27.07.2013 Views

BP in Angola Sustainability Report 2010 (pdf, 3860KB)

BP in Angola Sustainability Report 2010 (pdf, 3860KB)

BP in Angola Sustainability Report 2010 (pdf, 3860KB)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Operational performance We are work<strong>in</strong>g to improve the<br />

reliability of our operations and mak<strong>in</strong>g progress with our projects<br />

Operational performance<br />

Total net production from our major fields <strong>in</strong><br />

<strong>Angola</strong> was 170 thousand barrels of oil per day<br />

<strong>in</strong> <strong>2010</strong>, a decrease on 2008 and 2009. This<br />

was caused by a comb<strong>in</strong>ation of factors<br />

<strong>in</strong>clud<strong>in</strong>g planned, periodic shut downs of<br />

process units to perform ma<strong>in</strong>tenance,<br />

overhaul and repair operations as well as<br />

operational <strong>in</strong>tegrity challenges on the Greater<br />

Plutonio FPSO. There has also been lower<br />

production from fields operated by others.<br />

<strong>BP</strong> <strong>Angola</strong> net production by major field<br />

(thousand barrels per day)<br />

Greater Plutonio (operated by <strong>BP</strong>)<br />

Kizomba B development<br />

Dalia<br />

Girassol FPSO<br />

Other<br />

2008 2009 <strong>2010</strong><br />

Block 18<br />

In <strong>2010</strong>, gross production from the Greater<br />

Plutonio FPSO totalled approximately 155<br />

thousand barrels of oil per day. This figure<br />

reflects good <strong>in</strong>itial performance, offset by a<br />

decl<strong>in</strong>e <strong>in</strong> production <strong>in</strong> the second half of the<br />

year caused by a number of major early life<br />

operational challenges with the FPSO.<br />

Chloride <strong>in</strong>duced cracks <strong>in</strong> the water <strong>in</strong>jection<br />

pipework, discovered dur<strong>in</strong>g rout<strong>in</strong>e<br />

<strong>in</strong>spection, required a total water <strong>in</strong>jection<br />

shutdown for a period of 11 months. The<br />

impact on production rates from the reservoir<br />

was significant, result<strong>in</strong>g <strong>in</strong> reduced rates of<br />

production. Corrosion <strong>in</strong> the high pressure gas<br />

cool<strong>in</strong>g systems restricted operations from<br />

September <strong>2010</strong> to July 2011, necessitat<strong>in</strong>g a<br />

complex replacement project that was safely<br />

completed <strong>in</strong> June 2011.<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

1<br />

Block 31 developments<br />

In <strong>2010</strong>, we began the offshore stage of the<br />

PSVM project with the arrival of several<br />

vessels <strong>in</strong>to <strong>Angola</strong> waters. Initial delays to the<br />

start of drill<strong>in</strong>g operations on the Transocean<br />

operated drillship Discoverer Luanda occurred<br />

<strong>in</strong> <strong>2010</strong>, but pile <strong>in</strong>stallation has now been<br />

completed and <strong>in</strong>stallation of the production<br />

flowl<strong>in</strong>es has started.<br />

Oil production from PSVM is scheduled<br />

to start <strong>in</strong> 2012. This forecast takes account of<br />

a delay to the completion of the FPSO <strong>in</strong><br />

S<strong>in</strong>gapore caused by commission<strong>in</strong>g<br />

problems with the gas turb<strong>in</strong>e generators.<br />

Block 15 and 17 developments<br />

Block 15 cont<strong>in</strong>ues to provide successful<br />

production. A number of projects are planned<br />

for the next five years to maximise recovery<br />

from the resource base.<br />

In August <strong>2010</strong>, Total, as operator of block<br />

17 (<strong>BP</strong> 16.67%), announced the development<br />

of the Cravo Lirio Orquidea Violeta (CLOV)<br />

project and the award of the pr<strong>in</strong>cipal contracts.<br />

This project is the fourth development <strong>in</strong> block<br />

17, after Girassol, Dalia and Pazflor, and is<br />

located approximately 140 kilometres from<br />

Luanda and 40 kilometres north-west of Dalia<br />

<strong>in</strong> water depths rang<strong>in</strong>g from 1,100 to 1,400<br />

metres. The CLOV development will lead to<br />

four fields com<strong>in</strong>g onstream. Drill<strong>in</strong>g is<br />

expected to start <strong>in</strong> 2012 and first oil is<br />

expected <strong>in</strong> 2014. A total of 34 subsea wells are<br />

planned to be tied back to the CLOV FPSO unit,<br />

which will have a process<strong>in</strong>g capacity of<br />

160mbopd and a storage capacity of<br />

approximately 1.8 million barrels.<br />

2<br />

1 Drill<strong>in</strong>g activity <strong>in</strong> Block 31<br />

2 DCV Balder <strong>in</strong>stall<strong>in</strong>g subsea<br />

equipment<br />

How we operate<br />

In <strong>2010</strong>, gross production from<br />

the Greater Plutonio FPSO<br />

totalled approximately 155<br />

thousand barrels of oil per day.<br />