Download Gis Project Management Msc Thesis - Unigis
Download Gis Project Management Msc Thesis - Unigis
Download Gis Project Management Msc Thesis - Unigis
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Master <strong>Thesis</strong>: GIS <strong>Project</strong> management Final Version<br />
The business plan normally does not take into account the possibilities or pitfalls in the<br />
information and automation plans, there is no feedback whatsoever. As a consequence more<br />
and more organization are trying to establish a business plan using “business to IT<br />
alignment”. This is a process that ensures that all company strategies (business strategy, IS-<br />
strategy) are in line with each other. (Figure 13)<br />
Figure 13: Evolution of Business and IT Planning<br />
Business Plan<br />
Information Plan<br />
Evolution of Business and<br />
IT Planning<br />
Automation Plan<br />
<strong>Project</strong>s<br />
VISION<br />
Fundamental<br />
Business<br />
Objectives<br />
© 1997 Hans Bestebreurtje, MSc UNIGIS<br />
VISION<br />
E<br />
D<br />
U<br />
C<br />
A<br />
T<br />
I<br />
O<br />
N<br />
(Roadmap: process model)<br />
Business/Function<br />
Strategy<br />
NEEDS ASSESEMENT<br />
Information<br />
Systems<br />
Strategy<br />
TARGET<br />
ARCHITECTURE<br />
Technology<br />
Strategy:<br />
Implementation/<br />
DEPLOYMENT<br />
IT<br />
Strategy:<br />
TRANSITION<br />
PLANNING<br />
DEVELOPMENT/Pilot<br />
SUPPORT/MANAGEMENT<br />
of Applications, Systems,<br />
Networks, Users<br />
Implementation<br />
Proliferation<br />
Traditional Modern Source: Hewlett-Packard,1995<br />
In the past projects were defined after all the other plans were established. The present<br />
business demands are for a more flexible way of handling projects.<br />
At the highest level there are the mission and vision of the organization which provide the<br />
fundamental business objectives. The business strategy which is in line with mission, vision<br />
34<br />
P<br />
R<br />
O<br />
J<br />
E<br />
C<br />
T<br />
S