25.07.2013 Views

Case Study II

Case Study II

Case Study II

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ACCESS ROAD BOG CROSSING<br />

CONSTRUCTION DETAILS<br />

• PLACE A FILTER FABRIC ON TOP OF THE<br />

SECOND LAYER OF LOGS<br />

• ADD A FOOT OF GRAVEL 24 FEET WIDE ON<br />

TOP OF THE SECOND LAYER OF FILTER<br />

FABRIC (28’ WIDE AT BASE)<br />

• USE STUMP GRINDINGS FOR 4 FOOT<br />

SHOULDERS ON EACH SIDE OF THE ROAD<br />

TOO PREVENT GRAVEL FROM BEING<br />

PUSHED INTO THE ORGANIC BOG-STUMP<br />

GRINDINGS WILL BE SIMILAR TO THE<br />

WOODY MATERIAL ALREADY PART OF THE<br />

NATURAL BOG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!