survey of the irrigation potential of the lower tana river basin kenya
survey of the irrigation potential of the lower tana river basin kenya
survey of the irrigation potential of the lower tana river basin kenya
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
- 5 -<br />
Although it is apparent that <strong>the</strong> rate <strong>of</strong> development <strong>of</strong> <strong>irrigation</strong> is to some<br />
extent dependent upon '<strong>the</strong> rate <strong>of</strong> growth <strong>of</strong> <strong>the</strong> power system, this appears to he <strong>of</strong><br />
little practical significance, as a growing demand for power already exists. If<br />
this demand is met by development <strong>of</strong> <strong>the</strong> hydro-electric resources <strong>of</strong> <strong>the</strong> Tana, it is<br />
bound to provide <strong>the</strong> necessary flow control in advance <strong>of</strong> any reasonable schedule<br />
<strong>of</strong> <strong>irrigation</strong> development which may he foreseen.<br />
The power system envisaged would utilize to a high level <strong>the</strong> head and flow <strong>of</strong><br />
<strong>the</strong> middle Tana, through a complex <strong>of</strong> projects, <strong>the</strong> main features <strong>of</strong> which are summarized<br />
in Table 2-1. The power system defined in this table does not include <strong>the</strong><br />
additional 131 megawatt <strong>potential</strong> that could be developed by releasing some 400<br />
cubic feet per second (cusecs) <strong>of</strong> upstream allocations.<br />
Project Estimated<br />
capital cost*<br />
Seven Forks**<br />
Kiambere<br />
Mutanga<br />
Grand Falls<br />
Adamson's Falls<br />
Koreh<br />
Athi Diversion<br />
Table 2-1 - Power Development on <strong>the</strong> Middle Tana<br />
£ E.A.<br />
(millions)<br />
63.91<br />
23.70<br />
22.12<br />
16.39<br />
14.77<br />
17.58<br />
2.12<br />
Gross<br />
head<br />
ft<br />
1,005<br />
334<br />
268<br />
I85<br />
123<br />
177<br />
I6O.59 2,092<br />
Long-term<br />
firm flow<br />
cusecs<br />
2,730<br />
2,730<br />
3,850<br />
4,180<br />
4,550<br />
4,410<br />
575<br />
Installed<br />
capacity<br />
MW<br />
320<br />
I92<br />
112<br />
89<br />
65<br />
87<br />
Annual<br />
energy<br />
production<br />
GWh***<br />
1,630<br />
575<br />
63O<br />
494<br />
359<br />
479<br />
865 4,167<br />
* Including capitalized value <strong>of</strong> accumulated operating defioits during<br />
development period; for load growth rate 1.<br />
** Seven Forks development assumed as Confluence projeot to FSL 3,455 feet,<br />
plus Kindaruina as under construction.<br />
*** GWh - gigawatt/hour