25.08.2013 Views

Presentation Network Operations & CDM DPI / FUM Exchange Update

Presentation Network Operations & CDM DPI / FUM Exchange Update

Presentation Network Operations & CDM DPI / FUM Exchange Update

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ETFMS<br />

<strong>DPI</strong>/<strong>FUM</strong><br />

EVALUATION STATUS<br />

© EUROCONTROL1999 - Central Flow Management Unit<br />

URB\SEZ\29.10.03<br />

EUROCONTROL<br />

Central Flow Management Unit<br />

Hans Koolen<br />

EDITION 11/2005


<strong>DPI</strong>/<strong>FUM</strong> Trials<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

<strong>DPI</strong>/<strong>FUM</strong> Trials Purpose<br />

Purpose: Identify which <strong>DPI</strong> information airports can provide to<br />

ETFMS from an operational environment.<br />

Purpose: Airports to identify how <strong>FUM</strong>s can best be used<br />

Limited number of airports: EBBR, LEBL, LSZH, EDDM<br />

Following a standard pre-defined procedure<br />

Coordinator:<br />

Hans Koolen, tel +32 2 729 9876<br />

E-mail: johannes.koolen@eurocontrol.int<br />

2 07/10/2008


<strong>DPI</strong>/<strong>FUM</strong> Expected Benefits<br />

A way for airports’ integration into ATFCM process, contribution to common<br />

picture, support to network, facilitating understanding and decision making.<br />

Allow airports to have a better knowledge of the traffic into its destination and<br />

take it into account in its own processes.<br />

Allow CFMU to know airport constraints and take them into account in its own<br />

processes.<br />

Short messages that can rather easily be integrated into systems and<br />

understood by humans if required.<br />

Provide more accurate timing of traffic enabling automatic processes such as<br />

slot allocation to be more effective.<br />

Improve short term forecast of traffic situation.<br />

Enable Aircraft Operators to get a better view on their fleet before departure.<br />

Support the management of critical situations at airports and its impact on other<br />

actors.<br />

First step in data exchange with airports, Gate-To-Gate.<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

3 07/10/2008


<strong>DPI</strong>/<strong>FUM</strong> - Performing Trials<br />

Major Steps for Evaluation<br />

1. Communication and Message Syntax<br />

2. Evaluation of Live Data<br />

3. ATFCM Impact Assessment<br />

4. Evaluation with OPS Users<br />

5. Operational Trial<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

4 07/10/2008


<strong>DPI</strong>/<strong>FUM</strong> - Performing Trials<br />

1. Communication and Message Syntax<br />

Purpose: Initial and quick verification of message<br />

syntax and connections in order to save time during<br />

testing with live data.<br />

How: transmission of copies of several <strong>DPI</strong> message<br />

types via e-mail and via AFTN.<br />

How Long: one or several e-mails and a few<br />

messages via AFTN.<br />

Report: feedback is given by CFMU via e-mail.<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

5 07/10/2008


<strong>DPI</strong>/<strong>FUM</strong> - Performing Trials<br />

2. Evaluation of Live Data<br />

Purpose: Determine accuracy and consistency of<br />

Live Data and suitability for ATFCM purposes.<br />

How: transmission of <strong>DPI</strong>s for operational traffic to<br />

the ETFMS OPS evaluation (test) system.<br />

How Long: initially 1 hour, later 24hours to several<br />

days.<br />

Report: initial feedback is given by CFMU via e-mail.<br />

Later statistics reports will be produced and<br />

discussed with the airport concerned.<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

6 07/10/2008


<strong>DPI</strong>/<strong>FUM</strong> - Performing Trials<br />

3. ATFCM Impact Assessment<br />

Purpose: Determine the impact of the provided <strong>DPI</strong>s<br />

on the ATCFM process managed by ETFMS.<br />

How: transmission of <strong>DPI</strong>s for operational traffic to<br />

the ETFMS OPS evaluation (test) system.<br />

How Long: at least 24 hours without interruption.<br />

Report: Analysis and reports will be done via the<br />

ETFMS standard HMI (count graphs, oplog query,..).<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

7 07/10/2008


<strong>DPI</strong>/<strong>FUM</strong> - Performing Trials<br />

4. Evaluation with OPS Users<br />

Purpose: to offer OPS specialists of all parties<br />

involved to participate in <strong>DPI</strong> evaluations.<br />

How: transmission of <strong>DPI</strong>s for operational traffic to<br />

the ETFMS OPS evaluation (test) system. OPS<br />

specialists will be invited to participate to the <strong>DPI</strong><br />

evaluation in CFMU, using the ETFMS OPS eval<br />

system.<br />

How Long: one (working) day.<br />

Report: Analysis and reports will be done via the<br />

ETFMS standard HMI (count graphs, oplog query,..).<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

8 07/10/2008


<strong>DPI</strong>/<strong>FUM</strong> - Performing Trials<br />

5. Operational Trial<br />

Purpose: to verify the correct working of <strong>DPI</strong>/<strong>FUM</strong><br />

messages in a fully operational environment.<br />

How: transmission of <strong>DPI</strong>s for operational traffic to the<br />

ETFMS OPS system and <strong>FUM</strong>s to the airport OPS<br />

system.<br />

How Long: several hours on 2 different days.<br />

Report: Analysis and reports will be done via the<br />

ETFMS standard HMI (count graphs, oplog query,..)<br />

and via the airport <strong>CDM</strong> system.<br />

Note: This step may only take place after an ODSG decision.<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

9 07/10/2008


ZURICH<br />

Trial preparation meeting took place in January 2005.<br />

Participants: Unique airport (OPS & technical), SkyGuide (FMP,<br />

ODSG rep, TWR), delair, SWISS, CFMU (URB+OPS),<br />

EUROCONTROL airport <strong>CDM</strong> team.<br />

The <strong>CDM</strong> system’s software (darts) has been modified and the<br />

AFTN connection has been tested.<br />

Next steps:<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

<strong>DPI</strong>/<strong>FUM</strong> Trials Status<br />

Start the first message evaluations<br />

10 07/10/2008


BARCELONA<br />

Trial preparation meeting took place in February 2005.<br />

Participants: AENA airports (Barcelona, Madrid), AENA ANSP<br />

(FMP, ODSG rep), CFMU (URB, OPS), Eurocontrol Airport <strong>CDM</strong><br />

team.<br />

E-<strong>DPI</strong> and T-<strong>DPI</strong> message have been implemented.<br />

Transmission of <strong>DPI</strong>s to ETFMS test system started on<br />

25/10/2005.<br />

Next steps:<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

<strong>DPI</strong>/<strong>FUM</strong> Trials Status<br />

CFMU to evaluate and produce first statistics.<br />

11 07/10/2008


BRUSSELS<br />

Trial preparation meeting took place in February 2005.<br />

Participants: BIAC, Belgocontrol, CFMU (URB, OPS),<br />

Eurocontrol Airport <strong>CDM</strong> team.<br />

<strong>DPI</strong> message have been implemented in AMS.<br />

First message transmission took place on 7/11/2005 and first<br />

feedback was provided to Belgocontrol.<br />

Next steps:<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

<strong>DPI</strong>/<strong>FUM</strong> Trials Status<br />

Date of next test to be planned.<br />

12 07/10/2008


MUNICH<br />

Preliminary preparation meetings took place in Dec 2004 and<br />

February 2005.<br />

Participants: DFS (HQ, ODSG rep, TWR, TWR-MUC), FMG,<br />

CFMU (URB, OPS), Eurocontrol Airport <strong>CDM</strong> team.<br />

All <strong>DPI</strong> messages have been implemented.<br />

Test started on 8/11/2005 and first feedback has been provided<br />

to EDDM.<br />

Next actions<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

<strong>DPI</strong>/<strong>FUM</strong> Trials Status<br />

Next evaluation planned for Mid December or Mid January.<br />

13 07/10/2008


Planning<br />

Step 1: done<br />

Step 2:<br />

<strong>DPI</strong>/<strong>FUM</strong> – Trials Planning<br />

First feedback: before end of November.<br />

Statistics reports: end of December.<br />

Evaluation/Discussion with airport: January/February 2006.<br />

Step 3: January/February 2006<br />

Step 4: February/March 2006<br />

Report to ODSG: April 2006<br />

© EUROCONTROL2000 - Central Flow Management Unit<br />

URB\SEZ\083\1740\02.11.01<br />

14 07/10/2008


© EUROCONTROL2003 - Central Flow Management Unit<br />

URB\SEZ\30.10.03<br />

<strong>DPI</strong>/<strong>FUM</strong><br />

Questions …???<br />

15 07/10/2008


Thank you for your<br />

© EUROCONTROL2003 - Central Flow Management Unit<br />

URB\SEZ\30.10.03<br />

attention<br />

Hans Koolen<br />

CFMU/URB<br />

16 07/10/2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!