15.11.2013 Views

Ashby Heritage Review: Stage 2 - City of Greater Geelong

Ashby Heritage Review: Stage 2 - City of Greater Geelong

Ashby Heritage Review: Stage 2 - City of Greater Geelong

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Ashby</strong> <strong>Heritage</strong> <strong>Review</strong> <strong>Stage</strong> 2: Database <strong>of</strong> Milton <strong>Heritage</strong> Places (Draft, July 2009)<br />

Place Name<br />

Address No.<br />

Street<br />

Residence<br />

172<br />

Autumn Street<br />

Town<br />

Proposed<br />

Significance<br />

Integrity<br />

New Precinct<br />

Name<br />

Existing<br />

Individual HO<br />

<strong>Geelong</strong> West<br />

Not Significant<br />

Not Applicable<br />

Milton<br />

Construction Date<br />

Era/Style<br />

Later 20th Century<br />

Architect<br />

Drainage Plan<br />

Source Date<br />

Dr David Rowe: Authentic <strong>Heritage</strong> Services Pty Ltd & Wendy Jacobs: Architect & <strong>Heritage</strong> Consultant 164

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!