17.12.2013 Views

IUOE News Winter 2013

The December 2013 issue of the OE News from IUOE Local 115 contains updates for all equipment operators and union supporters in BC. Enjoy!

The December 2013 issue of the OE News from IUOE Local 115 contains updates for all equipment operators and union supporters in BC. Enjoy!

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Work opportunities<br />

across B.C. continue<br />

to grow for Operating<br />

Engineers.<br />

Bob Higgs,<br />

Member Representative<br />

The end is near!<br />

The end of <strong>2013</strong> that is. This year has been one of the most<br />

memorable years since I’ve been on staff. We had some great<br />

victories as well as some disappointing losses. From the draw<br />

of skilled operating engineers to the north to the Temporary<br />

Foreign Worker issues to the provincial election, we have been<br />

kept busy. These are just a few of the<br />

very important topics we’ve dealt with<br />

this year.<br />

Just when we think construction is<br />

slowing down, another tower crane<br />

goes up to accommodate a new high<br />

rise project. If you look at the skyline anywhere in the Lower<br />

Mainland you can’t help seeing a crane in every direction.<br />

Although traditionally the Operating Engineers don’t have a<br />

large number of members working on high rise developments,<br />

the spinoff work is where we see most of our hours. With all<br />

the towers going up, the need for concrete increases, putting a<br />

lot of pressure on our aggregate mines to supply.<br />

“If you look at the skyline<br />

anywhere in the Lower Mainland,<br />

you can’t help seeing a crane in<br />

every direction”<br />

District One<br />

Aggregate production is still flat-out as mines try to meet<br />

or exceed their yearly quotas, and the demand for the material<br />

is ever increasing. One of the mines actually applied to load<br />

out on a 24 hour schedule, as they are producing more than<br />

they can load out in a normal work day.<br />

Recently the provincial government has been hinting at a<br />

number of projects to be started in the near future. This is<br />

great news for Operating Engineers. The big buzz is the LNG<br />

plants proposed for the northern region. Closer to home we<br />

have the twinning of the Kinder Morgan line. This project<br />

could be started quite soon as the new line will run parallel to<br />

the existing one and it is so much easier to follow an existing<br />

right of way than to create a new one. This project alone will<br />

draw heavily on our dispatch.<br />

With the existing projects being pushed to completion and<br />

all the new proposed projects gearing up to start in the new<br />

year, now is truly a great time to be an<br />

Operating Engineer.<br />

As an Operating Engineer, there<br />

are some things you may want to do.<br />

Upgrading and training are essential<br />

to our industry and we encourage all<br />

operators to take all the upgrading and training offered to<br />

you. Every additional skill makes you that much more valuable<br />

to our contractors.<br />

All in all, it has been a great year and I’m looking forward<br />

to an even better 2014.<br />

Have a great holiday season and I’m looking forward to<br />

seeing everyone on the job sites in the new year!<br />

The team at Atlas Copco Thiessen, which has grown exponentially in recent years.<br />

<strong>News</strong> December <strong>2013</strong> 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!