Forms Manual - NW Colorado BOCES
Forms Manual - NW Colorado BOCES
Forms Manual - NW Colorado BOCES
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>NW</strong> <strong>BOCES</strong><br />
IEP <strong>Forms</strong> – Referral Review and Evaluation Plan<br />
Purpose: To guide the referral review and evaluation planning process.<br />
Usage: This form is not required, but documentation of the review of the referral and<br />
individual plan for evaluation is important.<br />
Page 3 of 62<br />
Overview<br />
This form is intended to help school teams consider<br />
how to conduct referral reviews and plan for<br />
individually focused evaluations.<br />
Upon receipt of a referral to special education, the<br />
school must determine the appropriateness of the<br />
referral and, if appropriate, what type of evaluation<br />
data is needed,<br />
if any.<br />
Instructions<br />
• Document that the parent was informed of the<br />
referral.<br />
• Briefly describe the reason for referral.<br />
<br />
• Conduct a review of existing information.<br />
• Fo rmulate Evaluation Questions. Examples:<br />
• What is the student’s level of reading<br />
fluency?<br />
• How do they process verbal information?<br />
• What are the student’s strengths? Needs?<br />
• What is their primary language?<br />
• Have they received appropriate instruction in<br />
reading and math?<br />
• How do they function independently?<br />
• Mark the decision of the referral review team and<br />
take the necessary next steps.<br />
• Involve your special education director when<br />
rejecting a referral and writing a Prior Written<br />
Notice.<br />
Remember the requirement is now to conduct a<br />
focused evaluation that is sufficient to identify the<br />
needs of the student. We are no longer required<br />
to<br />
engage in a comprehensive evaluation in all<br />
domains.<br />
Current hearing and vision screening results and<br />
health<br />
histories are no longer required, unless<br />
determined<br />
by the Evaluation Planning team.