ATTACHMENT C January 25, 2012<br />

RFP #240427 - “Modified KW Basin Annex Construction”<br />

(<strong>FFU</strong>) <strong>PRICING</strong> <strong>TEMPLATE</strong> <strong>AND</strong> <strong>MEASUREMENT</strong> <strong>FO</strong>R PAYMENT Page 1 of 6<br />

1. WORK TO BE PER<strong>FO</strong>RMED<br />

SCHEDULE OF QUANTITIES <strong>AND</strong> PRICES<br />

This work scope is for modifying the existing KW Basin Fuel Transfer System (FTS) Annex to<br />

accommodate the STP process equipment and provide a loading bay to support sludge packaging<br />

and transfer and the construction of a new NQA-1 Nuclear Facility structure to house the sludge<br />

loading equipment and provide radiation shielding of the KW Basin Annex. The Contractor<br />

shall furnish all necessary supervision, technical oversight, safety management, professional<br />

services, labor, materials, tools, equipment, and consumables necessary and required to perform<br />

the following activities stated in the Scope of Work titled “Modified KW Basin Annex<br />

Construction” and its attachments.<br />

The Contractor shall perform the operations necessary and required for the satisfactory<br />

completion of the work in accordance with the requirements of the Subcontract Documents.<br />

2. UNIT RATES<br />

The fixed unit prices in the pricing template Attachment C, "Schedule of Unit and/or Lump Sum<br />

Prices," for performing Subcontract Work must include all expenses and fee for the duration of<br />

the Subcontract from Award. The established unit rates are to be for the duration of the Contract<br />

and no escalation will be allowed unless approved in writing by the BUYER (CHPRC).<br />

Payment of the unit price shall constitute full compensation for performance of the<br />

corresponding work and shall cover all costs of whatever nature incurred by the Contractor to<br />

accomplish the work in accordance with the provisions of the Subcontract Documents.<br />

The fixed unit price shall be guaranteed for the term of the contract.<br />

3. ESTIMATED QUANTITIES<br />

The Contractor understands and agrees that any or all of this work may or may not be authorized,<br />

and that neither the CHPRC nor the OWNER warrants that any or all of the work will be<br />

authorized. The Contractor further understands and agrees to perform any portion of each item<br />

of authorized work at the stated unit price, which shall constitute full payment for authorized<br />

work.<br />

If final installed quantities of the pay item, summed by individual line items, exceed the upper or<br />

lower bounds of the variable range of the estimated quantity, the Contractor shall be<br />

compensated for the additional or deficient quantities in accordance with the terms of the change<br />

order as released by amendment to contract.<br />

The payments


ATTACHMENT C January 25, 2012<br />

RFP #240427 - “Modified KW Basin Annex Construction”<br />

(<strong>FFU</strong>) <strong>PRICING</strong> <strong>TEMPLATE</strong> <strong>AND</strong> <strong>MEASUREMENT</strong> <strong>FO</strong>R PAYMENT Page 2 of 6<br />

Notes:<br />

1. All Quantities are estimates only and are subject to variation for any reason on each Pay<br />

Item. When directed by CHPRC, Contractor shall perform work of the Pay Item at the<br />

same unit price regardless of whether the actual quantity is less than or more than the<br />

estimated quantity.<br />

2. Fixed Unit Prices shall include all construction consumables, and small tools having a<br />

purchase price


ATTACHMENT C January 25, 2012<br />

RFP #240427 - “Modified KW Basin Annex Construction”<br />

(<strong>FFU</strong>) <strong>PRICING</strong> <strong>TEMPLATE</strong> <strong>AND</strong> <strong>MEASUREMENT</strong> <strong>FO</strong>R PAYMENT Page 3 of 6<br />

Pay Item Descriptions<br />

over $25,000.00; 5 percent administrative commission on total costs over<br />

$100,000.00 .<br />

• No more than three mark-ups, one performing commission and two<br />

administrative commissions, none of which exceed the percentages<br />

shown above, will be allowed regardless of the number of tiers of<br />

subcontractors or the subcontract instrument (ie. Purchase order, contract,<br />

etc.).<br />

• The contractor’s or subcontractor’s administrative commission shall be<br />

only applied to the net increase in the change order price after deductions<br />

have been taken.<br />

• See also Attachment B, Part II “Financial Terms”, of the 4 Part Draft<br />

Contract, for additional terms.<br />

<strong>MEASUREMENT</strong> <strong>FO</strong>R PAYMENT<br />

For all Pay Items (1-12) listed below, payment is made monthly on the basis of percentage of<br />

progress complete. Pay Item Descriptions are general and do not necessarily represent all<br />

activities which may be required to perform the specific task. All quantities are approximated<br />

estimates based on 90% design. All items listed in the pricing sheet template are to be<br />

considered furnished and installed unless otherwise noted, and are to include all required<br />

supports, hangers, fasteners and etc., and all costs as required by the specification(s) and design<br />

documents. All items are to include shipping, handling and delivery costs as required to furnish<br />

and install.<br />

Pay Item Line #1. Mobilization<br />

Measurement will be made on a Lump Sum basis upon Contractor’s successful<br />

completion and (CHPRC) approval to begin construction of the KW Basin Annex.<br />

Mobilization includes the following items:<br />

• Onsite office personnel (key personnel, administration) and home office support up<br />

to beginning construction activities<br />

• Delivery of all equipment, tools, materials, supplies, and personnel necessary to<br />

conduct construction of the Annex<br />

• Delivery and installation of field office and support facilities<br />

• Installation of any roads, staging, inspection and control areas<br />

• Work zone delineation and traffic control materials, equipment, and installation<br />

• Safety equipment, communication equipment, and industrial hygiene (IH)<br />

monitoring equipment<br />

• Task lighting<br />

• Other associated work activities required to begin construction activities<br />

Payment will constitute full compensation for all direct and indirect costs including any


ATTACHMENT C January 25, 2012<br />

RFP #240427 - “Modified KW Basin Annex Construction”<br />

(<strong>FFU</strong>) <strong>PRICING</strong> <strong>TEMPLATE</strong> <strong>AND</strong> <strong>MEASUREMENT</strong> <strong>FO</strong>R PAYMENT Page 4 of 6<br />

operation and overhead, profit/fee, adders, labor, material, and equipment to complete<br />

this pay item. Firm Fixed Unit Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 2 “Civil Demolition/Site Preparation/Construction Utilities”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru Q.<br />

Unit Price is to include all direct and indirect costs including any operation and overhead,<br />

profit/fee, adders, labor, material, and equipment to complete this pay item. Firm Fixed<br />

Unit Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 3 “Shielded Hose Chase - Exterior & Interior”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru B.<br />

Unit Price shall include all direct and indirect costs including any operation and<br />

overhead, profit/fee, adders, labor, material, and equipment to complete this pay item.<br />

Firm Fixed Unit Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 4 “Substructure/Concrete Walls/Structural Steel Connections”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru G.<br />

Unit Price shall include all direct and indirect costs including any operation and<br />

overhead, profit/fee, adders, labor, material, and equipment to complete this pay item.<br />

Firm Fixed Unit Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 5 “Shell”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru N.<br />

Unit Price shall include all direct and indirect costs including any operation and<br />

overhead, profit/fee, adders, labor, material, and equipment to complete this pay item.<br />

Firm Fixed Unit Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 6 “Interiors”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru F. Unit<br />

Price shall include all direct and indirect costs including any operation and overhead,<br />

profit/fee, adders, labor, material, and equipment to complete this pay item. Firm Fixed<br />

Unit Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 7 “Services”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru W.<br />

Unit Price shall include all direct and indirect costs including any operation and<br />

overhead, profit/fee, adders, labor, material, and equipment to complete this pay item.<br />

Firm Fixed Unit Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 8 “Equipment and Furnishings”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru B.<br />

Unit Price shall include all direct and indirect costs including any operation and<br />

overhead, profit/fee, adders, labor, material, and equipment to complete this pay item.<br />

Firm Fixed Unit Rate Summary Price Total is $_____________.


ATTACHMENT C January 25, 2012<br />

RFP #240427 - “Modified KW Basin Annex Construction”<br />

(<strong>FFU</strong>) <strong>PRICING</strong> <strong>TEMPLATE</strong> <strong>AND</strong> <strong>MEASUREMENT</strong> <strong>FO</strong>R PAYMENT Page 5 of 6<br />

Pay Item Line No. 9 “Special Construction”–<br />

Measurement will be made on the basis of furnishing and installing Item(s) A thru C.<br />

Unit Price shall include all direct and indirect costs including any operation and overhead,<br />

profit/fee, adders, labor, material, and equipment to complete this pay item. Firm Fixed Unit<br />

Rate Summary Price Total is $_____________.<br />

Pay Item Line No. 10 “Roadways/Site Finish”–<br />

Measurement will be made on the basis of furnishing Item(s) A thru G. Unit Price shall<br />

include all direct and indirect costs including any operation and overhead, profit/fee,<br />

adders, labor, material, and equipment to complete this pay item. Firm Fixed Unit Rate<br />

Summary Price Total is $_____________.<br />

Pay Item Line No. 11 “Demobilization”–<br />

Measurement will be made on the basis of completing Item. Payment will be made<br />

on a lump sum basis at the time the Contractor has completed demobilization and site<br />

cleanup activities relating to personnel, materials, equipment and infrastructure, final<br />

placement of hazard postings and barricades, work areas (e.g., roads) removed and other<br />

activities as required by Subcontract documents. Not more than 75% of demobilization<br />

may be paid until SUBCONTACTOR successfully completes all subcontract<br />

requirements and completes final demobilization. Unit Price shall include all direct and<br />

indirect costs including any operation and overhead, profit/fee, adders, labor, material,<br />

and equipment to complete this pay item. Firm Fixed Unit Rate Summary Price Total is<br />

$_____________.<br />

Pay Item Line No. 12 “Bonds”–<br />

Measurement will be made on the basis of furnishing Item(s) A thru B. Measurement will<br />

be made on a lump sum basis per the established rate schedule at the time the Payment<br />

and Performance Bond, having been executed in accordance with Subcontract<br />

requirements, are received and accepted by Buyer. Payment will constitute full<br />

compensation for Contractor meeting these Subcontract requirements.<br />

a.) The Offeror shall provide a 100% performance bond equal to the estimated for<br />

value of the work to be performed.<br />

b.) The Offeror shall provide annual 100% payment bond, equal to the estimated<br />

value of work to be performed.<br />

Unit Price shall include all direct and indirect costs including any operation and<br />

overhead, profit/fee, adders, labor, material, and equipment to complete this pay item.<br />

Firm Fixed Unit Rate Summary Price Total is $_____________.<br />

NOTE: Overhead and operations is NOT included as a pay item. These costs MUST be<br />

included in the line item Fixed Unit Prices. No Overhead costs of any kind from


ATTACHMENT C January 25, 2012<br />

RFP #240427 - “Modified KW Basin Annex Construction”<br />

(<strong>FFU</strong>) <strong>PRICING</strong> <strong>TEMPLATE</strong> <strong>AND</strong> <strong>MEASUREMENT</strong> <strong>FO</strong>R PAYMENT Page 6 of 6<br />

Contractor or sub-tier Contractors may be added to proposed rates without prior Buyer<br />

written approval. See also Tab 3, “Itemized Unit Rate Schedule Template” for<br />

informational examples.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!