<strong>SPECIAL</strong> PROVISION<br />

TO<br />

ITEM 8<br />

Prosecution and Progress<br />

For this project, Item 8, "Prosecution and Progress", of the Standard<br />

Specifications is hereby amended with respect to the clauses cited below<br />

and no other clauses or requirements of this Item are waived or changed<br />

hereby.<br />

Article 8.5 Computation of Contract Time for Completion is supplemented<br />

by the following:<br />

To insure timely and smooth completion of the project the following<br />

milestones are hereby established.<br />

1. Submittals:<br />

Within thirty (30) working days after time charges begin, complete<br />

submittal documentation shall be provided for all of the following items .<br />

Data Fiber Optic Transceiver<br />

Dial Up 14400 BPD Modem<br />

CCTV Field Equipment<br />

Limited Distance Modem<br />

Drop/Insert Multiplexor Demultiplexor<br />

Network Management Software System<br />

Portable Notebook Microcomputer<br />

Communications Hub Building<br />

Fiber Optic Cable<br />

CCTV Central Equipment<br />

Satellite Control Building<br />

Video Multiplex Fiber Optic<br />

Transmission Equipment<br />

This documentation shall address all of the pertinent data as outlined i n<br />

the General Notes for each of the above listed Items. The Engineer shal l<br />

have thirty (30) working days to verify that all pertinent data for all<br />

items has been addressed in the documentation. Incomplete documentation<br />

will be rejected and returned to the contractor for completion. If all<br />

pertinent data for all of the above listed items has been addressed, the<br />

contractor will be paid a lump sum of $1000.00 per day for each day the<br />

documentation is delivered prior to the thirty (30) day milestone up to a<br />

maximum of ten (10) working days. A lump sum of $1000.00 shall be<br />

deducted for each working day the documentation is delivered after the<br />

thirty (30) working day milestone up to a maximum of ten (10) working<br />

days.<br />

2. Installation and testing of all communications cable (fiber and<br />

twisted wire) and all electrical cables and wire.<br />

This item shall be completed 270 working days after time charges begin.<br />

Completion shall include replacement of failed cable and wire and retesting<br />

of replacement cable, submission of all test data, and all test<br />

data, and all associated clean-up required by the contract<br />

specifications. Upon successful completion of this work within the<br />

specified time frame the contrator shall be paid a lump sum of $1000.00<br />

per day for each day the work is completed prior to the 270 working day<br />

1-2 <strong>008</strong>---<strong>082</strong><br />

<strong>12</strong>-<strong>98</strong>


milestone up to a maximum of ten working days. A lump sum of $1000.00<br />

shall be deducted for each working day this work is not successfully<br />

completed after the 270 working day milestone up to a maximum of ten (10 )<br />

working days.<br />

3. Installation of T-1 communications systems.<br />

This item shall be completed 300 working days after authorization to<br />

begin work. Completion shall include installation of all communications<br />

components, testing, making the system operational, and completion of al l<br />

associated clean-up required by the contract specifications is completed .<br />

Installation will not be considered until the entire T-1 communications<br />

system successfully passes all communication tests as outlined in the<br />

General Notes. Upon successful completion of this work within the<br />

specified time frame the contractor shall be paid a lump sum of $1000.00<br />

per working day for each working day the work is completed prior to the<br />

300 working day milestone up to a maximum of ten (10) working days. A<br />

lump sum of $1000.00 shall be deducted for each working day the work is<br />

not completed after the 300 working day milestone up to a maximum of ten<br />

(10) working days.<br />

4. Installation of Closed Circuit Television (CCTV) system.<br />

This item shall be completed 330 working days after authorization to<br />

begin work. Completion of this item of work shall include the complete<br />

installation, testing, synchronization, and making operational a cmplete<br />

CCTV system. Also included is all associated clean-up required by the<br />

contract specifications. Upon successful completion of this work within<br />

the specified time frame, the contractor shall be paid a lump sum of<br />

$1000.00 per working day for each day the work is completed prior to the<br />

330 working day milestone up to a maximum of ten (10) working days. A<br />

lump sum of $1000.00 shall be deducted for each working day the work is<br />

not completed after the 330 working day milestone up to a maximum of ten<br />

(10) working days.<br />

5. Interconnect to Transtar<br />

This item shall be completed 360 working days after authorization to<br />

begin work. Completion shall include successful transmission of video,<br />

voice, and data between the satellite building and Transtar, and all<br />

associated clean-up required by the contract specifications. Upon<br />

successful completion of this work within the specified time frame the<br />

contractor shall be paid a lump sum of $1000.00 per working day for each<br />

working day the work is completed prior to the 360 working day milestone<br />

up to a maximum of ten (10) working days. A lump sum of $1000.00 shall<br />

be deducted for each working day the work is not completed after the 360<br />

working day milestone up to a maximum of ten (10) working days.<br />

2-2 <strong>008</strong>---<strong>082</strong><br />

<strong>12</strong>-<strong>98</strong>