04.09.2013 Views

SE Process Development in an Organisation in Change - FINSE

SE Process Development in an Organisation in Change - FINSE

SE Process Development in an Organisation in Change - FINSE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Activity block diagrams<br />

Step-by-step modell<strong>in</strong>g of the implementation of<br />

ISO/IEC 15288 activities<br />

Goal: The def<strong>in</strong>ition of the activity flow <strong>in</strong>clud<strong>in</strong>g its<br />

artefacts.<br />

Output: Flow diagrams to the level required<br />

(ISO/IEC 15288 activities <strong>an</strong>d if needed one level<br />

below). The diagram states the sequential flow of<br />

tasks <strong>an</strong>d other meta <strong>in</strong>formation:<br />

• What to ref<strong>in</strong>e (<strong>in</strong>put)<br />

• What to be done (Outputs)<br />

• How to do it (description)<br />

• Check lists (best practice <strong>an</strong>d knowledge based)<br />

• etc<br />

Method: Preferable FBD (Functional block diagrams).<br />

Status: Partly implemented <strong>in</strong> the FMV <strong>in</strong>tr<strong>an</strong>et.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!