Request For Quotation Print Program - Hindustan Petroleum ...
Request For Quotation Print Program - Hindustan Petroleum ...
Request For Quotation Print Program - Hindustan Petroleum ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TENDER ENQUIRY OFFICE COPY<br />
( This is only a Price Enquiry not a Purchase Order )<br />
Title :<br />
RCC DRIVE WAY PAMPORE LPG PLAN<br />
Tender No.<br />
: 10000021 - HA - 12102/PSK<br />
Tender Date : 22/6/2010<br />
Direct Queries to : KHYALIA PRADEEP SINGH<br />
Designation : Senior Operations Officer<br />
Department : JAMMU LPG RO<br />
Telephone No. : 01923 - 220875<br />
Fax No. : 01923 - 220271<br />
P R No. : 10000014 - HP - 12173<br />
1. Tender to be received on or before 16/7/2010 by 16:30 Hrs at the address Mentioned below.<br />
Tenders are to be dropped in the designated tender box at the address mentioned below. In situations where the<br />
tenders are big, which cannot be dropped in the box or where the specific tender boxes are not available,<br />
tenders are to be submitted with the concerned purchasing authority at the following address.<br />
Tenders received after due date & time due to whatever reasons will be rejected.<br />
JAMMU LPG REGIONAL OFFICE<br />
LANE NO. 3, PHASE -II<br />
SIDCO INDUSTRIAL COMPLEX<br />
BARI BRAHMNA<br />
JAMMU<br />
JAMMU - 181133<br />
Jammu and Kashmir<br />
India<br />
2. HPCL has developed a Grievance Redressal Mechanism, details of which are availiable<br />
on the Corporation web site.<br />
3. All unit rates in _____________________ (Specify the Currency)<br />
Cont on next page . . 10000021 - HA - 12102<br />
Sign and Seal of the Tenderer Page 1 of 7
Please quote for the following items/service, as per the terms and conditions mentioned below and in<br />
attachments :<br />
DETAILS OF ITEMS / SERVICES<br />
Deliver To : PAMPORE LPG PLANT, NH-1 A,NEAR GAS TURBINE,PAMPORE,PULWAMA,PAMPORE, - 190121.<br />
Jammu and Kashmir India.<br />
Sr.<br />
No.<br />
Tender Line<br />
Number<br />
Ref<br />
Line No<br />
Item<br />
Number<br />
Item<br />
Description<br />
1 1.000 Excavation<br />
of existing<br />
damaged<br />
2 2.000 Excavation<br />
of existing<br />
WBM by<br />
3 3.000 Earthwork in<br />
excavtion in<br />
all<br />
4 4.000 Providing<br />
and laying<br />
of stone<br />
5 5.000 Screening ,<br />
laying and<br />
compact<br />
Quantity Qty<br />
UOM<br />
95.000 Cubic<br />
Meters<br />
Unit Rate In Figures and<br />
Words Refer pt # 3 above<br />
Purchasing<br />
UOM<br />
Cubic<br />
Meters<br />
( Only)<br />
380.000 Cubic<br />
Meters<br />
Cubic<br />
Meters<br />
( Only)<br />
480.000 Cubic<br />
Meters<br />
Cubic<br />
Meters<br />
( Only)<br />
145.000 Cubic<br />
Meters<br />
Cubic<br />
Meters<br />
( Only)<br />
145.000 Cubic<br />
Meters<br />
Cubic<br />
Meters<br />
( Only)<br />
6 6.000 Praviding , 145.000 Cubic Cubic<br />
Cont on next page . . 10000021 - HA - 12102<br />
Sign and Seal of the Tenderer Page 2 of 7
Sr.<br />
No.<br />
Tender Line<br />
Number<br />
Ref<br />
Line No<br />
Item<br />
Number<br />
Item<br />
Description<br />
laying and<br />
consoli<br />
7 7.000 Providing<br />
and laying<br />
of PCC :<br />
8 8.000 Providing<br />
and laying<br />
175 mm th<br />
9 9.000 Reinforcemen<br />
t steel for<br />
RCC Dr<br />
TOTAL QUOTED VALUE (IN FIGURES) **<br />
TOTAL QUOTED VALUE (IN WORDS) **<br />
**<br />
Quantity Qty<br />
UOM<br />
Unit Rate In Figures and<br />
Words Refer pt # 3 above<br />
Purchasing<br />
UOM<br />
Meters Meters<br />
( Only)<br />
95.000 Cubic<br />
Meters<br />
Cubic<br />
Meters<br />
( Only)<br />
335.000 Cubic<br />
Meters<br />
Cubic<br />
Meters<br />
( Only)<br />
23.000 Metric Ton Metric Ton<br />
( Only)<br />
Unless otherwise specifically mentioned in HPCL Tender Enquiry<br />
1) When there is a difference between the rates in figures and words, the rate which corresponds to the amount worked<br />
out by the tenderer shall be taken as correct.<br />
2) When the rate quoted by the tenderer in figures and words tallies but the amount is incorrect, the rate quoted by the<br />
tenderer shall be taken as correct.<br />
3) When it is not possible to ascertain the correct rate in the manner prescribed above, the rate as quoted in words shall<br />
Cont on next page . . 10000021 - HA - 12102<br />
Sign and Seal of the Tenderer Page 3 of 7
e adopted.<br />
QUOTED DELIVERY PERIOD :<br />
EXTRAS (TAXES,DUTIES & OTHERS) :<br />
Details of taxes, duties, levies, etc., if to be paid extra to be filled in the space given below. The values specifically<br />
mentioned below will only be considered for extra payments. The values to be filled below can be in percentage (%)<br />
of unit rate or an add - on amount per unit rate. Vendor to specifically mention % or currency, after the value<br />
(e.g. X% or X Rs/-), else the value having least impact to HPCL on the unit rate will only be considered.<br />
DGS&D Rate Contract ( Y/N ) : __________<br />
NSIC Unit ( Y/N ) : __________<br />
PSE Unit ( Y/N ) : __________<br />
SSI Unit ( Y/N ) : __________<br />
Delivery Terms - Free to Destination location unless specified otherwise _____________________________________<br />
Validity of offer - 90 days from the initial or extended Due Date for submission of Tender whichever is later unless<br />
specified otherwise : __________<br />
Liquidated Damages accepted ( Y/N ) : __________<br />
Payment Term ( 30 Days ), unless specified otherwise<br />
NOTES / TERMS / CONDITIONS :<br />
This Tender Enquiry is being sent to you to submit quote for the construction of RCC Drive<br />
Cont on next page . . 10000021 - HA - 12102<br />
Sign and Seal of the Tenderer Page 4 of 7
way at pampore LPG Plant.<br />
EARNEST MONEY DEPOSIT:<br />
Bidders have to submit an EMD of Rs. 80000/-{EIGHTY THOUSAND ONLY} in the form of DD in<br />
favor of <strong>Hindustan</strong> <strong>Petroleum</strong> Corporation LTD. payable at Jammu Only. EMD has to be<br />
submitted in a separate envelope that has to be attached to the sealed Tender envelope and<br />
then both have to be put in a sealed envelope, failing which Tender will be rejected.<br />
Public Sector Enterprises and Small Scale Units registered with National Small Scale<br />
Industries are exempted from payment of Earnest Money Deposit. Small Scale Units<br />
registered with National Small Scale Industries should enclose a photocopy of their<br />
registration certificate with their quotation to make their quotation eligible for<br />
consideration. The registration certificate should remain valid during the period of the<br />
contract that may be entered into with the successful bidder. Such tenderers should ensure<br />
validity of the Registration Certificate for the purpose.<br />
<strong>For</strong> unsuccessful bidders, the EMD will be refunded after the finalization of the contract.<br />
<strong>For</strong> successful tenders EMD will be converted to Security Deposit which shall be refunded<br />
after successful completion of the work. Offers without EMD will be rejected.<br />
Payment Terms: Payments will be made against Running Accounts bills certified by the<br />
Owner's Engineer-in-Charge/Site-in-Charge within 15 days from the date of receipt of the<br />
bill. Payment Terms are as under:<br />
Payment will be made after receiving the measurement sheets and bills certified by Party<br />
and EIC at intervals of 25%, 50 % , 75 % and 100% of total PO value.<br />
Note: The Consultant / User / Finance whoever may be receiving the bill first, from the<br />
contractor shall acknowledge it for the date of receipt. It is this date from which the<br />
stipulated number of days as mentioned above shall be reckoned.<br />
Retention money:<br />
HPCL shall retain 10% of the contract value from bills as retention money which shall be<br />
released after one year of the commissioning of the completed project and its trouble free<br />
service.<br />
PERFORMANCE GUARANTEE:<br />
Cont on next page . . 10000021 - HA - 12102<br />
Sign and Seal of the Tenderer Page 5 of 7
Your work shall be guaranteed for one year from the date of completion. Any defect<br />
observed in workmanship/material will be rectified / replaced by you free of cost. The<br />
decision of the Engineer In-charge/Site-In charge/Owner shall be the final in deciding<br />
whether the defect has to be rectified or replaced.<br />
Delivery Period: 100% of work should be completed within 4 months from acknowledgement of<br />
Purchase Order by the vendor or 10 days from placement of PO whichever is less.<br />
PENALTY CLAUSE:<br />
The contractor will be liable to pay penalty of 0.5% of the total cost of the project per<br />
week or part thereof to a maximum of 5% for any delay due to contractors fault over the<br />
specified completion date without prejudice to the other conditions as specified in the<br />
completion date clause. HPCL shall be the sole judge to determine whether reasons put<br />
forth by the contractor for delay are acceptable.<br />
Terms and conditions , Schedule of Quantities and Tender Doccument as per attachment.<br />
Cont on next page . . 10000021 - HA - 12102<br />
Sign and Seal of the Tenderer Page 6 of 7
Enclosures :<br />
Detailed Item Description / Specifications (Yes/No)<br />
Technical Terms and Conditions (Yes/No)<br />
Commercial Terms and Conditions (Yes/No)<br />
Special Terms and Conditions (Yes/No)<br />
General Terms and Conditions (Yes/No)<br />
Others _____ Nos (Yes/No)<br />
Signature :<br />
Name : JALWAN HAWA SINGH<br />
Designation: Sr Manager - E&P<br />
End of Document 10000021 - HA - 12102<br />
Sign and Seal of the Tenderer Page 7 of 7