Brief Project History<br />

CDM Project Started in 1998 locally and 2001 with Eurocontrol<br />

Partners involved: Airport Operator – ANSP – Eurocontrol – GH - Major AOs<br />

(SNBA-VEX-TCW) and AOC<br />

Project setup: BBCG, MoU is underway and all CDM-levels are engaged<br />

Data Exchange becomes optimized<br />

TA-CDM & SA-CDM & CDMP-Working Group (liaison cell)<br />

Current accuracy of data<br />

ELDT: less than 1’<br />

EIBT: less than 1’<br />

86.65% of the flights obtain a TSAT with less than 1’ deviation from their TOBT<br />

79.46% of the flights obtain a TSAT with less than 1’ deviation from their EOBT<br />

ETOT: less than 1’<br />

Main objectives & goals: Focus on the improvement of the turnaround<br />

process and related pre-departure sequencing by introducing the TOBTprocedure