Group 1
Group 1
Group 1
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2.8 Validation<br />
2.8.1. Validation I<br />
• The applied operators for the context diagram are given directly below the<br />
diagram.<br />
• The system mission statement addresses the shortcomings or refer to domain<br />
knowledge of the system in use:<br />
SM1 address shortcomings SC2 and SC4<br />
SM2 address shortcomings SC1 and SC3<br />
• The phenomena and the domains of the context diagram are printed<br />
emphasized in the requirements and in the domain knowledge.<br />
2.8.2 Validation II<br />
All given and designed domains are referenced in the requirements and the<br />
domain knowledge:<br />
Driver<br />
Table1 All given, design domains & phenomenon referenced to the<br />
Requirement<br />
ACC Control Unit<br />
Accel_Pedal<br />
Brake_Pedal<br />
CAN-Bus Controller<br />
Multifuntional Display<br />
Sensor<br />
Actuator<br />
Engine<br />
ABS<br />
Brake<br />
pressButtonResume<br />
pressButtonOff<br />
pressButtonSet<br />
setSpeed<br />
pressButtonPlus<br />
pressButtonMinus<br />
distanceValue<br />
R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 R1<br />
1<br />
DOMAIN<br />
PHENOMENA<br />
R1<br />
2<br />
R1<br />
3<br />
Page 8