18.10.2013 Views

Final Report - Flathead County, Montana

Final Report - Flathead County, Montana

Final Report - Flathead County, Montana

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DEVELOPMENT OUTSIDE OF DISTRICT:<br />

There have been numerous requests and inquiries over the years about existing<br />

and proposed development connecting to the District’s sewer main running down Big<br />

Mountain to East Lakeshore Drive. The District has refused to allow any of these<br />

connections for several reasons.<br />

The Agreement between the District and the City of Whitefish limits the total<br />

number of EDUs to 2,000, and although the District is currently not near that total, giving<br />

away allotted wastewater capacity could possibly jeopardize future growth within the<br />

District. Wastewater flow from the District is currently metered at three (3) locations –<br />

one on the 12” interceptor line near the old inlet to abandoned Lagoon Cell #1; one on<br />

the Elk Highlands’ 8” main prior to its connection with the 12” interceptor line, also near<br />

abandoned Cell #1; and one at the bottom of the mountain just before connection to the<br />

City’s manhole at East Lakeshore Drive. Any connection to the District’s sewer main<br />

would also have to be metered requiring the District to first annex the new service area<br />

and then requiring the District to bill and collect fees from the new users.<br />

Lastly, in accordance with the Agreement, no other party outside of the District’s<br />

boundaries may connect to the District’s collection system without the express prior<br />

written consent of the City and the District. The District is currently content with its<br />

Agreement with the City and is reluctant to do anything that may expose that Agreement<br />

to possible revisions that could adversely affect future development within the District or<br />

subject the District to additional operation and maintenance costs.<br />

Figure BM-1 at the end of this section of the report shows the District boundaries,<br />

the District’s wastewater collection system and properties with on-site septic systems in<br />

the general vicinity of the Whitefish Mountain Resort and the gravity conveyance line<br />

down the mountain to East Lakeshore Drive. Also see Exhibit BM-1 at the end of this<br />

report for a 24” x 36” plan sheet showing the same but at a much more readable scale.<br />

Sewage Treatment in the <strong>Flathead</strong> Basin 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!