15.11.2013 Views

Ashby Heritage Review: Stage 2 - City of Greater Geelong

Ashby Heritage Review: Stage 2 - City of Greater Geelong

Ashby Heritage Review: Stage 2 - City of Greater Geelong

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Ashby</strong> <strong>Heritage</strong> <strong>Review</strong> <strong>Stage</strong> 2: Database <strong>of</strong> Milton <strong>Heritage</strong> Places (Draft, July 2009)<br />

Place Name<br />

Address No.<br />

Street<br />

Residence<br />

112<br />

Autumn Street<br />

Town<br />

Proposed<br />

Significance<br />

Integrity<br />

New Precinct<br />

Name<br />

Existing<br />

Individual HO<br />

<strong>Geelong</strong> West<br />

Contributory<br />

Moderately Intact<br />

Milton<br />

Construction Date<br />

Era/Style<br />

1938<br />

Interwar Bungalow<br />

Architect<br />

Drainage Plan<br />

Source Date<br />

GWST Plan <strong>of</strong> Drainage no. 9963, 27 Apr 1938 (original layout date)<br />

Dr David Rowe: Authentic <strong>Heritage</strong> Services Pty Ltd & Wendy Jacobs: Architect & <strong>Heritage</strong> Consultant 137

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!