE</strong> <strong>GENERAL</strong> <strong>OF</strong> <strong>WORKS</strong><br />
<strong>CENTRAL</strong> <strong>PUBLIC</strong> <strong>WORKS</strong> DEPARTMENT<br />
NO. 1/1/2006-S&D/ DATED: NIRMAN BHAWAN FEBRUARY, ___ 2007<br />
<strong>OF</strong>FICE MEMORANDUM<br />
SUB: PREPARATION <strong>OF</strong> STATEMENT CONTAINING BRIEF ACTIVITIES <strong>OF</strong><br />
MINISTRY <strong>OF</strong> URBAN FOR THE YEAR 2006-07.<br />
REF: MINISTRY <strong>OF</strong> UD&PA OM NO. D-29013/1/2003–COORD., DATED __/__/2006<br />
IN PURSUANCE <strong>OF</strong> THE ABOVE MENTIONED OM MATERIAL FOR<br />
PREPARATION <strong>OF</strong> THE DOCUMENT IS SENT HEREWITH.<br />
TO<br />
DY. SECRETARY (COORD.)<br />
MIN. <strong>OF</strong> UD<br />
NIRMAN BHAWAN<br />
COPY FOR INFORMATION TO DS(<strong>WORKS</strong>), MINISTRY <strong>OF</strong> UD<br />
V.K. SHARMA<br />
DIRECTOR (S&D)<br />
DIRECTOR(S&D)
<strong>CENTRAL</strong> <strong>PUBLIC</strong> <strong>WORKS</strong> DEPARTMENT<br />
The Central Public Works Department (<strong>CPWD</strong>), is the principal agency of the Government of<br />
India for creation and maintenance of all Central Government assets excluding those<br />
belonging to Railways, Defence, Communication, Atomic Energy, Airports (National and<br />
International) and All India Radio. <strong>CPWD</strong> was created in July 1854 when the then Governor<br />
General, Lord Dalhousie, decided to set up a central agency for execution of ‘Public Works’.<br />
The Ajmer Provincial Division was the first to be created and it executed many works<br />
including famine relief. However, <strong>CPWD</strong> was formally created in its present form in 1930.<br />
The Central Public Works Department handles a wide range of projects like Housing and<br />
Office complexes, Hospitals, Workshops and Factories, Hostels and Hotels, Food Grain<br />
storage structures, Roads, National Highways, Bridges and Flyovers, Airports, Computer<br />
Centres, Environmental and other utility services. It also executes Border Fencing, Flood<br />
lighting and Road projects in difficult terrain and under hostile conditions along the Indo Pak<br />
and Indo-Bangladesh border. It is an organisation which can render the most comprehensive<br />
services in the field of planning, designing, construction and maintenance management, for<br />
all Civil Engineering projects with Total Quality Assurance.<br />
Over the years the department has created structures with engineering excellence, which are<br />
still being used. It has to its credit construction of a number of prestigious buildings like<br />
Rashtrapati Bhawan, North Block, South Block, Parliament House, Vigyan Bhawan and<br />
many Multi storeyed office and residential Structures all over the country. It has also<br />
developed infrastructure for sports, education, agriculture etc. It is actively involved in<br />
providing facilities for the Central Para Military Forces. Department has also executed many<br />
overseas works such as construction of Embassies and Hospital Buildings in various<br />
countries and Roads & Bridges in Nepal. Presently it is executing works in Afghanistan for<br />
the Ministry of External Affairs.<br />
Involvement of <strong>CPWD</strong> with a project starts from the stage of selection of site, carrying out<br />
geo-technical investigations, collection of field data, assisting the client in analyzing their<br />
requirements, preparation of architectural, structural, electrical, air conditioning and<br />
landscape designs and drawings, undertaking construction management including quality<br />
assurance and continuing its responsibility through post completion maintenance<br />
management etc.<br />
The Department is moving forward in the field of construction by developing innovative<br />
techniques and adopting state-of–the Art technologies. A Technology Application and<br />
Development Cell (TAD Cell) has been established to identify and select environment<br />
friendly construction materials and technologies in close liaison and co-ordination with<br />
Research Organisations.<br />
<strong>CPWD</strong> is playing a major role towards sustainable development of human settlement. It has<br />
also developed expertise in Rehabilitation of Structures and is imparting its expertise to<br />
rehabilitate structures in distress. A manual for Repair and Rehabilitation of Buildings has<br />
been recently brought out by the department.
<strong>CPWD</strong> has well documented Specifications & Standards and Schedules of Rates, which are<br />
updated from time to time, to keep pace with latest Technologies and market trends with a<br />
definite Quality Assurance Plan. These publications are followed by various construction<br />
organisations both in public as well as private sectors. Besides this, the department brings<br />
out a number of manuals for assisting in execution of projects. Guidelines for designing<br />
buildings for elderly and disabled people, Manual of rain water harvesting etc. published by<br />
<strong>CPWD</strong> have been found very useful by everybody.<br />
The department also assists the Income Tax Department in implementation of Direct Tax<br />
Law so far as they relate to immovable properties. The Civil Construction Unit of the Ministry<br />
of Environment is manned by <strong>CPWD</strong> engineers. Similarly the Andaman and Nicobar Islands<br />
have also encadered a post of Chief Engineer with <strong>CPWD</strong> to help manage their PWD.<br />
Establishment has Director General Works as its head. Jurisdiction of the department is<br />
divided into seven regular Regions. The Director General Works is assisted by Additional<br />
Director General (Works) for effective control of works and in administration matters. Its field<br />
units are located all over India to take up construction and maintenance works even in the<br />
remotest parts of the country. Through its countrywide network of planning and construction<br />
units, it is in a position to undertake the works of Public sector Undertakings and<br />
Autonomous bodies as Deposit works also.<br />
The department has a decentralized system of working, which provides for better & easily<br />
accessible service as the units are placed close to work centers. Autonomy, in most areas,<br />
has been given to the Regional Units headed by ADGs. The jurisdiction of various regions is<br />
as below:<br />
ADG (Strategy & Planning) (Headquarter – Delhi)<br />
ADG(S&P) is in-charge of establishment and administrative functions of the department.<br />
There are two Chief Engineers (CEs) and two Directors looking after administrative functions<br />
relating to Vigilance, systems and personnel matters assisting the ADG. In addition<br />
ADG(S&P) is also incharge of the New Delhi Region. There are three zones under this<br />
region. Chief Architect (NDR) provides the architectural support to these zones.<br />
ADG (Technology Development) (Headquarter – Delhi)<br />
The ADG(TD) heads the Delhi Region also. There are two Civil zones and one electrical<br />
zone in the Region. In addition there are three CEs for looking after the Head Quarter<br />
functions relating to Design, Contract, Standards, Quality Control functions and Consultancy<br />
Services.<br />
ADG (Northern Region) (Headquarter – Delhi)<br />
ADG(NR) is responsible for the works under Northern Region. There are four CEs(Civil),<br />
one CE(E) and one Chief Architect in this Unit. Zones are located at New Delhi, Chandigarh,<br />
Lucknow and Jaipur for looking after the works in the States of UP, Punjab, Haryana,<br />
Himachal Pradesh, Rajasthan, U.T. of Chandigarh, Uttaranchal, J&K and in National Capital<br />
Region.<br />
ADG (WR) (Headquarter – Mumbai)<br />
ADG(WR) is responsible for works under Western Region. Jurisdiction of the region covers<br />
the states of Maharashtra, Madhya Pradesh, Chattisgarh, Goa, Gujarat, and Union Territory
of Dadra and Nagar Haveli. There are three CEs (Civil), one CE(E) and one Chief Architect<br />
under this unit.<br />
ADG (ER) (Headquarter - Kolkatta)<br />
ADG(ER) is responsible for works under Eastern Region. Jurisdiction of the Region covers<br />
the states of West Bengal, Bihar, Jharkhand, Sikkim, Orissa and all the North Eastern States.<br />
There are three CEs(Civil), one CE(Electrical) and one Chief Architect in this Unit .<br />
ADG (SR) (Headquarter – Chennai)<br />
ADG(SR) is in-charge of works in Southern Region in the States of Tamil Nadu, Andhra<br />
Pradesh, Karnataka, Kerala and Union Territory of Pondichery, Andaman Nicobar and<br />
Lakshdeep Islands. There are three CEs(Civil) and one CE(Electrical) in this unit.<br />
Engineer-in-Chief (PWD) (Headquarter – Delhi)<br />
The public works of National Capital Territory of Delhi are handled by <strong>CPWD</strong> through four<br />
Zones in Delhi PWD under the Engineer-in-Chief, PWD. The E-in-C (PWD) reports to Govt.<br />
of NCT Delhi for day-to-day functions.<br />
ADG (Border) (Headquarter- Delhi)<br />
There is one post of Additional Director General for coordinating the activities of various<br />
organisations involved i.e. <strong>CPWD</strong>, Assam PWD and Border Roads Organisation in<br />
construction of Border Fencing, Roads and Lighting Systems along Indo-Bangladesh and<br />
Indo-Pak Borders. Five <strong>CPWD</strong> Zones, 3 civil and two electrical, are directly engaged in<br />
these works.<br />
ADG (Architect) (Headquarter- Delhi)<br />
The ADG (Arch.) exercises technical control on all the four Chief Architects. He is also<br />
advisor to Ministry of UD&PA on matters of Architectural Planning within the country and for<br />
Indian Embassies in other countries.<br />
ADG (Training) (Headquarter- Delhi)<br />
There is one post of ADG (Training), which looks after the training needs of the workers and<br />
officers in the department and carries out the important task of Human Resource<br />
Development. The department has a full fledged Training Institute located at Ghaziabad,<br />
apart from Regional Training Centres at Delhi, Mumbai, Chennai and Calcutta.<br />
<strong>CPWD</strong> is an organization which has expertise in all facets of construction activity. The<br />
presence of highly qualified architects, civil engineers, electrical engineers and horticulturists<br />
ensures that the projects entrusted to <strong>CPWD</strong> by the clients get to be handled in a<br />
comprehensive manner. It renders consultancy in the field planning and design and also<br />
takes up supervision consultancy through its Consultancy Wing for PSUs, Autonomous<br />
bodies, Co-operative Societies and for projects abroad. It has so far provided consultancy<br />
services for many works in as many as 10 countries outside India.<br />
SPECIALISED UNITS<br />
To achieve excellence in its operation, <strong>CPWD</strong> has under mentioned specialised units.<br />
(i) Central Design Organisation<br />
(ii) Training Institute<br />
(iii) Standards & Specifications and Technology Application & Development
(iv) Techno-legal Cell<br />
(v) Central Laboratory<br />
(vi) Quality Assurance Wing<br />
(vii) Consultancy Services Organisation<br />
(viii) Architectural Documentation Centre<br />
(ix) Landscape Horticulture Unit<br />
Central Design Organisation<br />
Central Design Organisation (CDO), a specialised unit of <strong>CPWD</strong>, was formed in the year<br />
1969. It has following four units each headed by a Superintending Engineer.<br />
(i) Design Unit.<br />
(ii) Repair & Rehabilitation Unit(RR Unit)<br />
Since its inception, the activities of CDO have become manifold to meet the modern<br />
developments, particularly in the field of structural design, computerization, adoption of new<br />
materials and new construction techniques, materials testing, soil investigations, repairs and<br />
rehabilitation of structure in distress, development of soft ware etc. This unit is entrusted with<br />
the work of structural designs of major structures costing more than Rs.8 crores and /or<br />
buildings/structures of complex nature and promoting new techniques and materials in the<br />
field of building construction.<br />
The Repairs and Rehabilitation Unit has been created to suggest corrective measures for<br />
the structures in distress. This unit has recently brought out a manual on repairs and<br />
rehabilitation of buildings which has been very received by practicing engineers.<br />
Contracts, Standards and Quality Assurance Unit<br />
This unit has four branches. Functioning of each branch is as under: -<br />
(i) Contract and Manual Unit<br />
This unit is responsible for registration and revalidation of contractors, updation of <strong>CPWD</strong><br />
manual. This unit also issues Technical Circulars in respect of Contracts, Manuals and<br />
Delegation of Powers to various officers of <strong>CPWD</strong>. The revised and updated Manual<br />
Volume-II, used for regulating the works incorporating many important changes in work<br />
procedures has been recently brought out.<br />
(ii) Quality Assurance Unit<br />
This unit is responsible for conducting inspection of various construction and maintenance<br />
works, issue of Inspection reports for assurance of quality in the works. Regular inspections<br />
of major works are carried out by this unit.<br />
(iii) Techno legal cell<br />
This unit is responsible for dealing with the arbitration cases, Court cases, and approval of<br />
counter statement of facts in the Arbitration cases, other litigation matters and issue of<br />
circulars regarding all the above activities.<br />
(iv) Standards & Specifications Unit<br />
This unit is responsible for up dating the Specifications of works, issue of circulars from time<br />
to time, laying down specifications for new materials, approval of Cost Index, revision and up<br />
dating of schedule of rates etc. New <strong>CPWD</strong> schedule of rates has been brought out 2002.<br />
Specifications of RCC, in light of revised IS Code 2000, have been revised.
Training Institute<br />
<strong>CPWD</strong> has its main Training Institute at Ghaziabad and regional Training Institutes and<br />
Workmen Training Centres at Delhi, Mumbai, Kolkata, Chennai and Guwahati. Institute<br />
conducts number of courses for officers and staff of all disciplines. The Institute has been<br />
enlisted as National Resource Institution by MHA. The training programmes of the Institute<br />
include foundation courses for direct recruit AEEs, Dy. Architects, JEs, orientation<br />
programme for newly promoted SEs and EEs, and other staff etc. In Service Training to<br />
serving officers at different stages, specialized training in computer application for various<br />
levels of staff, Modern Management Techniques like Project Management, Contract and<br />
Arbitration, Environmental Management, Stress Management etc. are also organised.<br />
MHA sponsored Training Programmes are also conducted by the Institute for state PWDs<br />
and Public Sector Govt. Organizations in field of Multi hazard risk management. The Institute<br />
also sponsors officers for training courses conducted by recognized Institutes in India<br />
besides deputing of officers for foreign training conducted by Japan International Cooperation<br />
Agency (JICA), Indo Swedish Development Corporation (SIDA), under Colombo<br />
Plan etc.<br />
Consultancy Services Organisation<br />
<strong>CPWD</strong> provides consultancy services for various public sector organisations/autonomous<br />
bodies, State Governments etc. in planning, design and execution of major building projects,<br />
infrastructure works, complex structures and specialised planning and services like air<br />
conditioning and electrical installations, project management etc. through its Consultancy<br />
Services Organization (CSO).<br />
The CSO has been entrusted a number of prestigious works. Some of them are:<br />
• Planning of major road works under the ‘Pradhan Mantri Gramin Sadak Yojna’ and the<br />
‘Rashtrya Sam Vikas Yojna’ for the state of Bihar.<br />
• Planning and designing ‘jetties’ for the Inland Water Ways Authority at Guwahati and<br />
Patna.<br />
• Executing works on behalf of the MEA at Kabul, Afghanistan. Repair and rehabilitation<br />
of Habibia School and of the Indira Gandhi Institute for Child Health have been<br />
completed. Planning for Indian Chancery Building and the new Afghan Parliament is<br />
in progress.<br />
• CSO has also standardized the contracts/specifications etc. for modern hockey fields<br />
and synthetic athletic tracks and is assisting the SAI in laying these at many locations.<br />
• Architectural and structural planning for a number of Kendrya Vidyalyas is also being<br />
done by the CSO.<br />
CSO is involved in planning of works for the department of Small Scale Industries and the<br />
Ministry of Environment &Forests.
Hockey field for SAI Bhopal<br />
Vigilance<br />
The vigilance Unit of <strong>CPWD</strong> was headed by Chief Engineer (Vigilance), who wa also the<br />
Chief Vigilance Officer of the Department. Now this unit is headed by an independent CVO.<br />
The activities of the Vigilance Unit include investigation of complaints, enquiries against<br />
erring officers and staff, issue of Vigilance Clearance Certificates for service matters,<br />
conducting surprise checks on stores and preventive vigilance by suggesting changes in the<br />
procedures.<br />
Citizen Charter<br />
To reflect the commitment of <strong>CPWD</strong> in the matter of construction and maintenance of<br />
Residential and Non-Residential buildings and other service activities following steps have<br />
been taken:<br />
i) Citizen Charter has been formulated and adopted in <strong>CPWD</strong>.<br />
ii) The Charter adopted has been put on the <strong>CPWD</strong> website http://cpwd.gov.in<br />
Special efforts to introduce transparency through computerisation<br />
Computerisation has been introduced by <strong>CPWD</strong> in areas like preparation of Architectural<br />
Designs, Structural Design & Detailing, Project Planning & Scheduling, Monitoring,<br />
Preparation of Schedule of Rates, Tender Justification, Pay Rolls, Personnel Management,<br />
Inventory control, Accounting and Budgeting, maintenance management etc. Considering,<br />
however, the need of a knowledge management system to be put in place and the directions<br />
of the Govt. for introducing e-governance <strong>CPWD</strong> has embarked upon a programme for<br />
integrated computerization which will seamlessly integrate all operations of <strong>CPWD</strong> making<br />
available complete information in real time and will usher in complete transparency and<br />
enable officers to exercise effective control on all facets. Expression of interest has been
invited and it is proposed to introduce customized solutions using commercial and industry<br />
standard software.<br />
The <strong>CPWD</strong> website has also been made more interactive and all circulars etc. are being<br />
posted on same. Facility to receive feedback from visitors has also been introduced.<br />
A fully computerized complaint receiving and monitoring system is already being used by<br />
<strong>CPWD</strong> in Delhi. The service can be accessed at http://cpwdsewa.nic.in .<br />
IMPROVEMENTS MADE IN MAINTENANCE<br />
During FY 2006-07 <strong>CPWD</strong> has made special efforts to usher in improvements in its<br />
maintenance operations. All field officers have been directed to be more responsive and to<br />
pay personal attention to the grievances brought to their notice. As an experiment <strong>CPWD</strong><br />
has outsourced maintenance of certain selected colonies and engaged a single agency for<br />
carrying out all operations. This experiment has just gone underway and initial reports<br />
indicate that it will be a successful venture and will also encourage the regular <strong>CPWD</strong><br />
workers to perform better. Besides this, in the current financial year, special funds have been<br />
received for taking up works of aesthetic improvement and retrofitting of old quarters. With<br />
this the look of old quarters is being slowly changed and this is generating higher satisfaction<br />
amongst residents.<br />
Involvement of <strong>CPWD</strong> in development of roads in Bihar<br />
<strong>CPWD</strong> is actively involved in development of roads and highways in the state of Bihar. 2000<br />
Km. of State highways under Rashtrya Sam Vikas Yojna in 33 districts of Bihar valued at<br />
about Rs. 3000 crore and 1222 Km. of roads under Pradhan Mantri Gramin Sadak Yojna in 4<br />
districts in Bihar valued at about Rs. 600 crore have been taken up by the department.<br />
Execution of works related to the Health sector by <strong>CPWD</strong>:<br />
<strong>CPWD</strong> has completed the work of Cardio Neuro Tower at AIIMS, Delhi. Department has<br />
been further assigned large works by for AIIMS, New Delhi. These include construction of<br />
super specialty hospitals etc. The total project is likely to cost about Rs. 1200 crore.<br />
Currently <strong>CPWD</strong> is also involved in planning, designing and up-gradation of 4 hospitals at<br />
Jammu, Srinagar, Varanasi and Dhanbad under Pradhan Mantri Swasthya Suraksha Yojna.
CN Tower built for AIIMS, New Delhi<br />
Assistance rendered by <strong>CPWD</strong> in JNNURM and for works in NE Region<br />
<strong>CPWD</strong> is assisting the Ministry of UD in implementing the JNNURM by vetting the schemes<br />
related to Urban Transport sector received from different states. 106 DPR for development<br />
were received and 87, having value of Rs. 4724 crore have been vetted.<br />
Similarly <strong>CPWD</strong> is also assisting in examining the estimates for works to be carried out in the<br />
NORTH EAST. 367 DPR for works being taken up in North East valued at Rs. 3626.18<br />
crore have been processed by <strong>CPWD</strong> in FY 2006-07.<br />
ACHIEVEMNTS DURING FY 2006-2007<br />
WORKLOAD<br />
• Workload of Rs. 4512 crore was achieved during 2005-2006. Equivalent work load of<br />
Rs. 5789 crore is targeted for achievement during the year 2006-2007.<br />
Construction of GPRA & GPOA<br />
• 564 number of General Pool accommodations have been added by <strong>CPWD</strong> during<br />
2005-06. Another 481 quarters have been added up to December 2006. Further 602<br />
will be added up to March 2007. Annexure – I & IIA.
• 17327 sq.m. of non residential General Pool Accommodation has been completed by<br />
<strong>CPWD</strong> during 2005-06. 6002 sqm of GPOA have been added up to November 2006.<br />
Another 8743 sq.m. of area is likely to be added by March 2007. Annexure – II & IIA.<br />
Details of major works<br />
• 124 major works each costing more than Rs. 2 crore have been started during FY<br />
2006-07 up to December 2006. Further 86 more works are targeted for<br />
commencement during the period January to March 2007. Refer Annexure – III&IIIA.<br />
• 59 major works each costing more than Rs. 2 crore have been completed during the<br />
FY 2006-07 up to the month of December 2006. Further 84 numbers of major works<br />
are likely to be completed during the period of January 2007 to March 2007. Refer<br />
Annexure – IV & IVA.<br />
• 105 major works costing more than Rs. 2 crore have been sanctioned during the FY<br />
2006-07 up to December 2006. Refer Annexure -V.<br />
Achievements of the various specialized units of <strong>CPWD</strong> are given in Annexure VI to VIII.<br />
Activities of <strong>CPWD</strong> in other important areas during 2006-07<br />
Border Roads, Fencing & Flood Lighting Works<br />
The Central Public Works Department is executing the work of Border fencing, flood lighting<br />
and construction of Roads along the international borders of the country both in the West and<br />
the East. In all 2936 Km of fencing, 1781 Km of Road and 1872 Km of flood lighting along the<br />
international borders of Punjab, Rajasthan, Gujarat and along Indo Bangla Border has been<br />
completed by <strong>CPWD</strong> so far.
The maintenance of the infrastructure created along the border in the form of roads, bridges,<br />
flood lighting etc. has also been entrusted to <strong>CPWD</strong>. Special units have been opened in<br />
North East to look after the works. About 2558 Km of road along the full IBB is being<br />
maintained by <strong>CPWD</strong>.<br />
<strong>CPWD</strong> has also been requested to submit proposals for 5 strategic roads in Uttaranchal. The<br />
stretches are:<br />
– Ghamsali to Geldung 24 km<br />
– Sonam to PDA 15 km<br />
– PDA to Sumla 05 km<br />
– PDA to Mendi 03 km<br />
– Sela to Tendang 24 km<br />
3 teams of officers, each headed by an EE, have carried out a reconnaissance survey in<br />
August 2006.<br />
Details of achievements of Border Fencing Region are given in Annexure-IX.<br />
Works for Inland Waterways Authority of India<br />
<strong>CPWD</strong> has been executing various works to facilitate development of the Inland waterways<br />
in India thus facilitating development of a net work similar to that of National Highways for<br />
transportation of goods and people at a much more economical rate.<br />
<strong>CPWD</strong> has completed various works for the IWAI which include jetties, terminal buildings,<br />
protective measures, development works etc.<br />
Works at Vaikom, Cherthala, Thirukkunnapuzha, Kayamkulam, Aluva, and Maradu in kerala<br />
have already been completed. The work of low level jetty at Gaighat at Patna has been<br />
completed during the FY 2006-07. Work for construction of jetty at Pandu at Guwahati is in<br />
progress.
Proposals for construction of high level jetty at Pandu at Guwahati and Gaighat at Patna and<br />
various other locations are under consideration.<br />
Construction of permanent houses for tsunami affected people of A&N Islands<br />
<strong>CPWD</strong> has started the construction of permanent houses for the Tsunami affected people of<br />
A&N Islands on the following islands:<br />
i) Little Andaman<br />
ii) Car Nicobar<br />
iii) Katchal<br />
iv) Chowra<br />
v) Kamorta<br />
vi) Terressa<br />
vii) Noncowrie<br />
viii) Great Nicobar<br />
ix) Little Nicobar
Out of 9797 houses to be built for the Tsunami affected people in the Islands 7966 are being<br />
built by <strong>CPWD</strong>. Foundation work for nearly 5000 units, for which locations have been<br />
identified is in progress. Super structure work for houses has been awarded and fabrication<br />
of material is under way. The design of the houses and the specifications being adopted<br />
have been evolved out a consultative process in which all the stakeholders including<br />
individual beneficiaries, tribal council members, village captains etc. were evolved. The<br />
houses have been designed to be earthquake resistant and eco-friendly materials are being<br />
used in construction.<br />
Commonwealth Games-2010<br />
<strong>CPWD</strong> has been entrusted the task of upgrading the existing infrastructure for the five major<br />
stadium of the Sports Authority of India at Delhi where the Commonwealth Games are to be<br />
held in 2010. These are:<br />
1. Jawahar Lal Nehru Stadium<br />
2. Indira Gandhi Indoor stadium<br />
3. Dr. Karni Singh Shooting Range<br />
4. Major Dhyan Chand National Stadium<br />
5. SPM Swimming Pool<br />
The detailed planning for all the venues has been started involving foreign experts having<br />
adequate experience to bring these venues to international standards. Work for<br />
development of designs has been awarded and venue wise contracting packages would be
taken up now. The services in all stadiums will be state of art and compare to best<br />
international sports facilities. The call of tenders will be started by May 2007.<br />
All related jobs have been planned for completion latest by December 2009 leaving adequate<br />
time for trial runs before commissioning. The EFC has approved a rough cost limit of Rs.<br />
1100/- crores A dedicated project team has been formed for all these time bound works.<br />
Integrated development of samadhies of National Leaders<br />
<strong>CPWD</strong> is tasked with maintaining samadhies of National Leaders. Since December 2004<br />
<strong>CPWD</strong> is also making all logistic arrangements for the functions held at these samadhies.<br />
Govt. has decided to integrate the samadhies to improve movement of visitors and also<br />
provide there adequate facilities and take steps to ensure safety of the VVIPs who visit<br />
these. <strong>CPWD</strong> with the help of experts has developed a plan for the development of these<br />
areas which include better lighting, pathways, new plantation and public utilities etc. Work of<br />
tree plantation is in progress.<br />
Activities of <strong>CPWD</strong> in North East.<br />
<strong>CPWD</strong> has been executing number of infrastructural works in the North East. The head<br />
quarters of the <strong>CPWD</strong> in this area is located in Shillong with divisions located at Guwahati,<br />
Shillong, Imphal, Tejpur, Silchar & Agartala.<br />
The works done by the Department cover diverse sectors such as Education, Health, Sports,<br />
Tribal Welfare, Inland Waterway Transport, maintenance of border roads etc. <strong>CPWD</strong> is<br />
creating infrastructure for various departments and ministries operating in this area such as<br />
Central Police Organisations like CRPF, BSF, Assam Rifles, SSB, ARC,
SIB & SB, Ministry of Labour, Ministry of Health & Family Welfare, Central Water<br />
Commission, Survey of India, Ministry of Environment & Forests, ICAR, KVIC, Sports<br />
Authority of India and Central Ground Water Board, ITPO etc.
Works of Assam University Campus at Silchar:<br />
Assam University, a Central University established in 1994, has a campus of 400macres<br />
located around 23 Kms from Silchar town. It has entrusted large scale construction and<br />
development works to <strong>CPWD</strong>. Since inception of University till 2005-06 works costing more<br />
than Rs. 200 crore have been completed and handed over successfully.<br />
At present, the works of C/o Building for Physics Department, Chemistry Department,<br />
Ecology Department and new Academic Complex, costing to the tune of Rs. 1500 lakhs are<br />
in advance stage of progress and, except Academic complex, are targeted for completion<br />
during FY 2006-07. The Academic Complex is scheduled to be completed in June 2007.<br />
Mizoram University:<br />
Mizoram University located about 15 kms from Aizwal, Mizoram has entrusted construction<br />
activity of entire campus, i/c development works to <strong>CPWD</strong>. It has been developed in two<br />
phases. A/A & E/S under phase I, to the tune of Rs. 2400 lakhs was received during the FY<br />
2003-04. The Campus has been developed with water harvesting systems in addition to<br />
general development components like roads, culverts, protective measures, SW drains etc.<br />
A/A & E/S for Rs. 2688.17 lakhs under Phase II has been received in June 2006.<br />
Preparation of Layout plan and other working drawings etc. is in under finalization. Estimate<br />
for C/o School for Earth Sciences and Natural Resources (Phase II), estimated to the tune of<br />
Rs. 252.75 lakhs has been sent to Mizoram University for obtaining approval.<br />
Construction of Institute of Hotel Management at Hengrabari, Guwahati.<br />
The project for M/o Tourism, GOI has been completed in FY 2006-07. The project comprises<br />
of following components.
1. C/o Administrative Block cum Institute Building for 5260 sqm<br />
2. C/o Boys hostel for 168 Nos. boarders comprising of 2445 sqm<br />
3. C/o Residential quarters type II 5 Nos., Type III 4 Nos., Type IV 6 Nos, and Type V<br />
1 No.<br />
4. Ancillary buildings like ESS Building and pump house<br />
5. External bulk services and development work.<br />
The Construction of Administrative block cum Institute building was completed in August<br />
2006 and Boys Hostel has been completed in March 2006. The Administrative Block cum<br />
Institute building has been made operational from December 2006<br />
Important events/foundation stone laying ceremonies/inaugurations:<br />
152 year celebration of <strong>CPWD</strong><br />
<strong>CPWD</strong> celebrated the completion of 152 nd year of its inception in July 2006. A function was<br />
held in Vigyan Bhawan which was presided over by the hon. UDM Shri Jaipal Reddy. During<br />
the function a presentation about achievements of <strong>CPWD</strong> during the preceding financial year<br />
i.e. 2005-06 was made. An open house discussion on various issues was also held in which<br />
all service associations/unions and individual officers voiced their concerns and made<br />
suggestions.
Inauguration of SEBI Building Mumbai<br />
The building for the SEBI, built by <strong>CPWD</strong> at the Bandra Kurla Complex, Mumbai was<br />
inaugurated by the Hon. Prime Minister on 06/10/2006. The building incorporates the latest<br />
features including state of the art building management systems. The building has been<br />
provided with furnishing also by the <strong>CPWD</strong> in line with the motto of providing fully outfitted<br />
buildings to clients if they so desire. All present highly appreciated the work done.
This SEBI building has been provided with state of the art systems for offices conference<br />
halls etc.<br />
Inauguration of new office building for CBSE at fazalpur, Manadavali, at Delhi<br />
<strong>CPWD</strong> has built a number of buildings for the CBSE at various places. These include<br />
buildings built at Rouse Avenue in new Delhi, Buildings at Allahabad, Panchkula etc. latest<br />
building to be completed is a Fazalpur, Mandavali. This completely disabled friendly building<br />
was inaugurated by Shri Fatmi, Hon. Minister of Education on 21.12.2006.
Construction of an Auditorium in President’s Estate, New Delhi<br />
<strong>CPWD</strong> has taken up construction of a new 300 person capacity auditorium, having design<br />
merging with that of the Rashtrapati Bhawan, in the President’s Estate. The building also<br />
includes a banquet hall with a capacity to accommodate 400 persons. Building is being<br />
provided with state of the art features including intelligent building management systems, fire<br />
detection and fire fighting systems, CCTV, modern audio and video projection systems etc.<br />
100% backup power supply is also proposed. Provisions for rainwater harvesting have also<br />
been made. Building has been planned as disabled friendly building.<br />
Start of new office building for Comptroller and Auditor General of India<br />
The foundation stone for the new office building for CAG was laid by His Excellency The<br />
President of India on October 19 2006.
The building has been designed had been developed by a Delhi based Architect <strong>CPWD</strong> is<br />
designing all services etc. to be provided for in the building. This includes conference<br />
facilities standby electric supply stems air conditioning, integrated building management<br />
system, LAN, VPM, CCTV and access control systems, fire fighting and fire alarm system<br />
etc.<br />
Construction of Jawahar Lal Nehru Bhawan – office for Ministry of External Affairs<br />
<strong>CPWD</strong> has started the construction of the JLN Bhawan located at Janpath which will house<br />
the Ministry of External Affairs. The building has been completely designed in house and this<br />
will be one of the most modern and eco friendly buildings to be built. Bhoomi Poojan of this<br />
building was done by Hon. Minister for External affairs Shri Pranab Mukherjee on November<br />
14, 2006.<br />
Office building for central Excise at EM Bye pass, Kolkata<br />
<strong>CPWD</strong> has completed a new office building for the Central Excise Department at EM Bye<br />
Pass, Kolkata during 2006-07.
Construction of office building for Income Tax at Hyderabad<br />
The work of construction of twin towers for the Income Tax Department at Hyderabad is<br />
nearing completion and building will be handed over to the client department shortly.
Construction of laboratory cum Administrative Block of NRCSS at Tabiji, Ajmer<br />
<strong>CPWD</strong> has completed construction of a double storied laboratory cum administrative block<br />
for the NRCSS at Ajmer. The building having a plinth area of 3152 sqm has 15 laboratories,<br />
offices and a conference room. The building has been designed keeping in view traditional<br />
Rajasthani Architecture.<br />
Lab NRCSS, Tabiji, Ajmer<br />
A detailed list of important events and activities of the department for the year 2006-07 is<br />
given in Annexure-X.
Sl.<br />
No.<br />
Description Constn I/c<br />
Deposit<br />
work<br />
Work Load (2006-07)<br />
Maint. I/c<br />
Deposit<br />
work<br />
Total<br />
Financial<br />
terms<br />
Total work<br />
load<br />
1 2 3 4 5 6<br />
1 Actual upto<br />
Dec'06 as per<br />
monthly cards<br />
received upto<br />
19th Jan'06<br />
2 Likely expenditure<br />
for remaining<br />
period Jan'07 to<br />
Mar'07<br />
3 Total Expenditure<br />
expected during<br />
2006-07<br />
2012.42 641.12 2653.54 3454.94<br />
1725.58 270.41 1995.99 2334.00<br />
3738 911.53 4649.53 5788.94
Annexures – I<br />
CITY WISE AND TYPEWISE DETAILS <strong>OF</strong> <strong>GENERAL</strong> POOL<br />
RESIDENTIAL ACCOMMODATION COMPLETED DURING THE YEAR<br />
2006-07<br />
(Period 1/4/06 to 31/12/06)<br />
Sl.<br />
No.<br />
1 WZ-<br />
II<br />
2 WZ-<br />
II<br />
2 NZ-<br />
1<br />
3 SZ-<br />
1<br />
4 NZ-<br />
III<br />
Zone Name of<br />
work<br />
C/o 215 Nos.<br />
GPRA Qtrs at<br />
Akurdi, Pune<br />
(Ph-I)<br />
C/o 65 Nos.<br />
GPRA Qtrs at<br />
Akurdi, Pune<br />
(Ph-II)<br />
C/o GPRA at<br />
Shimla<br />
(Summer Hill).<br />
C/o 16 Nos.<br />
Type V Qtrs.<br />
C/o GPRA at<br />
Jodhpur<br />
City /<br />
Location<br />
Akrudi,<br />
Pune<br />
Akrudi,<br />
Pune<br />
Number of Quarters<br />
I II III IV V VI Hostel<br />
Total No.<br />
of Qrs.<br />
Completed<br />
90 90<br />
15 15<br />
Shimla 16 16 32<br />
Besant<br />
Nagar /<br />
Chennai<br />
Jodhpur 104 103 92 22 4 3 0 328<br />
Total 104 119 213 22 20 3 0 481<br />
16<br />
16
Sl.<br />
No.<br />
Annexures – I A<br />
CITY WISE AND TYPE WISE DETAILS <strong>OF</strong><br />
<strong>GENERAL</strong> POOL RESIDENTIAL ACCOMMODATION TARGETED<br />
FOR COMPLETION DURING THE YEAR 2006-07<br />
(During the PERIOD 1-01-2007 TO 31-03-2007)<br />
1 NDZ-<br />
IV<br />
Zone Name of<br />
work<br />
C/o 319 Nos.<br />
Transit<br />
Accommodati<br />
on at<br />
Andrews<br />
Ganj, New<br />
Delhi<br />
(Funded by<br />
HUDCO)<br />
2 WZ-II C/o 65 Nos.<br />
GPRA Qtrs<br />
at Akurdi,<br />
Pune (Ph-II)<br />
3 NZ-II C/o Holiday<br />
Home at<br />
Sikandara,<br />
Agra<br />
4 NZ-II C/o Holiday<br />
Home at<br />
Khurpatal,<br />
Nainital<br />
5 EZ-I C/o of GPRA<br />
at Gangtok<br />
(SH: C/o of<br />
Ty-6 Nos<br />
qtrs)<br />
6 NZ-1 C/o GPRA at<br />
Shimla<br />
(Prospect<br />
Hill).<br />
7 NZ-1 C/o GPRA at<br />
Shimla<br />
(Kaithu).<br />
City /<br />
Location<br />
Akrudi,<br />
Pune<br />
Number of Quarters<br />
I II III IV V VI Hostel<br />
Total No.<br />
of Qrs.<br />
319 319<br />
30 15 45<br />
Agra 14 14<br />
Nainital 14 14<br />
Gangtok 6 6<br />
Shimla 24 24<br />
Shimla 24 18 42
8 NZ-1 C/o 10 Nos.<br />
for <strong>CPWD</strong><br />
and 2 Nos.<br />
qtrs/ for<br />
General Pool<br />
at Bemloe,<br />
Shimla<br />
9 WZ I C/O GPRA at<br />
Malwani,<br />
Malad,Mumb<br />
ai<br />
10 CZ C/o<br />
Residential<br />
Qtrs. For<br />
GPRA at<br />
Indore.<br />
Shimla 12 12<br />
Mumbai 112 112<br />
Indore 8 2 10<br />
11 EZ-I C/o <strong>CPWD</strong><br />
staff qtrs. at<br />
Himachal<br />
Vihar, Siliguri<br />
Siliguri 4 4<br />
Total 0 54 69 112 18 2 347 602
Annexures –II<br />
CITY WISE AND TYPE WISE DETAILS <strong>OF</strong> <strong>GENERAL</strong> POOL<br />
<strong>OF</strong>FICE<br />
ACCOMMODATION COMPLETED DURING THE YEAR 2006-07<br />
(PERIOD 1-04-2006 TO 31-12-2006)<br />
Sl.No. Zone Name of Work Station Total plinth Area<br />
under the work<br />
(sqm)<br />
Plinth Area<br />
completed up to<br />
Dec'06<br />
1 2 2 3 4 5<br />
1 WZ-II<br />
C/o GPOA at<br />
Akrudi, Pune (Ph-<br />
I)<br />
Pune 6002 6002
Annexures IIA<br />
CITY WISE AND TYPEWISE DETAILS <strong>OF</strong><br />
<strong>GENERAL</strong> POOL <strong>OF</strong>FICE ACCOMMODATION TARGETED FOR<br />
COMPLETION DURING THE YEAR 2006-07<br />
( PERIOD 1-01-2007 TO 31-03-2007)<br />
Sl.No. Zone Name of Work Station Total plinth<br />
Area under the<br />
work (sqm)<br />
Plinth Area to<br />
be completed<br />
between<br />
1-01-2007 TO<br />
31-03-2007<br />
1 2 3 4 5 6<br />
1 WZ-II C/o Office Building &<br />
Rest House for <strong>CPWD</strong><br />
officers at Gandhinagar<br />
Nasik (E)<br />
Nasik 878 878<br />
2 NZ-II C/o GPOA at Bareilly Bareilly 2075 2075<br />
3 SZ-III C/o GPOA at Kallai,<br />
Calicut<br />
Calicut 5790 5790<br />
Total 8743 8743
Sl.<br />
No.<br />
Annexures III<br />
Name of Work Zone City /<br />
location<br />
A/A & E/S<br />
Amount<br />
(Rs. In<br />
lacs)<br />
Date of<br />
A/A & E/S<br />
Remarks<br />
MINISTRY <strong>OF</strong> URBAN DEVELOPMENT<br />
1 Augmentation of Krishi NDZ-I New Delhi 333.77 Nov'06 Work in<br />
Bhawan (Civil works)<br />
progress<br />
2 Repair, Rehabilitation NDZ-II New Delhi 233.15 Nov'05 Work in<br />
and renovationof<br />
Shram Shakti<br />
Bhawan,New Delhi<br />
including<br />
augmentation of<br />
services.<br />
progress<br />
3 Upgradation of<br />
bunglows occupied by<br />
Supereme Court and<br />
High Court judges<br />
including improvement<br />
works<br />
4 Outsourcing of<br />
maintenance services<br />
of Aram Bagh colony<br />
I/c day to day<br />
maintenance, annual<br />
repair, special repair<br />
and upgradation work.<br />
5 C/o Auditorium &<br />
Banquet Hall in<br />
Schedule "B" area,<br />
President Estate<br />
Rastrapati Bhawan,<br />
New Delhi (Main civil<br />
work)<br />
6 C/o 36 Nos. Ty-II Qtrs<br />
in Block 4, 18 Nos. Ty-<br />
II Qtrs in Block -2<br />
Schedule "B",<br />
President Estate, New<br />
Delhi<br />
7 C/o GPRA PH-I, at<br />
Kane Nagar, Mumbai.<br />
SH: C/o 88 nos. Type-<br />
IV qtrs.<br />
NDZ-II New Delhi 246.00 Nov'05 Work in<br />
progress<br />
NDZ-II New Delhi 225.29 -- Work in<br />
progress<br />
PLP New Delhi 838.00 Jul'06 Work in<br />
progress<br />
PLP New Delhi 287.00 Nov'05 Work in<br />
progress<br />
WZ-I Mumbai 1195.30 Nov'04 Work in<br />
progress
8 C/o GPRA, PH-I, at<br />
kane Nagar, Mumbai.<br />
SH: C/o88 nos. Type-<br />
IV qtrs.<br />
9 Rajiv Gandhi<br />
Ninaivakam at<br />
Sriperumpudur, TN<br />
OTHER MINISTRY / DEPARTMENTS<br />
1 C/o Boundary wall<br />
with Perimeter<br />
Security and Access<br />
Control System for<br />
Indian Chancery<br />
Complex at Kabul,<br />
Afghanistan<br />
2 C/o Jawahar Lal<br />
Nehru Bhawan (for<br />
MEA) at Janpath, New<br />
Delhi.<br />
3 Development of T-5<br />
area vacated by Army<br />
& Peti Market besides<br />
Red fort, Delhi.<br />
4 Construction of office<br />
building of CAG at<br />
Pocket 9 DDU Marg.<br />
5 Replacement of<br />
existing AC plant in<br />
Sena Bhawan, New<br />
Delhi<br />
6 C/o Police station &<br />
Resdl qtrs. at<br />
Kanhawala, Delhi<br />
7 C/o Cabinet Sectt.<br />
Bldg at plot Nos. 5-A,<br />
CGO Complex New<br />
Delhi<br />
8 C/o office bldg for<br />
central excise<br />
commissionerate,<br />
Delhi-III at Plot N0. 36,<br />
& 37, Sec-32,<br />
Gurgaon.<br />
WZ-I Mumbai 1202.88 Dec'04 Work in<br />
progress<br />
SZ-I Sriperum-<br />
pudur<br />
CSO Kabul,<br />
Afghanistan<br />
210.88 Jul'06 Work in<br />
progress<br />
433.00 Jun'06 Work in<br />
progress<br />
NDZ-I New Delhi 17265.00 Oct'05 Work in<br />
progress<br />
NDZ-II New Delhi 418.00 Mar'04 Work in<br />
progress<br />
NDZ-II New Delhi 6612.00 Jan'06 Work in<br />
progress<br />
NDZ-II New Delhi 291.94 Sept'98 Work in<br />
progress<br />
NDZ-<br />
IV<br />
NDZ-<br />
IV<br />
NDZ-<br />
IV<br />
New Delhi 272.00 May'97 Work in<br />
progress<br />
New Delhi 9400.11 Feb'04 Work in<br />
progress<br />
New Delhi 769.25 Sept'04 Work in<br />
progress
9 C/o IHM at<br />
Kurukshetra.<br />
10 C/o Office Bldg, T-I/8<br />
Nos,T-II/8 Nos,T-III/8<br />
Nos,T-IV/8nos & T-V/1<br />
Nos Qtrs For CWC at<br />
Jammu<br />
Integrated<br />
Development of<br />
Jammu - Rajouri -<br />
Poonch Tourism<br />
Circuit in Jammu<br />
province of J&K.<br />
11 C/o Yatri Niwas at<br />
Nangali Sahib<br />
12 C/o Yatri Niwas at<br />
Budha Amar Nath.<br />
13 C/o Mid Way Amini-<br />
Ties at Ram Kund,<br />
Poonch.<br />
Development of<br />
Tourism Circuit<br />
Bhadarwah-Doda-<br />
Kishtwar-Kokarnag-<br />
Sinthan-Srinagar<br />
NZ-I Kurukshetra 1144.00 Jan'04 Work in<br />
(Hry.)<br />
progress<br />
NZ-I Bantalab 405.74 Aug-03 Work in<br />
progress<br />
NZ-I J&K 688.00 Dec-05<br />
NZ-I J&K -do- -do- Work in<br />
progress<br />
NZ-I J&K -do- -do- Work in<br />
progress<br />
NZ-I J&K -do- -do- Work in<br />
progress<br />
NZ-I J&K 691.00 Dec-05<br />
14 Bhadarwah NZ-I J&K 213.28 -- Work in<br />
progress<br />
15 C/o Ayyakar Bhawan<br />
for income tax deptt,<br />
at plot No-17-E,<br />
Chandigarh (M/o F&R)<br />
16 C/o 75 Nos. Type-II<br />
Quarters and five<br />
quarters area for<br />
parking purpose at<br />
group center CRPF<br />
Pinjore (Haryana).<br />
17 C/o Two 120 Men<br />
Barrack with kitchen<br />
cum dining hall for<br />
D.M. Bn. ITBP at<br />
Madanpur (Haryana)<br />
NZ-I Chandigarh 1498.67 Jun'06 Work in<br />
progress.<br />
NZ-I Pinjore (Hr.) 483.70 Sept'05 Work in<br />
progress.<br />
NZ-I Madanpur<br />
(Hr.)<br />
408.72 Aug'05 Work in<br />
progress.
18 C/o 2 No. 120 Men<br />
barrack with kitchen<br />
dinning Hall for SHQ<br />
and Bn. HQ at BSF<br />
campus Abohar.<br />
(BSF)<br />
19 C/o 120 men barrack<br />
at BSF campus,<br />
Ajnala under SHQ<br />
BSF Gurdaspur.<br />
20 C/o 3 nos. Admn.<br />
Block for ITBP at Leh.<br />
21 C/o 118 qtrs. for<br />
S.I.B.At Gomtinagar,<br />
Lucknow<br />
22 C/o office building for<br />
U.T.D.B. at I.H.M.<br />
campus, Dehradun.<br />
23 C/o S.F.A. for ITBP at<br />
Seemadwar,<br />
Dehradun (Phase-I).<br />
(SH:- C/o Type-I-200<br />
Nos. & Type-II-112<br />
Nos. quarters)<br />
24 C/o 2 Nos. 120 Men<br />
barracks for ITBP at<br />
Seemadwar,<br />
Dehradun.<br />
25 C/o 16 Nos. T-I and 16<br />
Nos. T-II quarters for<br />
ITBP at Mahi-ka-<br />
Danda (Uttarkashi)<br />
26 C/o Admn. Block for<br />
ITBP at Mahi-ka-<br />
Danda (Uttarkashi)<br />
27 C/o T-II-12 Nos. T-III-6<br />
Nos., T-IV-6 Nos., T-<br />
V-2 Nos., T-VI-1 No.<br />
residential quarters at<br />
SSB campus Srinagar<br />
(Garhwal)<br />
NZ-I Abohar (Pb.) 358.80 Mar'06 Work in<br />
progress.<br />
NZ-I Ajnala 253.34 Feb-06 Work in<br />
progress.<br />
NZ-I Leh 998.27 Aug-05 Work in<br />
progress.<br />
NZ-II Lucknow 967.33 Jul'05 Work in<br />
progress<br />
NZ-II Dehradun 435.00 Jul-06 Work in<br />
progress<br />
NZ-II Dehradun 3703.00 Feb-05 Work in<br />
progress<br />
NZ-II Dehradun 498.81 Aug-05 Work in<br />
progress<br />
NZ-II Mahi-ka-<br />
Danda<br />
NZ-II Mahi-ka-<br />
Danda<br />
NZ-II Srinagar<br />
(Garhwal)<br />
242.50 Mar-05 Work in<br />
progress<br />
406.35 Oct-05 Work in<br />
progress<br />
202.09 Oct-05 Work in<br />
progress
28 C/o Non-Residential<br />
Buildings for CISF,<br />
RTC, Anantpur. Distt.<br />
Alwar. (C/o 1 No.<br />
Barracks, Admn.<br />
Block, Qtr. Gurad, Trg.<br />
Block & Compound<br />
Wall. (A) SH : 1 No.<br />
180 Men Barracks)<br />
C/o MAP at Bikaner<br />
(Phase-I).<br />
29 C/o MAP at Bikaner<br />
(Phase-I).SH : C/o<br />
Quarters for Brig. 04<br />
Nos., Qtrs for Maj. S/S<br />
01 Nos., Qtrs for Major<br />
68 Nos., Qtrs for<br />
Captain 15 Nos., at<br />
Hoshiar Enclave and<br />
MH Location i/c pocket<br />
development works<br />
(Package-I).<br />
30 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Quarters for<br />
JCO's 84 Nos. at<br />
Umrao Colony i/c<br />
pocket development<br />
works (Package-IIa).<br />
31 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Qtrs for OR's<br />
174 Nos. at Umrao<br />
Colony i/c pocket<br />
development works<br />
(Package-IIb).<br />
32 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Quarters for<br />
OR's 144 Nos. at<br />
Umrao Colony i/c<br />
pocket development<br />
works (Package-III a).<br />
NZ-III Behror<br />
Anantpur<br />
NZ-III Bikaner Combined<br />
Sanction<br />
for Ph.-I<br />
10827.07<br />
lakhs<br />
1344.38 Jan'06 Work in<br />
progress<br />
Aug'05<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
NZ-III Bikaner -do- -do- Work in<br />
progress
33 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Quarters for<br />
OR's 174 Nos. at<br />
Umrao Colony i/c<br />
pocket development<br />
works (Package-III b).<br />
34 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Quarters for<br />
JCO's 126 Nos. at<br />
Longewal Complex i/c<br />
pocket development<br />
works (Package-IVa).<br />
35 C/o MAP at Bikaner<br />
(Phase-I).SH : C/o<br />
Quarters for OR's 204<br />
Nos. at Longewal<br />
Complex i/c pocket<br />
development works<br />
(Package-IVb).<br />
36 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Quarters for<br />
OR's 208 Nos. at<br />
Longewal Complex i/c<br />
pocket development<br />
works (Package-V a).<br />
37 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Quarters for<br />
OR's 144 Nos. at<br />
Longewal Complex i/c<br />
pocket development<br />
works, security wall &<br />
sub station (Package-<br />
V b).<br />
38 C/o Type - I/5 nos.. ,<br />
Type- II/11 Nos. &<br />
Type - IV/2 Nos.<br />
Residential Qtrs., site<br />
development for<br />
Admn. Building And<br />
Dormitories for SGMI<br />
at Gangtok<br />
39 C/o Guest house for<br />
SGMI at Gangtok.<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
NZ-III Bikaner -do- -do- Work in<br />
progress<br />
EZ-I Gangtok 658.52 Jul'05 Work in<br />
progress<br />
EZ-I Gangtok 658.52 Jul'05 Work in<br />
progress
40 C/o provisioning<br />
complex for BSF<br />
campus at FHQ, BSF<br />
Kadamtala,(West<br />
Bangal)<br />
41 C/o 120 men barrack<br />
for BSF, SHQ at<br />
Raninagar, Jalpaiguri.<br />
42 C/o 209 residential<br />
quarters for 22BN.<br />
SSB Ranidanga . SH:<br />
C/o Type-I-12 & Ty-II-<br />
48 nos. Qtrs.)<br />
43 C/o 147 Nos. Resdl .<br />
Qtrs. at BN HQ. for<br />
SSB , Kolkata.<br />
SH: C/O 48 Nos. Ty-II<br />
Qtrs.<br />
44 C/o 128 Men Barrack<br />
for SSB at<br />
Ranidanga .<br />
45 C/o. Res. & Non.Res.<br />
Complex at E.M.B.P,<br />
Cal. for I.Tax Deptt. at<br />
Cal. SH:-<br />
Superstructure For<br />
Admn. Bldg. (G+10<br />
Storeyed)<br />
46 C/o Office Building of<br />
DGCI & S, Kolkata .<br />
SH:- Superstructure.<br />
47 C/o. Building For JNV<br />
at Rabangla, South<br />
Sikkim. SH:- C/o Over<br />
Ground Sump<br />
Including Distribution<br />
lines to different<br />
Building for JNV<br />
48 C/o. Institute Block &<br />
Hostel Block for<br />
Moulana Abul Kalam<br />
Azad Institute for<br />
Asian Studies At Salt<br />
Lake, Kolkata.<br />
49 C/o Office building and<br />
Resdl. Qtrs. for<br />
Regional Passport<br />
office at<br />
Bhubaneswar.<br />
EZ-I Kadamtala,<br />
Siliguri<br />
EZ-I Raninagar,<br />
Jalpaiguri<br />
EZ-I Ranidanga,<br />
Siliguri<br />
389.57 Mar'06 Work in<br />
progress<br />
207.07 Dec'05 Work in<br />
progress<br />
828.68 Mar'06 Work in<br />
progress<br />
EZ-I Kolkata 1178.00 Feb'05 Work in<br />
progress<br />
EZ-I Ranidanga,<br />
Siliguri<br />
236.14 Mar'06 Work in<br />
progress<br />
EZ-I Kolkata 3512.00 Nov'96 Work in<br />
progress<br />
EZ-I Kolkata 1240.00 Feb'03 Work in<br />
progress<br />
EZ-I Rabangla,<br />
South Sikkim<br />
EZ-I Saltlake,<br />
Kolkata<br />
479.73 Feb'02 Work in<br />
progress<br />
579.06 Jan-04 Work in<br />
progress<br />
EZ-II Bhubaneswar 229.67 May'05 Work in<br />
progress
50 C/o combined officers<br />
Mess with 10 suits at<br />
BSF Campus<br />
Kishanganj<br />
51 C/o Resdl qtrs 36 Nos.<br />
at TC & BSF<br />
Hazaribagh<br />
52 C/o 40 Nos. for BSF at<br />
Kishanganj<br />
53 Electrical bulk services<br />
GC, CRPF Jhaphan,<br />
Muzaffarpur<br />
54 C/o 263 Nos. resdl<br />
qtrs. for CISF Diaster<br />
Management Bn (4th<br />
Res. Bn) Mundali<br />
55 C/o 2 Nos. 180 men<br />
barracks for Distaster<br />
Management BN of<br />
CISF at Mundali<br />
56<br />
C/o Roads in State of<br />
Bihar under Prime<br />
Minister Gram Sadak<br />
Yojana (PMGSY)<br />
NH-31 to Sadpur in<br />
Sahebpur Kammal<br />
57 Pukthaul Singhaul<br />
Road in Begusarai<br />
Block (6.082 KM)<br />
58 Bachhwara to<br />
Samsaghat in<br />
Bachhwara Block<br />
59 Armari to Khajhanpur<br />
Chowk in Bariarpur<br />
/Chhourahi Block<br />
(26.45 km)<br />
60 NH-31 to Simaria<br />
61<br />
Sharma tola<br />
Virpur<br />
Mhaidabhavaygama<br />
via Gahaapul<br />
to<br />
62 Khattopur Maniyappa<br />
to Rampur Hosspur<br />
Road<br />
63 Baranni PWD Road to<br />
Aalapur Pasopur<br />
EZ-II Kishanganj 233.78 Mar'05 Work in<br />
progress<br />
EZ-II Hazaribagh 289.28 Oct'05 Work in<br />
progress<br />
EZ-II Kishanganj 258.16 Jan'06 Work in<br />
progress<br />
EZ-II Jhaphan, 773.81 May'05 Work in<br />
Muzaffarpur<br />
progress<br />
EZ-II Mundali,<br />
Bhubaneswar<br />
EZ-II Mundali,<br />
Bhubaneswar<br />
1497.00 Aug'05 Tenders for<br />
development<br />
of site<br />
invited.<br />
1249.00 Nov'05 Work just<br />
awarded.<br />
EZ-II Begusarai 291.55 Jan'06 Work in<br />
progress<br />
EZ-II Begusarai 483.38 Jan'06 Work in<br />
progress<br />
EZ-II Begusarai 285.36 Jan'06 Work in<br />
progress<br />
EZ-II Begusarai 1317.29 Jan'06 Work in<br />
progress<br />
EZ-II Begusarai 167.96 Jun'06 Work in<br />
progress<br />
EZ-II Begusarai 249.68 Jun'06 Work in<br />
progress<br />
EZ-II Begusarai 357.40 Jun'06 Work in<br />
progress<br />
EZ-II Begusarai 362.39 Jun'06 Work in<br />
progress
64 Ratanpur to Singhaul<br />
Via Kamraddinpur<br />
Akashpur<br />
65 Dekuli to Sisauni<br />
66<br />
(43.45 km)<br />
Chharapatti-Laukahi-<br />
Mahadeomath-<br />
Rajarampatti-Narahia<br />
Path. (41.55 km)<br />
67 Piparaghat-Dewhar-<br />
Dhakjari-<br />
Andharatharhi-<br />
Gidharghanj-<br />
Madnaberia-Phulparas<br />
(21.50 km )<br />
68 Ladania-Khazedih-<br />
Gidhwas-Mirzapur-<br />
Salkhania-Pirthi-<br />
Babubarahi-Satghara<br />
Path (18.60 km)<br />
69 Rosera Shivajinagar<br />
Baheri Path in Rosera<br />
Block (17.75 km )<br />
70 REO road<br />
Brahmasthan<br />
Dudhpura in Rosera<br />
Block (10.50 km)<br />
71 Ballipur to Nakta<br />
72<br />
Chowk via Warisnagar<br />
in Warisnagar Block (5<br />
KM)<br />
Maha Kaina Morwara<br />
Path in Singhai Block<br />
73 C/o 120 men barrack<br />
with cook house &<br />
dining hall for Jawans<br />
at 99 Bn BSF at Tura -<br />
III<br />
74 C/o 2 Nos. 120 Men<br />
Jawans Living Barrack<br />
for BSF at Fatikchera<br />
75 C/o 2 Nos. 120 men<br />
barracks for BSF at<br />
131 Bn HQ, Nalkata.<br />
76 C/o 2 Nos. 120 Men<br />
Barrack for BSF,<br />
Bagafa<br />
EZ-II Begusarai 596.83 Jun'06 Work in<br />
progress<br />
EZ-II Darbhanga 2007.87 Nov'05 Work in<br />
progress<br />
EZ-II Madhubani 2325.48 Apr'06 Work in<br />
progress<br />
EZ-II Madhubani 1095.39 Apr'06 Work in<br />
progress<br />
EZ-II Madhubani 983.33 Apr'06 Work in<br />
progress<br />
EZ-II Samastipur 871.80 Jan'06 Work in<br />
progress<br />
EZ-II Samastipur 510.00 Jan'06 Work in<br />
progress<br />
EZ-II Samastipur 285.98 Jan'06 Work in<br />
progress<br />
EZ-II Samastipur 339.31 Jan'06 Work in<br />
progress<br />
NEZ Tura-III, 231.38 Oct-05 Work in<br />
Meghalaya<br />
progress.<br />
NEZ Fatikchera 526.36 Mar-06 Work in<br />
progress.<br />
NEZ Nalkata,<br />
Tripura<br />
678.17 Apr-06 Work in<br />
progress.<br />
NEZ Bagafa 556.47 Feb-06 Work in<br />
progress.
77 C/o 56 Nos. qtrs for<br />
BSF at Alamganj-II,<br />
Panbari, Dhubri,<br />
Assam. SH: 48 T-II<br />
Qtrs.<br />
78 C/o 2 Nos 120 men<br />
barrack for 88 Bn BSF<br />
Panbari, Alamganj-I<br />
79 C/o 2 Nos 120 men<br />
barrack for BSF<br />
Panbari, Alamganj-II<br />
80 C/o 120 men barrack<br />
with cook house &<br />
dining hall for Jawans<br />
at 182 Bn BSF at Tura<br />
- II<br />
81 C/o 143/T-II, 35/T-III &<br />
1/T-V qtrs for 88 Bn,<br />
BSF Panbari,<br />
Alamganj-I<br />
82 C/o Admn,. Block for<br />
BSF Masimpur,<br />
Silchar<br />
83 C/o 2 Nos. 120 Men<br />
Barrack for BSF,<br />
Teliamura<br />
84 C/o 1 No. 120 Men<br />
Barrack for BSF at<br />
Panisagar<br />
85 C/o 24 Nos. Suites<br />
with mess for SO's at<br />
BSF Salbagan<br />
86 C/o 90 men barrack<br />
for CRPF Usha Bazar,<br />
Agartala<br />
87 C/o office building for<br />
income tax dept. at<br />
Ambawadi,<br />
Ahmedabad.<br />
88 C/o office building for<br />
AG(Chattisgarh) at<br />
Raipur. SH: C/o<br />
Training Insitute for<br />
GSI.<br />
89 C/o 48 Nos. Type-II<br />
qtrs. For BSF.<br />
NEZ Panbari,<br />
Dhubri,<br />
Assam<br />
NEZ Alamganj-I,<br />
Assam<br />
NEZ Alamganj-II<br />
Assam<br />
NEZ Tura-II,<br />
Meghalaya<br />
NEZ Alamganj-I,<br />
Assam<br />
NEZ Masimpur,<br />
Silchar<br />
481.50 Dec-05 Work in<br />
progress.<br />
424.00 Dec-05 Work in<br />
progress.<br />
423.66 Oct-05 Work in<br />
progress.<br />
214.61 Aug-05 Work in<br />
progress.<br />
1280.21 May-06 Work in<br />
progress.<br />
220.48 Sep-05 Work in<br />
progress<br />
NEZ Teliamura 562.28 Jan-05 Work in<br />
progress<br />
NEZ Panisagar 272.02 Jan-05 Work in<br />
progress<br />
NEZ Salbagan 226.76 Jan-06 Work in<br />
progress<br />
NEZ Agartala 219.42 Mar-06 Work in<br />
progress<br />
WZ-I Ahmedabad 1468.77 Feb'05 Work in<br />
progress<br />
CZ Raipur 3585.72 Jan-04 Work in<br />
progress<br />
CZ Tekanpur 204.94 Dec'05 Work in<br />
progress
90 C/o GO's / Sos mess<br />
and Admn. Block for<br />
IRBN at Mata Randha<br />
Silvassa I/c W/S, S/I<br />
and drainage.<br />
91 Renovationof 4th to<br />
7th floor of C-12<br />
building and providing<br />
compactor to<br />
basement of C-11<br />
building for I.Tax dept.<br />
at B.K. complex,<br />
Mumbai.<br />
92 C/o one office block<br />
for SIB at Block-31,<br />
Shahibaug,<br />
Ahmedabad.<br />
93 C/o 65 nos (Ty I/3, Ty-<br />
II/42,Ty-III/15,Ty-IV/3<br />
and Ty-V/2 for SHQ<br />
BSFat Bhuj.<br />
94 C/o provisioning<br />
complex for Frontier<br />
HQ, BSF at<br />
Gandhinagar.<br />
95 C/o 133 Nos. (100<br />
nos. Ty-II,32 nos. Ty-<br />
III, and 1 no. Ty-V)<br />
qtrs for BSF BN HQ at<br />
Gandhinagar.<br />
96 C/o 2 nos. 120 men<br />
barracks for BN HQ<br />
BSF at Dantiwada.<br />
97 C/o Admn.<br />
Buildingand 1 no. 120<br />
men barracks for BSF<br />
at Gandhidham.<br />
98 C/o permanent houses<br />
for the tusnami<br />
affected people of<br />
A&Nilands<br />
99 C/o Sewerage<br />
Treatment Plant for<br />
Staff quarters<br />
including pipelines for<br />
disposal of effluent<br />
from qtrs. to plant at<br />
GC, CRPF.<br />
WZ-I Silvassa 245.61 Apr'05 Work in<br />
progress<br />
WZ-I Mumbai 467.49 Apr'06 Work in<br />
progress<br />
WZ-I Ahmedabad 375.00 Jan'06 Work in<br />
progress<br />
WZ-I Bhuj 414.76 Jul'06 Work in<br />
progress<br />
WZ-I Gandhinagar 274.68 Nov'05 Work in<br />
progress<br />
WZ-I Gandhinagar 809.91 Jan'06 Work in<br />
progress<br />
WZ-I Gandhinagar 409.42 Mar'06 Work in<br />
progress<br />
WZ-I Gandhinagar 296.39 Mar'06 Work in<br />
progress<br />
SZ-I A&N Admn. 122100.00 Revised<br />
sanctioned<br />
received in<br />
Dec'06<br />
Work in<br />
progress<br />
SZIII Bangalore 225.59 Sep-05 Work in<br />
progress
100 C/o Buidling for<br />
Workshop & stores of<br />
division No. XIV,<br />
CGWB, Bangalore on<br />
the Plot No. 104.<br />
Bommasandra<br />
Industrial area, IV<br />
Phase.<br />
101 C/o Campuses for<br />
Direct Taxes Regional<br />
Training Institute.<br />
DEPOSIT <strong>WORKS</strong><br />
1 C/o Girls hostel at IIT<br />
Delhi<br />
2 C/o 4 lane carriagway<br />
by covering of Nallah<br />
at AIIMS<br />
3 C/o Multi Level<br />
parking near OPD at<br />
PGIMER, Chandigarh<br />
4 C/o 100 Bedded<br />
women Hostel for Elite<br />
sports persons for<br />
SAI, at NIS Patiala.<br />
5 Laying of Synthetic<br />
Athletic track of Ch.<br />
Devi Lal Memorial,<br />
SAI regional centre,<br />
Sonepat.<br />
6 Laying of Synthetic<br />
Hockey track of Ch.<br />
Devi Lal Memorial,<br />
SAI regional centre,<br />
Sonepat<br />
7 C/o Hudco Office<br />
Building at Rail Head,<br />
Jammu<br />
8 C/o A Type School<br />
Bldg., 09 Units Staff<br />
Qtrs. and B/Wall For<br />
Kendriya Vidyalya.,<br />
DDN, Shikar (Pb.)<br />
9 C/o Computer Centre<br />
and I.T. Park for NIT,<br />
Jalandhar<br />
SZIII Bangalore 221.29 Oct-05 Work in<br />
progress<br />
SZIII Bangalore 1107.51 Feb-06 Work in<br />
progress<br />
NDZ-<br />
IV<br />
New Delhi 1599.00 Apr'06 Work in<br />
progress<br />
NDZ-V New Delhi 2200.00 Mar'06 Work in<br />
progress<br />
NZ-I (UT)<br />
Chandiagrh<br />
487.33 Nov'05 Work in<br />
progress<br />
NZ-I Patiala (Pb.) 393.65 Apr'06 Work in<br />
progress<br />
NZ-I Sonepat 315.00 Jan'06 Work in<br />
progress<br />
NZ-I Sonepat 230.00 Jan'06 Work in<br />
progress<br />
NZ-I JAMMU 427.40 Jan-05 Work in<br />
progress<br />
NZ-I Shikhar 346.45 Aug-05 Work in<br />
progress<br />
NZ-I Jalandhar 558.00 Apr-05 Work in<br />
progress
10 C/o New Project of<br />
CIBS at Leh. SH: C/o<br />
Auditorium<br />
11 C/o JNV (Phase-I) at<br />
Pallu Distt.<br />
Hanumangarh.<br />
12 C/o Extension of 2<br />
wings of 88nos.<br />
Rooms to new hostel<br />
block for Shipping at<br />
T.S Chankya, Karae,<br />
Navi Mumbai.<br />
13 C/o Admn. Building of<br />
PNB,<br />
Gomtinagar,Lucknow<br />
14 Revitalisation of<br />
Shilpgram I/c new<br />
shopping facilities and<br />
other improvement<br />
measure (Phase-I)<br />
15 C/o 8 no. T-I, 16 No.<br />
T-II, 24 No. T-III, 6 No.<br />
T-IV, & 6 No. T-V<br />
Residential Qtrs. at<br />
IIIT, Allahabad.<br />
16 C/o Boys Hostel No. 3<br />
Ph-II at IIIT,<br />
Allahabad.<br />
17 C/o Married Scholar<br />
apartments of one<br />
block of 30 units and<br />
one unit of 20 blocks,<br />
Ph-II at IIIT,<br />
Allahabad.<br />
18 C/o Building for JNV at<br />
Channdauli, Ph-A.<br />
(UP).<br />
19 C/o Building for JNV at<br />
Sonebhadra, Ph-A.<br />
(UP).<br />
20 C/o Bldg for JNV at<br />
Koderma<br />
21 C/o Bldg for JNV at<br />
Nirsa Dhanbad<br />
22 C/o Bldg for JNV at<br />
Jamtara<br />
NZ-I Leh 214.53 Mar'02 Work in<br />
progress<br />
NZ-III Hanumangarh<br />
Pallu<br />
468.24 Feb'05 Foundation<br />
work is in<br />
progress.<br />
WZ-I Navi Mumbai 374.23 Jan'06 Work in<br />
progress<br />
NZ-II Lucknow 563.00 Aug'06 Work in<br />
progress<br />
NZ-II Agra 276.00 Jan'06 Work in<br />
progress<br />
NZ-II Allahabad 635.00 Jun'06 Work in<br />
progress<br />
NZ-II Allahabad 627.00 Sept'06 Work in<br />
progress<br />
NZ-II Allahabad 354.00 Aug'06 Work in<br />
progress<br />
NZ-II Chandli 661.79 Jan'06 Work in<br />
progress<br />
NZ-II Sonebhadra 515.55 Feb'05 Work in<br />
progress<br />
EZ-II Koderma,<br />
Jharkhand<br />
EZ-II Nirsa<br />
Dhanbad<br />
EZ-II Jamtara,<br />
Jharkhand<br />
610.37 Dec'04 Work in<br />
progress<br />
619.89 Dec'04 Work in<br />
progress<br />
619.89 Jul'05 Work in<br />
progress
23 C/o 192 Nos. Bedded<br />
dormitory (for boys &<br />
Girls) with warden<br />
residence at Sitamarhi<br />
(phase-B)<br />
24 C/o Admn. Cum Lab.<br />
Building for National<br />
Research for Litchi at<br />
Mushahari,<br />
Muzaffarpur.(Phase-I)<br />
25 C/o Resdl.<br />
Accommodation for<br />
the staff of RLC &<br />
CGIT cum Labour<br />
court at Dhanbad.<br />
26 C/o Centenary Bldg. at<br />
Pusa (Bihar)<br />
27 C/o Internal roads of<br />
Bodhgaya<br />
28 C/o Training Hostel for<br />
institute of Hotel<br />
Management Catering<br />
Tech. & Applied<br />
Nutrition at<br />
Bhubaneswar<br />
29 C/o Academic<br />
Complex building for<br />
Assam University,<br />
Silchar under the 10th<br />
Plan UGC Project<br />
(SH: C/o Mass<br />
Communication Fine<br />
Arts, Law, History<br />
Education and<br />
language laboratory<br />
(Ph.I)<br />
30 C/o A-O Type School<br />
building for KV at<br />
Panisagar<br />
31 C/O School Bldg. for<br />
KV at Aizawl, Mizoram<br />
32 C/o 16 nos. Staff Qrts.<br />
(8-T-II, 4-T-IV & 4-T-V)<br />
for RFRI at Jorhat,<br />
Assam<br />
33 C/o Boundary wall<br />
with railing i/c major<br />
retaining wall for GSI,<br />
EZ-II Sitamarhi 296.97 Mar'05 Work in<br />
progress<br />
EZ-II Muzaffarpur 245.30 Mar'05 Work in<br />
progress<br />
EZ-II Dhanbad 308.00 Oct'05 Work in<br />
progress<br />
EZ-II Pusa 205.36 Nov'05 Work just<br />
Samastipur<br />
awarded.<br />
EZ-II Bodhgaya 332.38 Dec-05 Work in<br />
progress<br />
EZ-II Bhubaneswar 516.77 Dec-05 Work in<br />
progress<br />
NEZ Dargakona,<br />
Silchar<br />
217.95 Dec-05 Work in<br />
progress<br />
NEZ Panisagar 344.60 Jan-05 Work in<br />
progress<br />
NEZ Aizawl,<br />
Mizoram<br />
NEZ Jorhat,<br />
Assam<br />
NEZ Shillong,<br />
Meghalaya<br />
549.12 Feb-05 Work in<br />
progress<br />
209.38 Feb-06 Work in<br />
progress<br />
210.42 Dec-05 Work in<br />
progress
Shillong.<br />
34 C/o 200 bedded girl<br />
hostel and canteen<br />
and staff qtrs. For<br />
NIFT at Gandhinagar<br />
35 Repair &<br />
Rehabilitation of<br />
Rakholi Bridge across<br />
river Daman Ganga on<br />
Silvasa-Khanvel Road<br />
in UT of D&NH<br />
36 Synthetic Hockey<br />
surface at Kandivali,<br />
Mumbai<br />
37 Replacement of<br />
existing synthetic track<br />
at Sports Authority of<br />
India, Western Sector,<br />
Gandhinagar<br />
38 C/o Mahatma Gandhi<br />
Antarrashitriya Hindi<br />
Vishwa Vidyalaya at<br />
Wardha. SH: Central<br />
Admn, faculty building,<br />
Transit Hostel & Girls<br />
Hostel, Building for<br />
school of language.,<br />
Staff qtrs. & approach<br />
road<br />
39 C/o Boys Hostel for<br />
240 students capacity<br />
at NIT, Trichy Block<br />
No. III<br />
40 C/o Boys Hostel for<br />
240 students capacity<br />
at NIT, Trichy Block<br />
No. IV<br />
41 C/o Building for<br />
Department of<br />
Chemistry for<br />
Pondicherry University<br />
42 C/o New Modern<br />
Library Building for<br />
NIT, Trichy.<br />
43 C/o 16Nos Lecture<br />
Type Quarters for<br />
NIT, Trichy.<br />
WZ-I Gandhinagar 427.13 Mar'06 Work<br />
awarded<br />
WZ-I D & NH 208.31 Jan'06 Work<br />
awarded<br />
WZ-I Mumbai 230.00 Jan'06 Work<br />
awarded for<br />
base work.<br />
WZ-I Gandhinagar 350.00 Sept'05 Work<br />
awarded for<br />
base work.<br />
WZ-II Wardha 796.31 Nov'04 Work in<br />
progress<br />
SZ- I Trichy 379.28 Mar'06 Work in<br />
progress<br />
SZ- I Trichy 379.28 Mar'06 Work in<br />
progress<br />
SZ- I Pondi-cherry 273.61 Jan'06 Work in<br />
progress<br />
SZ- I Trichy 798.33 Oct'05 Work in<br />
progress<br />
SZ- I Trichy 214.78 Sept'06 Work in<br />
progress
44 C/o Building for<br />
Physics Department<br />
for Pondicherry<br />
University,<br />
45 C/o 5 Nos. standard<br />
factory shed and 10<br />
Nos. trading sheds for<br />
VSEZ at Duvvada,<br />
Vishakapatnam<br />
46 C/o sports hostel for<br />
Acharya Nagarjuna<br />
University, Nagarjuna<br />
Nagar, Guntur Dist.<br />
47 C/o Distance<br />
Education Block for<br />
Acharya Nagarjuna<br />
University, Nagarjuna<br />
Nagar, Guntur Dist.<br />
48 International Students<br />
Hostel for 250 inmates<br />
at NIT, Warangal<br />
49 C/o Office Building,<br />
Internal roads etc. for<br />
Wireless Monitoring<br />
Station at<br />
Madhuravada,<br />
Visakhapatnam.<br />
50 C/o Hospital Buidling<br />
for Central Research<br />
Institute of<br />
Homeopathy.<br />
51 C/o JNV, Phase A at<br />
Wayanad<br />
52 C/o Addl. Floor over<br />
the existing 4 storied<br />
SME building for MG<br />
University at<br />
Gandhinagar.<br />
53 C/o Child<br />
Development Centre<br />
at Medical College<br />
Campus. SH: C/o 4<br />
Additional floors<br />
Phase II.<br />
54 C/o Golden Jubilee<br />
Memorial Building for<br />
Rubber Research<br />
Institute Phase II.<br />
SZ- I Pondicherry 274.70 Jan'06 Work in<br />
progress<br />
SZ-II Vishakapatnam<br />
286.70 Aug-05 Work in<br />
progress<br />
SZ-II Guntur Dt. 267.00 Jan-06 Work in<br />
progress<br />
SZ-II Guntur Dt. 676.68 Jan-06 Work in<br />
progress<br />
SZ-II Warangal 615.99 Apr-06 Work in<br />
progress<br />
SZ-II Vishakapatnam<br />
200.00 Mar-06 Work in<br />
progress<br />
SZ-III Kottayam 499.99 Dec-05 Work in<br />
progress<br />
SZ-III Wayanad 828.28 Jan-06 Work in<br />
progress<br />
SZ-III Kottayam 210.50 Feb-06 Work in<br />
progress<br />
SZ-III Trivandrum 972.52 Feb-06 Work in<br />
progress<br />
SZ-III Kottayam 369.34 Mar-06 Work in<br />
progress
55 C/o Acadmic Block for<br />
University Teacher<br />
Education Centre for<br />
KU at Dharmasala.<br />
SZ-III Kannur 253.92 Jun-06 Work in<br />
progress<br />
56 C/o JNV,at Chisda, CZ Chisda 482.87 Feb'05 Work in<br />
Janjgir, Champa<br />
progress<br />
57 C/o JNV Kurrd at CZ Dhamtari 715.57 Aug'05 Work in<br />
Dhamtari<br />
progress<br />
58 C/o JNV Harda CZ Harda 609.77 Nov'05 Work in<br />
progress<br />
59 C/o JNV Guna CZ Guna 568.30 Nov'05 Work in<br />
progress<br />
60 C/o JNV at<br />
CZ Dindori 550.99 Jul'05 Work in<br />
Dharmagaon Dindori<br />
(MP) Ph-A<br />
progress<br />
61 C/o Library building at CZ Gwalior 734.49 Jul'05 Work in<br />
LNIPE Gwalior<br />
progress<br />
62 C/o Residential and CZ Khandwa 234.44 Aug'05 Work in<br />
Non-Residential<br />
building for I.T<br />
department at<br />
Khandwa<br />
progress<br />
63 C/o building for the CZ Indore 474.00 Nov'05 Work in<br />
regional centre of<br />
NIPCCD at Indore<br />
progress
Sl.<br />
No.<br />
Annexures III<br />
Name of Work Zone City /<br />
location<br />
MINISTRY <strong>OF</strong> URBAN DEVELOPMENT<br />
1 Conversion of 124 D-I<br />
flats at Chanakyapuri<br />
into C-II Type flats.<br />
2 C/o 140 Nos. T-V, 104<br />
Nos. T-VI qtrs at DDU<br />
Marg.<br />
3 Construction of 340<br />
Type-IV qtrs. at DDU<br />
Marg, New delhi.<br />
4 Extra ordinary repair<br />
and rehabilitation to<br />
Janpath Bhawan i/c<br />
argumentation of<br />
services, new delhi dg<br />
05-06.<br />
5 Integrated<br />
development of<br />
Samadhi Complex.<br />
6 Construction of GPOA<br />
at Poket IX, DDU<br />
Marg, (53,000 sqm I/c<br />
20,000 sqm basement<br />
floor for car parking<br />
etc. )<br />
NDZ-<br />
III<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
Chankyapuri,<br />
New Delhi<br />
DDU<br />
Marg,New<br />
Delhi.<br />
Minto Road<br />
Area, Pkt-I<br />
DDU<br />
Marg,New<br />
Delhi.<br />
A/A &<br />
E/S<br />
Amount<br />
(Rs. In<br />
lacs)<br />
Date<br />
of A/A<br />
& E/S<br />
Remarks<br />
372.63 Dec'05 Tender under<br />
acceptance.<br />
8056.00 May'05 The tenders are<br />
under process.<br />
DDA being<br />
persued<br />
clearance of<br />
drawings.<br />
6423.00 -- * The work is<br />
being taken up<br />
under PPP mode<br />
on the advice of<br />
Ministry of finance<br />
by 31.03.07.<br />
* Consultant<br />
appointed for<br />
preparation of<br />
TOR for call of<br />
bids under PPP<br />
mode.<br />
New Delhi 302.75 Mar'06 DE under<br />
preparation.<br />
New Delhi 344.00 Nov'06 Work in<br />
preconstruction<br />
stage.<br />
New Delhi 9700.00 -- Plans under<br />
approval of<br />
DUAC.
7 C/o 63 nos. <strong>CPWD</strong><br />
Staff Quarters at<br />
Himachal Vihar,<br />
Matigara, Siliguri.(T-II<br />
22 nos. T-III = 23 nos.<br />
T-IV =14 nos.T-V=4<br />
nos.)<br />
8 C/o Residential<br />
quarters for <strong>CPWD</strong> at<br />
Bamunimaidan,<br />
Guwahati SH: C/o 8<br />
Nos T-II, 8 Nos T-III, 8<br />
Nos T-IV & Officer's<br />
Hostel<br />
OTHER MINISTRY / DEPARTMENTS<br />
1 Providing and laying<br />
Synthetic Hockey<br />
surface at various<br />
places in India<br />
(Gandhi Nagar,<br />
Kolkata, Madikere,<br />
Mumbai, Patiala,<br />
Shillaroo, Sonepat &<br />
Sundergarh).<br />
2 Providing and laying<br />
Synthetic Althletics<br />
Track Surface at SAI's<br />
Sports Centers at<br />
Gandhi Nagar,<br />
Kolkata, Guwahati,<br />
Mumbai, Patiala,<br />
Trivandrum, Sonepat<br />
& Imphal)<br />
3 C/o Indian Chancery<br />
Complex at<br />
Afghanistan<br />
EZ-I Matigara<br />
Siliguri<br />
NEZ Guwahati,<br />
Assam<br />
CSO Gandhi Nagar,<br />
Kolkata,<br />
Madikere,<br />
Mumbai,<br />
Patiala,<br />
Shillaroo,<br />
Sonepat &<br />
Sundergarh<br />
CSO Gandhi Nagar,<br />
Kolkata,<br />
Guwahati,<br />
Mumbai,<br />
Patiala,<br />
Trivandrum,<br />
Sonepat &<br />
Imphal<br />
412.85 Dec'04 Work awarded.<br />
226.63 Aug-05 Tenders called.<br />
1530.00 Nov'06 Tenders<br />
accepted.<br />
1985.00 Jan'07 NIT for the<br />
Athletic turf is<br />
under preparation<br />
for call of tenders.<br />
CSO Afghanistan 4773.00 Dec'05 In view of<br />
repeated<br />
infructuos call of<br />
tender, proposal<br />
for splitting the<br />
civil work in to<br />
pacakages and<br />
awarding to local<br />
Afghan agencies<br />
is under<br />
consideration of<br />
MEA.
4 Development of State<br />
Highways in the State<br />
of Bihar under RSVY<br />
5 C/o Resdl.<br />
Accommodation for<br />
Income Tax Deptt. at<br />
Sector-20,<br />
Panchkula(Hry.) SH:<br />
T-I/6 , T-II/28, T-III/54,<br />
T-IV/20, T-V/3,T-VI/5<br />
Nos,<br />
6 C/o T-II/40 Qtrs.<br />
(Resdl. Qtrs.) for BSF<br />
at Sundarbani.<br />
7 C/o 1 No. 120 Men<br />
Barrack Including<br />
Kitchen & Dinning Hall<br />
for ITBP at Udhampur.<br />
8 C/o S.F.A. for ITBP at<br />
Seemadwar,<br />
Dehradun (Phase-I).<br />
(SH:- C/o Type-IIII-24<br />
Nos. quarters &<br />
Development of bulk<br />
services)<br />
9 C/o Admn. and<br />
training block for ITBP<br />
at Auli.<br />
10 C/o Quarter Guard,<br />
Quarter Master store<br />
and M. I. Room for M<br />
& SI, ITBP at Auli.<br />
11 C/o 24 Nos. T-II<br />
quarters (T/S) for ITBP<br />
at Pithoragarh.<br />
12 C/o CAT Building at<br />
Allahabad.<br />
13 C/o 227 Nos. Quarters<br />
for CRPF at GC-II,<br />
Ajmer<br />
14 C/o 93 Residential<br />
Qtrs. for Staff of<br />
Income Tax<br />
Department at<br />
Balsamand, Jodhpur.<br />
CSO Bihar 107283.0 Nov'06 Tendering of work<br />
in proocess.<br />
NZ-I Panchkula<br />
(Hry)<br />
867.49 Mar'04 Tenders reinvited<br />
in Jan'07<br />
NZ-I Sunderbani 253.93 Apr-06 Tenders<br />
accepted.<br />
NZ-I Udhampur 230.23 Aug-06 Tenders invited.<br />
NZ-II Dehradun 3703.00 Feb-05 Works awarded<br />
recently.<br />
NZ-II Auli 438.76 Feb-06 Tenders are<br />
being called<br />
NZ-II Auli 401.33 Aug-06 DE under<br />
process.<br />
NZ-II Pithoragarh 238.12 Aug-06 Tender to be<br />
received on<br />
25.01.2007.<br />
NZ-II Allahabad 684.59 Sept'06 DE is being<br />
prepared.<br />
NZ- Ajmer 1249.81 Aug'06 Tenders received<br />
III<br />
and are under<br />
consideration.<br />
NZ-<br />
III<br />
Jodhpur 837.27 Jul'06 Tendes invited<br />
however kept in<br />
abeyance<br />
pending decision<br />
on GPRA
15 C/o 51 Staff Qtrs. for<br />
Income Tax<br />
Department at Kota.<br />
C/o MAP at Suratgarh<br />
(Phase-I).<br />
16 C/o MAP at Suratgarh<br />
(Phase-I).<br />
SH : C/o Sewerage<br />
Treatment Plant<br />
(Package-VII).<br />
C/o MAP at Bikaner<br />
(Phase-I).<br />
17 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Sewerage<br />
Treatment Plant and<br />
Pump House.<br />
(Package-VII).<br />
18 C/o Combined officers<br />
mess at BSF campus<br />
Raninagar , Jalpaiguri<br />
( One sector HQ &<br />
three battalions )<br />
19 C/O Vocational<br />
Rehabilitation Centre<br />
for Handicapped at<br />
Salt Lake, Kolkata.<br />
SH: Superstructure<br />
20 Construction of<br />
Additional Office<br />
Building, garage for<br />
vehicles and barracks<br />
at Hathikanda.<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
quarters at<br />
Jodhpur.<br />
Kota 414.79 Mar'06 Tender under<br />
scrutiny.<br />
Suratgarh 9939 Apr'05 Combined<br />
Sanction for Ph.-I<br />
9939 lakhs<br />
Suratgarh -do- -do- Tender under<br />
scrutiny.<br />
Bikaner 10827.07 Aug'05 Combined<br />
Sanction for Ph.-I<br />
10827.07 lakhs<br />
Bikaner -do- -do- Tender under<br />
scrutiny.<br />
EZ-I Rannninagar,<br />
Jalpaiguri<br />
EZ-I Salt Lake<br />
Kolkata<br />
267.41 Sept'06 Tender under<br />
scrutiny.<br />
823.76 Mar'04 Work awarded.<br />
EZ-I Hathikanda 288.28 Jun'04 Work in<br />
progress.
21 C/o Resdl. & Non-<br />
Resdl. Bldg. for AIIH &<br />
PH at Salt Lake<br />
Kolkata. SH:-<br />
Superstructure i/c W/S<br />
& S/I of Institute Bldg.<br />
22 C/o Office bldg. for<br />
HUDCO at DJ Block ,<br />
Saltlake, Kolkata.<br />
Phase - I.<br />
23 Construction of 200<br />
bedded Hostel at SAI<br />
NSEC, Kolkata.<br />
24 C/o Hospital Building<br />
& Resdl. Bldgs. at old<br />
Campus GE Block NIH<br />
at Salt Lake. SH: Extn.<br />
Of Hospital Bldg.<br />
,Boys Hostel, Girls<br />
Hostel and 4 Nos.Ty-<br />
IV Qtrs.<br />
25 C/O Office Building for<br />
Census Deptt. At Salt<br />
Lake<br />
(Balance work )<br />
C/o Roads in State of<br />
Bihar under Prime<br />
Minister Gram Sadak<br />
Yojana (PMGSY)<br />
26 Pahsnara Bagrak<br />
Road<br />
27 Rajaura to Nima<br />
Chandpura<br />
28 Satlakha to Izra<br />
(12.68 km )<br />
29 Ballipur to Nakta<br />
Chowk via.<br />
Warisnagar in<br />
Warisnagar Block<br />
(6.25Km)<br />
30 C/o 159 /T-II(T/S), 34<br />
/T-III(T/S), 1 /T-IV(S/S)<br />
& 1 /T-V(S/S) qrtrs. at<br />
135 Bn, BSF,<br />
Fatikchera.<br />
EZ-I Salt Lake 1971.55 Mar'95 Pile work is<br />
completed.Tender<br />
for super<br />
structure<br />
received.<br />
EZ-I Salt Lake 1061.68 Jan'06 Tenders under<br />
scrutiny.<br />
EZ-I Saltlake 803.00 Jan'06 DE/NIT for pile<br />
foundation under<br />
process.<br />
EZ-I Saltlake 729.00 Mar'06 Work for pile<br />
foundation all<br />
bldg. except<br />
hospital<br />
bldg.awarded.<br />
EZ-I SaltLake 435.09 Jan'01 Tender under<br />
scrutiny<br />
EZ-II Begusarai 646.37 Jun'06 Tender under<br />
acceptance.<br />
EZ-II 455.37 Jun'06 Tender under<br />
scrutiny.<br />
EZ-II Madhubani 519.35 Nov'05 Work awarded<br />
recently<br />
EZ-II Samastipur 388.53 Jan'06 Tender under<br />
scrutiny.<br />
NEZ Fatikchera,<br />
Tripura<br />
1552.41 Jul-06 Tender under<br />
scrutiny.
31 C/o Admn. Block for<br />
IGP/DIGP, Usha<br />
Bazar, Agartala<br />
32 C/o Office bldg. & 6-<br />
T/II(D/S), 12-T/III (D/S)<br />
Qtrs. for ISPW Stn. at<br />
Itanagar, Aru.Pradesh.<br />
33 C/o of security and<br />
retaining wall in ITBP<br />
campus at Katting<br />
Hall, Itanagar,<br />
Arunachal Pradesh.<br />
34 C/o Resdl qtrs for Itax<br />
deptt at "G" Block<br />
Bandra Kurla Complex<br />
Mumbai<br />
35 C/o Multistoried Resdl.<br />
Qtrs. 12 Nos. (Ty-V-4<br />
and Ty-VI-8) for I tax<br />
deptt at Surat<br />
36 C/o Resdl qtrs for<br />
CAT, Vejalpur,<br />
Ahmedabad<br />
37 C/o Regional training<br />
institute and hostel<br />
bldg for CAG at<br />
Bandra Kurla Complex<br />
Mumbai<br />
38 C/o 100 Nos. qtrs for<br />
BN HQ BSF at<br />
Dantiwada<br />
39 C/o Admn. Bldg and 1<br />
no. 120 men barrack<br />
for SHQ at Bhuj.<br />
40 C/o Hanger & Model<br />
for the Multipurpose<br />
Wave basin for design<br />
of part layout at<br />
Khadakwasla, Pune.<br />
NEZ Agartala,<br />
Tripura<br />
299.36 Mar-06 Work awarded<br />
recently<br />
NEZ Itanagar (A.P.) 244.40 Aprl-06 Tenders for Type-<br />
II qtrs. under<br />
scrutiny.<br />
NEZ Itanagar (A.P.) 371.80 Nov-06 NIT under<br />
finalization.<br />
WZ-I Mumbai 1021.37 Dec'05 Drawing<br />
submitted to local<br />
body for approval.<br />
Extension of time<br />
for start of<br />
constuction to be<br />
obtained from<br />
MMRDA by the<br />
client.<br />
WZ-I Surat 490.96 Jul'06 Tender called.<br />
WZ-I Ahmedabad 492.85 Apr'06 Tenders under<br />
scrutiny.<br />
WZ-I Mumbai 3556.13 Sept'06 NIT being<br />
finalized.<br />
WZ-I Dantiwada 640.75 Aug'06 Tenders reinvited.<br />
WZ-I Bhuj 413.66 Aug'06 Tenders called.<br />
WZ-<br />
II<br />
Khadakwasla 242.20 May'05 Work started.
41 C/o Additional four<br />
floors I.e. 4th to 7th<br />
over the existing<br />
Income Tax bldg. at<br />
Plot No. 5 EDC Plot,<br />
Panaji, Goa.<br />
42 C/o 3 Nos.120 Men<br />
Barracks, CRPF,<br />
Talegaon, Pune.<br />
43 C/o 268 Nos.<br />
Residential<br />
Accommodation Type<br />
II / for BSF Campus,<br />
Thekkalur Village,<br />
Avinasi Taluk,<br />
Coimbatore<br />
44 C/o Resdl. Bldgs. SH:<br />
23 Nos. Type I, 48<br />
Nos., Type III, 6 Nos.,<br />
Type IV, 2 Nos. Type<br />
V for BSF Campus at<br />
Thekkalur Village,<br />
Avinashi Taluk,<br />
Coimbatore<br />
45 C/o 26 Nos. Staff Qrs.<br />
for Central Excise<br />
Department at<br />
Sivakasi<br />
46 C/o Office Building for<br />
Central Excise<br />
Department at<br />
Sivakasi<br />
47 Community Centre for<br />
Income Tax Dept. at<br />
Hyderabad<br />
48 C/o Library building for<br />
MANUU at<br />
Gachibowli,<br />
Hyderabad<br />
49 C/o Ancient Bio-<br />
Malecular DNA<br />
Research LAB SRC.<br />
50 C/o Income Tax office<br />
annexe at Kowdiar.<br />
WZ-<br />
II<br />
WZ-<br />
II<br />
Panaji Goa 296.66 Jun'06 NIT issued.<br />
Talegaon 599.46 Mar'06 NIT issued.<br />
SZ- I Coimbatore<br />
(TN)<br />
SZ- I Coimbatore<br />
(TN)<br />
1267.16 Mar'06<br />
441.64 Mar'06<br />
Tenders under<br />
process<br />
Tenders under<br />
scrutiny<br />
SZ- I Sivakasi 213.86 Nov'06 Arch. drawings<br />
under preparation<br />
SZ- I Sivakasi 222.55 Nov'06 Arch. drawings<br />
under preparation<br />
SZ-II Hyderabad 303.09 May'06 Tenders invited.<br />
SZ-II Hyderabad 325.00 Jul-06 Tender accepted<br />
SZIII Mysore 498.79 Mar-06 Drawings under<br />
preparation.<br />
SZIII Trivandrum 339.57 Jun-06 Tenders called.<br />
Work likely to<br />
start in February
51 C/o Office & Staff qtrs<br />
for IT Department<br />
DEPOSIT <strong>WORKS</strong><br />
1 Construction of Public<br />
Library in the Memory<br />
of Lok Nayak Jai<br />
Prakash Naryan,<br />
Mandir Marg, New<br />
Delhi.<br />
2 C/o Bio Safety level -3<br />
laboratory at NICD<br />
3 Replacement of<br />
Synthetic hockey<br />
Surface at NS, NIS,<br />
Patiala (Punjab).<br />
4 Laying of Synthetic<br />
Hockey surface at<br />
SAI, NS, NIS, Patiala<br />
(Pb.)<br />
5 Laying of Atheletic<br />
track at Patiala.<br />
6 C/o Building for JNV at<br />
Dhanansu (Ph-B),<br />
Distt. Ludhiana<br />
Punjab. SH:<br />
Dormitories (1 Boys<br />
and half Girls) staff<br />
qtrs (8 Nos. Type-III, 2<br />
Nos. Type-I)<br />
7 Ext. of Lecture<br />
Theatre at NIT,<br />
Jalandhar<br />
2007.<br />
SZIII Udupi 294.40 Sep-06 DE Under<br />
preparation. Work<br />
likely to start in<br />
March 2007.<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
New Delhi 282.54 Mar'04 * Location of<br />
Library Building<br />
being rexamined<br />
by NDMC. *<br />
HUDCO is to get<br />
the building plan<br />
approved from<br />
NDMC.<br />
New Delhi 497.00 Nov'03 * DUAC approval<br />
awaited.<br />
Preconstruction<br />
activities in<br />
progress. Client<br />
yet to approe the<br />
modified PQ<br />
documents.<br />
NZ-I Patiala(Pb.) 200.00 Sep'05 Tender for civil<br />
work received<br />
and under<br />
scrutiny.<br />
NZ-I Patiala (Pb.) 300.00 Jun'06 Tender for civil<br />
work approved.<br />
NZ-I Patiala (Pb.) 225.53 Jun'06 Awarded<br />
NZ-I Dhanansu<br />
(pb.)<br />
225.53 Apr'06 Tender recently<br />
approved.<br />
NZ-I Jalandhar 242.25 Tender has been<br />
called in Jan.-07
8 C/o Udai Shanker<br />
Academy for Dance &<br />
Music at Almora (SH:-<br />
Balance building work<br />
and approach road of<br />
the Museum and<br />
Auditorium)<br />
9 C/o Office bldg. for<br />
HUDCO at DJ Block ,<br />
Saltlake, Kolkata.<br />
Phase - I.<br />
10 C/o Bodhgaya hatt<br />
near by pass main<br />
approach road.<br />
11 Faculty bldg. For Nav-<br />
Nalanda Mahavihar at<br />
Nalanda.<br />
12 C/o building for JNV at<br />
Nuapada (Ph-B)<br />
13 C/o building for JNV at<br />
Malkangiri, Orissa<br />
14 C/o building for JNV at<br />
Jharsuguda, Orissa<br />
15 C/o building atJNV<br />
Distt. East Chatra,<br />
Jharkhand, (Ph-B)<br />
16 C/o building at JNV<br />
Distt. East<br />
Champaran, Bihar<br />
(Ph-B)<br />
17 C/o building at JNV<br />
Distt. Siwan, Bihar<br />
(Ph-B)<br />
18 C/o Extension for<br />
Ruby Hostel for ISM at<br />
Dhanbad.<br />
19 C/o Vocational<br />
Rehabilitation Centre<br />
for Handicapped at<br />
BBSR. SH: C/o<br />
Auditorium Hall, Staff<br />
Qtrs I/c Development<br />
of Site and Bulk<br />
services (Civil)<br />
NZ-II Almora 500.00 Mar-03 Work awarded on<br />
15.12.2006<br />
EZ-I Salt Lake 1061.68 Jan'06 Tenders under<br />
process of<br />
acceptance.<br />
EZ-II Bodhgaya 236.71 Mar'04 Work awarded<br />
EZ-II Nalanda 355.35 Apr'04 Tender called 3rd<br />
time but no<br />
response. Tender<br />
being called 4th<br />
time on 02.1.07<br />
EZ-II Nuapada 214 Feb'06 Tender received<br />
& under scrutiny.<br />
EZ-II Malkangiri 612.74 Feb'06 Tender received<br />
& under scrutiny.<br />
EZ-II Jharsuguda 650.75 Jul'06 Tender received<br />
& under scrutiny.<br />
EZ-II Chatra 223.65 Feb'06 Work awarded<br />
EZ-II East<br />
Champaran<br />
238.79 Feb'06 Tender received<br />
& under scrutiny.<br />
EZ-II Siwan 237.84 Feb'04 Tender received<br />
on 24.11.06 &<br />
under scrutiny.<br />
EZ-II Dhanbad 215.78 Dec'05 Work awarded<br />
EZ-II Bhubaneswar. 594.83 Mar'04 Tender received<br />
on 8.12.06 &<br />
under scrutiny.
20 C/o buildings for JNV<br />
at Thingsulthliah,<br />
Aizawl<br />
21 C/o buildings for JNV<br />
at Bijni, Distt.<br />
Bongaigaon, Assam<br />
(Phase-A)<br />
22 C/O JNV at Nongstoin,<br />
Dist. West Khasi Hills<br />
(Meghalaya)(SH:- C/o<br />
4 Nos. Dormitories<br />
23 C/o Bldg. of JNV at<br />
Mawphlang, Dist. East<br />
Khasi (Meghalaya) Ph-<br />
A.(SH:- C/o<br />
Dormitories<br />
24 C/o dormitory, Type-II,<br />
Type-III staff quarters,<br />
Phase-B at Jorhat<br />
(Assam) (SH:- C/o<br />
Dormitories for 96<br />
boys and 96 girls<br />
along with warden<br />
residence.<br />
25 C/o JNV at Lower<br />
Subansiri (Arunachal<br />
Pradesh)- (Ph-B) SH:<br />
C/o Dormitory, T-III, T-<br />
II, T-I staff Qtrs.and T-<br />
II Guest House.<br />
26 C/o Building for JNV<br />
(Part) of area 450 sqm<br />
etc. at JNV Serchip<br />
27 C/o JNV Dhalai (Ph-A)<br />
(SH. C/o boys<br />
dormitory, T-III, T-II &<br />
T-I Staff Qtrs. and T/II<br />
Guest House<br />
NEZ Aizawl,<br />
Mizoram<br />
NEZ Bongaigaon,<br />
Assam<br />
NEZ Nongstoin,<br />
Meghalaya<br />
NEZ Mawphlang<br />
Meghalaya<br />
NEZ Jorhat ,<br />
Assam<br />
1028.92 Oct-05 Work of dining &<br />
kitchen recently<br />
awarded. For<br />
others tenders<br />
under scrutiny,<br />
666.72 Jul-05 Work of dining &<br />
kitchen recently<br />
awarded. For<br />
others tenders<br />
called.<br />
200.74 May-05 Tender under<br />
process of<br />
acceptance<br />
738.63 May-05 Tender under<br />
process of<br />
acceptance<br />
278.22 Sep-06 Tenders under<br />
scrutiny,<br />
NEZ Yachuli (A.P.) 245.95 Aug-06 NIT under<br />
finalization.<br />
NEZ Serchip,<br />
Mizoram<br />
NEZ Dhalai,<br />
Tripura<br />
332.65 Sep-06 Tender accepted.<br />
574.88 Sep-06 Tenders under<br />
scrutiny,
28 Providing & laying of<br />
water supply line along<br />
NH 37 from<br />
Khanapara to Jorabat.<br />
29 C/o 'A' school building<br />
forK.V.<br />
30 C/o Admn. Academic<br />
& Library block for<br />
Rashtriya Sanskrit<br />
Sansthan.<br />
31 C/o Bridge across river<br />
Kolak with approaches<br />
at Daman UT &<br />
Daman<br />
32 Synthetic Hockey track<br />
at Kandivali, Mumbai<br />
33 Additional and<br />
alteration to 122 nos.<br />
flats and external<br />
services i/c interla<br />
elect. for SEBI at<br />
Shivajinagar,<br />
Mankhurd, Mumbai<br />
34 C/o office bldg for IDBI<br />
with interior at Plot No.<br />
G-7, Bandra Kurla<br />
Complex (BKC)<br />
Mumbai<br />
35 C/o A type school<br />
bldg. and 9 units staff<br />
quarters, boundary<br />
wall for Kendriya<br />
Vidylaya at Ajni,<br />
Nagpur.<br />
36 C/o Examination Wing<br />
for MS University at<br />
Tirunelveli<br />
37 C/o Additional 150<br />
Men's Hostel for<br />
Pondicherry University<br />
at Pondicherry<br />
NEZ NHAI,<br />
Guwahati<br />
229.94 Apr-05 Tenders called<br />
and to be<br />
received on<br />
29.01.07<br />
CZ Vidisha 467.57 Dec'05 Work awarded<br />
recently.<br />
CZ Bhopal 299.2 Nov'04 Deposit received<br />
recently. Tender<br />
under scrutiny.<br />
WZ-I D & NH 334.48 Mar'06 Tenders recd.<br />
Revised sanction<br />
awaited.<br />
WZ-I Mumbai 315 Jan'06 Tenders received<br />
for base work.<br />
WZ-I Mumbai 501.21 Jul'06 Tenders reinvited.<br />
WZ-I Mumbai 11418 Nov'06 Preparation of<br />
tender documents<br />
in process.<br />
WZ-<br />
II<br />
SZ -<br />
I<br />
SZ -<br />
I<br />
Nagpur 490.43 Apr'05 Tender accepted.<br />
Plans yet to be<br />
approved by the<br />
local body.<br />
Tirunelveli 334.59 Nov'05 Work just<br />
awarded<br />
Pondicherry 1010.19 Aug'06 Work just<br />
awarded
38 C/o Academic Block<br />
for NIFT at Taramani<br />
39 C/o Multipurpose Hall<br />
for Sports Authority of<br />
India, SAG Centre at<br />
Mayiladuthurai<br />
40 C/o Pasport Office at<br />
Rayala Towers,<br />
Chennai - Electrical<br />
and Civil Works<br />
41 C/o Synthetic Atheltic<br />
Track at LNCPE,<br />
42 C/o Additional areas<br />
for NIFT.<br />
43 C/o Buildings over the<br />
existing structure at<br />
NIFT.<br />
44 C/o Main Block for<br />
Cochin University<br />
College of<br />
Engineering,<br />
Pulinkunnu.<br />
45 C/o Building for<br />
Pareeksha Bhavan for<br />
MG university<br />
SZ -<br />
I<br />
SZ -<br />
I<br />
SZ -<br />
I<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
Taramani,<br />
Chennai<br />
354.04 Apr'06 Tenders received.<br />
Mayiladuthurai 732.1 Sep'06 Tenders under<br />
scrutiny<br />
Chennai 309.6 Nov'06 Drawings under<br />
preparation.<br />
Trivandrum 300.00 Sep-05 Tenders being<br />
called. Work likely<br />
to start in<br />
February 2007.<br />
B'lore 205.60 Feb-06 Tenders accepted<br />
& work is being<br />
awarded.<br />
B'lore 236.94 Apr-06 Work likely to<br />
start in February<br />
2007.<br />
Alleppey 555.49 Oct-06 DE Under<br />
preparation. Work<br />
likely to start in<br />
March 2007.<br />
Kottayam 1026.03 Oct-06 Tenders under<br />
scrutiny. Work<br />
likely to start in<br />
February 2007.
Sl.<br />
No.<br />
Annexures – III-A<br />
Name of Work Zone City /<br />
location<br />
MINISTRY <strong>OF</strong> URBAN DEVELOPMENT<br />
1 Conversion of 124 D-I<br />
flats at Chanakyapuri<br />
into C-II Type flats.<br />
2 C/o 140 Nos. T-V, 104<br />
Nos. T-VI qtrs at DDU<br />
Marg.<br />
3 Construction of 340<br />
Type-IV qtrs. at DDU<br />
Marg, New delhi.<br />
4 Extra ordinary repair<br />
and rehabilitation to<br />
Janpath Bhawan i/c<br />
argumentation of<br />
services, new delhi dg<br />
05-06.<br />
5 Integrated<br />
development of<br />
Samadhi Complex.<br />
6 Construction of GPOA<br />
at Poket IX, DDU<br />
Marg, (53,000 sqm I/c<br />
20,000 sqm basement<br />
floor for car parking<br />
etc. )<br />
NDZ-<br />
III<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
Chankyapuri,<br />
New Delhi<br />
DDU<br />
Marg,New<br />
Delhi.<br />
Minto Road<br />
Area, Pkt-I<br />
DDU<br />
Marg,New<br />
Delhi.<br />
A/A &<br />
E/S<br />
Amount<br />
(Rs. In<br />
lacs)<br />
Date<br />
of A/A<br />
& E/S<br />
Remarks<br />
372.63 Dec'05 Tender under<br />
acceptance.<br />
8056.00 May'05 The tenders are<br />
under process.<br />
DDA being<br />
persued<br />
clearance of<br />
drawings.<br />
6423.00 -- * The work is<br />
being taken up<br />
under PPP mode<br />
on the advice of<br />
Ministry of finance<br />
by 31.03.07.<br />
* Consultant<br />
appointed for<br />
preparation of<br />
TOR for call of<br />
bids under PPP<br />
mode.<br />
New Delhi 302.75 Mar'06 DE under<br />
preparation.<br />
New Delhi 344.00 Nov'06 Work in<br />
preconstruction<br />
stage.<br />
New Delhi 9700.00 -- Plans under<br />
approval of<br />
DUAC.
7 C/o 63 nos. <strong>CPWD</strong><br />
Staff Quarters at<br />
Himachal Vihar,<br />
Matigara, Siliguri.(T-II<br />
22 nos. T-III = 23 nos.<br />
T-IV =14 nos.T-V=4<br />
nos.)<br />
8 C/o Residential<br />
quarters for <strong>CPWD</strong> at<br />
Bamunimaidan,<br />
Guwahati SH: C/o 8<br />
Nos T-II, 8 Nos T-III, 8<br />
Nos T-IV & Officer's<br />
Hostel<br />
OTHER MINISTRY / DEPARTMENTS<br />
1 Providing and laying<br />
Synthetic Hockey<br />
surface at various<br />
places in India<br />
(Gandhi Nagar,<br />
Kolkata, Madikere,<br />
Mumbai, Patiala,<br />
Shillaroo, Sonepat &<br />
Sundergarh).<br />
2 Providing and laying<br />
Synthetic Althletics<br />
Track Surface at SAI's<br />
Sports Centers at<br />
Gandhi Nagar,<br />
Kolkata, Guwahati,<br />
Mumbai, Patiala,<br />
Trivandrum, Sonepat<br />
& Imphal)<br />
3 C/o Indian Chancery<br />
Complex at<br />
Afghanistan<br />
EZ-I Matigara<br />
Siliguri<br />
NEZ Guwahati,<br />
Assam<br />
CSO Gandhi Nagar,<br />
Kolkata,<br />
Madikere,<br />
Mumbai,<br />
Patiala,<br />
Shillaroo,<br />
Sonepat &<br />
Sundergarh<br />
CSO Gandhi Nagar,<br />
Kolkata,<br />
Guwahati,<br />
Mumbai,<br />
Patiala,<br />
Trivandrum,<br />
Sonepat &<br />
Imphal<br />
412.85 Dec'04 Work awarded.<br />
226.63 Aug-05 Tenders called.<br />
1530.00 Nov'06 Tenders<br />
accepted.<br />
1985.00 Jan'07 NIT for the<br />
Athletic turf is<br />
under preparation<br />
for call of tenders.<br />
CSO Afghanistan 4773.00 Dec'05 In view of<br />
repeated<br />
infructuos call of<br />
tender, proposal<br />
for splitting the<br />
civil work in to<br />
pacakages and<br />
awarding to local<br />
Afghan agencies<br />
is under<br />
consideration of<br />
MEA.
4 Development of State<br />
Highways in the State<br />
of Bihar under RSVY<br />
5 C/o Resdl.<br />
Accommodation for<br />
Income Tax Deptt. at<br />
Sector-20,<br />
Panchkula(Hry.) SH:<br />
T-I/6 , T-II/28, T-III/54,<br />
T-IV/20, T-V/3,T-VI/5<br />
Nos,<br />
6 C/o T-II/40 Qtrs.<br />
(Resdl. Qtrs.) for BSF<br />
at Sundarbani.<br />
7 C/o 1 No. 120 Men<br />
Barrack Including<br />
Kitchen & Dinning Hall<br />
for ITBP at Udhampur.<br />
8 C/o S.F.A. for ITBP at<br />
Seemadwar,<br />
Dehradun (Phase-I).<br />
(SH:- C/o Type-IIII-24<br />
Nos. quarters &<br />
Development of bulk<br />
services)<br />
9 C/o Admn. and<br />
training block for ITBP<br />
at Auli.<br />
10 C/o Quarter Guard,<br />
Quarter Master store<br />
and M. I. Room for M<br />
& SI, ITBP at Auli.<br />
11 C/o 24 Nos. T-II<br />
quarters (T/S) for<br />
ITBP at Pithoragarh.<br />
12 C/o CAT Building at<br />
Allahabad.<br />
13 C/o 227 Nos. Quarters<br />
for CRPF at GC-II,<br />
Ajmer<br />
14 C/o 93 Residential<br />
Qtrs. for Staff of<br />
Income Tax<br />
Department at<br />
Balsamand, Jodhpur.<br />
CSO Bihar 107283.0 Nov'06 Tendering of work<br />
in proocess.<br />
NZ-I Panchkula<br />
(Hry)<br />
867.49 Mar'04 Tenders reinvited<br />
in Jan'07<br />
NZ-I Sunderbani 253.93 Apr-06 Tenders<br />
accepted.<br />
NZ-I Udhampur 230.23 Aug-06 Tenders invited.<br />
NZ-II Dehradun 3703.00 Feb-05 Works awarded<br />
recently.<br />
NZ-II Auli 438.76 Feb-06 Tenders are<br />
being called<br />
NZ-II Auli 401.33 Aug-06 DE under<br />
process.<br />
NZ-II Pithoragarh 238.12 Aug-06 Tender to be<br />
received on<br />
25.01.2007.<br />
NZ-II Allahabad 684.59 Sept'06 DE is being<br />
prepared.<br />
NZ- Ajmer 1249.81 Aug'06 Tenders received<br />
III<br />
and are under<br />
consideration.<br />
NZ-<br />
III<br />
Jodhpur 837.27 Jul'06 Tendes invited<br />
however kept in<br />
abeyance<br />
pending decision<br />
on GPRA
15 C/o 51 Staff Qtrs. for<br />
Income Tax<br />
Department at Kota.<br />
C/o MAP at Suratgarh<br />
(Phase-I).<br />
16 C/o MAP at Suratgarh<br />
(Phase-I).<br />
SH : C/o Sewerage<br />
Treatment Plant<br />
(Package-VII).<br />
C/o MAP at Bikaner<br />
(Phase-I).<br />
17 C/o MAP at Bikaner<br />
(Phase-I).<br />
SH : C/o Sewerage<br />
Treatment Plant and<br />
Pump House.<br />
(Package-VII).<br />
18 C/o Combined officers<br />
mess at BSF campus<br />
Raninagar , Jalpaiguri<br />
( One sector HQ &<br />
three battalions )<br />
19 C/O Vocational<br />
Rehabilitation Centre<br />
for Handicapped at<br />
Salt Lake, Kolkata.<br />
SH: Superstructure<br />
20 Construction of<br />
Additional Office<br />
Building, garage for<br />
vehicles and barracks<br />
at Hathikanda.<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
quarters at<br />
Jodhpur.<br />
Kota 414.79 Mar'06 Tender under<br />
scrutiny.<br />
Suratgarh 9939 Apr'05 Combined<br />
Sanction for Ph.-I<br />
9939 lakhs<br />
Suratgarh -do- -do- Tender under<br />
scrutiny.<br />
Bikaner 10827.07 Aug'05 Combined<br />
Sanction for Ph.-I<br />
10827.07 lakhs<br />
Bikaner -do- -do- Tender under<br />
scrutiny.<br />
EZ-I Rannninagar,<br />
Jalpaiguri<br />
EZ-I Salt Lake<br />
Kolkata<br />
267.41 Sept'06 Tender under<br />
scrutiny.<br />
823.76 Mar'04 Work awarded.<br />
EZ-I Hathikanda 288.28 Jun'04 Work in<br />
progress.
21 C/o Resdl. & Non-<br />
Resdl. Bldg. for AIIH &<br />
PH at Salt Lake<br />
Kolkata. SH:-<br />
Superstructure i/c W/S<br />
& S/I of Institute Bldg.<br />
22 C/o Office bldg. for<br />
HUDCO at DJ Block ,<br />
Saltlake, Kolkata.<br />
Phase - I.<br />
23 Construction of 200<br />
bedded Hostel at SAI<br />
NSEC, Kolkata.<br />
24 C/o Hospital Building<br />
& Resdl. Bldgs. at old<br />
Campus GE Block<br />
NIH at Salt Lake. SH:<br />
Extn. Of Hospital Bldg.<br />
,Boys Hostel, Girls<br />
Hostel and 4 Nos.Ty-<br />
IV Qtrs.<br />
25 C/O Office Building for<br />
Census Deptt. At Salt<br />
Lake<br />
(Balance work )<br />
C/o Roads in State of<br />
Bihar under Prime<br />
Minister Gram Sadak<br />
Yojana (PMGSY)<br />
26 Pahsnara Bagrak<br />
Road<br />
27 Rajaura to Nima<br />
Chandpura<br />
28 Satlakha to Izra<br />
(12.68 km )<br />
29 Ballipur to Nakta<br />
Chowk via.<br />
Warisnagar in<br />
Warisnagar Block<br />
(6.25Km)<br />
30 C/o 159 /T-II(T/S), 34<br />
/T-III(T/S), 1 /T-<br />
IV(S/S) & 1 /T-V(S/S)<br />
qrtrs. at 135 Bn, BSF,<br />
Fatikchera.<br />
EZ-I Salt Lake 1971.55 Mar'95 Pile work is<br />
completed.Tender<br />
for super<br />
structure<br />
received.<br />
EZ-I Salt Lake 1061.68 Jan'06 Tenders under<br />
scrutiny.<br />
EZ-I Saltlake 803.00 Jan'06 DE/NIT for pile<br />
foundation under<br />
process.<br />
EZ-I Saltlake 729.00 Mar'06 Work for pile<br />
foundation all<br />
bldg. except<br />
hospital<br />
bldg.awarded.<br />
EZ-I SaltLake 435.09 Jan'01 Tender under<br />
scrutiny<br />
EZ-II Begusarai 646.37 Jun'06 Tender under<br />
acceptance.<br />
EZ-II 455.37 Jun'06 Tender under<br />
scrutiny.<br />
EZ-II Madhubani 519.35 Nov'05 Work awarded<br />
recently<br />
EZ-II Samastipur 388.53 Jan'06 Tender under<br />
scrutiny.<br />
NEZ Fatikchera,<br />
Tripura<br />
1552.41 Jul-06 Tender under<br />
scrutiny.
31 C/o Admn. Block for<br />
IGP/DIGP, Usha<br />
Bazar, Agartala<br />
32 C/o Office bldg. & 6-<br />
T/II(D/S), 12-T/III<br />
(D/S) Qtrs. for ISPW<br />
Stn. at Itanagar,<br />
Aru.Pradesh.<br />
33 C/o of security and<br />
retaining wall in ITBP<br />
campus at Katting<br />
Hall, Itanagar,<br />
Arunachal Pradesh.<br />
34 C/o Resdl qtrs for Itax<br />
deptt at "G" Block<br />
Bandra Kurla Complex<br />
Mumbai<br />
35 C/o Multistoried Resdl.<br />
Qtrs. 12 Nos. (Ty-V-4<br />
and Ty-VI-8) for I tax<br />
deptt at Surat<br />
36 C/o Resdl qtrs for<br />
CAT, Vejalpur,<br />
Ahmedabad<br />
37 C/o Regional training<br />
institute and hostel<br />
bldg for CAG at<br />
Bandra Kurla Complex<br />
Mumbai<br />
38 C/o 100 Nos. qtrs for<br />
BN HQ BSF at<br />
Dantiwada<br />
39 C/o Admn. Bldg and 1<br />
no. 120 men barrack<br />
for SHQ at Bhuj.<br />
40 C/o Hanger & Model<br />
for the Multipurpose<br />
Wave basin for design<br />
of part layout at<br />
Khadakwasla, Pune.<br />
NEZ Agartala,<br />
Tripura<br />
299.36 Mar-06 Work awarded<br />
recently<br />
NEZ Itanagar (A.P.) 244.40 Aprl-06 Tenders for Type-<br />
II qtrs. under<br />
scrutiny.<br />
NEZ Itanagar (A.P.) 371.80 Nov-06 NIT under<br />
finalization.<br />
WZ-I Mumbai 1021.37 Dec'05 Drawing<br />
submitted to local<br />
body for approval.<br />
Extension of time<br />
for start of<br />
constuction to be<br />
obtained from<br />
MMRDA by the<br />
client.<br />
WZ-I Surat 490.96 Jul'06 Tender called.<br />
WZ-I Ahmedabad 492.85 Apr'06 Tenders under<br />
scrutiny.<br />
WZ-I Mumbai 3556.13 Sept'06 NIT being<br />
finalized.<br />
WZ-I Dantiwada 640.75 Aug'06 Tenders reinvited.<br />
WZ-I Bhuj 413.66 Aug'06 Tenders called.<br />
WZ-<br />
II<br />
Khadakwasla 242.20 May'05 Work started.
41 C/o Additional four<br />
floors I.e. 4th to 7th<br />
over the existing<br />
Income Tax bldg. at<br />
Plot No. 5 EDC Plot,<br />
Panaji, Goa.<br />
42 C/o 3 Nos.120 Men<br />
Barracks, CRPF,<br />
Talegaon, Pune.<br />
43 C/o 268 Nos.<br />
Residential<br />
Accommodation Type<br />
II / for BSF Campus,<br />
Thekkalur Village,<br />
Avinasi Taluk,<br />
Coimbatore<br />
44 C/o Resdl. Bldgs. SH:<br />
23 Nos. Type I, 48<br />
Nos., Type III, 6 Nos.,<br />
Type IV, 2 Nos. Type<br />
V for BSF Campus at<br />
Thekkalur Village,<br />
Avinashi Taluk,<br />
Coimbatore<br />
45 C/o 26 Nos. Staff Qrs.<br />
for Central Excise<br />
Department at<br />
Sivakasi<br />
46 C/o Office Building for<br />
Central Excise<br />
Department at<br />
Sivakasi<br />
47 Community Centre for<br />
Income Tax Dept. at<br />
Hyderabad<br />
48 C/o Library building for<br />
MANUU at<br />
Gachibowli,<br />
Hyderabad<br />
49 C/o Ancient Bio-<br />
Malecular DNA<br />
Research LAB SRC.<br />
50 C/o Income Tax office<br />
annexe at Kowdiar.<br />
WZ-<br />
II<br />
WZ-<br />
II<br />
Panaji Goa 296.66 Jun'06 NIT issued.<br />
Talegaon 599.46 Mar'06 NIT issued.<br />
SZ- I Coimbatore<br />
(TN)<br />
SZ- I Coimbatore<br />
(TN)<br />
1267.16 Mar'06<br />
441.64 Mar'06<br />
Tenders under<br />
process<br />
Tenders under<br />
scrutiny<br />
SZ- I Sivakasi 213.86 Nov'06 Arch. drawings<br />
under preparation<br />
SZ- I Sivakasi 222.55 Nov'06 Arch. drawings<br />
under preparation<br />
SZ-II Hyderabad 303.09 May'06 Tenders invited.<br />
SZ-II Hyderabad 325.00 Jul-06 Tender accepted<br />
SZIII Mysore 498.79 Mar-06 Drawings under<br />
preparation.<br />
SZIII Trivandrum 339.57 Jun-06 Tenders called.<br />
Work likely to<br />
start in February
51 C/o Office & Staff qtrs<br />
for IT Department<br />
DEPOSIT <strong>WORKS</strong><br />
1 Construction of Public<br />
Library in the Memory<br />
of Lok Nayak Jai<br />
Prakash Naryan,<br />
Mandir Marg, New<br />
Delhi.<br />
2 C/o Bio Safety level -3<br />
laboratory at NICD<br />
3 Replacement of<br />
Synthetic hockey<br />
Surface at NS, NIS,<br />
Patiala (Punjab).<br />
4 Laying of Synthetic<br />
Hockey surface at<br />
SAI, NS, NIS, Patiala<br />
(Pb.)<br />
5 Laying of Atheletic<br />
track at Patiala.<br />
6 C/o Building for JNV<br />
at Dhanansu (Ph-B),<br />
Distt. Ludhiana<br />
Punjab. SH:<br />
Dormitories (1 Boys<br />
and half Girls) staff<br />
qtrs (8 Nos. Type-III, 2<br />
Nos. Type-I)<br />
7 Ext. of Lecture<br />
Theatre at NIT,<br />
Jalandhar<br />
2007.<br />
SZIII Udupi 294.40 Sep-06 DE Under<br />
preparation. Work<br />
likely to start in<br />
March 2007.<br />
NDZ-<br />
II<br />
NDZ-<br />
II<br />
New Delhi 282.54 Mar'04 * Location of<br />
Library Building<br />
being rexamined<br />
by NDMC. *<br />
HUDCO is to get<br />
the building plan<br />
approved from<br />
NDMC.<br />
New Delhi 497.00 Nov'03 * DUAC approval<br />
awaited.<br />
Preconstruction<br />
activities in<br />
progress. Client<br />
yet to approe the<br />
modified PQ<br />
documents.<br />
NZ-I Patiala(Pb.) 200.00 Sep'05 Tender for civil<br />
work received<br />
and under<br />
scrutiny.<br />
NZ-I Patiala (Pb.) 300.00 Jun'06 Tender for civil<br />
work approved.<br />
NZ-I Patiala (Pb.) 225.53 Jun'06 Awarded<br />
NZ-I Dhanansu<br />
(pb.)<br />
225.53 Apr'06 Tender recently<br />
approved.<br />
NZ-I Jalandhar 242.25 Tender has been<br />
called in Jan.-07
8 C/o Udai Shanker<br />
Academy for Dance &<br />
Music at Almora (SH:-<br />
Balance building work<br />
and approach road of<br />
the Museum and<br />
Auditorium)<br />
9 C/o Office bldg. for<br />
HUDCO at DJ Block ,<br />
Saltlake, Kolkata.<br />
Phase - I.<br />
10 C/o Bodhgaya hatt<br />
near by pass main<br />
approach road.<br />
11 Faculty bldg. For Nav-<br />
Nalanda Mahavihar at<br />
Nalanda.<br />
12 C/o building for JNV at<br />
Nuapada (Ph-B)<br />
13 C/o building for JNV at<br />
Malkangiri, Orissa<br />
14 C/o building for JNV at<br />
Jharsuguda, Orissa<br />
15 C/o building atJNV<br />
Distt. East Chatra,<br />
Jharkhand, (Ph-B)<br />
16 C/o building at JNV<br />
Distt. East<br />
Champaran, Bihar<br />
(Ph-B)<br />
17 C/o building at JNV<br />
Distt. Siwan, Bihar<br />
(Ph-B)<br />
18 C/o Extension for<br />
Ruby Hostel for ISM at<br />
Dhanbad.<br />
19 C/o Vocational<br />
Rehabilitation Centre<br />
for Handicapped at<br />
BBSR. SH: C/o<br />
Auditorium Hall, Staff<br />
Qtrs I/c Development<br />
of Site and Bulk<br />
services (Civil)<br />
NZ-II Almora 500.00 Mar-03 Work awarded on<br />
15.12.2006<br />
EZ-I Salt Lake 1061.68 Jan'06 Tenders under<br />
process of<br />
acceptance.<br />
EZ-II Bodhgaya 236.71 Mar'04 Work awarded<br />
EZ-II Nalanda 355.35 Apr'04 Tender called 3rd<br />
time but no<br />
response. Tender<br />
being called 4th<br />
time on 02.1.07<br />
EZ-II Nuapada 214 Feb'06 Tender received<br />
& under scrutiny.<br />
EZ-II Malkangiri 612.74 Feb'06 Tender received<br />
& under scrutiny.<br />
EZ-II Jharsuguda 650.75 Jul'06 Tender received<br />
& under scrutiny.<br />
EZ-II Chatra 223.65 Feb'06 Work awarded<br />
EZ-II East<br />
Champaran<br />
238.79 Feb'06 Tender received<br />
& under scrutiny.<br />
EZ-II Siwan 237.84 Feb'04 Tender received<br />
on 24.11.06 &<br />
under scrutiny.<br />
EZ-II Dhanbad 215.78 Dec'05 Work awarded<br />
EZ-II Bhubaneswar. 594.83 Mar'04 Tender received<br />
on 8.12.06 &<br />
under scrutiny.
20 C/o buildings for JNV<br />
at Thingsulthliah,<br />
Aizawl<br />
21 C/o buildings for JNV<br />
at Bijni, Distt.<br />
Bongaigaon, Assam<br />
(Phase-A)<br />
22 C/O JNV at<br />
Nongstoin, Dist. West<br />
Khasi Hills<br />
(Meghalaya)(SH:- C/o<br />
4 Nos. Dormitories<br />
23 C/o Bldg. of JNV at<br />
Mawphlang, Dist. East<br />
Khasi (Meghalaya)<br />
Ph-A.(SH:- C/o<br />
Dormitories<br />
24 C/o dormitory, Type-II,<br />
Type-III staff quarters,<br />
Phase-B at Jorhat<br />
(Assam) (SH:- C/o<br />
Dormitories for 96<br />
boys and 96 girls<br />
along with warden<br />
residence.<br />
25 C/o JNV at Lower<br />
Subansiri (Arunachal<br />
Pradesh)- (Ph-B) SH:<br />
C/o Dormitory, T-III, T-<br />
II, T-I staff Qtrs.and T-<br />
II Guest House.<br />
26 C/o Building for JNV<br />
(Part) of area 450 sqm<br />
etc. at JNV Serchip<br />
27 C/o JNV Dhalai (Ph-A)<br />
(SH. C/o boys<br />
dormitory, T-III, T-II &<br />
T-I Staff Qtrs. and T/II<br />
Guest House<br />
NEZ Aizawl,<br />
Mizoram<br />
NEZ Bongaigaon,<br />
Assam<br />
NEZ Nongstoin,<br />
Meghalaya<br />
NEZ Mawphlang<br />
Meghalaya<br />
NEZ Jorhat ,<br />
Assam<br />
1028.92 Oct-05 Work of dining &<br />
kitchen recently<br />
awarded. For<br />
others tenders<br />
under scrutiny,<br />
666.72 Jul-05 Work of dining &<br />
kitchen recently<br />
awarded. For<br />
others tenders<br />
called.<br />
200.74 May-05 Tender under<br />
process of<br />
acceptance<br />
738.63 May-05 Tender under<br />
process of<br />
acceptance<br />
278.22 Sep-06 Tenders under<br />
scrutiny,<br />
NEZ Yachuli (A.P.) 245.95 Aug-06 NIT under<br />
finalization.<br />
NEZ Serchip,<br />
Mizoram<br />
NEZ Dhalai,<br />
Tripura<br />
332.65 Sep-06 Tender accepted.<br />
574.88 Sep-06 Tenders under<br />
scrutiny,
28 Providing & laying of<br />
water supply line<br />
along NH 37 from<br />
Khanapara to Jorabat.<br />
29 C/o 'A' school building<br />
forK.V.<br />
30 C/o Admn. Academic<br />
& Library block for<br />
Rashtriya Sanskrit<br />
Sansthan.<br />
31 C/o Bridge across<br />
river Kolak with<br />
approaches at Daman<br />
UT & Daman<br />
32 Synthetic Hockey<br />
track at Kandivali,<br />
Mumbai<br />
33 Additional and<br />
alteration to 122 nos.<br />
flats and external<br />
services i/c interla<br />
elect. for SEBI at<br />
Shivajinagar,<br />
Mankhurd, Mumbai<br />
34 C/o office bldg for IDBI<br />
with interior at Plot No.<br />
G-7, Bandra Kurla<br />
Complex (BKC)<br />
Mumbai<br />
35 C/o A type school<br />
bldg. and 9 units staff<br />
quarters, boundary<br />
wall for Kendriya<br />
Vidylaya at Ajni,<br />
Nagpur.<br />
36 C/o Examination Wing<br />
for MS University at<br />
Tirunelveli<br />
37 C/o Additional 150<br />
Men's Hostel for<br />
Pondicherry University<br />
at Pondicherry<br />
NEZ NHAI,<br />
Guwahati<br />
229.94 Apr-05 Tenders called<br />
and to be<br />
received on<br />
29.01.07<br />
CZ Vidisha 467.57 Dec'05 Work awarded<br />
recently.<br />
CZ Bhopal 299.2 Nov'04 Deposit received<br />
recently. Tender<br />
under scrutiny.<br />
WZ-I D & NH 334.48 Mar'06 Tenders recd.<br />
Revised sanction<br />
awaited.<br />
WZ-I Mumbai 315 Jan'06 Tenders received<br />
for base work.<br />
WZ-I Mumbai 501.21 Jul'06 Tenders reinvited.<br />
WZ-I Mumbai 11418 Nov'06 Preparation of<br />
tender documents<br />
in process.<br />
WZ-<br />
II<br />
SZ -<br />
I<br />
SZ -<br />
I<br />
Nagpur 490.43 Apr'05 Tender accepted.<br />
Plans yet to be<br />
approved by the<br />
local body.<br />
Tirunelveli 334.59 Nov'05 Work just<br />
awarded<br />
Pondicherry 1010.19 Aug'06 Work just<br />
awarded
38 C/o Academic Block<br />
for NIFT at Taramani<br />
39 C/o Multipurpose Hall<br />
for Sports Authority of<br />
India, SAG Centre at<br />
Mayiladuthurai<br />
40 C/o Pasport Office at<br />
Rayala Towers,<br />
Chennai - Electrical<br />
and Civil Works<br />
41 C/o Synthetic Atheltic<br />
Track at LNCPE,<br />
42 C/o Additional areas<br />
for NIFT.<br />
43 C/o Buildings over the<br />
existing structure at<br />
NIFT.<br />
44 C/o Main Block for<br />
Cochin University<br />
College of<br />
Engineering,<br />
Pulinkunnu.<br />
45 C/o Building for<br />
Pareeksha Bhavan for<br />
MG university<br />
SZ -<br />
I<br />
SZ -<br />
I<br />
SZ -<br />
I<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
SZ-<br />
III<br />
Taramani,<br />
Chennai<br />
354.04 Apr'06 Tenders received.<br />
Mayiladuthurai 732.1 Sep'06 Tenders under<br />
scrutiny<br />
Chennai 309.6 Nov'06 Drawings under<br />
preparation.<br />
Trivandrum 300.00 Sep-05 Tenders being<br />
called. Work likely<br />
to start in<br />
February 2007.<br />
B'lore 205.60 Feb-06 Tenders accepted<br />
& work is being<br />
awarded.<br />
B'lore 236.94 Apr-06 Work likely to<br />
start in February<br />
2007.<br />
Alleppey 555.49 Oct-06 DE Under<br />
preparation. Work<br />
likely to start in<br />
March 2007.<br />
Kottayam 1026.03 Oct-06 Tenders under<br />
scrutiny. Work<br />
likely to start in<br />
February 2007.
Sl.<br />
No.<br />
Annexures – IV<br />
Name of Work Zone City /<br />
location<br />
MINISTRY <strong>OF</strong> URBAN DEVELOPMENT<br />
1 C/o GPRA at<br />
Shimla - Phase-<br />
II. SH: C/o T-II/<br />
16 Nos. (F/S)<br />
and T-III/ 16 Nos.<br />
(F/S) qtrs. at<br />
Summer Hill,<br />
Shimla.<br />
2 C/o Office<br />
building for<br />
GPOA at Akurdi,<br />
Pune (Phase-I)<br />
3 C/o 215 Nos.<br />
GPRA Qtrs at<br />
Akurdi, Pune<br />
(Ph-I) SH: C/o<br />
105 Nos. Ty-III<br />
qtrs.<br />
4 C/o Type A & C<br />
transit<br />
accommodation<br />
near G block at<br />
NS Road,<br />
Mumbai<br />
5 C/o 65 Nos.<br />
GPRA Qrts at<br />
Akurdi, Pune.<br />
SH: C/o Ty-III-15<br />
Nos.<br />
6 C/o 16 Nos. Type<br />
V Qtrs.<br />
A/A &<br />
E/S<br />
Amount<br />
(Rs. In<br />
lacs)<br />
Date of<br />
A/A &<br />
E/S<br />
Achieve<br />
ment<br />
upto<br />
Dec'06<br />
Remarks<br />
NZ-I Shimla 1726.44 Jan'04 -- out of total<br />
sanction of<br />
246 Nos.<br />
quarters<br />
under the<br />
project 32<br />
Nos. qtrs.<br />
completed.<br />
WZ-II Akurdi, Pune 478.24 May'02 100% Work<br />
completed.<br />
WZ-II Akrudi, Pune 1323.00 Aug'00 -- out of total<br />
sanction of<br />
215 Nos.<br />
quarters<br />
under the<br />
project 90<br />
Nos. qtrs.<br />
completed.<br />
WZ-I Mumbai 491.74 Jan'96 100% Work<br />
completed.<br />
WZ-II Akurdi, Pune 416.68 Nov'04 -- out of total<br />
sanction of<br />
65 Nos.<br />
quarters<br />
under the<br />
project 15<br />
Nos. qtrs.<br />
SZ-1 Besant nagar<br />
/ Chennai 196.21 Feb'03<br />
completed.<br />
100% Work<br />
completed<br />
7 C/o GPRA at NZ-III Jodhpur 1220.00 Jan'04 100% Work<br />
Jodhpur<br />
completed<br />
OTHER MINISTRY / DEPARTMENTS
1 C/o CBSE Bldg<br />
at Mandawali<br />
Fazalpur<br />
2 C/o 2Nos. 120<br />
Men Barrack,<br />
CRPF, Talegaon,<br />
Pune.<br />
3 AG Punjab<br />
(Audit)<br />
4 C/o 180 Men<br />
barrack for CRPF<br />
at Hallomajra,<br />
Chandigarh<br />
(CRPF)<br />
5 C/o 180 Men<br />
Barrack for<br />
CRPF at<br />
Jalandhar.<br />
(CRPF)<br />
6 C/o Office<br />
building for<br />
Custom &<br />
Excise, Jammu.<br />
(F&R)<br />
7 C/o 16 Ty-II, 32<br />
Nos. T-I quarters<br />
for ITBP at Mirthi.<br />
8 C/o Office Bldg.<br />
& Staff Qtrs. for<br />
Special Bureau<br />
at Indira Nagar,<br />
Lucknow<br />
9 C/o Admn. block<br />
for IGP (CS)<br />
CRPF at<br />
Gomtinagar,<br />
Lucknow<br />
10 C/o Resdl. qtrs.<br />
for Census at<br />
Aliganj, Lko<br />
TIV-5 Nos.,<br />
T-III-55, T-II-<br />
30 & T-I-10 Nos.<br />
11 C/O Office<br />
Building and<br />
Residential<br />
Quarters for SIB<br />
at Ganga Nagar,<br />
NDZ-IV New Delhi 1047.31 Sept'04 100% Work<br />
completed<br />
WZ-II Talegaon 310.10 May'04 100% Work<br />
completed.<br />
NZ-I Chandigarh 1318.00 Nov'02 100% Work<br />
completed.<br />
NZ-I Hallomajra(C 235.81 May'04 100% Work<br />
hd.)<br />
completed.<br />
NZ-I Jalandhar 249.17 May-04 100% Work<br />
completed.<br />
NZ-I Jammu 234.89 Oct'02 100% Work<br />
completed.<br />
NZ-II Mirthi 361.43 Feb-05 100% Civil work<br />
completed .<br />
NZ-II Lucknow 298.00 Jan'04 100% Work<br />
Completed<br />
NZ-II Lucknow 250.00 May'04 100% Work<br />
Completed<br />
NZ-II Lucknow 496.90 Jan'03 100% Work<br />
Completed<br />
NZ-II Meerut 223.35 Feb'05 100% Work<br />
Completed
Meerut.<br />
12 C/O Office<br />
building and<br />
hostel for<br />
vocational<br />
rehabilitation<br />
centre for<br />
handicapped at<br />
Kanpur.<br />
13 C/o 240 Nos.<br />
Staff Qtrs for<br />
CRPF, GC-I,<br />
Ajmer.<br />
14 C/o laboratory<br />
bldg. For HPL<br />
and PLINat<br />
Ghaziabad. (UP)<br />
15 C/o bldg. For<br />
Central Institute<br />
for search and<br />
Training<br />
Employment at<br />
Sec-62 at Noida.<br />
16 C/o. Staff Qrs.<br />
Ty.II/56 Nos.<br />
Ty.III/6 Nos. Y<br />
Ty.IV/2 Nos. For<br />
BSF Bn. H.Q at<br />
Sonari, Cooch<br />
Behar, N.<br />
Bengal.<br />
17 C/o, 85 Nos.<br />
CRPF Qtrs. at<br />
Kolkata<br />
SH: 5 Nos. Ty- III<br />
Qrts.<br />
18 C/o. Staff Qrs. &<br />
International<br />
Hostel for NIH at<br />
J.C. Block, Salt<br />
Lake Kolkata. 8<br />
Nos. Ty.II, 8 Nos.<br />
Ty.III, 4 Nos.<br />
Ty.IV, 4 Nos.<br />
Ty.V Qrs. with<br />
servants qrs.,<br />
NZ-II Kanpur 526.00 Mar'04 100% Work<br />
Completed<br />
NZ-III Ajmer 1042.38 Aug'04 100% Work<br />
completed.<br />
Map<br />
Zone<br />
Map<br />
Zone<br />
Ghaziabad<br />
(UP)<br />
1317.00 Nov'01 100% Work<br />
Completed<br />
Noida (UP) 893.23 Mar'01 100% Work<br />
Completed<br />
EZ-I Coochbehar<br />
Siliguri<br />
EZ-I Kolkata<br />
291.55 Nov'01 100% Work<br />
Completed<br />
450.00 Jun'03 100% Work<br />
Completed<br />
EZ-I Kolkata 704.00 Oct'04 100% Work<br />
Completed
garrage and<br />
International<br />
Hostel.<br />
19 C/o. A Type<br />
School Bldg. for<br />
K.V. at I.I.M.C.,<br />
Joka, Kolkata.<br />
SH:<br />
Superstructure (<br />
Phase - Ii )<br />
20 C/o. Building For<br />
JNV at Phodong,<br />
North Sikkim. (A)<br />
SH : C/o. Resdl.<br />
Accomm. Ty-III/ 8<br />
Nos. ( B) SH:<br />
C/o. Resdl.<br />
Accomm. Ty-I/4<br />
Nos. Ty-II/4 Nos.<br />
& Principal's<br />
Residence 1 No<br />
21 C/o. Office Bldg.<br />
of forest survey<br />
of India(EZ) at<br />
Salt Lake,<br />
Kolkata. SH:<br />
Superstructure.<br />
22 C/o. Office Bldg.<br />
for Central<br />
Excise at<br />
E.M.Bye Pass,<br />
Kolkata.<br />
23 C/o 196 Nos.<br />
family qtrs for<br />
GC, CRPF,<br />
Jhapha,<br />
Muzaffarpur.<br />
24 C/o Boundary<br />
wall with railing<br />
i/c major<br />
retaining wall for<br />
GSI, Shillong.<br />
EZ-I Joka,<br />
Kolkata<br />
EZ-I Phodong,<br />
North Sikkim<br />
Rs.247.4<br />
2<br />
Mar'03 100% Work<br />
Completed<br />
659.79 Jul'02 100% Work<br />
Completed<br />
EZ-I Kolkata 312.37 Mar'00 100% Work<br />
completed.<br />
EZ-I Kolkata 3803.00 Dec'96 100% Work<br />
completed.<br />
EZ-II Jhaphan,<br />
Muzaffarpur<br />
NEZ Shillong,<br />
Meghalaya<br />
857.20 Jun'02 100% Work<br />
completed.<br />
210.42 Dec-05 100% Work<br />
completed.
25 C/o 1 No. 180<br />
men barrack for<br />
CTC-I CRPFat<br />
Neemuch.<br />
26 C/o 2 nos. 180<br />
men barracks for<br />
107 battalion,<br />
RAF, Hinotia.<br />
27 C/o office bldg &<br />
Resdl qtrs for Itax<br />
deptt at Nadiad<br />
28 Development of<br />
Suleman Shah<br />
Plot at for<br />
Custom deptt at<br />
Wadala, Mumbai<br />
29 C/o Resdl qtrs for<br />
IA & AS officer<br />
for AG at Bandra<br />
Kurla Complex,<br />
Mumbai<br />
30 C/o 122 Nos.<br />
Family qtrs for<br />
CRPF at<br />
Gandhinagar<br />
31 C/o GO's<br />
mess/suits for<br />
102 BN RAF<br />
Navi Mumbai<br />
32 C/o SO's<br />
mess/suits for<br />
102 BN RAF<br />
Navi Mumbai<br />
33 C/o SO's mess<br />
for Mess for RAF,<br />
Vastral,<br />
Ahmedabad<br />
34 C/o family qtrs for<br />
GC CRPF at GC,<br />
CRPF at<br />
Gandhinagar<br />
35 C/o 3 Nos. 180<br />
Men Barracks for<br />
RTC II, CRPF,<br />
Avadi<br />
36 C/0 Technical cum<br />
Office Bldg. For<br />
Met Deptt at<br />
Begumpet,<br />
Hyderabad.<br />
CZ Neemuch 233.21 Jun'04 100% Work<br />
completed.<br />
CZ Bhopal 418.91 Dec'01 100% Work<br />
completed.<br />
WZ-I Nadiad 214.65 Feb'99 100% Work<br />
completed.<br />
WZ-I Mumbai 394.90 Oct'03 100% Work<br />
completed.<br />
WZ-I Mumbai 615.65 Oct'01 100% Work<br />
completed.<br />
WZ-I Gandhinagar 581.11 Sept'04 100% Work<br />
completed.<br />
WZ-I Navi Mumbai 218.53 Sept'04 100% Work<br />
completed.<br />
WZ-I Navi Mumbai 308.44 Sept'04 100% Work<br />
completed.<br />
WZ-I Ahmedabad 254.45 Oct'02 100% Work<br />
completed.<br />
WZ-I Gandhinagar 437.91 May'04 100% Work<br />
completed.<br />
SZ-I Avadi,<br />
Chennai<br />
793.45 Aug'04 100% Work<br />
completed.<br />
SZ-II Hyderabad 369.58 May'00 100% Work<br />
completed.
37 C/o 5 Nos.<br />
standard factory<br />
shed and 10 Nos.<br />
trading sheds for<br />
VSEZ at Duvvada,<br />
Vishakapatnam<br />
38 C/o Office Bldg<br />
for GSI,<br />
Nettayam.<br />
39 C/o 76 Nos Qrs<br />
for GC, CRPF,<br />
Pallipuram.<br />
40 C/o 121 Nos<br />
Staff Qrs for<br />
STC, BSF<br />
41 C/o 60 Nos. Qtrs.<br />
for AG at<br />
Pullazhy.<br />
42 C/o 180 Men<br />
Barrack at GC,<br />
CRPF. (V<br />
Barrack)<br />
DEPOSIT <strong>WORKS</strong><br />
1 C/o Boundary<br />
wall along<br />
Nainwal Village<br />
(from TCP-III to<br />
old gas godown)<br />
at NSG Campus,<br />
Manesar<br />
2 C/o C.N. Tower<br />
at AIIMS<br />
3 Extension of<br />
Admn, block at<br />
NRCE, Hissar<br />
4 C/o IHM Building<br />
at Rambagh,<br />
Srinagar<br />
5 C/o building for<br />
JNV at Naurokh<br />
(Pipalkoti) (SH:-<br />
C/o school bldg.,<br />
dormitory, T-III-8<br />
Nos., T-II-4 Nos.<br />
and T-I-4<br />
Nos.quarters)<br />
6 C/o. New Bldg for<br />
NICED at ID<br />
Hospital Capmus<br />
Belighata<br />
SZ-II Vishakapatnam<br />
286.70 Aug-05 100% Work<br />
completed.<br />
SZ-III Trivandrum 245.40 Dec-03 100% Work<br />
completed.<br />
SZ-III Trivandrum 289.52 Mar-04 100% Work<br />
completed.<br />
SZ-III Bangalore 450.86 Jun-04 100% Work<br />
completed.<br />
SZ-III Trichur 540.15 Oct-04 100% Work<br />
completed.<br />
SZ-III Bangalore 300.00 Sep-05 100% Work<br />
completed.<br />
NDZ-IV Manesar 270.25 May'05 100% Work<br />
completed<br />
NDZ-V Delhi 1730.00 100% Work<br />
completed.<br />
NZ-I Hissar (Hry.) 255.41 31-03- 100% Work<br />
04.<br />
completed.<br />
NZ-I Srinagar 714.52 12/03 100% Work<br />
completed.<br />
NZ-II Pipalkoti 800.00 Oct-01 100% Work<br />
completed.<br />
EZ-I Kolkata 687.34 03/200<br />
0<br />
100% Work<br />
completed.
7 C/o JNV at<br />
Pachari,<br />
Darbhanga.<br />
8 Development of<br />
work of Jain<br />
temple at<br />
Pawapuri, Bihar<br />
9 Extension of 66<br />
Bedded Hostel<br />
building for<br />
NIFFT at Ranchi.<br />
SH: C/o First and<br />
Second floor &<br />
Development<br />
work.<br />
10 C/o<br />
Administrative<br />
Block cum<br />
Animal Science<br />
Fisheries Eastern<br />
region, Patna<br />
(ICAR)<br />
11 C/o office bldg<br />
(Part-I) Guest<br />
house, Director's<br />
Residence, 4<br />
nos. Type-I qtrs<br />
and<br />
Development<br />
work of Institute<br />
of Forest<br />
productivity<br />
Ranchi.<br />
12 C/o 200 bedded<br />
boys hostel for<br />
ISM at Dhanbad.<br />
13 C/o Shree<br />
Sadasiva<br />
Kendriya Sanskrit<br />
Vidyapeetham<br />
puri. SH: Primary<br />
block & Library<br />
building.<br />
14 C/o Computer<br />
Science Building<br />
for Assam<br />
University,<br />
Silchar.<br />
EZ-II Darbhanga 206.00 Feb'92 100% Work<br />
completed (<br />
except Admn.<br />
Bldg)<br />
EZ-II Pawapuri 241.00 Jan'02 100% Work<br />
completed.<br />
EZ-II Ranchi 327.60 Sep'04 100% Work<br />
completed.<br />
EZ-II Patna 439.44 Mar'02 100% Work<br />
completed.<br />
EZ-II Ranchi 347.81 Jun'03 100% Work<br />
completed.<br />
EZ-II Dhanbad 553.40 Mar'04 100% Work<br />
completed.<br />
EZ-II Puri 392.00 Mar'02 100% Work<br />
completed.<br />
NEZ Silchar,<br />
Assam<br />
365.84 May,02 100% Work<br />
completed
15 C/o JNV at<br />
Udaipur (Ph.B)<br />
SH: C/o 2 Boys'<br />
dorm. & 2<br />
warden<br />
residences, 2<br />
Girls' dorm. & 2<br />
nos. warden<br />
residences and<br />
resdl qrts.<br />
16 C/o<br />
Archaeological<br />
Museumat<br />
Khajuraho.<br />
17 C/o JNV at<br />
SheopurKallan<br />
M.P<br />
18 C/oJNV<br />
Badwara, Distt<br />
Katni<br />
19 C/o Jaiprakash<br />
Narayan<br />
Mahidyalaya,<br />
Gandhi Asharam.<br />
20 C/o Office bldg<br />
for SEBI at BK<br />
Complex,<br />
Mumbai SH:<br />
Diaphram Wall<br />
21 Development<br />
work in & around<br />
Jain Tirthsthan at<br />
Palitana, Distt.<br />
Bhavnagar,<br />
Gujrat<br />
22 C/o Boys Hostel<br />
for I Year<br />
Students (Block<br />
I) at NIT, Trichy<br />
23 C/o Boys Hostel<br />
for I Year<br />
Students (Block<br />
II) at NIT, Trichy<br />
24 C/o 150 Bedded<br />
Women's Hostel<br />
for Pondicherry<br />
University,<br />
Pondicherry<br />
NEZ Udaipur<br />
South Tripura<br />
322.44 Feb.05 100% Work<br />
completed.<br />
CZ Khajuraho 260.00 Apr-04 100% Work<br />
completed<br />
CZ Sheopur<br />
kallan<br />
453.48 Apr'01 100% Work<br />
completed<br />
CZ Katni 513.70 Oct'05 100% Work<br />
completed<br />
CZ Jaura 266.10 Feb'03 100% Work<br />
completed<br />
WZ-I Mumbai 8677.36 Feb'05 100% Work<br />
completed<br />
WZ-I Palitana 303.33 Nov'02 100% Work<br />
completed<br />
SZ-I Trichy 284.24 09/04 100% Work<br />
completed<br />
SZ-I Trichy 284.24 09/04 100% Work<br />
completed<br />
SZ-I Pondicherry 202.04 02/05 100% Work<br />
completed
25 C/o Fishing Gear<br />
Section and<br />
Workshop for FSI<br />
at Port Blair<br />
26 C/o Boys & Girls<br />
Hostel, Guest<br />
House, Library<br />
and 9 nos staff<br />
qrs for<br />
Guruvayoor<br />
Kendriya Sanskrit<br />
Vidyapeeth.<br />
27 C/o Bldg. for<br />
DPE&SS for<br />
Kannur<br />
University SH:<br />
Gymnasium<br />
28 C/o College of<br />
Nursing for MG<br />
University.<br />
29 C/o Boundary<br />
Wall for farm<br />
area in IIHR,<br />
Hasaragatta.<br />
SZ-I Port Blair,<br />
Andamans<br />
SZ-III Puranattukar<br />
a<br />
SZ-III Mangattapar<br />
amba<br />
SZ-III Pathanamthit<br />
ta<br />
342.00 02/02 100% Work<br />
completed<br />
630.75 Nov-01 100% Work<br />
completed<br />
229.18 Mar-03 100% Work<br />
completed<br />
305.13 Jan-05 100% Work<br />
completed<br />
SZ-III Bangalore 225.73 Mar-05 100% Work<br />
completed
Sl.<br />
No.<br />
Annexures IVA<br />
Name of Work Zone City /<br />
location<br />
MINISTRY <strong>OF</strong> URBAN DEVELOPMENT<br />
1 C/o, GPRA at Gangtok<br />
(Ty-I / 24 Nos. Ty-II /<br />
24 Nos & Ty-III / 40<br />
Nos , Ty-IV / 12 Nos &<br />
Ty-V / 6 Nos.) (A) Sh:<br />
C/o Ty-V / 6 Nos Qtrs.<br />
2 C/o 65 Nos. GPRA<br />
Qrts at Akurdi, Pune.<br />
SH: C/o Ty-II-30, Ty-III-<br />
15 Nos.<br />
A/A &<br />
E/S<br />
Amount<br />
(Rs. In<br />
lacs)<br />
Date<br />
of A/A<br />
& E/S<br />
Remarks<br />
EZ-I Gangtok 397.50 Feb'05 Work in<br />
progress<br />
TDC<br />
Mar'07<br />
WZ-<br />
II<br />
Akurdi,<br />
Pune<br />
416.68 Nov'04 45 Nos.<br />
out of<br />
sanction of<br />
65 Nos.<br />
are in<br />
progress.<br />
TDC<br />
Mar'07<br />
3 C/o GPOA at Calicut SZIII Calicut 894.46 Aug-02 Work in<br />
progress<br />
TDC<br />
Mar'07<br />
4 C/o GPOA at Bareily NZ-II Bareily 290.97 Aug'05 Work in<br />
progress<br />
TDC<br />
5 C/o 319 Nos. Transit<br />
Accommodation at<br />
Andrews Ganj, New<br />
Delhi (Funded by<br />
HUDCO)<br />
NDZ-<br />
IV<br />
Mar'07<br />
New Delhi 3354.70 Mar'00 Work in<br />
progress<br />
TDC<br />
Jan'07
6 C/o 36 Nos. Ty-II Qtrs<br />
in Block 3 Schedule<br />
"B", President Estate,<br />
New Delhi<br />
7 C/o 246 Nos. GPRA at<br />
Shimla (SH: 98 Nos.<br />
GPRA)<br />
8 C/o Ty-III-12 Nos. qtrs<br />
( 10 Nos. for <strong>CPWD</strong><br />
and 2 Nos. General<br />
Pool at Bemloe, Shimla<br />
9 C/O GPRA at Malwani,<br />
Malad,Mumbai<br />
10 C/o 63 Nos. <strong>CPWD</strong><br />
Staff Quarters at<br />
Himachal Vihar,<br />
Matigara, Siliguri<br />
.(SH:T-V=4 Nos.)<br />
OTHER MINISTRY / DEPARTMENTS<br />
PLP New Delhi 287.00 Nov'05 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
NZ-1 Shimla 1726.44 Jan'04 Out of 246<br />
Nos.<br />
GPRA,<br />
work taken<br />
up for 98<br />
Nos., out<br />
of which<br />
work<br />
completed<br />
in 32 Nos.,<br />
42 Nos.<br />
targeted<br />
for Mar'07<br />
to be<br />
completed<br />
in Sept'07<br />
now.<br />
Balance<br />
24 not<br />
feasible.<br />
NZ-1 Shimla 99.87 Apr'03 Work in<br />
progress<br />
TDC<br />
Mar'07<br />
WZ I Mumbai 1952.00 Mar'00 Work in<br />
progress<br />
TDC<br />
Mar'07<br />
EZ-I Siliguri 412.85 Jan'05 Work in<br />
progress<br />
TDC<br />
Mar'07
1 C/o Staff qtrs. for met.<br />
deptt. At Dwarka. SH:<br />
T-I, 6 nos., T-II, 15<br />
nos., T-III, 30 nos. T-<br />
IV, 3 nos. & T-V 3 nos.<br />
2 C/o Training Institute<br />
(Phase-II) for Cabinet<br />
Secretariat at Gurgaon.<br />
3 C/o semi-permanent<br />
Gymnasium bldg and 2<br />
nos. AHU rooms for<br />
PC Plant at SPG<br />
Complex. Pappan<br />
Kalan, ND<br />
4 C/o 62 Nos. family qtrs<br />
for CRPF Academy at<br />
Kadir pur Gurgaon<br />
5 C/o GC and Academy<br />
for CRPF at Kadirpur<br />
6 C/o regional labour<br />
Institute at sec-47at<br />
Faridabad, Haryana.<br />
7 Development BSF<br />
Campus Lakhnaur.<br />
(BSF)<br />
NDZ-<br />
IV<br />
NDZ-<br />
IV<br />
NDZ-<br />
IV<br />
NDZ-<br />
IV<br />
NDZ-<br />
IV<br />
Map<br />
Zone<br />
New Delhi 325.00 Nov-03 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
Gurgaon 1307.00 Dec-96 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
New Delhi 260.38 Jul'06 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
Gurgaon 261.98 Sept'02 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
Gurgaon 2501.17 Sept'03 Work in<br />
progress.<br />
TDC<br />
Faridabad ,<br />
HR<br />
Jan'07<br />
1950.18 Jan'03 Work in<br />
progress.<br />
TDC<br />
03/07.<br />
NZ-I Chandigarh 514.22 Jun'03 Work is<br />
completed<br />
except rain<br />
water<br />
harvesting<br />
and<br />
horticulture<br />
works<br />
Phase-II<br />
for which<br />
TDC is<br />
Jan 2007.
8 C/o Type-I/88 Nos.<br />
quarters (F/S), T-II/32<br />
Nos. quarters (F/S) for<br />
ITBP at Ramgarh,<br />
Haryana including<br />
Development of site.<br />
(ITBP)<br />
9 C/o WWR Store at No.<br />
1FBSU, Aire-force,<br />
ASR. SH: Main Store<br />
(CFFA)<br />
10 C/o Married Accommodation<br />
Project at<br />
Janglote (J&K). SH:<br />
C/o 128 OR's quarters<br />
including internal and<br />
external services.<br />
11 C/o 16 Nos. T-II, 32<br />
Nos. T-I quarters for<br />
ITBP at Mirthi.<br />
12 C/o N.S.S.O<br />
Bldg.Office & Hostel<br />
bldg. at Vikas Nagar,<br />
Lucknow.<br />
13 C/o M.T. Garage&<br />
work shop at G.C.<br />
CRPF, Bijnore,<br />
Lucknow.<br />
14 C/O 4nos. 160men<br />
barrack for 104Bn.<br />
RAF at Aligarh<br />
NZ-I Ramgarh<br />
(Hr.)<br />
466.18 Aug'04 Work<br />
completed<br />
except<br />
road work<br />
which is in<br />
progress &<br />
trageted to<br />
be<br />
completed<br />
on<br />
NZ-I Amritsar 312.06 Sep-<br />
04<br />
NZ-I Janglote<br />
(J&K)<br />
02/2007<br />
Work in<br />
progress.<br />
TDC<br />
02/07.<br />
787.70 Aug-04 Work in<br />
progress.<br />
TDC<br />
02/07.<br />
NZ-II Mirthi 361.43 Feb-05 Work in<br />
progress.<br />
TDC<br />
02/07.<br />
NZ-II Lucknow 337.31 Feb'05 Work in<br />
progress.<br />
TDC<br />
02/07.<br />
NZ-II Lucknow 306.47 Nov'04 Work in<br />
progress.<br />
TDC<br />
03/07.<br />
NZ-II Aligarh 635.40 Apr'02 Work in<br />
progress.<br />
TDC<br />
01/07.
15 C/o 355 no. Qtrs. for<br />
GC, CRPF at<br />
Allahabad. (SH: C/o T-<br />
II 327 No. and T-I- 28<br />
No).<br />
16 C/o 3 Nos. 180 Men<br />
Barracks for CISF,<br />
Deoli.<br />
17 C/o 240 Nos. Staff<br />
Qtrs. for CRPF, GC-I,<br />
Ajmer. (SH : C/o T-<br />
II/90 Nos., T-II/105<br />
Nos. Qtrs.).<br />
18 C/o 3 Nos. 180 Men<br />
Barracks for CISF,<br />
Deoli.<br />
19 C/o Residential and<br />
Non- Residential<br />
Buildings i/c Guest<br />
House for SGMI at<br />
Gangtok .<br />
20 C/o. Building for JNV at<br />
Phodong, North<br />
Sikkim.<br />
SH:- Compound Wall<br />
21 C/o, Ahthropological<br />
Survey of India office<br />
cum Musium Bldg.<br />
Complex at Salt Lake<br />
,Kolkata.<br />
NZ-II Allahabad 1475.15 Jun'04 Work in<br />
progress.<br />
TDC<br />
03/07.<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
NZ-<br />
III<br />
Deoli 442.57 Ju'04 Work in<br />
progress.<br />
TDC<br />
03/07.<br />
Ajmer 1042.38 Aug'04 Work in<br />
progress.<br />
TDC<br />
03/07.<br />
Deoli 442.57 Jul'04 Work in<br />
progress.<br />
TDC<br />
03/07.<br />
EZ-I Gangtok 658.52 Jul'05 Work in<br />
progress.<br />
TDC<br />
03/07.<br />
EZ-I Phodong,<br />
North Sikkim<br />
EZ-I Saltlake,<br />
Kolkata<br />
659.79 Jul'02 Work in<br />
progress.<br />
TDC for<br />
Kitchen<br />
and<br />
Dinning<br />
Hall<br />
Mar'07<br />
533.73 Oct'00 Work in<br />
progress.<br />
TDC<br />
Mar'07
22 C/o. Office Bldg for<br />
Positional Astronomy<br />
Centre, Plot No.8, A.Q.<br />
Block, Sector-IV/V, Salt<br />
Lake , Kolkata.<br />
23 C/o Multi storied office<br />
bldg for IT deptt at<br />
Ranchi.<br />
24 C/o 37 Nos. staff qtrs<br />
for IT deptt. At<br />
Rourkela.<br />
25 C/o office building &<br />
Guest House for IT<br />
deptt.<br />
26 C/o Rehabilitation<br />
service building<br />
27 C/o office bldg. For<br />
labour welfare<br />
commissioner &<br />
Regional Labour<br />
Commissioner at<br />
BBSR.<br />
28 C/o Residential & Nonresdl.<br />
For Vocational<br />
Rehabiliatation Centre<br />
for Handicapped.<br />
29 C/o Inland water<br />
Transport Terminal<br />
building at Gaighat,<br />
Patna<br />
EZ-I Kolkata 424.00 Mar'98 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
EZ-II Ranchi 786.13 May'00 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Rourkela 317.00 Sep'03 Work in<br />
progress.<br />
TDC<br />
EZ-II Bhubanesw<br />
ar<br />
Mar'07<br />
451.31 Mar'03 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Olatpur 988.10 Feb'00 Work in<br />
progress.<br />
TDC<br />
EZ-II Bhubanesw<br />
ar<br />
EZ-II Bhubanesw<br />
ar<br />
Mar'07<br />
207.00 Oct'99 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
594.83 Mar'04 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Patna 2549.50 Mar'02 All the<br />
works<br />
except<br />
approach<br />
to<br />
temporary
30 Development & bulk<br />
services (Civil)<br />
I. Road work, II. Water<br />
supply, III Sewerage,<br />
IV OHT, V Drainage.<br />
I) Internal Road and<br />
path<br />
II) 3 nos. OHT and<br />
Tubewells<br />
III) Providing and<br />
laying external water<br />
supply line for Resdl. &<br />
Non-Resdl. Bldg.<br />
31 C/o 64-T/I Qtrs. for Bn<br />
HQ BSF at Umpling,<br />
Shillong<br />
32 C/o Ecology building<br />
for A.U. campus at<br />
Silchar i/c w/s & s/i<br />
33 C/o 2 Nos. 180 men<br />
barracks for RTC-I<br />
CRPF at Neemuch<br />
34 C/o 206 nos. family<br />
qtrs. At GC, CRPF<br />
Bangarasia.<br />
EZ-II Jhaphan,<br />
Muzaffarpur<br />
EZ-II Jhaphan,<br />
Muzaffarpur<br />
EZ-II Jhaphan,<br />
Muzaffarpur<br />
EZ-II Jhaphan,<br />
Muzaffarpur<br />
NEZ Shillong,<br />
Meghalaya<br />
NEZ Dorgakona,<br />
Silchar.<br />
1119.06 May'04<br />
Jetty<br />
completed.<br />
TDC<br />
Mar'07<br />
Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
Work<br />
completed.<br />
Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
396.26 May-03 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
331.83 May-02 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
CZ Neemuch 466.42 Apr-03 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
CZ Bhopal 905.54 May'04 Work in<br />
progress.<br />
TDC<br />
Mar'07
35 C/o 2 nos. 180 men<br />
barracks at CRPF,<br />
Bangrasia.<br />
36 C/o 2 Nos. 120 men<br />
barracks for BN HQ<br />
BSF Bhuj-II<br />
37 C/o Additional 220<br />
Nos. Type II Family<br />
Qrs., at GC, CRPF,<br />
Avadi<br />
38 C/o Auditorium for<br />
JIPMER, at<br />
Pondicherry<br />
39 C/o AG Branch Office<br />
at Madurai<br />
40 C/o Office Complex for<br />
Central Ground Water<br />
Board at Tattiannaram,<br />
Hyderabad.<br />
41 C/o sports hostel for<br />
Acharya Nagarjuna<br />
University, Nagarjuna<br />
Nagar, Guntur Dist.<br />
42 Renovation of<br />
Manikyavelu Mansion<br />
at Palace Road for<br />
NGMA.<br />
43 C/o Bldg for Central<br />
Ground Water Board<br />
44 C/o Bldg for<br />
ASI(Epigraphy)<br />
CZ Bangrasia 552.12 Feb'04 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
WZ-I Bhuj 308.75 Jan'04 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZ- I Avadi 1469.37 Aug'05 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
SZ- I Pondi-cherry 656.83 Sept'03 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZ- I Madurai 279.10 Feb'05 Work in<br />
progress.<br />
TDC<br />
SZ-II Hyderabad 462.29 Mar-<br />
04<br />
Mar'07<br />
Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
SZ-II Guntur Dt. 267.00 Jan-06 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZIII Bangalore 777.71 Dec-01 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
SZIII Bangalore 398.41 Oct-03 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
SZIII Mysore 587.00 Nov-03 Work in<br />
progress.<br />
TDC<br />
Feb'07
45 C/o Office Bldg for<br />
HQs for<br />
Commissionerate II,<br />
Central Excise and<br />
Customs<br />
46 Development of Bulk<br />
Services, RTC III,<br />
CRPF<br />
47 C/o Office Bldg for<br />
RPO<br />
48 C/o 277 Nos Family<br />
Qrs for GC, CRPF (SH:<br />
248 Nos. Type II<br />
quarters)<br />
49 C/o International<br />
Guest House for CIIL.<br />
50 C/o 188 Nos. Family<br />
quarters. (Type II -<br />
180 nos, Type III - 8<br />
nos) at GC, CRPF.<br />
DEPOSIT <strong>WORKS</strong><br />
1 C/o Police Station and<br />
Staff Qtrs at Sarita<br />
Vihar, New Delhi (Sh:<br />
Type-II-14 Nos. Type-<br />
III-7 Nos. & Type-IV-1<br />
No.)<br />
2 C/o Main school<br />
building portion (A-I<br />
type), 11 Nos. qtrs (T-<br />
I/2 (S/S) T-II/4(D/S) T-<br />
III/4 (D/S) T-IV/1 (S/S)<br />
for KV at Bhanu.<br />
SZIII Kozhikode 699.16 Mar-04 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
SZIII Peringom 1443.58 Jun-04 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZIII Bangalore 594.97 Jul-04 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
SZIII Bangalore 1180.22 Sep-04 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
SZIII Mysore 327.62 Jul-05 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
SZIII Bangalore 1073.05 Sep-05 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
NDZ-<br />
IV<br />
New Delhi 555.00 Oct'02 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
NZ-I Bhanu(Hry). 258.86 Oct'04 Work in<br />
progress.<br />
TDC<br />
Jan'07
3 C/o Building for JNV at<br />
Kauni, Distt. Faridkot,<br />
SH: Dormitories (Boys<br />
and Girls) Kitchen &<br />
Dinning Hall, Staff Qtrs<br />
(8 Nos. Type-I)<br />
Principal Residence i/c<br />
development<br />
4 C/o Building for Lohara<br />
Distt. Moga Punjab.<br />
SH: School Building ,<br />
Dormitories (Boys and<br />
Girls) Kitchen &<br />
Dinning Hall, Staff Qtrs<br />
(8 Nos. T-III, 4 Nos.,<br />
T-II, 4Nos. T-I),<br />
Principal Residenence<br />
& development<br />
5 C/o New library<br />
building at I.I.T.<br />
Roorkee.<br />
6 C/o K.S.V.P. at<br />
Gomtinagar, Lucknow.<br />
7 C/O Interpretation<br />
Centre, Shopping<br />
Centre related<br />
development works &<br />
services at Fatehpur<br />
Sikri, Agra<br />
NZ-I Faridkot 526.77 Feb'05 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
NZ-I Moga 529.53 Feb'05 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
NZ-II Roorkee 1200.00 Apr-03 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
NZ-II Lucknow 297.00 Mar'03 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
NZ-II Agra 495.80 Sept'03 Work<br />
completed.
8 C/O Building for JNV at<br />
Moradabad (Phase-A)<br />
(SH : C/O School<br />
building with dinning<br />
hall, 1.5nos.<br />
Dormitories, Princiapl<br />
Residence, 16nos.<br />
Quarters etc.)<br />
9 C/o Office and 37 Qtrs.<br />
for Custom Deptt. at<br />
Barhni, Siddarthnagar.<br />
10 C/o 'A' Type school<br />
building for KV at<br />
Sikar.<br />
NZ-II Moradabad 352.65 Jul'02 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
NZ-II Siddardhnag<br />
ar<br />
NZ-<br />
III<br />
326.00 Jul'03 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
Sikar 298.24 Mar'04 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
11 C/o JNV at Siwan EZ-II Siwan 536.14 Jul'01 Work in<br />
progress.<br />
TDC<br />
12 C/o Bldg at JNV Distt<br />
Araria, Bihar Ph-B<br />
works<br />
13 C/o 30 Bedded hospital<br />
for Beedi workers at<br />
Bihar Sharif Nalanda<br />
SH: C/o Hospital Bldg.<br />
14 Development scheme<br />
for Bodhgaya (Ph-II) in<br />
Bihar under scheme of<br />
distination<br />
15 (a) Traffic Interchange<br />
Node<br />
Mar'07<br />
EZ-II Araria 232.78 Mar'05 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Nalanda 1078.00 Apr'01 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Bodhgaya 462.53 Mar'04 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Bodhgaya -do- -do- Work in<br />
progress.<br />
TDC<br />
Mar'07
16 (b) Shopping cum<br />
traffic interchange<br />
node near road along<br />
river.<br />
17 C/o KV at Namkum,<br />
Ranchi<br />
18 C/o Central school bldg<br />
(A-I) type at Dhurwa<br />
19 C/o Office -cum-lab<br />
bldg & resdl. Bldg for<br />
Central Soil & Water<br />
Conservation<br />
Research & Training<br />
Institute, Rosearch<br />
Centre<br />
20 C/o A-I type School<br />
Bldg at Keonjhar<br />
21 C/o A-I type School<br />
Bldg at Bhawanipatna<br />
C/o Roads in State of<br />
Bihar under Prime<br />
Minister Gram Sadak<br />
Yojana (PMGSY)<br />
22 NH-31 to Sahuri,<br />
Phulkari Road In<br />
Barauni Block<br />
23 Bisfi-Narsam Main<br />
Road to Siwol, Lohra,<br />
Rthos Durjoulia<br />
EZ-II Bodhgaya -do- -do- Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Ranchi 394.02 Jan'05 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Ranchi 254.04 Sept'04 Work in<br />
progress.<br />
TDC<br />
EZ-II Bhubanesw<br />
ar<br />
Mar'07<br />
292.00 Mar'04 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
EZ-II Keonjhar 281.13 Jan'05 Work in<br />
progress.<br />
TDC<br />
EZ-II Bhawanipat<br />
na<br />
EZ-<br />
II<br />
EZ-<br />
II<br />
Mar'07<br />
272.94 Mar'04 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
Begusarai 204.14 May'05 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
Madhubani 352.40 May'05 Work in<br />
progress.<br />
TDC<br />
Mar'07
24 Paleliya-Sarauli-<br />
Dalsing Srari Road in<br />
Vibhutipur Block<br />
25 C/o Archaeological<br />
Museum at Chanderi.<br />
26 Structural repairs and<br />
additonal works of<br />
Hospital Bldg & resdl<br />
qtrs of ESIC at Andheri<br />
Mumbai<br />
27 Development of works<br />
around Pandharpur.<br />
28 Development of<br />
Vijayadurg<br />
29 C/o ECE Lab over the<br />
Ist floor of Common<br />
Lecture Hall at NIT,<br />
Trichy<br />
30 C/o Office Building ,<br />
Guest House and<br />
Students Hostel for<br />
EGRL, IIGM Campus<br />
at Tirunelveli<br />
31 C/o 302 Nos. Family<br />
Qrs.for separated<br />
families forGC, CRPF,<br />
RR Dist.<br />
32 C/o 93<br />
Nos.Staff.Qrts.(6 T-I,<br />
40 T-II, 36 T-III, 9 T-IV,<br />
1 T-V, 1 T-VI) for SIB<br />
at Patrika Nagar,<br />
Shaikpet Mandal, Hyd<br />
EZ-<br />
II<br />
Samastipur 503.75 May'05 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
CZ Chanderi 260.00 Dec'02 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
WZ-I Mumbai 425.54 May'02 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
WZ-<br />
II<br />
WZ-<br />
II<br />
Pandharpur 200.00 Aug'02 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
Vijayadurg 200.00 Jan'03 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZ-I Trichy 300.91 Nov'05 Work in<br />
progress.<br />
TDC<br />
Jan'07<br />
SZ-I Tirunelveli 253.64 Jan'05 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZ-II Hyd'bad 1167.00 Aug -<br />
04<br />
Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZ-II Hyd'bad 712.07 Dec'03 Work in<br />
progress.<br />
TDC<br />
Mar'07
33 C/o Executive<br />
Development Centre<br />
for IHMCT<br />
34 C/o Bldg for Dept. of<br />
Chemical Science for<br />
at KU, Kannur Dt.<br />
35 C/o Superspeciality<br />
hospital for ESIC,<br />
Ashramam.<br />
SH: Superstructure<br />
36 C/o Office Bldg for<br />
Chitradurga Gramin<br />
Bank<br />
37 C/o 3 storeyed bldg for<br />
College of Nursing MG<br />
University<br />
38 C/o Marine<br />
Engineering Block (4<br />
nos.) at Thrikkakara<br />
campus for Cochin<br />
University of Science<br />
& Technology.<br />
SZIII Bangalroe 395.00 Apr-02 Work in<br />
progress.<br />
TDC<br />
SZIII Mangattapar<br />
amba<br />
Jan'07<br />
315.04 Mar-03 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
SZIII Kollam 1168.29 Jun-03 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZIII Chitradurga 209.37 Dec-03 Work in<br />
progress.<br />
TDC<br />
Feb'07<br />
SZIII Thalappady 243.00 Jan-05 Work in<br />
progress.<br />
TDC<br />
Mar'07<br />
SZIII Cochin 843.96 Dec-05 Work in<br />
progress.<br />
TDC<br />
Mar'07
Sl.<br />
No.<br />
Annexures V<br />
Name of Work Zone Client City /<br />
location<br />
1 Development of<br />
infrastrcutre for<br />
Sports Authority<br />
of India for<br />
Commonwealth<br />
Games-2010 to<br />
be held in Delhi<br />
2 Providing and<br />
laying Synthetic<br />
Hockey surface<br />
at various<br />
places in India<br />
(Gandhi Nagar,<br />
Kolkata,<br />
Madikere,<br />
Mumbai,<br />
Patiala,<br />
Shillaroo,<br />
Sonepat &<br />
Sundergarh).<br />
3 Providing and<br />
laying Synthetic<br />
Althletics Track<br />
Surface at SAI's<br />
Sports Centers<br />
at Gandhi<br />
Nagar, Kolkata,<br />
Guwahati,<br />
Mumbai,<br />
Patiala,<br />
Trivandrum,<br />
Sonepat &<br />
Imphal)<br />
4 C/o Boundary<br />
wall with<br />
Perimeter<br />
Security and<br />
Access Control<br />
System for<br />
Indian Chancery<br />
Complex at<br />
Kabul,<br />
Afghanistan<br />
A/A & E/S<br />
Amount<br />
(Rs. In<br />
lacs)<br />
Date of A/A &<br />
E/S<br />
PM(CWGames) SAI New Delhi 100000.00 EFC<br />
recommended<br />
approval in<br />
Oct'06<br />
CSO SAI Gandhi<br />
Nagar,<br />
Kolkata,<br />
Madikere,<br />
Mumbai,<br />
Patiala,<br />
Shillaroo,<br />
Sonepat &<br />
Sundergarh<br />
CSO SAI Gandhi<br />
Nagar,<br />
Kolkata,<br />
Guwahati,<br />
Mumbai,<br />
Patiala,<br />
Trivandrum,<br />
Sonepat &<br />
Imphal<br />
CSO MEA Kabul,<br />
Afghanistan<br />
1530.00 Nov'06<br />
1985.00 Jan'07<br />
433.00 Jun'06
5 C/o Indian<br />
Chancery<br />
Complex at<br />
Afghanistan<br />
6 Development of<br />
State Highways<br />
in the State of<br />
Bihar under<br />
RSVY<br />
7 Upgradation,<br />
retrofitting and<br />
aesthetic<br />
improvement of<br />
MP's<br />
flats/bungalows<br />
situated at North<br />
& South Avenue<br />
and MS flats at<br />
B.K. S. Marg<br />
New Delhi.<br />
8 Upgradation,<br />
retrofitting and<br />
aesthetic<br />
improvement of<br />
MP's<br />
flats/bungalows<br />
situated at<br />
Ferozeshah Rd,<br />
R.P.,SJ Rdand<br />
Meena Bagh,<br />
New Delhi.<br />
9 Upgradation,<br />
retrofitting and<br />
aesthetic<br />
improvement of<br />
Vithal Bhai Patel<br />
House situated<br />
at Rafi Marg,<br />
New Delhi.<br />
10 C/o Media<br />
Centre at Race<br />
Course<br />
Rd,Prime<br />
Minister House<br />
Complex, New<br />
Delhi.<br />
CSO MEA Afghanistan 4773.00 Dec'05<br />
CSO RSVY Bihar 107283.0 Nov'06<br />
NDZ.I GPRA New Delhi 428.46 Nov'06<br />
NDZ.I GPRA New Delhi 415.61 Nov'06<br />
NDZ.I GPRA New Delhi 230.91 Nov'06<br />
NDZ.I GPRA New Delhi 320.14 Nov'06
11 Electrical works<br />
for upgradation,<br />
retrofitting and<br />
aesthetic<br />
improvement in<br />
flats /<br />
bungalows<br />
situated at<br />
Vithal Bhai Patel<br />
House and<br />
B.K.S. Marg,<br />
New Delhi. .<br />
12 Providing,<br />
installation,Testi<br />
ng connection at<br />
H.T. Sub-<br />
Station including<br />
HT equipment<br />
Transformers,<br />
DG set & C/o<br />
Sub-Station at<br />
RCR Complex.<br />
13 Augmentation of<br />
electric substation<br />
with<br />
4x2000 KVA at<br />
North Block,<br />
New Delhi.<br />
14 Upgradation of<br />
Electrical Sub-<br />
Station including<br />
HT Equipment,<br />
Transformer ,LT<br />
Panel etc. at<br />
South Block,<br />
New Delhi .<br />
15 Electrical works<br />
for upgradation,<br />
retrofitting and<br />
aesthetic<br />
improvement of<br />
MPs<br />
flats/bungalows<br />
situated, New<br />
Delhi.<br />
NDZ.I GPRA New Delhi 258.02 Nov'06<br />
NDZ.I GPRA New Delhi 737.00 Oct'06<br />
NDZ.I GPOA New Delhi 321.00 Aug'06<br />
NDZ.I GPOA New Delhi 462.00 Aug'06<br />
NDZ.I GPRA New Delhi 290.38 Nov'06
16 Renovation /<br />
refurbishing of<br />
Vigyan Bhawan,<br />
New Delhi (SH:<br />
Replacement<br />
and<br />
modernisation<br />
of Sound<br />
System in Main<br />
Hall.)<br />
17 Augmentation<br />
of Sub-Station<br />
at Krishi<br />
Bhawan, New<br />
Delhi.<br />
(Electrical Work)<br />
18 C/o boundary<br />
wall road & post<br />
including<br />
frontgate and<br />
front wall and<br />
also for<br />
construction of<br />
dematory<br />
blockwith<br />
attached toilet at<br />
Greater Noida,<br />
Gautam Budh<br />
Nagar, (UP)<br />
19 C/o project<br />
RICHARD at Air<br />
force station<br />
Hirdan, U.P<br />
20 C/o 4 lane<br />
carriage way by<br />
covering of<br />
Nallah at AIIMS<br />
21 C/o Ayyakar<br />
Bhawan for<br />
income tax<br />
deptt, at plot no-<br />
17-E,<br />
Chandigarh<br />
22 C/o 100 Bedded<br />
women Hostel<br />
for Elite sports<br />
persons at SAI,<br />
NS, Patiala I/c,<br />
W/S, Sewerage<br />
& internal EI *<br />
NDZ.I GPOA New Delhi 483.04 Nov'06<br />
NDZ.I GPOA New Delhi 333.77 Nov'06<br />
MAP Zone MHA Greater<br />
Noida, UP<br />
MAP Zone India<br />
Air<br />
Force<br />
Air force<br />
station<br />
hindan<br />
Ghaziabad.<br />
582.35 Aug'06<br />
8318.60 Oct'06<br />
NDZ-V AIIMS Delhi 2200.00 May-06.<br />
NZ-I Income<br />
Tax<br />
Chandigarh 1498.67 Mar-06<br />
NZ-I SAI Patiala (Pb.) 393.65 Apr'06
development<br />
works.<br />
23 Laying of<br />
Synthetic<br />
Hockey surface<br />
at SAI, NS, NIS,<br />
Patiala (Pb.)<br />
24 Laying of<br />
Synthetic<br />
Atheletic Track,<br />
Patiala (Pb.)<br />
25 C/o 2 No. 120<br />
Men barrack<br />
D/S with kitchen<br />
dinning Hall S/S<br />
and toilet block<br />
I/c External W/S<br />
and sewerage<br />
and E/I for SHQ<br />
and Bn. HQ at<br />
BSF campus<br />
Abohar.<br />
26 C/o Building for<br />
JNV at<br />
Dhanansu (Ph-<br />
B), Distt.<br />
Ludhiana<br />
Punjab. SH:<br />
Dormitories (1<br />
Boys and half<br />
Girls) staff qtrs<br />
(8 Nos. Type-III,<br />
2 Nos. Type-I),<br />
including<br />
Internal<br />
Electrical<br />
installation,<br />
water supply,<br />
sanitary<br />
installtions,<br />
drainage<br />
27 Ext. of Lacture<br />
Theatre at NIT,<br />
Jalandhar<br />
NZ-I SAI Patiala (Pb.) 300.00 Jun'06<br />
NZ-I Sports Patiala (Pb.) 300.00 Jun'06<br />
NZ-I BSF Abohar(Pb.) 179.40 Dec-06<br />
NZ-I JNV Dhanansu 225.53 Apr'06<br />
NZ-I NIT Jalandhar 242.25 --
28 C/o New Boys<br />
Hostel No: IV for<br />
NIT Hamirpur.<br />
SH: Building<br />
Work.<br />
29 C/o Residential<br />
accommodation<br />
for staff at NIT<br />
Hamirpur (HP).<br />
30 C/o Modern<br />
Lecture Hall<br />
Blocks (Main<br />
Building) at NIT,<br />
Hamirpur (HP).<br />
31 C/o A-O type<br />
school building<br />
and 9 units of<br />
staff quarters,<br />
boundary wall<br />
etc. for KV<br />
Bhanala (HP).<br />
32 C/o T-II/40 Qtrs.<br />
(Resdl. Qtrs.)<br />
for BSF at<br />
Sundarbani.<br />
33 C/O 1 No. 120<br />
Men Barrack<br />
(F/S) Including<br />
Kitchen &<br />
Dinning Hall For<br />
ITBP at<br />
Udhampur<br />
34 C/o Training<br />
Shed for 12th,<br />
15 th & 23rd Bn.<br />
ITBP at Leh<br />
(J&K)<br />
35 C/o Mt<br />
Workshop at<br />
SHQ, ITBP at<br />
Leh (J&K).<br />
36 C/o 10 Bedded<br />
Hospital for 15th<br />
Bn. For ITBP<br />
Leh.<br />
NZ-I NIT Hamirpur<br />
(HP)<br />
NZ-I NIT Hamirpur<br />
(HP)<br />
NZ-I NIT Hamirpur<br />
(HP)<br />
NZ-I KVS Bhanala<br />
Distt. Kangra<br />
(HP)<br />
1592.00 Feb'06<br />
299.73 Dec'06<br />
848.00 Dec'06<br />
371.70 Apr'06<br />
NZ-I BSF Sunderbani 253.93 Apr-06<br />
NZ-I ITBP Udhampur 230.23 Aug-06<br />
NZ-I ITBP Leh 417.35 Jul-06<br />
NZ-I ITBP Leh 202.26 Feb-06<br />
NZ-I ITBP Leh 532.06 Sep-06
37 C/o T-I/ 4 Nos,<br />
T-II/4 Nos, T-<br />
II/8nos, T-IV/4<br />
Nos & T-V/2<br />
Nos, Total 42<br />
Nos Qtrs for<br />
SHQ (Ldk) ITBP<br />
at Leh.<br />
38 C/o Boundary<br />
wall, Gate,<br />
Living Bunkers<br />
and March at<br />
BSF Campus,<br />
Bandipura.<br />
39 C/o Phase A at<br />
JNV, Kaza,<br />
Distt. Lahaul<br />
Spiti (HP) and<br />
T-I/4, T-II/4, T-<br />
III/8, Principal<br />
Resdl. Qtrs.,<br />
Kitchen, Dinning<br />
1 No. (Two<br />
block)<br />
Development.<br />
40 C/o New<br />
Academic Block<br />
at LBSNAA,<br />
Mussoorie.<br />
41 C/o Admn and<br />
training block for<br />
M & SI, ITBP at<br />
Auli.<br />
42 C/o Quarter<br />
Guard, Quarter<br />
Master store<br />
and M.I. Room<br />
for M & SI for<br />
ITBP at Auli.<br />
43 C/o Multistoried<br />
boys hostel at<br />
I.I.T., Roorkee.<br />
44 C/o 24 Nos. T-II<br />
quarters (T/S)<br />
for ITBP at<br />
Pithoragarh.<br />
45 C/o 30 Nos. T-B<br />
Qtrs.BBAU,<br />
Lucknow.<br />
NZ-I ITBP Leh 531.66 Sep-06<br />
NZ-I BSF Bandipura 224.65 Sep-06<br />
NZ-I JNV Lari, Kaza<br />
Distt. Lahaul<br />
Spiti (HP).<br />
NZ-II LBSNA<br />
A<br />
874.32 Sep-04<br />
Mussoorie 1582.00 Dec-06<br />
NZ-II ITBP Auli 438.76 Feb-06<br />
NZ-II ITBP Auli 401.33 Aug-06<br />
NZ-II IIT Roorkee 2184.24 Sep-06<br />
NZ-II ITBP Pithoragarh 238.12 Aug-06<br />
NZ-II BBAU Lucknow 328.42 Sep'06
46 C/o 8 no. T-I (54<br />
Sqm), 16 No. T-<br />
II (85 sqm), 24<br />
No. T-III (120<br />
Sqm) 6 No. T-IV<br />
(155 Sqm) & 6<br />
No. T-V (200<br />
Sqm)<br />
Residential<br />
Qtrs. at IIIT,<br />
Allahabad.<br />
47 C/o Boys Hostel<br />
No. 3 Ph-II at<br />
IIIT, Allahabad.<br />
48 C/o Married<br />
Scholar<br />
apartments of<br />
one block of 30<br />
units and one<br />
unit of 20<br />
blocks, Ph-II at<br />
IIIT, Allahabad.<br />
49 C/o CAT<br />
Building at<br />
Allahabad.<br />
50 C/o Building for<br />
JNV at<br />
Channdauli, Ph-<br />
A. (UP).<br />
51 C/o Building for<br />
JNV at<br />
Sonebhadra,<br />
Ph-A. (UP).<br />
52 C/o Building for<br />
JNV at<br />
Ambedkarnagar<br />
, Ph-A. (UP).<br />
53 C/o 227 Nos.<br />
Quarters for<br />
CRPF at GC-II,<br />
Ajmer<br />
54 C/o 93<br />
Residential<br />
Qtrs. for Staff of<br />
Income Tax<br />
Department at<br />
Balsamand,<br />
Jodhpur.<br />
NZ-II IIIT Allahabad 635.00 Jun'06<br />
NZ-II IIIT Allahabad 627.00 Sep'06<br />
NZ-II IIIT Allahabad 354.00 Aug'06<br />
NZ-II CAT Allahabad 684.95 Sep'06<br />
NZ-II JNV Chandauli 661.79 Jan'06<br />
NZ-II JNV Sonebhadra 515.55 Feb'05<br />
NZ-II JNV Ambedkar<br />
nagar<br />
560.56 Sep'05<br />
NZ-III CRPF Ajmer 1249.81 Aug'06<br />
NZ-III Income<br />
Tax<br />
Jodhpur 837.27 Jul'06
55 C/o 51 Staff<br />
Qtrs. for<br />
Income Tax<br />
Department at<br />
Kota.<br />
56 C/o Income Tax<br />
office building at<br />
Udaipur.<br />
57 C/o office<br />
building of WB,<br />
HIDCO near 3rd<br />
Rotary of MAR<br />
at New Town<br />
(Rajarhat),<br />
Kolkata.<br />
58 C/o office<br />
building for I.T.<br />
Department at<br />
Chunchura,<br />
West Bengal.<br />
59 C/O Post<br />
Graduate Hostel<br />
for NIH at Salt<br />
Lake, Kolkata.<br />
60 C/o annexe<br />
building for I.T.<br />
Department at<br />
Durgapur, West<br />
Bengal.<br />
61 C/o building for<br />
JNV at<br />
Jharsuguda,<br />
Orissa.<br />
62 C/o Office<br />
building for<br />
Income Tax at<br />
Dhanbad<br />
63 C/o Office-cumlaboratory<br />
bdldg. for All<br />
India Soil & land<br />
use Survey at<br />
Kanke, Ranchi.<br />
64 C/o 800 Room<br />
Boys Hostel for<br />
ISM, Dhanbad.<br />
65 C/o 24 Nos.<br />
Type-V qtrs for<br />
ISM, Dhanbad.<br />
NZ-III Income<br />
Tax<br />
NZ-III Income<br />
Tax<br />
Kota 414.79 Mar'06<br />
Udaipur 807.59 Jun'06<br />
EZ-I MAR Kolkata 1759.74 Oct'06<br />
EZ-I Income<br />
Tax<br />
ChunchuraW<br />
est Bengal<br />
431.74 Apr'06<br />
EZ-I NIH Saltlake 361.00 May'06<br />
EZ-I Income<br />
Tax<br />
Durgapur 285.50 May'06<br />
EZ-II JNV Jhasuguda 650.75 Jul-06<br />
EZ-II Income<br />
Tax<br />
Dhanbad 723.00 Aug-06<br />
EZ-II AISLIS Ranchi 277.00 Aug-06<br />
EZ-II ISM Dhanbad 1368.00 Sep-06<br />
EZ-II ISM Dhanbad 613.00 Sep-06
66 C/o Tourism<br />
Facility near<br />
Hotel Sidhartha<br />
Vihar at<br />
Bodhgaya.<br />
67 Land scaping &<br />
embankment<br />
work on river<br />
Nirangann,<br />
Bodhgaya.<br />
68 C/o JNV at East<br />
Singhbhum<br />
69 C/o Regional<br />
centre for<br />
IITTM.<br />
C/o Roads in<br />
State of Bihar<br />
under Prime<br />
Minister Gram<br />
Sadak Yojana<br />
(PMGSY)<br />
70 Virpur to<br />
Mhaidabhavayg<br />
ama via<br />
Gahaapul<br />
71 Khattopur<br />
Maiyappu to<br />
Rumpur<br />
Hosspur Road.<br />
72 Barauni PWD<br />
Rpad tp Aalapur<br />
Pasopur.<br />
73 Ratanpur to<br />
Singhaul via<br />
Kumruddinpur<br />
Akashpur.<br />
74 Pubsaara<br />
Bagrak Road.<br />
75 Rajaura to Nima<br />
Chandpura.<br />
76 NH31 Balla to<br />
Dandari via<br />
Nurjampur to<br />
Kutarmala.<br />
77 Ratauli to<br />
Hardiya via<br />
Vinodpur<br />
Baghani.<br />
EZ-II Touris<br />
m<br />
EZ-II Touris<br />
m<br />
Bodhgaya 946.00 Nov-06<br />
Bodhgaya 960.81 Nov-06<br />
EZ-II JNV East<br />
Singhbhum<br />
705.06 Nov-06<br />
EZ-II IITTM Bodhgaya 980.23 Apr-06<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
Begusarai 249.68 Aug-06<br />
Begusarai 357.40 Jun-06<br />
Begusarai 362.39 Jun-06<br />
Begusarai 596.83 Jun-06<br />
Begusarai 646.37 Jun-06<br />
Begusarai 455.37 Jun-06<br />
Begusarai 740.39 Jun-06<br />
Begusarai 291.13 Jun-06
78 Bhagnwarpur to<br />
Deshri Sanjaat<br />
Raod.<br />
79 Rampur Pitch<br />
Road to<br />
Gardhpura.<br />
80 Baitpur to<br />
Baraiyarpur.<br />
81 Bachwara<br />
Panchat<br />
Bhawan to<br />
Gobindpur.<br />
82 Virpur to<br />
Pakthaul.<br />
83 Kilaghat Ekmi<br />
Taralahi Simri<br />
Singpora Path.<br />
(16.60 KM).<br />
84 Akrehu (Ashok<br />
Paper Mill) to<br />
Bideswarusthan<br />
NH: 57 (41.55<br />
km)<br />
85 From Kedu to<br />
Bharoli Sobhan<br />
Chowk Koda<br />
Kathosa.<br />
86 From Hayaghat<br />
(Gumti to<br />
Bahedi via<br />
Hathori Path.<br />
(17.15 KM).<br />
87 Pehadi PWD<br />
Path to Paruri<br />
via Mahinam<br />
Kanhauli Maloul<br />
Road.<br />
88 Murya to<br />
Bhalpulti<br />
Nainaghat<br />
Mohammadpur<br />
Sonki Path.<br />
89 Milki Hariat<br />
Suhar Road.<br />
90 Dhohi Chauk to<br />
Dhohingaon,<br />
Sirahi, Samalta<br />
to Mahiganma<br />
Ami Road.<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
Begusarai 310.87 Jun-06<br />
Begusarai 814.87 Jun-06<br />
Begusarai 406.16 Jun-06<br />
Begusarai 348.04 Jun-06<br />
Begusarai 371.76 Aug-06<br />
Darbhanga 651.69 Apr-06<br />
Darbhanga 1895.72 Apr-06<br />
Darbhanga 777.73 Jun-06<br />
Darbhanga 822.36 Apr-06<br />
Darbhanga 813.72 Sep-06<br />
Darbhanga 778.14 Sep-06<br />
Darbhanga 376.60 Sep-06<br />
Darbhanga 486.48 Sep-06
91 Chumpa<br />
Nurailla Rardh<br />
Baluatol<br />
Persoliya<br />
Bardepur<br />
Kalikapur<br />
Laximipur Dattar<br />
Path.<br />
(19.33 km)<br />
92 Piparghat<br />
Dewhar<br />
Dhakhari<br />
Andharatharhi<br />
Gidharghanj<br />
Madnaberia<br />
Phulparas.<br />
(31.30 km)<br />
93 Ladania<br />
Khazedih<br />
Gidhwas<br />
Mirzapur<br />
Salkhania Pithi<br />
Babubarahi<br />
Satghuru Path<br />
(18.60 KM)<br />
94 C/o 0.50 Unit<br />
boys dorm.&<br />
girls dorm., T/III<br />
& T/II Staff Qtrs.<br />
and T/II Guest<br />
House at JNV,<br />
Dist. Changlong<br />
(Arunachal<br />
Pradesh) Ph-B.<br />
95 C/o Buildings<br />
for JNV at West<br />
Garo Hills Distt.,<br />
Mahendraganj,<br />
Meghalaya (PH-<br />
B).<br />
96 C/o Bldgs. for<br />
JNV at<br />
Niangbari, Ri<br />
Bhoi Distt.<br />
Meghalaya.<br />
(Ph.B)<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
EZ-II PMGS<br />
Y<br />
NEZ JNV Changlong, Ar.<br />
Pradesh<br />
NEZ JNV West Garo<br />
Hills,<br />
Meghalaya<br />
NEZ JNV Ri Bhoi,<br />
Meghalaya<br />
Madhubani 1187.13 Apr-06<br />
Madhubani 2550.20 Apr'06<br />
Madhubani 983.33 Apr-06<br />
296.38<br />
290.89<br />
258.75<br />
253.97<br />
225.67<br />
221.52<br />
Jul-06<br />
Sep-06<br />
Aug-06<br />
Sep-06<br />
Aug-06<br />
Sep-06
97 C/o 0.50 unit<br />
boys dorm.,<br />
0.50 unit girls<br />
dorm., T/III &<br />
T/II Staff Qtrs.<br />
and T/II Guest<br />
House at JNV,<br />
Dist. Jorhat,<br />
Assam. Phase-<br />
B.<br />
98 C/o dormotiry,<br />
T/III, T/II & T/I<br />
Staff Qtrs., T/II<br />
Guest House at<br />
JNV, Dist.<br />
Dhalai, Tripura.<br />
Ph-A (Bal.).<br />
99 C/o dormitory at<br />
JNV, Yachuli,<br />
Dist. Lower<br />
Subansiri<br />
(Arunachal<br />
Pradesh) Ph-B.<br />
100 C/o T/III & T/II<br />
Staff Qtrs. and<br />
T/II Guest<br />
House and T/I<br />
Staff Qtrs. at<br />
JNV, Dist. East<br />
Kameng, Seppa<br />
(Aru. Pradesh)<br />
Phase-B.<br />
101 C/o dormitory,<br />
T/III & T/II Staff<br />
Qtrs. and T/II<br />
Guest House at<br />
JNV, Dist.<br />
Tinsukia,<br />
Assam.<br />
102 C/o Buildings<br />
for JNV at<br />
Serchhip,<br />
Mizoram (Ph-<br />
B).<br />
103 Laying of<br />
Synthetic<br />
Athletic Track at<br />
SAI, North<br />
Eastern<br />
Regional<br />
NEZ JNV Jorhat, Assam 283.47<br />
278.22<br />
NEZ JNV Dhalai, Tripura 584.57<br />
574.88<br />
NEZ JNV Yachuli, Ar.<br />
Pradesh<br />
NEZ JNV East Kameng,<br />
Ar. Pradesh<br />
NEZ JNV Tinsukia,<br />
Assam.<br />
NEZ JNV Serchhip,<br />
Mizoram<br />
NEZ SAI Imphal,<br />
Manipur<br />
245.95<br />
241.42<br />
120.56<br />
118.32<br />
Aug-06<br />
Sep-06<br />
Aug-06<br />
Sep-06<br />
Aug-06<br />
Sep-06<br />
Aug-06<br />
Sep-06<br />
248.61 Sep-06<br />
338.95<br />
332.65<br />
May-06<br />
Sep-06<br />
330.30 Sep-06
Centre, Imphal.<br />
104 Laying of<br />
Synthetic<br />
Hockey Surface<br />
at SAI, North<br />
Eastern<br />
Regional<br />
Centre, Imphal.<br />
105 Establishment<br />
of Special Area<br />
Games Centre<br />
at NEHU,<br />
Shillong<br />
106 C/o Hostel cum<br />
Suites for NIRD.<br />
NERC,<br />
Guwahati.<br />
107 C/o 2 nos. 120<br />
men barrack<br />
for BSF at 131<br />
Bn HQ, Nalkata.<br />
108 C/o 2 nos. 120<br />
men Jawans<br />
living barrack<br />
with cook house<br />
cum dining hall&<br />
lav. block for<br />
BSF at Bagafa.<br />
109 C/o 159 /T-<br />
II(T/S), 34 /T-<br />
III(T/S), 1 /T-<br />
IV(S/S) & 1 /T-<br />
V(S/S) qrtrs. at<br />
135 Bn, BSF,<br />
Fatikchera.<br />
110 C/o Office bldg.<br />
& 6-T/II(D/S),<br />
12-T/III(D/S)<br />
Qtrs. for ISPW,<br />
at Itanagar, Aru.<br />
Pradesh.<br />
111 C/o Swimming<br />
Pool (Olympic<br />
Size) at NEPA,<br />
Umsaw,<br />
Meghalaya.<br />
NEZ SAI Imphal,<br />
Manipur<br />
NEZ NEHU Shillong,<br />
Meghalaya<br />
NEZ NERC Guwahati,<br />
Assam<br />
NEZ BSF Nalkata,<br />
Tripura<br />
NEZ BSF Bagafa,<br />
Tripura<br />
NEZ BSF Fatikchera,<br />
Tripura<br />
NEZ ISPW Itanagar, Ar.<br />
Pradesh.<br />
NEZ NEPA Umsaw,<br />
Meghalaya<br />
247.00 Sep-06<br />
2379.00 Oct-06<br />
351.00 Oct-06<br />
678.17 Apr-06<br />
556.47 Apr-06<br />
1552.41 Jul-06<br />
244.40 Apr-06<br />
220.20 Oct-06
112 C/o of security<br />
and retaining<br />
wall in ITBP<br />
campus at<br />
Itanagar, Ar.<br />
Pradesh.<br />
113 C/o Office bldg.<br />
& guest house<br />
for AG, Aizawl,<br />
Mizoram.<br />
114 C/o building for<br />
RVTI<br />
115 C/o school<br />
building 'A' type<br />
and staff<br />
qtrsetc. For KV2<br />
at Raipur.<br />
116 C/o A Type<br />
School building<br />
(Single section<br />
with science<br />
labs) & 9 units<br />
staff qrts for K.V<br />
117 C/o KV 2 at<br />
Rewa<br />
118 C/o Admn.<br />
Building and 1<br />
nos. 120 men<br />
barracks for<br />
BSF at<br />
Gandhidham.<br />
119 C/o 2 nos. 120<br />
men barracks<br />
for BN HQ BSF<br />
at Dantiwada<br />
120 C/o Residential<br />
quarters (36<br />
nos.) I/c bulk<br />
serices for CAT,<br />
Vejalpur,<br />
Ahmedabad.<br />
NEZ ITBP Itanagar,<br />
Aru. Pradesh<br />
NEZ AG Aizawl,<br />
Mizoram<br />
371.79 Nov-06<br />
1091.26 Nov-06<br />
CZ RVTI Indore 518.66 Aug'06<br />
CZ KVS Raipur 489.92 Sep'06<br />
CZ KVS Mandla 376.45 Oct'06<br />
CZ KVS Rewa 399.69 Nov'06<br />
WZ-I BSF Gandhidham 296.39 Mar'06<br />
WZ-I BSF Dantiwada 409.42 Mar'06<br />
WZ-I CAT Ahmedabad 492.85 Apr'06
121 Renovation of<br />
4th to 7th floor<br />
of C-12 building<br />
and providding<br />
compactor to<br />
basement of C-<br />
11 building for<br />
I.Tax dept at<br />
B.K. complex,<br />
Mumbai.<br />
122 Additional and<br />
alteration to 122<br />
nos. flats and<br />
external<br />
services I/c<br />
internal<br />
electrificationfor<br />
SEBI at<br />
Shivajinagar,<br />
Mankhurd,<br />
Mumbai.<br />
123 C/o 65 nos (Ty-<br />
1/3, Ty-II/42, Ty-<br />
III/15, Ty-IV/3,<br />
and Ty-V/2)<br />
SHQ BSF<br />
atBhuj.<br />
124 C/o multistoried<br />
Residential qtrs.<br />
12 nos. ( Ty-V4<br />
and Type VI-8)<br />
for I.Tax dept. at<br />
Surat.<br />
125 C/o 4 nos. Ty/I,<br />
66nos. Ty-II, 24<br />
nos. Ty-III 4nos.<br />
Ty-/IV and 2<br />
nos. Ty-./V for<br />
BN HQ BSF at<br />
Dantiwada.<br />
126 C/o Admn.<br />
Building and 1<br />
nos. 120 men<br />
barracks for<br />
SHQ at Bhuj.<br />
WZ-I Income<br />
Tax<br />
Mumbai 467.48 May'06<br />
WZ-I SEBI Mumbai 501.21 Jun'06<br />
WZ-I BSF Bhuj 414.76 Jul'06<br />
WZ-I Income<br />
Tax<br />
Surat 490.96 Jul'06<br />
WZ-I BSF Dantiwada 640.75 Aug'06<br />
WZ-I BSF Bhuj 413.65 Aug'06
127 C/o Regional<br />
Training Insitute<br />
and Hostel<br />
Building for<br />
CAG at Banra<br />
Kurla Complex,<br />
Mumbai.<br />
128 C/o office<br />
premises<br />
forI.Tax<br />
Department at<br />
'G' Block, B.K.<br />
complex,<br />
Mumbai.<br />
129 C/o office<br />
Building for IDBI<br />
with interior a<br />
plot no. G-7.<br />
Bandra Kurla<br />
complex (BKC),<br />
Mumbai.<br />
130 C/o Mahatma<br />
Gandhi<br />
Antarrashitriya<br />
Hindi Vishwa<br />
Vidyalaya at<br />
Wardha.<br />
(Phase-II)<br />
131 C/o office-cumlaboratory<br />
building for NRC<br />
on pomegranate<br />
at Kegaon,<br />
Solapur.<br />
132 C/o Additional<br />
four floors I.e.<br />
4th to 7th over<br />
the existing<br />
Income Tax<br />
bldg. at Plot No.<br />
5 EDC Plot,<br />
Panaji, Goa.<br />
133 C/o 16 Nos.<br />
Lecture Type<br />
Quarters for<br />
NIT, Trichy<br />
WZ-I CAG Mumbai 3556.13 Sept'06<br />
WZ-I Income<br />
Tax<br />
Mumbai 9722.00 Nov'06<br />
WZ-I IDBI Mumbai 11418.00 Nov'06<br />
WZ-II Hindi<br />
Vishwa<br />
Vidyala<br />
ya<br />
Wardha 1400.00 Oct'06<br />
WZ-II NRC Solapur 365.00 Sept'06<br />
WZ-II Income<br />
Tax<br />
Panaji, Goa 296.66 Jun'06<br />
SZ-I NIT Trichy 214.78 Sept'06
134 C/o Hostel<br />
Building for<br />
Department of<br />
Ocean Studies<br />
and Marine<br />
Biology for<br />
Pondicherry<br />
University at<br />
Port Blair SH:<br />
Girls and Boys<br />
Hostel<br />
135 C/o Additional<br />
150 Men's<br />
Hostel Block I,<br />
Block II and<br />
Block III for<br />
Pondicherry<br />
University at<br />
Pondicherry<br />
136 C/o Additional<br />
Academic Block<br />
for NIFT at<br />
Taramani<br />
137 C/o Rajiv<br />
Gandhi<br />
Ninaivagam at<br />
Sriperumpudur,<br />
TN SH: Upkeep<br />
and retrofitting<br />
of Memorial<br />
Phase I<br />
138 C/o 26 Nos. Staf<br />
Quarters (Type<br />
I-2 Nos; Type II-<br />
4 Nos; Type III-<br />
19 Nos; Type<br />
IV-1 No.) for<br />
Central Excise<br />
Department at<br />
Sivakasi<br />
139 C/o Office<br />
Building for<br />
Central Excise<br />
Department at<br />
Sivakasi<br />
140 C/o<br />
Multipurpose<br />
Hall for Sports<br />
Authority of<br />
India, SAG<br />
SZ-I Pondic<br />
herry<br />
Univers<br />
ity<br />
SZ-I Pondic<br />
herry<br />
Univers<br />
ity<br />
Port Blair 275.00 Aug'06<br />
Pondi-cherry 1010.79 Aug'06<br />
SZ-I NIFT Taramani 354.04 Apr'06<br />
SZ-I MOUD Sriperumpudur 210.88 Jul'06<br />
SZ-I Central<br />
excise<br />
SZ-I Central<br />
excise<br />
Sivakasi 213.86 Nov'06<br />
Sivakasi 222.55 Nov'06<br />
SZ-I SAI Mayiladuthurai 732.10 Sept'06
Center at<br />
Mayiladuthurai<br />
141 C/o Passport<br />
Office at Rayala<br />
Towers,<br />
Chennai -<br />
Electrical and<br />
Civil Works<br />
142 C/o permanent<br />
houses for the<br />
tusnami affected<br />
people of<br />
A&Nilands<br />
143 C/o Addl. Areas<br />
at NIFT<br />
(National<br />
Institute of<br />
Fashion<br />
Technology)<br />
144 C/o Lab building<br />
for housing<br />
CSSP, Gas<br />
hydrate and<br />
SMM Lab for<br />
NGRI (Phase II)<br />
145 C/o Income Tax<br />
office annexe at<br />
Kowdiar.<br />
146 C/o Office &<br />
Staff qtrs for IT<br />
Department<br />
147 C/o 208 Nos.<br />
Type II Family<br />
Qrts. at GC,<br />
CRPF.<br />
148 C/o Buildings<br />
over the existing<br />
structure at<br />
NIFT.<br />
149 C/o Acadmic<br />
block for<br />
University<br />
Teacher<br />
Education<br />
Centre for KU<br />
at Dharmasala.<br />
SZ-I MEA Chennai 309.60 Nov'06<br />
SZ-I A&N<br />
Admn.<br />
A & N Island 122100.00 Revised<br />
sanctioned<br />
received in<br />
Dec'06<br />
SZ-II NIFT Hyderabad 354.84 Mar'06<br />
SZ-II NGRI Hyderabad 416.00 Jun'06<br />
SZIII Income<br />
Tax<br />
SZIII Income<br />
Tax<br />
Trivandrum 339.57 Jun-06<br />
Udupi 294.40 Sep-06<br />
SZIII CRPF B'lore 1229.12 Dec-06<br />
SZIII NIFT B'lore 236.94 Apr-06<br />
SZIII Kannur<br />
Univers<br />
ity<br />
Kannur 253.92 Jun-06
150 C/o Main Block<br />
for Cochin<br />
University<br />
College of<br />
Engineering,<br />
Pulinkunnu.<br />
151 C/o Building for<br />
Pareeksha<br />
Bhavan for MG<br />
University.<br />
SZIII Cochin<br />
Univers<br />
ity<br />
SZIII MG<br />
Univers<br />
ity.<br />
Alleppey 555.49 Oct-06<br />
Kottayam 1026.03 Oct-06
Sl.No. NAME <strong>OF</strong> WORK<br />
identified for the<br />
year<br />
Name of<br />
Client<br />
Annexures VI<br />
Cost<br />
(Rs in<br />
Lakhs)<br />
Target<br />
for the<br />
year in<br />
%<br />
Achievemen<br />
ts during<br />
the quarter<br />
in %<br />
Achievemen<br />
t during the<br />
year in %<br />
Remarks Reason<br />
for short-fall in<br />
the achievement<br />
1 2 3 4 5 6 7 8<br />
1 MEA works at<br />
Kabul,<br />
Afghanistan.<br />
MEA<br />
New Chancery<br />
4770 70 5 35 Proposal for<br />
Building.<br />
splitting the works<br />
in small packages<br />
and further call of<br />
Tenders at Kabul is<br />
under process.<br />
2 C/o Fire Station & CE, PWD 234 100 30 DE sent. Structural<br />
Staff Qrts. At Zone-II<br />
analysis completed.<br />
Dallupura N.D. EE-<br />
Design & Drawings<br />
III<br />
for foundation for<br />
fire station issued.<br />
Approval of local<br />
body awaited.<br />
Drawings for<br />
superstructure to<br />
be issued only after<br />
the approval of<br />
3 C/o Central<br />
KVS 2600 70 0 70<br />
local body.<br />
Alll planing works<br />
Schools at Various Delhi<br />
for all the school<br />
locations ( 9 Nos.)<br />
buildings<br />
completed.<br />
4 Vetting of Projects MoUD &<br />
Some Project<br />
for North Eastern MUE&PA<br />
reports amounting<br />
States and Sikkim<br />
Rs. 79.18 crore<br />
(approximaterly)<br />
were scrutnised<br />
during quarter<br />
5 C/o Afghan<br />
MEA 33700 20 2 7<br />
ending Decemeber<br />
2006<br />
The enabling work<br />
Parliament house<br />
(Modifi<br />
estiamte amounting<br />
at Kabul<br />
ed)<br />
Rs. 67.00 lakh<br />
(Afghanistan)<br />
sanctioned by the<br />
MEA. Architectural<br />
drawings have<br />
been modified as<br />
per the<br />
requirements of<br />
Afghan authorities.<br />
The Arch. drawings<br />
have since been<br />
approved vide letter<br />
dt.21.12.2006 of<br />
MoUD, Govt of<br />
Afghanistan,
6 C/o Laghu Udhog<br />
Mart at NSIC, New<br />
Delhi.<br />
7 Development of<br />
State Highways in<br />
the state of BIHAR<br />
under RSVY.<br />
8 Carring out repairs<br />
in the Chancery<br />
Building at<br />
Islamabad.<br />
NSIC,<br />
New<br />
Delhi<br />
Governm<br />
ent of<br />
Bihar<br />
conveyed by JS<br />
(PAI) MEA vide no.<br />
6811/JS (PAI)/<br />
2006<br />
dt.14.12.2006.<br />
Modified P.E.by<br />
including the extra<br />
financial<br />
implications has<br />
since been sent to<br />
MEA on 9.1.2007<br />
for sanction.<br />
989 50 2 19 Structural<br />
Consultant has<br />
been appointed<br />
and design work in<br />
under progress.<br />
Approval for the<br />
drawings submitted<br />
to MCD is awaited.<br />
246658 100 5 95 DPRs for all the 19<br />
packages approved<br />
by Govt. of Bihar,<br />
MoSRTH (Govt.of<br />
India) & Planning<br />
Commission.<br />
Tenders were<br />
invited for prequalification<br />
again<br />
for execution of<br />
work in 14<br />
packages but<br />
response was<br />
received for 3<br />
packages only.<br />
Tenders being<br />
invited again for<br />
remaining 16<br />
packages.<br />
MEA 100% 5 30 Work awarded.<br />
Details of persons<br />
of Agency for<br />
issuing passport &<br />
visa to MEA.<br />
However, MEA<br />
requested to carry<br />
out the work<br />
through<br />
departmental<br />
labour considering<br />
the difficulty in<br />
issuing passport &<br />
visa to private<br />
labour. CE NDZ-II<br />
& CE(E) DR have<br />
been requested, to<br />
select the<br />
appropriate labour.<br />
Accordingly, a<br />
proposal for
9 Apprisal of the<br />
Detailed Project<br />
Reports for<br />
JNNURM for<br />
MoUD.<br />
10 Providing & Laying<br />
Synthetic Hockey<br />
Surface at various<br />
places in India<br />
(Gandhi Nagar,<br />
Kolkata, Madicus,<br />
Mumbai, Patiala,<br />
Shillaroo, Sonepat<br />
and Sundar Garh)<br />
11 Providing and<br />
Laying Synthetic<br />
Atheletics Track<br />
Surface at Sports<br />
Authority of India's<br />
centers at Gandhi<br />
Nagar, Kolkata,<br />
Guwahati,<br />
Mumbai, Patiala,<br />
Trivandrum,<br />
Sonepat and<br />
Imphal<br />
12 CCU Projects at<br />
Dehradun, Sawai<br />
Madhopur and<br />
Shillong.<br />
MoUD 11351.<br />
7 Lacs<br />
SAI 1530<br />
Lacs<br />
(Appr.)<br />
SAI 1550<br />
Lacs<br />
(App.)<br />
Min. of<br />
Enviro. &<br />
Forest<br />
approving the<br />
modalities for<br />
carrying out the<br />
work<br />
departmentally has<br />
been sent to MEA<br />
for their approval.<br />
Approval is<br />
awaited.<br />
100% 90% 90% Model document<br />
for Hockey field &<br />
Ohrer related work<br />
was finalised and<br />
sent to respective<br />
field unity for taking<br />
up the sub-base<br />
work. N.I.T. for the<br />
Hockey Turf was<br />
finalised & Tender<br />
were called which<br />
were recieved on<br />
31.10.2006 and<br />
after scrutinising of<br />
the tenders, same<br />
have been sent to<br />
C.W. Board for<br />
acceptance of the<br />
competent<br />
authority.<br />
25% 5% 5% General<br />
Arrangement<br />
drawing for the<br />
eight lane<br />
Athletic track with<br />
completion facilities<br />
finalised and sent<br />
to respective field<br />
units for taking up<br />
the sub-base work.<br />
N.I.T. for the<br />
atheletic turf is<br />
under preparation<br />
for call of Tenders.<br />
25% 5% 5% The work is at<br />
invitation stage.<br />
Concept drgs. for<br />
type IV quarter at<br />
Dehradun have<br />
been sent to client<br />
department.<br />
Approval is<br />
awaited. For works<br />
at Sawai Madhopur<br />
and Shillong
13 Construction of<br />
Indian Chancery<br />
Building at Beijing,<br />
China.<br />
14 Maintenance and<br />
resufacing of<br />
Tender - Kalewa-<br />
Kalemyo<br />
(TKK) Road along<br />
the India<br />
15 Providing Linear<br />
accelarator in<br />
AIIMS (Proof<br />
Checking of<br />
structural Design.)<br />
16 Feasibility report<br />
for the<br />
renovation/repair<br />
of buildings of<br />
Govt. Medical<br />
Store Deptt.<br />
(GMSD) at<br />
Chennai,<br />
Hydrabad,<br />
Mumbai, Kolkata,<br />
Karnal& New<br />
Delhi.<br />
MEA 4237<br />
Lacs<br />
MEA 5400<br />
Lacs<br />
AIIMS 68<br />
Lacs<br />
requirements from<br />
clients are awaited.<br />
Estimate for the<br />
works shall be<br />
prepared only after<br />
the approval of<br />
concept drawings.<br />
Proposal along with<br />
the cost estimate<br />
for assisting MEA<br />
in tender evaluation<br />
and taking up the<br />
quality assurance<br />
management for<br />
the Chancery<br />
Building at Beijing<br />
sent to MEA.<br />
Approval awaited.<br />
The Proposal has<br />
been received to<br />
take up the techinal<br />
audit for road<br />
work. To prepare<br />
the cost estimate<br />
for the <strong>CPWD</strong><br />
team to take up<br />
this<br />
work,doucments<br />
are awaited from<br />
MEA.<br />
75% 25% 25% The work is only for<br />
Proof checking of<br />
structural design<br />
which is in<br />
progress. Drawing<br />
for foundation have<br />
been released<br />
after Proof<br />
checking .<br />
DGHS Proposal for<br />
consultancy fee<br />
has been sent to<br />
DGHS approval<br />
awaited.
Annexures VII<br />
Performance of Vigilance Unit in terms of action taken on Complaints , Investigation of Cases and<br />
Disciplinary Proceedings inititated during 2005-06<br />
COMPLAINTS<br />
S.No. Stages<br />
Total<br />
1 Closed being Anonymous /Pseudonemous 84<br />
2<br />
3<br />
Closed after priliminary Investigation<br />
Taken up for detailed Investigation<br />
INVESTIGATION CASES<br />
S.No. Stages Total<br />
1<br />
2<br />
3<br />
IR's Finalised 84<br />
Sent to MOUD 47<br />
Draft put up for approval Nil<br />
4 Closed in Vigilance Unit after detailed<br />
investigation 25<br />
5 Closed in Vigilance Unit after preliminary<br />
investigation 1<br />
6 Major Penalty Charge Sheet<br />
issued 17<br />
7 Minor Penalty Charge Sheet<br />
issued 14<br />
8<br />
Caution Memo issued 15<br />
DISCIPLINARY PROCEEDINGS CASES<br />
S.No. Stages Total<br />
1<br />
Inquiries Conducted & P.O.<br />
Brief presented<br />
Comments on CO's<br />
51<br />
2 representation of IO's report<br />
Comments on<br />
51<br />
3 report of CO (Rule 16) 30<br />
4<br />
5<br />
6<br />
7<br />
Final Orders issued by DG (W)<br />
Final Orders issued by MOUD<br />
Appeal Cases finalised<br />
Review Cases finalised<br />
98<br />
19<br />
32<br />
53<br />
5<br />
4
8<br />
Sl.<br />
No.<br />
1.<br />
2.<br />
Counter statement prepared in CAT / Court Cases<br />
9 Vigilance Clearance Ceritificate (VCC) issued for Gazetted Officers<br />
10 Vigilance Clearance Ceritificate (VCC) issued for Non-Gazetted Officers<br />
Annexures VIII<br />
ACHIEVENTS <strong>OF</strong> THE <strong>CPWD</strong> TRAINING INSTITUTE UNIT DURING 2006-2007<br />
19<br />
2899<br />
3554<br />
Activity Target for Achievement upto<br />
2006-2007 December 2006<br />
No. of Courses for Group A' officers<br />
128 90<br />
No of Participants<br />
No. of sponsored courses Inland<br />
No. of participants sponsored for inland<br />
courses<br />
3. Sponsored participants for foreign<br />
courses<br />
4.<br />
5.<br />
No. of Courses for Group ‘B’ & ‘C’<br />
officers<br />
No of Participants<br />
No. of Courses for Group ‘D’ & workmen<br />
No. of Participants<br />
3840 1813<br />
100 86<br />
1000 454<br />
2 2<br />
140<br />
89<br />
2800 1312<br />
82 53<br />
1640 1332
Sl.No. Name of Work Inaugurated /<br />
Foundation stone<br />
1. Inauguration of<br />
Building for<br />
National Geo-<br />
Physical Research<br />
Institute.<br />
2. Inauguration of<br />
Administrative<br />
Building and<br />
Campus of the<br />
Institute of Hotel<br />
Management at<br />
Hajipur<br />
3. Foundation stone of<br />
Auction Hall etc. for<br />
Tobacco Board at<br />
Jangaraddgudem.<br />
4. Foundation stone of<br />
Hospital Building for<br />
Central Research<br />
Institute for<br />
Homeopathy<br />
5. Inauguration of<br />
NCAP Building at<br />
Pusa<br />
6. Inauguration of<br />
House Boat<br />
Terminal at<br />
Punnamada,<br />
Alleppey<br />
7. The inauguration of<br />
Youth Hostel at<br />
Udaipur<br />
8. Inauguration of<br />
Incubation Centre<br />
for STPI at<br />
Dehradun<br />
9. Foundation stone of<br />
Library Building at<br />
Laxmi Bai National<br />
laid by<br />
Lt. General (Rtd.) Sh.<br />
M.M. Lakhera, Lt.<br />
Governor of Adaman &<br />
Nicobar Islands and<br />
Pondicherry<br />
Smt. Ambika Soni<br />
Hon’ble Minister for<br />
Tourism<br />
Sh. Y. S. Rajasekhara<br />
Reddy, Hon’ble Chief<br />
Minister of Andhra<br />
Pradesh<br />
Shri K.S. Suresh<br />
Kurup, Hon’ble<br />
Member of Parliament<br />
Sh. Sharad Pawar,<br />
Hon’ble Minister for<br />
Agriculture<br />
Sh. Kodigeri<br />
Balakrishnan, Hon’ble<br />
Minister for Tourism<br />
and Home,<br />
Government of Kerala<br />
Smt. Vasundhara Raje,<br />
Hon’ble Chief Minister<br />
of Rajasthan<br />
Sh. Daya Nidhi Maran,<br />
Hon’ble Union Minister<br />
of Communication and<br />
Information<br />
Technology<br />
Sh. Balram Jhakar,<br />
Hon’ble Governor of<br />
Madhya Pradesh<br />
City Cost<br />
(In<br />
Lacs )<br />
Date of<br />
event<br />
Hyderabad 157.00 12/4/06<br />
Hajipur,<br />
Bihar<br />
Jangaraddgudem,<br />
Andhra Pradesh<br />
Kottayam,<br />
Kerala<br />
New Delhi<br />
Alleppey,<br />
Kerala<br />
Udaipur<br />
Rajasthan<br />
Dehradun<br />
989.00 12/4/06<br />
177.84 30/5/06<br />
500.00 1/6/06<br />
300.16 26/7/06<br />
100.00 8/8/2006<br />
100.71 14/8/2006<br />
174.00 22/8/06<br />
Gwalior ,M.P 734.49 21/9/06
Institute of Physical<br />
Education, Gwalior<br />
10. Inauguration of<br />
Indoor Stadium<br />
(Gymnasium) for<br />
Kannur University,<br />
Mangattuparamba<br />
11. Inauguration of<br />
Men’s Hostel for<br />
Kannur University,<br />
Mangattuparamba<br />
12. Foundation stone of<br />
Academic Block for<br />
University<br />
Teachers”<br />
Education Centre<br />
for Kannur<br />
University at<br />
Dharmasala,<br />
13. Foundation stone of<br />
Campus for Direct<br />
Taxes Regional<br />
Training Institute<br />
Complex at<br />
Jalahalli<br />
14. Inauguration of<br />
SEBI Bhawan at<br />
Bandra Kurla<br />
Complex<br />
15. Inauguration of<br />
Technical Centre<br />
for FSTI at NISA<br />
Campus Hyderabad<br />
16. Foundation stone of<br />
Residential<br />
Quarters at Sports<br />
Authority of India,<br />
Bhopal<br />
Shri V.S.<br />
Achuthanandan,<br />
Hon’ble Chief Minister<br />
of Kerala<br />
Shri P. Karunakaran,<br />
Hon’ble M. P.<br />
Shri M.A. Baby,<br />
Hon’ble Minister for<br />
Education & Culture,<br />
Government of Kerala<br />
Shri S.<br />
Palanimanickam,<br />
Hon’ble Minister of<br />
State for Finance,<br />
Government of India<br />
by Sh. Man Mohan<br />
Singh, Hon’ble Prime<br />
Minister of India<br />
Shri Shivraj Patil,<br />
Hon’ble Union Minister<br />
for Home Affairs<br />
Sh. R. P. Wattal, D. G.<br />
Sports Authority of<br />
India<br />
Mangattuparamba<br />
Kerala<br />
Mangattuparamba<br />
Kerala<br />
Dharmasala<br />
Kerala<br />
229.18<br />
22/9/06<br />
22/9/06<br />
315.56 22/9/06<br />
Bangalore 1107.51 25/9/06<br />
Mumbai 8677.36 6/10/06<br />
Hyderabad<br />
Andhra Pradesh<br />
90.00 10/10/06<br />
Bhopal 131.69 11/10/06
17. Foundation stone of<br />
Pandit Sunderlal<br />
Sharma Institute of<br />
Vocational<br />
Education at<br />
Bhopal<br />
18. Foundation stone of<br />
Centenary Building<br />
for ICAR at Pusa,<br />
Samastipur<br />
19. Inauguration of<br />
Administrative<br />
Block (Lab Building<br />
for stock fisheries &<br />
social science<br />
programme) for<br />
ICAR Research<br />
Complex for<br />
Eastern Region<br />
Patna named after<br />
late Shri Jagjivan<br />
Ram<br />
20. Inauguration of<br />
Office building for<br />
Central Water<br />
Commission at AC<br />
Guards Hyderabad<br />
21. Inauguration of<br />
Regional Office<br />
Building for CBSE<br />
at IP Extension<br />
22. The statue of Late<br />
Prime Minister Shri<br />
Lal Bahadur Shastri<br />
was unveiled at<br />
Lodhi Road, New<br />
Delhi.<br />
Sh. Arjun Singh,<br />
Hon’ble Minister of<br />
Human Resource<br />
Development, Govt. of<br />
India<br />
Sh. Sharad Pawar,<br />
Hon’ble Minister of<br />
Agriculture, Govt. of<br />
India<br />
Sh. Sharad Pawar,<br />
Hon’ble Union Minister<br />
of Agriculture<br />
Professor Saifuddin<br />
Soz, Hon’ble Minister<br />
for Water Resources,<br />
Govt. of India<br />
Shri Md. Ali Ashraf<br />
Fatmi, Hon’ble Union<br />
Minister of State for<br />
Human Resource and<br />
Development<br />
Sh. Man Mohan Singh,<br />
Hon’ble Prime Minister<br />
of India<br />
Bhopal 1951.00 13/10/06<br />
Samastipur<br />
Bihar<br />
Patna<br />
Bihar<br />
Hyderabad<br />
Andhra Pradesh<br />
205.00 16/10/06<br />
440.00 16/10/06<br />
578.00 19/10/06<br />
New Delhi 1616.00 21/11/06<br />
New Delhi 22.30 25/11/06
Annexures IX<br />
BORDER ROADS, FENCING & FLOOD LIGHTING <strong>WORKS</strong><br />
DURING 2006-2007<br />
Item Work<br />
completed<br />
up to March<br />
2006<br />
A. INDO-PAK BORDER<br />
(1) PUNJAB & RAJASTHAN<br />
SECTOR<br />
Work<br />
completed<br />
during the<br />
year 2006-07<br />
up to<br />
December<br />
2006<br />
Work targeted to be<br />
completed during the<br />
period January 2007 to<br />
March 2007<br />
(i) FENCING (in Km.) 1564 Km -- --<br />
(ii) FLOOD LIGHTING( in Km.) 1483 Km -- --<br />
(2) GUJARAT SECTOR<br />
(i) FENCING (in Km.) 165 Km 6 Km 45 Km<br />
(ii) ROAD (in Km) 170 Km 16 km 30 km<br />
(iii) FLOOD LIGHTING (in Km) 119 Km 59 Km 40 km<br />
(iv) BOPS (in Nos.) 18 Nos. 8 Nos. 9 Nos.<br />
B. INDO-BANGLADESH BORDER<br />
(1) West Bengal Sector<br />
(i) ROAD (in km) 1583 km 12 Km --<br />
(ii) BRIDGES (in meters) 14263 m -- --<br />
(iii) FENCING (in km) 1156 Km 20 Km 4 km<br />
(iV) FLOOD LIGHTING (in KM) 270 Km<br />
(2) Tripura Sector<br />
(i) FENCING (in km) 25 Km -- --<br />
Grand Total<br />
Fencing 2910 Km 26 49 Km<br />
Road 1753 Km 28 30 Km<br />
Flood lighting 1872 Km 59 40 Km<br />
Bridges 14263 m -- --<br />
BOP’s 18 Nos. 8 Nos. 9 Nos.
Annexures X<br />
LIST <strong>OF</strong> IMPORTANT EVENTS IN <strong>CPWD</strong> (2006-07)<br />
UPTO JAN’06<br />
Sl.No. Name of Work Inaugurated /<br />
Foundation stone<br />
23. Inauguration of<br />
Building for<br />
National Geo-<br />
Physical Research<br />
Institute.<br />
24. Inauguration of<br />
Administrative<br />
Building and<br />
Campus of the<br />
Institute of Hotel<br />
Management at<br />
Hajipur<br />
25. Foundation stone of<br />
Auction Hall etc. for<br />
Tobacco Board at<br />
Jangaraddgudem.<br />
26. Foundation stone of<br />
Hospital Building for<br />
Central Research<br />
Institute for<br />
Homeopathy<br />
27. Inauguration of<br />
NCAP Building at<br />
Pusa<br />
28. Inauguration of<br />
House Boat<br />
Terminal at<br />
Punnamada,<br />
Alleppey<br />
29. The inauguration of<br />
Youth Hostel at<br />
Udaipur<br />
laid by<br />
Lt. General (Rtd.) Sh.<br />
M.M. Lakhera, Lt.<br />
Governor of Adaman &<br />
Nicobar Islands and<br />
Pondicherry<br />
Smt. Ambika Soni<br />
Hon’ble Minister for<br />
Tourism<br />
Sh. Y. S. Rajasekhara<br />
Reddy, Hon’ble Chief<br />
Minister of Andhra<br />
Pradesh<br />
Shri K.S. Suresh<br />
Kurup, Hon’ble<br />
Member of Parliament<br />
Sh. Sharad Pawar,<br />
Hon’ble Minister for<br />
Agriculture<br />
Sh. Kodigeri<br />
Balakrishnan, Hon’ble<br />
Minister for Tourism<br />
and Home,<br />
Government of Kerala<br />
Smt. Vasundhara Raje,<br />
Hon’ble Chief Minister<br />
of Rajasthan<br />
City Cost<br />
(In<br />
Lacs )<br />
Date of<br />
event<br />
Hyderabad 157.00 12/4/06<br />
Hajipur,<br />
Bihar<br />
Jangaraddgudem,<br />
Andhra Pradesh<br />
Kottayam,<br />
Kerala<br />
New Delhi<br />
Alleppey,<br />
Kerala<br />
Udaipur<br />
Rajasthan<br />
989.00 12/4/06<br />
177.84 30/5/06<br />
500.00 1/6/06<br />
300.16 26/7/06<br />
100.00 8/8/2006<br />
100.71 14/8/2006<br />
30. Inauguration of Sh. Daya Nidhi Maran, Dehradun 174.00 22/8/06
Sl.No. Name of Work Inaugurated /<br />
Foundation stone<br />
Incubation Centre<br />
for STPI at<br />
Dehradun<br />
31. Foundation stone of<br />
Library Building at<br />
Laxmi Bai National<br />
Institute of Physical<br />
Education, Gwalior<br />
32. Inauguration of<br />
Indoor Stadium<br />
(Gymnasium) for<br />
Kannur University,<br />
Mangattuparamba<br />
33. Inauguration of<br />
Men’s Hostel for<br />
Kannur University,<br />
Mangattuparamba<br />
34. Foundation stone of<br />
Academic Block for<br />
University<br />
Teachers”<br />
Education Centre<br />
for Kannur<br />
University at<br />
Dharmasala,<br />
35. Foundation stone of<br />
Campus for Direct<br />
Taxes Regional<br />
Training Institute<br />
Complex at<br />
Jalahalli<br />
36. Inauguration of<br />
SEBI Bhawan at<br />
Bandra Kurla<br />
Complex<br />
37. Inauguration of<br />
Technical Centre<br />
laid by<br />
Hon’ble Union Minister<br />
of Communication and<br />
Information<br />
Technology<br />
Sh. Balram Jhakar,<br />
Hon’ble Governor of<br />
Madhya Pradesh<br />
Shri V.S.<br />
Achuthanandan,<br />
Hon’ble Chief Minister<br />
of Kerala<br />
Shri P. Karunakaran,<br />
Hon’ble M. P.<br />
Shri M.A. Baby,<br />
Hon’ble Minister for<br />
Education & Culture,<br />
Government of Kerala<br />
Shri S.<br />
Palanimanickam,<br />
Hon’ble Minister of<br />
State for Finance,<br />
Government of India<br />
by Sh. Man Mohan<br />
Singh, Hon’ble Prime<br />
Minister of India<br />
Shri Shivraj Patil,<br />
Hon’ble Union Minister<br />
City Cost<br />
(In<br />
Lacs )<br />
Date of<br />
event<br />
Gwalior ,M.P 734.49 21/9/06<br />
Mangattuparamba<br />
Kerala<br />
Mangattuparamba<br />
Kerala<br />
Dharmasala<br />
Kerala<br />
229.18<br />
22/9/06<br />
22/9/06<br />
315.56 22/9/06<br />
Bangalore 1107.51 25/9/06<br />
Mumbai 8677.36 6/10/06<br />
Hyderabad<br />
Andhra Pradesh<br />
90.00 10/10/06
Sl.No. Name of Work Inaugurated /<br />
Foundation stone<br />
for FSTI at NISA<br />
Campus Hyderabad<br />
38. Foundation stone of<br />
Residential<br />
Quarters at Sports<br />
Authority of India,<br />
Bhopal<br />
39. Foundation stone of<br />
Pandit Sunderlal<br />
Sharma Institute of<br />
Vocational<br />
Education at<br />
Bhopal<br />
40. Foundation stone of<br />
Centenary Building<br />
for ICAR at Pusa,<br />
Samastipur<br />
41. Inauguration of<br />
Administrative<br />
Block (Lab Building<br />
for stock fisheries &<br />
social science<br />
programme) for<br />
ICAR Research<br />
Complex for<br />
Eastern Region<br />
Patna named after<br />
late Shri Jagjivan<br />
Ram<br />
42. Inauguration of<br />
Office building for<br />
Central Water<br />
Commission at AC<br />
Guards Hyderabad<br />
43. Inauguration of<br />
Regional Office<br />
Building for CBSE<br />
at IP Extension<br />
44. The statue of Late<br />
Prime Minister Shri<br />
laid by<br />
for Home Affairs<br />
Sh. R. P. Wattal, D. G.<br />
Sports Authority of<br />
India<br />
Sh. Arjun Singh,<br />
Hon’ble Minister of<br />
Human Resource<br />
Development, Govt. of<br />
India<br />
Sh. Sharad Pawar,<br />
Hon’ble Minister of<br />
Agriculture, Govt. of<br />
India<br />
Sh. Sharad Pawar,<br />
Hon’ble Union Minister<br />
of Agriculture<br />
Professor Saifuddin<br />
Soz, Hon’ble Minister<br />
for Water Resources,<br />
Govt. of India<br />
Shri Md. Ali Ashraf<br />
Fatmi, Hon’ble Union<br />
Minister of State for<br />
Human Resource and<br />
Development<br />
Sh. Man Mohan Singh,<br />
Hon’ble Prime Minister<br />
City Cost<br />
(In<br />
Lacs )<br />
Date of<br />
event<br />
Bhopal 131.69 11/10/06<br />
Bhopal 1951.00 13/10/06<br />
Samastipur<br />
Bihar<br />
Patna<br />
Bihar<br />
Hyderabad<br />
Andhra Pradesh<br />
205.00 16/10/06<br />
440.00 16/10/06<br />
578.00 19/10/06<br />
New Delhi 1616.00 21/11/06<br />
New Delhi 22.30 25/11/06
Sl.No. Name of Work Inaugurated /<br />
Foundation stone<br />
Lal Bahadur Shastri<br />
was unveiled at<br />
Lodhi Road, New<br />
Delhi.<br />
laid by<br />
of India<br />
City Cost<br />
(In<br />
Lacs )<br />
Date of<br />
event