- 5 -<br />

Although it is apparent that <strong>the</strong> rate <strong>of</strong> development <strong>of</strong> <strong>irrigation</strong> is to some<br />

extent dependent upon '<strong>the</strong> rate <strong>of</strong> growth <strong>of</strong> <strong>the</strong> power system, this appears to he <strong>of</strong><br />

little practical significance, as a growing demand for power already exists. If<br />

this demand is met by development <strong>of</strong> <strong>the</strong> hydro-electric resources <strong>of</strong> <strong>the</strong> Tana, it is<br />

bound to provide <strong>the</strong> necessary flow control in advance <strong>of</strong> any reasonable schedule<br />

<strong>of</strong> <strong>irrigation</strong> development which may he foreseen.<br />

The power system envisaged would utilize to a high level <strong>the</strong> head and flow <strong>of</strong><br />

<strong>the</strong> middle Tana, through a complex <strong>of</strong> projects, <strong>the</strong> main features <strong>of</strong> which are summarized<br />

in Table 2-1. The power system defined in this table does not include <strong>the</strong><br />

additional 131 megawatt <strong>potential</strong> that could be developed by releasing some 400<br />

cubic feet per second (cusecs) <strong>of</strong> upstream allocations.<br />

Project Estimated<br />

capital cost*<br />

Seven Forks**<br />

Kiambere<br />

Mutanga<br />

Grand Falls<br />

Adamson's Falls<br />

Koreh<br />

Athi Diversion<br />

Table 2-1 - Power Development on <strong>the</strong> Middle Tana<br />

£ E.A.<br />

(millions)<br />

63.91<br />

23.70<br />

22.12<br />

16.39<br />

14.77<br />

17.58<br />

2.12<br />

Gross<br />

head<br />

ft<br />

1,005<br />

334<br />

268<br />

I85<br />

123<br />

177<br />

I6O.59 2,092<br />

Long-term<br />

firm flow<br />

cusecs<br />

2,730<br />

2,730<br />

3,850<br />

4,180<br />

4,550<br />

4,410<br />

575<br />

Installed<br />

capacity<br />

MW<br />

320<br />

I92<br />

112<br />

89<br />

65<br />

87<br />

Annual<br />

energy<br />

production<br />

GWh***<br />

1,630<br />

575<br />

63O<br />

494<br />

359<br />

479<br />

865 4,167<br />

* Including capitalized value <strong>of</strong> accumulated operating defioits during<br />

development period; for load growth rate 1.<br />

** Seven Forks development assumed as Confluence projeot to FSL 3,455 feet,<br />

plus Kindaruina as under construction.<br />

*** GWh - gigawatt/hour