6. Following is a snap shot <strong>of</strong> the proposed expansion programmes envisaged by<br />
<strong>GAIL</strong>:-<br />
Pipeline<br />
Phase I<br />
DVPL<br />
GREP<br />
CJ HPL<br />
DBNPL<br />
Phase II<br />
DVPL<br />
GREP<br />
CJHPL<br />
DBNPL<br />
Proposed Facilities <strong>for</strong> Augmentation<br />
• Capacity augmentation <strong>of</strong> the existing Compressor Station at Jhabua<br />
by installation <strong>of</strong> additional compressors in the configuration <strong>of</strong> 2 No.<br />
running and 1 No. standby, each <strong>of</strong> 20 MW capacity.<br />
• Capacity augmentation <strong>of</strong> the existing Compressor Station at Vijaipur<br />
<strong>for</strong> both new GREP (in the configuration <strong>of</strong> 2 Nos. running and 1 No.<br />
standby) and old GREP (1 No.)<br />
New Pipeline <strong>of</strong> 48” diameter (approx. 500 km long) parallel to the<br />
existing line (GREP)<br />
• New Pipeline <strong>of</strong> 36” diameter (approx. 100 km long) from Chainsa to<br />
Jhajjar<br />
• New Delivery Terminals at 3 locations viz. Neemrana (KP 54.0),<br />
Manesar (KP 54.0) and Gurgaon (KP 67.5) between Chainsa and<br />
Jhajjar<br />
• New Pipeline <strong>of</strong> 36” diameter (approx. 89 km long) from Dadri to<br />
Bawana (Tap-<strong>of</strong>f) Point<br />
• New Pipeline <strong>of</strong> 20” diameter (approx. 33 km long) from Bawana<br />
(Tap-<strong>of</strong>f) Point to PPCL, Bawana<br />
• New Despatch Terminal at Dadri and new Consumer Terminal at<br />
PPCL, Bawana<br />
• New Pipeline <strong>of</strong> 48” diameter (approx. 612 km long) looped with the<br />
existing pipeline from Dahej to Vijaipur.<br />
• Capacity Augmentation <strong>of</strong> existing Compressor Station at Jhabua by<br />
installation <strong>of</strong> 1 No. additional compressor<br />
• Capacity Augmentation <strong>of</strong> existing Compressor Station at Vijaipur by<br />
by installation <strong>of</strong> 1 No. additional compressor<br />
• Setting-up <strong>of</strong> new Compressor Stations at Rithonia (between Kelaras<br />
and Shivpuri) with installation <strong>of</strong> compressors in the configuration <strong>of</strong><br />
2 No. running and 1 No. standby, each <strong>of</strong> 20 MW capacity and<br />
Jatauli (near Palwal) with installation <strong>of</strong> compressors in the<br />
configuration <strong>of</strong> 1 No. running and 1 No. standby, each <strong>of</strong> 20 MW<br />
capacity<br />
• New Pipeline <strong>of</strong> 20” diameter (approx. 100 km long) from Jhajjar to<br />
Hissar<br />
• New Delivery Terminals at 2 locations viz. Jhajjar (KP 90.0) and<br />
Hissar (KP 188.0)<br />
• New Pipeline <strong>of</strong> 36” diameter (approx. 78 km long) from Bawana<br />
(Tap-<strong>of</strong>f) Point to Chorkarsa<br />
• New Pipeline <strong>of</strong> 30” diameter (approx. 103 km long) from Chorkarsa