26.12.2013 Views

Centralized Lubrication Chassis Systems for Trucks, Buses or Off ...

Centralized Lubrication Chassis Systems for Trucks, Buses or Off ...

Centralized Lubrication Chassis Systems for Trucks, Buses or Off ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Centralized</strong> fluid grease lubrication <strong>f<strong>or</strong></strong> all rolling stock<br />

with pneumatically operated piston pump PEU-98 <strong>or</strong> PEU-99 and VKR distribut<strong>or</strong>s<br />

These systems are suitable <strong>f<strong>or</strong></strong> almost all trucks, buses,<br />

construction equipment, etc . equipped with compressed<br />

air.<br />

The pneumatically operated piston pumps PEU-98 <strong>or</strong><br />

PEU-99 deliver approx. 50 cm3 (3 cu Inch) per pump<br />

stroke, sufficient <strong>f<strong>or</strong></strong> centralized lubrication systems of<br />

standard size trucks, buses and trailers .<br />

Reservoir capacities : 4 <strong>or</strong> 3 liters .<br />

Usable lubricants are : Fluid greases of NLGI grades<br />

000, 00 .<br />

The pump is activated by a solenoid valve .<br />

Using the Impulse counter DSWM 21-2iS1, the pneumatically<br />

operated piston pumps adapt also to systems <strong>f<strong>or</strong></strong><br />

trailer lubrication . See page 8.<br />

PEU-98<br />

The 2-, 4-and 6-p<strong>or</strong>ted VKR piston distribut<strong>or</strong>s distribute<br />

and meter the iubricantfed by the pump . They pass the<br />

lubricant premetered to the lubrication points .<br />

Piston distribut<strong>or</strong>s feed lubricant while driving ; the<br />

friction areas are moving and the bearings are capable<br />

to receive new lubricant .<br />

The IG 433-3 controller allows <strong>f<strong>or</strong></strong> timed on-off period<br />

cycle control of the solenoid and pump action and<br />

rep<strong>or</strong>ts any faults via an indication lamp mounted on<br />

the dashboard In the driver's cab .<br />

VKR distribut<strong>or</strong> systems may also operate with 12 V <strong>or</strong><br />

24 V, using the electrically operated gear pump unit<br />

KFU 2 <strong>or</strong> KFU 6 and the IC 433-4 control unit that<br />

monit<strong>or</strong>s the on and off time of the gear pump unit .<br />

See also page 6 .<br />

PEU-99<br />

piston distribut<strong>or</strong>s VKR,<br />

2-, 4- and 6-p<strong>or</strong>ted<br />

4<br />

<strong>Centralized</strong><br />

<strong>Lubrication</strong><br />

will pay off your investment within one year<br />

2430583203<br />

http://legacy.library.ucsf.edu/tid/iux47e00/pdf

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!