must be cleaned before the end of each workday. Street sweeping provides<br />

a mechanism for removal of loose soil materials, but may not be sufficient to<br />

remove materials compacted onto the roadway surfaces. Removal of such<br />

compacted materials during each workday and when required by the<br />

Administrator is also required. Removal of adhered soil materials will be done<br />

in a manner that does not damage the roadway or other right-of-way<br />

appurtenances.<br />

§ T300(n) Temporary Stream Crossings<br />

Temporary stream crossings (bridges, fords, and culvert crossings) should be<br />

designed for short-term use periods not to exceed 1 year. Temporary stream<br />

crossings are to be used only where there is no practicable alternative for<br />

moving heavy equipment from one side of a stream channel to another or<br />

where light duty equipment must cross a stream frequently for a very short<br />

period (