ACCESS ROAD BOG CROSSING<br />

CONSTRUCTION DETAILS<br />

• IN THE AREA OF THE LONGEST BOG<br />

CROSSING WHERE MOVING WATER<br />

WAS OBSERVED SOME OF THE TOP<br />

LAYER OF LOGS WILL BE REPLACED<br />

BY METAL PIPES OF A SIMILAR<br />

DIAMETER TO THE LOGS TO ACT AS<br />

SMALL CULVERTS THAT WILL<br />

SPREAD OUT THE WATER OVER THE<br />

ENTIRE AREA WHERE MOVING<br />

WATER WAS OBSERVED