24.08.2013 Views

efects of turbine type selection on technical and economical ... - ESHA

efects of turbine type selection on technical and economical ... - ESHA

efects of turbine type selection on technical and economical ... - ESHA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONCLUSION<br />

The main characteristic <str<strong>on</strong>g>of</str<strong>on</strong>g> this design soluti<strong>on</strong><br />

is the joint powerhouse for both power plants.<br />

From tender request for two Francis <str<strong>on</strong>g>turbine</str<strong>on</strong>g>, to final<br />

decisi<strong>on</strong> for choosing this <str<strong>on</strong>g>turbine</str<strong>on</strong>g> <str<strong>on</strong>g>type</str<strong>on</strong>g>, with <strong>technical</strong> <strong>and</strong><br />

ec<strong>on</strong>omical str<strong>on</strong>g reas<strong>on</strong>s, processing explained.<br />

Turbine-generator unit <str<strong>on</strong>g>selecti<strong>on</strong></str<strong>on</strong>g> for the new small<br />

hydropower plant is a very sensitive phase <str<strong>on</strong>g>of</str<strong>on</strong>g> the project<br />

development, needs more criteria involved in process <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

designing.<br />

Most important criteria are <strong>technical</strong> availability operati<strong>on</strong><br />

all equipment during annual period with highest number<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> working hours, which means highest total income for<br />

owners <strong>and</strong> investors <str<strong>on</strong>g>of</str<strong>on</strong>g> the small hydropower projects.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!