25.07.2013 Views

Case Study II

Case Study II

Case Study II

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ACCESS ROAD BOG CROSSING<br />

CONSTRUCTION DETAILS<br />

THE DEP AND ACOE WANTED TO INSTALL A<br />

CULVERT(S) TO MAINTAIN THE NATURAL<br />

HYDROLOGY BUT I FIGURED THEY WOULD<br />

JUST BECOME EMBEDDED IN THE PEAT<br />

AND NOT FUNCTION AS PLANNED<br />

THIS WAS REINFORCED AFTER STUDYING<br />

HOW THE HYDROLOGY WORKED IN THE<br />

BOG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!