<strong>20</strong>05 15 th year<br />
17. 05. <strong>20</strong>05<br />
A merger contract was<br />
signed, overseen by<br />
Ing. Jindřich Hess, CEO <strong>of</strong> EL-<br />
TODO EG, a.s., and as as <strong>of</strong><br />
June 30th <strong>the</strong> <strong>companies</strong> AC-<br />
TUAL Plus, a.s., ELTODO Parking<br />
s.r.o., Kates spol. s.r.o. and<br />
ELEXA spol. s.r.o. ceased to<br />
exist. The business activities <strong>of</strong><br />
<strong>the</strong>se <strong>companies</strong> were fully assumed<br />
by <strong>the</strong> parent company.<br />
28. 06. <strong>20</strong>05<br />
CEO <strong>of</strong> ELTODO EG, a.s.<br />
Ing. Jindřich Hess<br />
On <strong>the</strong> basis <strong>of</strong> a cooperation agreement, a contract for<br />
work was closed with <strong>the</strong> TAISEI company, and we became<br />
a supplier for complete tunnel equipment <strong>of</strong> <strong>the</strong> SITINA Tunnel<br />
in Bratislava.<br />
Tunnel portal with mounting structures (<strong>20</strong>06)<br />
07. 07. <strong>20</strong>05<br />
ELTODO Národní dům s.r.o. was founded, and on 21.07 a<br />
contract was signed for <strong>the</strong> reconstruction and completion<br />
<strong>of</strong> <strong>the</strong> National House in Karlovy Vary.<br />
Study <strong>of</strong> <strong>the</strong> completion <strong>of</strong> <strong>the</strong> National House in Karlovy Vary<br />
<strong>20</strong>06 16 th year<br />
17. 08. <strong>20</strong>06<br />
A contract was signed with <strong>the</strong> subsidiary company Strabag<br />
to supply complete tunnel technology, traffic light signalization,<br />
road signs and street lighting in <strong>the</strong> construction area<br />
<strong>of</strong> Lahovice – Slivenec, Ring Road around Prague.<br />
Real condition <strong>of</strong> <strong>the</strong> Lochkov<br />
exploratory tunnel<br />
21. 03. <strong>20</strong>06<br />
We become <strong>the</strong> sole owner <strong>of</strong> ELTODO MIS-ELEKTROTECH-<br />
NIKA, s.r.o. and change <strong>the</strong> business name to ELTODO Ostrava,<br />
s.r.o.<br />
Headquarters <strong>of</strong> ELTODO Ostrava<br />
Computer study <strong>of</strong> <strong>the</strong> tunnel<br />
portal <strong>of</strong> Lochkov tunnel<br />
We receive an order as part <strong>of</strong> <strong>the</strong> project ”Building electronic<br />
tolls”‘ given by <strong>the</strong> Czech Ministry <strong>of</strong> Transport, <strong>the</strong><br />
supplier <strong>of</strong> which is Kapsch. The task <strong>of</strong> ELTODO is primarily<br />
to ensure <strong>the</strong> complete design and engineering activities associated<br />
with <strong>the</strong> construction and subsequent connection<br />
system <strong>of</strong> toll gates on <strong>the</strong> engineering network.<br />
Construction <strong>of</strong> <strong>the</strong> first toll gate on <strong>the</strong> 34th kilometre <strong>of</strong> Highway D1<br />
Under an agreement with <strong>the</strong> company AMBERG Engineering<br />
Brno a.s., <strong>the</strong> company <strong>of</strong> ELTODO dopravní systémy<br />
s.r.o. prepares detailed documentation for <strong>the</strong> technological<br />
part <strong>of</strong> <strong>the</strong> Klimkovice Tunnel on <strong>the</strong> construction <strong>of</strong> <strong>the</strong><br />
Moravian Silesian Highway D47. Construction <strong>of</strong> <strong>the</strong> tunnel<br />
is completed in <strong>20</strong>06. Through an agreement with Metrostav,<br />
a.s., we won <strong>the</strong> contract for <strong>the</strong> complete supply <strong>of</strong> tunnel<br />
technology – assembly takes place in <strong>20</strong>07.<br />
<strong>20</strong> <strong>years</strong> <strong>of</strong> <strong>the</strong> ELTODO <strong>companies</strong> <strong>1991–</strong><strong>20</strong>11<br />
23 24<br />
1. 7. <strong>20</strong>06<br />
Order for Liberec<br />
The contract for <strong>the</strong> Liberec company ELTODO-CITELUM,<br />
s.r.o., won a long-term contract (15 <strong>years</strong>) to ensure <strong>the</strong> operation,<br />
administration, maintenance<br />
and modernization<br />
<strong>of</strong> public lighting in <strong>the</strong> city <strong>of</strong><br />
Liberec. The contract includes<br />
<strong>the</strong> management, operation,<br />
maintenance and modernization<br />
<strong>of</strong> traffic lights and <strong>the</strong><br />
construction <strong>of</strong> o<strong>the</strong>r transportation<br />
solutions, including<br />
navigation to parking areas<br />
and building a central transportation<br />
hub.<br />
5. 12. <strong>20</strong>06<br />
New lighting for Republic Square (Náměstí Republiky)<br />
In connection with <strong>the</strong> construction<br />
<strong>of</strong> <strong>the</strong> Palladium<br />
business center, extensive repair<br />
<strong>of</strong> Republic Square took<br />
place, including <strong>the</strong> reconstruction<br />
<strong>of</strong> public lighting in<br />
this part <strong>of</strong> <strong>the</strong> historic center<br />
<strong>of</strong> Prague. New lampposts for<br />
street lighting were, in addition<br />
to Republic Square, also<br />
installed in parts <strong>of</strong> <strong>the</strong> street<br />
Na Poříčí and at <strong>the</strong> end <strong>of</strong><br />
Truhlářská Street. Replicas <strong>of</strong><br />
<strong>the</strong> original lighting poles from<br />
<strong>the</strong> middle 19th and early <strong>20</strong>th<br />
century were carefully selected<br />
for this site from <strong>the</strong> EL-<br />
TODO workshops.<br />
December <strong>20</strong>06<br />
Panenská Tunnel on Highway D8<br />
was put into operation<br />
The delivery <strong>of</strong> tunnel technology was contributed to by EL-<br />
TODO EG, a.s. for <strong>the</strong> launch <strong>of</strong> <strong>the</strong> operation <strong>of</strong> Panenská<br />
Tunnel, <strong>the</strong> longest Czech roadway tunnel with a length <strong>of</strong><br />
over 2 km. It is located near<br />
<strong>the</strong> end <strong>of</strong> <strong>the</strong> D8 Motorway at<br />
<strong>the</strong> last section from Trmice at<br />
<strong>the</strong> state border with Germany.<br />
The tunnel is two-way with<br />
two separate tubes which are<br />
connected with nine safety<br />
passages at about every<br />
<strong>20</strong>0 meters.<br />
Beneš Square in Liberec lit<br />
by historical lamp type 2380.<br />
Lamp type 2370 on Republic<br />
Square in Prague.<br />
Assembly work<br />
– Panenská Tunnel.<br />
<strong>20</strong>07 17 th year<br />
31. 1. <strong>20</strong>07<br />
We provide traffic lights in Prague<br />
On 31. January, <strong>the</strong> ELTODO dopravní systémy s.r.o. company<br />
and <strong>the</strong> Technical management <strong>of</strong> roadways <strong>of</strong> <strong>the</strong><br />
capital city <strong>of</strong> Prague (TSK)<br />
signed an agreement on <strong>the</strong><br />
maintenance, rehabilitation,<br />
and supply <strong>of</strong> equipment for<br />
traffic management in Prague.<br />
The contract was signed for<br />
15 <strong>years</strong>, its value is 4.4 billion<br />
Czech Crowns, and <strong>the</strong><br />
major subcontractors to <strong>the</strong><br />
EDS company are Corporate<br />
Signalbau Huber CZ s.r.o. and<br />
AZD Praha s.r.o.<br />
1. 4. <strong>20</strong>07<br />
The merger <strong>of</strong> ELTODO Slovakia, s.r.o. with <strong>the</strong> successor<br />
subsidiary <strong>of</strong> Elektrovod Osvetlenie s.r.o.<br />
12. 4. <strong>20</strong>07<br />
Gas Lighting: All <strong>the</strong> Way to <strong>the</strong> Castle<br />
On 12 April, <strong>the</strong> number <strong>of</strong> gas lamps in <strong>the</strong> center <strong>of</strong> Prague<br />
expanded to include 182 more,<br />
on <strong>the</strong> streets <strong>of</strong> Železná and<br />
Rytířská. As part <strong>of</strong> <strong>the</strong> festive<br />
lighting <strong>of</strong> <strong>the</strong> historic lantern<br />
replicas, deputy mayor <strong>of</strong><br />
Prague Pavel Klega, who has<br />
focused on <strong>the</strong> support <strong>of</strong> gas<br />
lighting in <strong>the</strong> center <strong>of</strong> Prague<br />
for several <strong>years</strong>, reiterated<br />
that <strong>the</strong> objective <strong>of</strong> <strong>the</strong> municipality<br />
is to install gas lamps<br />
along <strong>the</strong> entire Royal Path all<br />
<strong>the</strong> way to Prague Castle. Gas lamp type HLP 052 G.<br />
11. 5. <strong>20</strong>07<br />
Preference for public transport in Olomouc<br />
In <strong>the</strong> presence <strong>of</strong> city and<br />
<strong>Eltodo</strong> representatives, <strong>the</strong><br />
launch <strong>of</strong> <strong>the</strong> operation <strong>of</strong><br />
a public preference system for<br />
public transport in Olomouc<br />
was celebrated. Contracts<br />
awarded in a two-round tender<br />
process were implemented<br />
by ELTODO dopravní systémy<br />
s.r.o. The system allows for<br />
<strong>the</strong> localization and identification<br />
<strong>of</strong> buses and trams via<br />
GPS and <strong>the</strong> transmission <strong>of</strong><br />
service information for passengers,<br />
which appears on <strong>the</strong> information<br />
panels located at <strong>the</strong><br />
so-called ‚intelligent stops‘.<br />
Lighted junction at <strong>the</strong> nor<strong>the</strong>rn<br />
portal <strong>of</strong> Strahov Tunnel<br />
(before reconstruction).<br />
Information panel at a public<br />