23.10.2013 Views

April - Library

April - Library

April - Library

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SIRF Roundtables National Forums<br />

Who will benefit from attending?<br />

Those serious about delivering high<br />

reliability and cost effective<br />

maintenance, on time and on<br />

budget.<br />

National Forum<br />

on<br />

Planning Reliability<br />

4<br />

June 19 th & 20 th<br />

Carlton Crest Hotel, Melbourne<br />

Managing the Change From Reactive to Planned to Proactive, Shutdowns & Turnarounds,<br />

Maximising the Benefit from Your CMMS, Optimising Repeating Procedures,<br />

Spares Optimisation. How to Make RCM Work? Eliminating Defects to Drive Reliability.<br />

• Practical RCM<br />

• CMMS systems<br />

• Educating Planners<br />

• Safety in shutdowns<br />

• Scope management<br />

• Managing spare parts<br />

• Operator engagement<br />

• Decentralized planning<br />

• Use of bar-coding & PDA’s For Further information<br />

• Changing face of technology www.sirfrt.com.au<br />

• Best Practice in Scheduling +61 3 96971100<br />

• Managing the planning cycle<br />

• Sustaining a living PM System<br />

• Pushing from reactive to planned<br />

• Managing the ageing workforce<br />

Key note speaker<br />

& workshop by<br />

International<br />

Planning Specialist<br />

Joel Levitt<br />

Case studies from some of<br />

Australia's leading Companies;<br />

Rio Tinto, CS Energy,<br />

NewCrest, Xstrata, Kraft,<br />

Snowy Hydro, Caltex,<br />

Australian Air Services<br />

Stanwell Power, BH P Billiton<br />

International Power<br />

Learn from Australia's leading Industrial companies about<br />

best practices in<br />

Planning, Scheduling & Reliability<br />

www.sirfrt.com.au +61 3 9697 1100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!