<strong>Sør</strong>-<strong>Amerika</strong>:<br />

<strong>Et</strong> <strong>marked</strong> <strong>for</strong> <strong>norsk</strong> småkraftkompetanse?<br />

Øyvind Engelstad<br />

General Manager<br />

Norconsult Andina SA<br />

Chile


Content<br />

• Norconsult i <strong>Sør</strong> <strong>Amerika</strong><br />

• <strong>Energi</strong> situasjonen i Chile<br />

• Rammebetingeser <strong>for</strong> Småkraft i Chile<br />

• Samarbeidsmodell <strong>for</strong> å fremmer <strong>norsk</strong> eksport og<br />

investeringer i regionen<br />

2


Main countries of interest <strong>for</strong><br />

Small scale hydro<br />

Central America<br />

Ecuador<br />

Colombia<br />

Peru<br />

Southern Chile<br />

Venezuela<br />

Bolivia<br />

Argentina<br />

Brazil


Norconsult in South America


Projects in Latin America


Norconsult in Chile<br />

• Norconsult has been in Chile from 1985 (Alfalfal)<br />

• Norconsult Andina S.A established in 2007<br />

• 3 Offices (Santiago, Chillan, Los Angeles)<br />

• Main Markets:<br />

– Large scale hydro<br />

– Small scale hydro<br />

– Mining (underground technology)<br />

• At present 26 employees<br />

• Approx. 100-150 assosiated resources<br />

• Support from NO AS on knowledge transfer and specialized<br />

services<br />

• Current involvement:<br />

– 3 mining projects<br />

– 3 Large Scale hydro projects (180-500 MW)<br />

– approx. 20 Small Scale Hydro Projects


Energy Situation in Chile


Dagens <strong>Energi</strong> situasjon - Del 1<br />

• I tørrår importerer Chile 70% av energien (Gass, Olje, Kull).<br />

• 40% av Chiles installerte effekt er vannkraft. Værfenomeenet La<br />

Niña gir periodevis (ca. hvert 3-5 år) tørke i sentrale deler av landet<br />

der de eksisterende vannkraftanleggene er installert.<br />

• På1990-tallet ble 7 pipelines <strong>for</strong> import av gass fra Argentina<br />

installert, men kranene har, i lengre perioder, blitt stengt av<br />

Argentinske myndigheter. <strong>Et</strong>ter 2007 er <strong>for</strong>syningen mer eller<br />

mindre stoppet.<br />

• I senere år har LNG import overtatt deler av av opprinnelig <strong>for</strong>syning<br />

fra Argentina, men dette er ikke nok til å dekke opp energibehovet.<br />

• Chile har økst importen av kull, olje og diesel. I lengere perioder er<br />

det, som følge av underdekning, diesel produksjon som er<br />

prissettende.<br />

9


Dagens <strong>Energi</strong> situasjon - Del 1<br />

• Chile har i dag ca.13,000MW installert effekt.<br />

• Årlig økning i BNP på ca. 7% og stor aktivitet innen gruve og annen<br />

kraftkrevende virksomhet gir estimert behov på ca. 25,000 MW<br />

(dobling) innen 2025.<br />

• Installert effekt vannkraft = 5000 MW (der ca. 200 anlegg < 20 MW).<br />

• Den årlige vannkraft produksjonen er på mellom 20 and 35 TWh<br />

(LF45-80%).<br />

• Det teoretiske potesialet er ca. 165 TWh/y, men utbyggbart<br />

potensiale er selvfølgelig mye mindre som følge av økonomiske,<br />

miljømessige og ikke minst sosiale <strong>for</strong>hold.<br />

• Det største potesialet ligger sør i landet og dermed opp mot 2000<br />

km fra lastsenter.<br />

• Myndighetene ønsker vannkraftandelen skal øke fra 40% i dag til<br />

55% innen 2025. Dette innebærer behov <strong>for</strong> ca. 8000 MW ny<br />

vannkraft innen 8-10 år. Mer enn dobling.<br />

10


Net demand in region SIC<br />

11


Historic production distribution in SIC<br />

vs Marginal cost (USD/MWh)<br />

Gas Diesel<br />

Reservoir HP<br />

Run of river HP<br />

Coal<br />

Gas<br />

12


Run of distribution in the<br />

south central regiones<br />

2000-4000 mm<br />

Variation W to E<br />

13


Current situation <strong>for</strong> SSH<br />

developement


Current situation in SSH market in Chile<br />

• Small scale hydro is in line with Norwegian government policy viewed as<br />

non conventional renewable energy (NCRE)(ny <strong>for</strong>nybar).<br />

• The limit is 20 MW <strong>for</strong> getting «special privileges in the developement», but<br />

energy from plants up to 40 MW will be counted as NCRE.<br />

• Open spot <strong>marked</strong> with modeled least cost marginal cost as basis <strong>for</strong> nodal<br />

price («perfect market») but also many long term PPA’s<br />

• All consumers with more than 200 MW demand must have more than 10 %<br />

renewable in their system.The punishment <strong>for</strong> not meeting the demand is<br />

20-30 USD/MWh in the current situation. Give PPA opertunities.<br />

• Many small investors trying to capture waterrights and develop projects, but<br />

lately some larger developers have also entered the market<br />

• Increasing interest from suppliers, but still limited competition<br />

• Transmission capacity and access to grid is one of the most challanging<br />

hurdles. The laws and regulations have been altered to improve this.<br />

• Development time <strong>for</strong> SSH is 3-4 years from obtaing the waterright to start<br />

of commercial operation<br />

15


Models <strong>for</strong> SSH developement


Advice <strong>for</strong> market penetration<br />

• Local presence<br />

• Local knowledge<br />

• Local contacts<br />

• Solid knowledge of regulatory system and local processes<br />

• Cultural understanding and respect <strong>for</strong> local groups<br />

• Long term commitment to market<br />

• Local supply<br />

17


Our model <strong>for</strong> SSH development in Chile<br />

• Closer cooperation between land owner, waterright owner, developer,<br />

engineers, ESIA team, suppliers and civil contractor through all steps.<br />

• Balanced risk taking between parties<br />

• Portfolio management and optimization<br />

• Utilization of export finance mechanisms to gain competetive advantages<br />

>15% Equity<br />

CAPEX<br />

100% CAPEX<br />

Up to 85%<br />

Eksportfinans<br />

40% Local<br />

30% Foreign<br />

30% Norwegian<br />

15% Commercial bank<br />

85% GIEK<br />

18


We welcome both suppliers and investors to<br />

cooperate in the development of small scale<br />

hydro in South America!


¡Gracias por su atención!<br />

¡Nos vemos en Santiago!<br />

Øyvind Engelstad<br />

Gerente General<br />

Norconsult Andina S.A.<br />

Chile