ARTICLE 13 – FEE-IN-LIEU OF SITE RUNOFF<br />

STORAGE AND WETLAND MITIGATION<br />

§ T1300 Fee-in-Lieu of Site Storage Runoff<br />

The Director or Administrator may in some limited circumstances pay a fee-in-lieu of<br />

site runoff storage to fulfill part or all of the site runoff storage requirement. The fee<br />

will be determined to be the lesser of<br />

a fee per acre foot or part thereof computed from a schedule adopted by the<br />

permitting authority.<br />

OR<br />

the verifiable cost of providing the required storage<br />

§ T1301 Procedures; Use of Funds<br />

The Administrator shall grant or deny the fee-in-lieu request within 45 days of written<br />

request. The funds shall be collected and used in the same watershed for which<br />

they were paid. The fees may be used to plan, design, construct or improve<br />

<strong>stormwater</strong> management facilities in the watershed for which they were collected.<br />

§ T1302 Fee-in-Lieu of Wetland Mitigation<br />

If a wetland mitigation is required under this ordinance, the applicant may choose to<br />

satisfy the mitigation requirement by paying a fee-in-lieu of mitigation. To satisfy the<br />

requirements of § 1302 the applicant shall:<br />

Prepare a statement of the estimated probable cost to acquire the land, install,<br />

monitor and maintain a wetland mitigation facility for five years as if the applicant<br />

had chosen to satisfy the mitigation requirement by mitigating within a wetland<br />

mitigation facility;<br />

and<br />

If mitigation credits are available from any wetland mitigation bank, the applicant<br />

shall also prepare a statement of the estimated probable cost of satisfying the<br />

mitigation requirement through the purchase of credits from a wetland mitigation<br />

bank as if the applicant had chosen to satisfy the mitigation requirement in such<br />

manner. Each estimate shall require the approval of the Director and the fee-in-lieu<br />

of wetland mitigation shall be the lesser of the two estimates.<br />

<strong>Kane</strong> <strong>County</strong> Technical Guidance Manual 109