Hydro Intag – A case of green project finance in Ecuador

Hydro Intag – A case of green project finance in Ecuador

Hydro Intag – A case of green project finance in Ecuador

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E C OE N E R G I A<br />

Total <strong>project</strong> <strong>in</strong>vestment budget<br />

ITEM DESCRIPTION VALUE<br />

1 Civil works 53.901.496<br />

2 Mechanical equipments 3.630.000<br />

3 Electrical and comunicational equipment 11.187.500<br />

4 Generation equipment 55.353.150<br />

5 Transmission l<strong>in</strong>e 11.385.000<br />

6 Environmental mitigation 2.018.450<br />

7 Community improvemnt works 300.000<br />

Total Construction Works 137.775.596<br />

8 Studies and designs 2.187.000<br />

9 Permits and licencess 675.000<br />

10 Environmental costs 1.155.000<br />

Pre-<strong>in</strong>vestment costs 4.017.000<br />

11 Eng<strong>in</strong>eer<strong>in</strong>g and adm<strong>in</strong>istration 8.248.525<br />

12 Prog. Qulified local employment access 890.550<br />

13 Cont<strong>in</strong>gency 5.998.229<br />

Cost <strong>of</strong> eng<strong>in</strong>eer<strong>in</strong>g and management<br />

15.137.30<br />

Total cost <strong>of</strong> the <strong>project</strong> 156.929.900