Figure 11: Unconfined Compressive Strength (UCS) Test on SOLFIX Final Products<br />

Economic Analysis<br />

Product UCS by Metcalf &<br />

Eddy (psi)<br />

UCS by BNL (psi)<br />

SOLFIX on raw<br />

screened sediment<br />

728 102<br />

SOLIFIX on ORG-<br />

X treated sediment<br />

600 487<br />

The processing cost depends on which combination of the three processes: HYDRO-SEP,<br />

ORG-X, and SOLFIX are used. The cost in Table 12 below gives the cost analysis <strong>for</strong><br />

three viable production options. The end-use product prices are derived from the same<br />

source as those used in the NUIEG economic analysis. The average market price <strong>for</strong> fill<br />

and cement are roughly $6 and $11 per cubic yard respectively. Taking into account that<br />

about half of the dredged sediment is water, the revenue that would be generated by each<br />

cubic yard of dredged sediment is approximately $3 and $5.50 <strong>for</strong> the production of fill<br />

and cement respectively.<br />

The estimated processing costs of the HYDRO-SEP and SOLFIX is $44 per cubic yard of<br />

dredged sediment . The material produced by per<strong>for</strong>ming this process on one yard of<br />

dredged sediment is worth approximately $3. As a result, Metcalf and Eddy would lose<br />

roughly $6 per cubic yard of dredged sediment by using these processes. The HYDRO-<br />

SEP and ORG-X processes cost $45 and generate approximately $5.50 of revenue per<br />

cubic yard of dredged sediment. Factoring in the tipping fee, processing costs, and end-<br />

product revenue, Metcalf & Eddy would lose about $4.50 per cubic yard of dredged<br />

sediment. The processing costs associated with HDRO-SEP, ORG-X, and SOLFIX is<br />

$67 per cubic yard of dredged sediment. The cement material produced by this<br />

40