REVISED FINAL ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED COMBINED CYCLE GAS<br />
TURBINE (CCGT) POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA PROVINCE<br />
Balancing dam. A more detailed description and assessment of proposed alignments will<br />
follow in the EIA phase, in the form of corridors, from the sources of water to the point of<br />
usage.<br />
6.7 Alignment of Access Roads<br />
Both existing and new access roads will be used or constructed, respectively to link the<br />
proposed CCGT power plant with the existing transport network. The alignment of these<br />
access roads will be inclusive of temporary and permanent roads. Details regarding the<br />
various access road alignments or corridors are not available at this stage of the process but<br />
will be designed at a later stage and used to inform the EIA phase studies.<br />
6.8 Construction Village<br />
A construction village will either be established or the existing mine hostel or construction<br />
village used to house workers for the construction of the Majuba Power Station could<br />
potentially be used to accommodate the construction crew. The exact positioning of the<br />
construction village is not decided at this stage but will form part of the layout to be designed.<br />
However, impacts associated with the construction village will be studied at the EIA phase.<br />
ALTERNATIVES 62<br />
11/08/2008