Change in Energy Cost Units (Data from Class 1 Energy Management of 4 Fujifilm facilities)<br />

(1993 fiscal year=100)<br />

100.0 99.9<br />

100<br />

95.6<br />

93.3<br />

91.0<br />

89.1<br />

87.8<br />

84.0<br />

75<br />

50<br />

1993 1994 1995 1996 1997 1998 1999 2000<br />

(Fiscal Year)<br />

Changes in CO2 Emission Amounts (Data from Class 1 Energy Management of 4 Fujifilm facilities)<br />

(Unit:<br />

1,000 tons)<br />

800<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

536.4 543.4 554.8551.3 540.5 571.3 569.4 587.4 621.1<br />

639.1<br />

595.9<br />

0<br />

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2010<br />

(Fiscal Year)<br />

Starting this fiscal year, figures for CO2 emission amounts (formerly recorded as carbon tons) are shown. Due to<br />

Fujifilm’s introduction of cogeneration-type generators, the reduction in CO2 emissions from thermal power<br />

generation by power companies (CO2 emission energy cost unit 0.612 kg/kwh) is included in these calculations (as<br />

per the Ministry of the Environment’s “Index of <strong>Environmental</strong> Performance of Companies”).<br />

Note: 0.612 kg/kwh is the average receiving-end CO2 emission energy cost unit for Tokyo Electric Power Company’s<br />

thermal power generation at power plants (for fiscal 1995).<br />

Cogeneration-Type Generators Installed at the Yoshida-Minami Factory<br />

At Fujifilm’s Yoshida-Minami Factory, starting in January 2000 we have been using<br />

cogeneration-type generators as a regular power source. <strong>The</strong>se generators use<br />

engine cooling water and heat from exhaust gas to produce steam, which is then<br />

converted into thermal<br />

energy. This has made<br />

a great contribution to<br />

energy conservation<br />

and the reduction of CO2<br />

emissions at the factory.<br />

Target Value<br />

517.0<br />

Newly installed natural gas facilities at the Fujinomiya<br />

Factory<br />