04.09.2013 Views

Oosterhout - Prologis

Oosterhout - Prologis

Oosterhout - Prologis

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

www.prologis.com<br />

THE NETHERLANDS


<strong>Prologis</strong> Park <strong>Oosterhout</strong> is located at the Energieweg<br />

in the large scale industrial park Weststad.<br />

<strong>Oosterhout</strong> dc1 consists of three existing units<br />

with a total area of 50,000 m2 which have been<br />

leased to LG Electronics. A further 7,5 ha of land<br />

is available for the possibility to build out another<br />

three units, with a total area of approximately<br />

40,000 m2. the units will range in size from 9,200<br />

to 15,600 m2 with a total height of 10.8m or, on request,<br />

a possible height of 12.2m with an optional<br />

mezzanine above the loading area.<br />

State-of-the-art Facilities<br />

industrial Park Weststad, divided into Phase i and<br />

ii, is located to the north of <strong>Oosterhout</strong>. <strong>Oosterhout</strong><br />

is a dynamic municipality in West Brabant region<br />

with over 52,000 inhabitants and located close<br />

to other major cities such as tilburg and Breda.<br />

recently, West Brabant region was chosen as<br />

number one logistic hot spot in the Netherlands.<br />

this choice is based on three main items: site and<br />

personnel availability; cost- and infrastructure;<br />

accessability and productivity.<br />

the size and location of the offices are flexible and<br />

can be determined in consultation with the needs<br />

of the customer. due to direct connections with<br />

rail (on site) and waterway (via Wilhelminakanaal<br />

which is 300 m away from the site), <strong>Prologis</strong> Park<br />

<strong>Oosterhout</strong> offers excellent bi-modal hinterland<br />

access.<br />

the region is situated at an intersection of European<br />

roads. the north-south corridor between the<br />

delta metropolis (Amsterdam, the hague, rotterdam)<br />

and the Flemish ruit (Brussels, Antwerpen,<br />

Ghent, Bruges) crosses the east-west axis in West<br />

Brabant between the German ruhr region and<br />

Flushing.<br />

the Park is favourably located adjacent to the A27<br />

and A59 motorways (also known as Maas route,<br />

Breda-den Bosch). A base of operations where<br />

many leading companies as Martens Beton, ikea,<br />

Whirlpool feel at home.


Bird´S - EyE ViEW<br />

<strong>Prologis</strong> Park <strong>Oosterhout</strong><br />

The Netherlands<br />

A27<br />

A59<br />

ON SitE<br />

iNLANd POrt<br />

WiLhELMiNA cANAL 300 m<br />

AMS 105 km<br />

BrU 115 km


A58<br />

LOcAtiON<br />

<strong>Prologis</strong> Park <strong>Oosterhout</strong> is situated at a high-profile location along<br />

the A59 motorway (Maas route) and it is readily accessed by water<br />

(Wilhelminakanaal). With its exemplary infrastructure via road, water,<br />

railway and centrally located in one of the main logistic hotspots of the<br />

Netherlands, it has excellent tri-modal hinterland connections. <strong>Prologis</strong><br />

Park <strong>Oosterhout</strong> is situated just 100 km from Schiphol and Zaventem<br />

airports with national and international connections.<br />

A16<br />

A59<br />

PROLOGIS PARK<br />

OOSTERHOUT<br />

Breda<br />

www.prologis.com<br />

A27<br />

<strong>Oosterhout</strong><br />

A58<br />

Dongen<br />

N282<br />

N260<br />

A59<br />

N628<br />

N632<br />

N261<br />

N262<br />

Waalwijk<br />

A261<br />

No warranties or representations, expressed or implied, are made as to the accuracy or completeness<br />

of the information contained herein. All sizes are approximate. <strong>Prologis</strong> makes no commitment<br />

to update the information contained herein, and may make changes to these materials at<br />

any time without notice.<br />

Tilburg<br />

N269<br />

cONtAct:<br />

BrAM VErhOEVEN<br />

Vice President<br />

Market Officer Benelux<br />

tel. +31 (0) 20 655 66 71<br />

GSM +31 (0) 62 073 86 20<br />

Email bverhoeven@prologis.com<br />

GiNA hELMOLd<br />

Leasing Officer<br />

the Netherlands<br />

tel. +31 (0) 20 655 19 16<br />

GSM +31 (0) 65 236 05 27<br />

Email ghelmold@prologis.com<br />

<strong>Prologis</strong> Management B.V.<br />

Wtc Schiphol Airport<br />

Schiphol Boulevard 115<br />

1118 BG Schiphol Airport<br />

the Netherlands<br />

tel. + 31 (0) 20 655 66 66<br />

Fax + 31 (0) 20 655 66 00<br />

Email info-benelux@prologis.com<br />

design: rUhrGOLd / Stilgrad / 04. 2012


PROLOGIS PARK OOSteRhOut<br />

Distribution Center 1<br />

Warehouse<br />

Mezzanine (optional)<br />

Office<br />

Total m 2<br />

Unit F Unit E Unit D<br />

Unit D<br />

15.608 m 2<br />

1.600 m 2<br />

650 m²<br />

17,858 m 2<br />

AVAILABLE<br />

Unit E<br />

14.767 m 2<br />

1.365 m 2<br />

650 m 2<br />

16.782 m 2<br />

AVAILABLE<br />

Unit F<br />

9.163 m 2<br />

1.090 m 2<br />

650 m 2<br />

10.903 m 2<br />

AVAILABLE<br />

125m<br />

Units<br />

A ,B<br />

and C<br />

LEASED<br />

Building permits<br />

already obtained<br />

TOTAL (m²)<br />

39.538 m 2<br />

4.055 m 2<br />

1.950 m 2<br />

45.543 m 2


OutLIne SPeCIfICAtIOnS DC1<br />

WARehOuSe<br />

• 10.8 m or 12.2 m clear height,<br />

steel frame<br />

• General column bay spacing of<br />

approximately 12 x 22 m<br />

• 1 no. electrical loading dock per<br />

1,000 m² warehouse area<br />

• 1 no. level access doors per unit<br />

(4.0 m x 4.5 m)<br />

• floor loading capacity of 5,000 kg/m2 and a maximum rack leg load of<br />

7,000 kg/m2 • Average floor flatness of class 4<br />

(neB 2747)<br />

• heating with individual gas units<br />

to possible 13 °C with outside<br />

temperature -10 °C<br />

• energy efficient t5 lighting:<br />

average lighting level 200 Lux in<br />

warehouse and average lighting<br />

level in order-picking area of<br />

250 Lux measured +1.0m<br />

-<br />

ffL<br />

• fire alarm and evacuation alarm,<br />

inclusive a fire alarm panel, fire<br />

hoses, emergency lighting as per<br />

regulations<br />

• Certified eSfR K14 roof-net sprinkler<br />

system in warehouse<br />

• Insulation value of 2.5 for the roof<br />

and façade (Rc = 2.5 m² K/W)<br />

Distribution Center 1<br />

• Battery charge area with battery<br />

charge electrical connection points<br />

(1 per 1,000 m² warehouse area)<br />

• Optional Rail Connection<br />

• Optional mezzanine along front<br />

elevation, approx. 12 m deep, level<br />

+5.25 m. floor loading capacity of<br />

500 kg/m²<br />

OffICe<br />

• Main office pod in 2 levels, mechanical<br />

ventilation<br />

• Central gas heating to 21 °C with<br />

outside temperature of -10 °C<br />

• top cooling in offices<br />

• Minimum lighting to 400 Lux on 1 m<br />

with fully-recessed fluorescent fixtures<br />

with low brightness louvers<br />

• Ceramic floor tile in reception area<br />

• Pantry with sink, fridge, kitchen<br />

block (one per floor)<br />

• Male and female toilet facilities on<br />

each floor<br />

• Power at perimeter and in wall<br />

ducts, with vacant provision for<br />

phone and data cabling<br />

• false ceiling<br />

No warranties or representations, expressed or implied, are made as to the accuracy or completeness of the information<br />

contained herein. All sizes are approximate. <strong>Prologis</strong> makes no commitment to update the information contained herein, and<br />

may make changes to these materials at any time without notice.<br />

• fire alarm and evacuation alarm,<br />

fire hoses, emergency lighting as<br />

per regulations<br />

SIte exteRIOR<br />

• 2 m high security fence with 2<br />

manually operating sliding gates<br />

(width 10 m)<br />

• Loading pit is suitable for incoming<br />

and outgoing standard european<br />

trucks according to eVO advice,<br />

semi-hardened fire road at rear of<br />

building<br />

• Landscaping: as required. non<br />

paved areas sown in with grass.<br />

Shrubs around office block<br />

• Paving with heavy-duty 100 mm<br />

concrete slabs in truck zone,<br />

80 mm concrete slabs in passenger<br />

vehicle areas<br />

• Ample car parking and truck<br />

parking on site (as per drawing)<br />

SuStAInABILItY<br />

• Air-tightness of building<br />

• Optional solar or photovoltaic<br />

panels on roof and/or wind energy<br />

• BReeAM certification<br />

THE NETHERLANDS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!