24.08.2013 Views

Final ESR - Part 2 - Eskom

Final ESR - Part 2 - Eskom

Final ESR - Part 2 - Eskom

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REVISED FINAL ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED COMBINED CYCLE GAS<br />

TURBINE (CCGT) POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA PROVINCE<br />

Balancing dam. A more detailed description and assessment of proposed alignments will<br />

follow in the EIA phase, in the form of corridors, from the sources of water to the point of<br />

usage.<br />

6.7 Alignment of Access Roads<br />

Both existing and new access roads will be used or constructed, respectively to link the<br />

proposed CCGT power plant with the existing transport network. The alignment of these<br />

access roads will be inclusive of temporary and permanent roads. Details regarding the<br />

various access road alignments or corridors are not available at this stage of the process but<br />

will be designed at a later stage and used to inform the EIA phase studies.<br />

6.8 Construction Village<br />

A construction village will either be established or the existing mine hostel or construction<br />

village used to house workers for the construction of the Majuba Power Station could<br />

potentially be used to accommodate the construction crew. The exact positioning of the<br />

construction village is not decided at this stage but will form part of the layout to be designed.<br />

However, impacts associated with the construction village will be studied at the EIA phase.<br />

ALTERNATIVES 62<br />

11/08/2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!